H1_Drawing_files___174466.pdf
PDF 19 MB Posted
- Attached to
- Repair periment fence
- Solicitation number
- w91qvn17r0223
About this file
Drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_Submittal_Register___174466.xls | XLS spreadsheet | |
| A21_W91QVN-17-R-0223.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 T - 1 1 OF 1 TITLE SHEET
CIVIL
T-1
TITLE SHEET
A
B C D
E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ENVIRONMENT
FORCE PROTECTION
AS SHOWN
CAMP CASEY
C - 6
C - 5
C - 4
C - 3
C - 2
C - 1
CHO, MC
C - 7
C - 8
8 OF 8 MISC. DETAILS - 1
CAMP CASEY
FEWR NO. 174466
174466
CONDITION AFTER VEGETATION REMOVAL
REPAIR/RETURN PERIMETER FENCE TO ITS ORIGINAL
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
SITE LAYOUT PLAN-1
SITE LAYOUT PLAN-2
SITE LAYOUT PLAN-5
SITE LAYOUT PLAN-6
SITE LAYOUT PLAN-3
SITE LAYOUT PLAN-4
PROJECT LOCATION PLAN AND SCOPE OF WORK,GENERAL NOTE
G
CB
CB
CB
00-49341
3-48PN
00-49341
4-200PN
00-49341
4-200PN
01-49550
00-49341
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
808 811
746 715 726
A B
00-49341
A
B
11491151
10291144
A
B
1918 1879
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
26462645
1991 1963
A B
18331832
456A
CCTT
CCTT
SIMNET
463Z
SSSC
TSAK MILES 2000
549 546
8114T
560G
A B
86M
48T
A
B
39 55
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
447A
F
497A
497B
458Z
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54132 BUP 010801
00-54127 BUP 040430
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
99-47353
4-200PN
01-QA00604 BUP
95-44066
4-184PN
96-QA00466 BUP
95-44066
4-184PN
95-44066
4-184PN
95-44066
4-184PN
01-55893 BUP
99-QA00603 BUP
XX-QA00602 BUP 0310XX
99-47353
4-200PN
96-43269
4-184PN
97-44592
4-200PN
XX-QA00287 BUP
01-55894 BUP
99-51682
4-200PN
99-51820
3-48PN
97-44592
4-200PN
99-51682
4-200PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
VEH BR
472?
455?
1839T
1840T
BARRIER
1564 1566
635A
2002B
A B
48A
A
B
A B
A B
A
B
A
B
A
B
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
BARRIER
BARRIER
1919LIFT STATION
PROJECTION ROOM
MECH
ROOM
CONFERENCE ROOM
BREAK ROOM
LAN / TEL
VEST
OFFICE
LOBBY
M. TOILET
W. TOILET
MARBLE FLOOR
CARPET
C-1
GENERAL NOTES :
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
UN DETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
PRIOR TO COMMENCING WORK ON THE PROJECT.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/
RESTORATION TO THEIR ORIGINAL CONDITIONS OF THE ITEMS
DAMAGED BY DISMANTLING DEMOLISHING OR REMOVING AT
THE CONTRACTOR’S EXPENSE TO THE SATISFACTION OF THT
CONTRACTING OFFICER.
4. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED
AND CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS
SUCH AS UNDER GROUND ROCK BASE EXISTING UTILITY LINES
AND OTHER ITEMS WHICH WILL INTERFERE WITH THE REPLACEION
OPERATIONS.
5. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD
REGION OFFICE FORM ARE A PART OF THIS PROJECT. THE DETAILS
WILL BE UTILIZED TO ACCOMPLISH THE CIVIL SOW AT NO ADDITIONAL
6. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO
VERIFY FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND
ALSO CHECK THE OTHER EXISTING SITE CONDITIONS PRIOR TO START
OF WORK AT NO ADDITIONAL COST.
7. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
MATERIALS,EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN A
CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER’S
REPRESENTATIVE.
COST TO THE PROJECT CONTRACT.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
TO SUBMISSION OF CONTRACT PROPOSAL.
DETAIL DRAWINGS FOR OM&A PROJECTS KOREA OCT 2003 DEP
ARTMENT OF THE REPLACEATION MANAGEMENT AGENCY KOREA
LAYOUT PLAN-1
LAYOUT PLAN-2
LAYOUT PLAN-3
LAYOUT PLAN-4
LAYOUT PLAN-5
LAYOUT PLAN-6
LAYOUT PLAN-4
N
174466
CAMP CASEY
PROJECT LOCATION PLAN
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
SCOPE OF WORK
SCHEDULE #1 (MAINTENANCE AND REPAIR : K)
WITH ARMS.
