W91QVN17T0095_Solicitation_A003_PRICING_SCHEDULE.xls
XLS spreadsheet 243 KB Posted
- Solicitation number
- W91QVN-17-T-0095
About this file
Solicitation W91QVN-17-T-0095 Attachment A003 Pricing Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN17T0095_Solicitation.pdf | ||
| W91QVN17T0095_Solicitation_A002_Submittal_Register.xlsx | XLSX spreadsheet | |
| W91QVN17T0095_Solicitation_A001_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
107215(2267,INT)
| SONTRACT NO: | |||||
| PWO NO.: | 107215 | ||||
| PROJECT DESCRIPTION: Paint Interior Building 2267, Yongsan | |||||
| A. IGCE using CLIN item & Cost | |||||
| CLIN NO. | DESCRIPTION | QTY | UNIT | UNIT PRICE | |
| (KW) | AMOUNT |
(KW)
| 4005AA | Paint, interior , 2-coats | 1,558 | SM | ₩0 |
| 4005AD | Paint on metal surface, aluminum paint, 2 coats | 29 | SM | ₩0 |
| 4005AE | Paint, galvanized metal primer, 1 coat | 29 | SM | ₩0 |
| 4005AF | Paint, interior primer sealer, 1 coat | 1,558 | SM | ₩0 |
| 4005AG | Remove existing paint for metal surface (By using hand & power tool machine) | 29 | SM | ₩0 |
| 4005AH | Remove existing paint for CMU or concrete surface (By using hand & power tool machine) | 220 | SM | ₩0 |
| 4005AJ | Remove existing paint for wooden surface (By using hand & power tool machine) | 63 | CM | ₩0 |
| 4005AP | Seal cracks on cement plaster wall | 50 | LM | ₩0 |
| 4005AQ | Remove and Reinstall Various Furniture Including Steel or |
wooden Cabinets, Shelves, Book Cases, Office Furniture, Chairs
| refrigerators & Other Office Equipments. | 150 | CM | ₩0 | |||
| Subtotal | ₩0 | |||||
| B. Over and Above Amount | ||||||
| CLIN NO. | DESCRIPTION | QTY | UNIT | UNIT PRICE | ||
| (KW) | AMOUNT |
(KW)
| 1 | Remove and dispose construction debris to outside compound (O&MA Specifications Section 024100) | 3 | CM | ₩0 |
| Subtotal: | ₩0 | |||
| Total Amount (A + B): | ₩0 | |||
| ($1.00 = ₩1,151.5242) | $0 |
&C Page &P of &N
113066(2267,EXT)
| SONTRACT NO: | |||||
| PWO NO.: | 113066 | ||||
| PROJECT DESCRIPTION: Paint Exterior of B2267, Yongsan | |||||
| A. IGCE using CLIN item & Cost | |||||
| CLIN NO. | DESCRIPTION | QTY | UNIT | UNIT PRICE | |
| (KW) | AMOUNT |
(KW)
| 4005AM | Repaint for exterior insulation and finish system | 2,161 | SM | 0 | ₩0 |
| 4005AD | Paint on metal surface, aluminum paint, 2 coats | 182 | SM | 0 | ₩0 |
| 4005AE | Paint, galvanized metal primer, 1 coat | 182 | SM | 0 | ₩0 |
| 4005AG | Remove existing paint for metal surface (By using hand & power tool machine) | 95 | SM | 0 | ₩0 |
| 4005AH | Remove existing paint for CMU or concrete surface (By using hand & power tool machine) | 500 | SM | 0 | ₩0 |
| 4005AJ | Remove existing paint for wooden surface (By using hand & power tool machine) | 9 | SM | 0 | ₩0 |
| 4005AP | Seal cracks on cement plaster wall | 500 | LM | 0 | ₩0 |
| 4005AQ | Remove and Reinstall Various Furniture Including Steel or |
wooden Cabinets, Shelves, Book Cases, Office Furniture, Chairs
| refrigerators & Other Office Equipments. | 10 | CM | 0 | ₩0 | ||
| Subtotal | ₩0 | |||||
| B. Over and Above Amount | ||||||
| CLIN NO. | DESCRIPTION | QTY | UNIT | UNIT PRICE | ||
| (KW) | AMOUNT |
(KW)
| 1 | Build-up Type Scaffolding Rental | 4 | SET | 0 | ₩0 |
| 2 | Remove and dispose construction debris to outside compound (O&MA Specifications Section 024100) | 5 | CM | 0 | ₩0 |
| Subtotal: | ₩0 | ||||
| Total Amount (A + B): | ₩0 | ||||
| ($1.00 = ₩1,151.5242) | $0 |
&C Page &P of &N
151980(4203)
| SONTRACT NO: | |||||
| PWO NO.: | 151980 | ||||
| PROJECT DESCRIPTION: Paint Interior of Building 4203, Yongsan | |||||
| A. IGCE using CLIN item & Cost | |||||
| CLIN NO. | DESCRIPTION | QTY | UNIT | UNIT PRICE | |
| (KW) | AMOUNT |
(KW)
| 4005AK | Paint on concrete floor, epoxy paint, 2 coats | 456 | SM | 0 | ₩0 |
| 4005AE | Paint, galvanized metal primer, 1 coat | 423 | SM | 0 | ₩0 |
| 4005AH | Remove existing paint for CMU or concrete surface (By using hand & power tool machine) | 423 | SM | 0 | ₩0 |
| 4005AP | Seal cracks on cement plaster wall | 200 | LM | 0 | ₩0 |
| 4005AQ | Remove and Reinstall Various Furniture Including Steel or |
wooden Cabinets, Shelves, Book Cases, Office Furniture, Chairs
| refrigerators & Other Office Equipments. | 9 | CM | 0 | ₩0 | ||
| Subtotal | $0 | |||||
| B. Over and Above Amount | ||||||
| CLIN NO. | DESCRIPTION | QTY | UNIT | UNIT PRICE | ||
| (KW) | AMOUNT |
(KW)
| 1 | Remove and dispose construction debris to outside compound (O&MA Specifications Section 024100) | 2 | CM | 0 | ₩0 |
| 2 | Apply non slip powder(KCC) on the concrete floor. | 456 | SM | 0 | ₩0 |
| 3 | Apply glass bead on the parking line. | 33 | SM | 0 | ₩0 |
| Subtotal: | ₩0 | ||||
| Total Amount (A + B): | ₩0 | ||||
| ($1.00 = ₩1,151.5242) | $0 |