LINK FENCE(8’ H) AND 3’ DIA CONCERTINA WIRE
3. INSTALL AND REMOVE TEMPORARY CHAIN
GATE W/NEW AND WARNING SIGN.
2. REPLACE VEHICLE GATE AND PERSONNEL
IN CAMP CASEY.
FENCE W/SECURITY CURBS AT EIGHT(8) PLACES
1. REPLACE DAMAGED CHAIN LINK PERIMETER
PROJECT LOCATION PLAN-11
2-
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SITE LAYOUT PLAN-1
0 40M302010
X P S
V E H
B R
F O
O T
B R
B
P
N
START POINT
ENDING POINT
CHO, MC
CIVIL
CAMP CASEY
* SPECIFIC NOTES
* DESIGN CRITERIA
FACILITIES.
1. UFC 4-022-03 *SECURITY ENGINEERING* FENCES GATES AND GUARD
2. UFC 4-022-02 *SELECTION AND APPLICATION* OF VEHICLE BARRIERS.
C-2
SHALL BE INSTALLED W/ WELDING ON 150MM EACH WAY.
BIGGER THAN 100MM, ZINC COATED D16MM-HOOK TYPE REBAR
3. IN CASE THE GAP BETWEEN BOTTOM RAIL AND GROUND IS
2. PROVIDE EXST & NEW FENCE CONNECTION DETAIL.
1. PROVIDE TEMPORARY FENCE. (SUBMIT SHOP DRAWING)
N
174466 174466
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
SITE LAYOUT PLAN-1
PERSONNEL GATE W/ NEW AND WARNING SIGN.
REPLACE ONE(1) VEHICLE GATE AND (1)
APPROX. 470LM (C-2,C-8)
S-497 TO S-1963 AS SHOWN ELEC. POLE
W/ NEW. NEAR BY MOTOR POOL FROM BLDG.
REPLACE CHAIN LINK PERIMETER FENCE(FE-10)
AS SHOWN
N
0 40M302010
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E
E
SITE LAYOUT PLAN-2
CHO, MC CAMP CASEY
C-3
174466
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
SITE LAYOUT PLAN-2
REPLACE CHAIN LINK FENCE FE-10 W/NEW 15 LM.
W/NEW 39 LM (C-4C-8).
REPLACE CHAIN LINK FENCE FE-10
1 3
N
0 40M302010
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
833T
SITE LAYOUT PLAN-3
CHO, MC CAMP CASEY
C-4
FROM P38 UP TO 39 LM.
REPLACE CONCERTINA WIRE W/NEW
174466
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
SITE LAYOUT PLAN-3
FROM P40 UP TO 33 LM.
REPLACE CHAIN LINK FENCE FE-10 W/NEW
FROM P41 UP TO 39 LM (C-5,C-8).
REPLACE CHAIN LINK FENCE FE-10 W/NEW
1 4
N
1:800
0 40M302010
SITE LAYOUT PLAN-4
CHO, MC CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
C-5
XX-QA00287 BUP
174466
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
SITE LAYOUT PLAN-4
NEAR BY S-1146. (C-6,C-8)
REPLACE CHAIN LINK FENCE FE-10 W/NEW 30 LM
FE-10 W/NEW 15 LM.
S-418 SEUNG JI GOL REPLACE CHAIN LINK FENCE
1 5
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1 SITE LAYOUT PLAN-5
0 40M302010
C-6
CHO, MC
CIVIL
CAMP CASEY
N
174466
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
SITE LAYOUT PLAN-5
(C-3.C-8)
APPROX. 30LM NEAR BY S-1023, ELEC.POLE P79
REPLACE CHAIN LINK FENCE FE-10 W/NEW
1 6
N
0 40M302010
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SITE LAYOUT PLAN-6
CHO, MC
CAMP CASEY
C-7
174466
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
(C-7,C-8)
FROM BLDG. S-1865 TO GATE APPROX. 425 LM
REPLACE EXIST CONCERTINA WIRE W/NEW
SITE LAYOUT PLAN-6
CON’C CURB W/WHEEP HOLE W/NEW APPROX. 60 LM
REPLACE CHAIN LINK FENCE FE-10 AND
NEAR BY ELEC POLE P4B24
REPLACE CHAIN LINK FENCE FE-10 15 LM
NEAR BY ELEC. POLE P4B 28,29,30 (C-7,C-8)
REPLACE CHAIN LINK FENCE FE-10 45 LM
APPROX. 123 LM
ONLY (ELEC. POLE P1~P3)
REPLACE CONCERTINA WIRE
1 7
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
AS SHOWN
SCALE: NONE
CHAIN LINK
FABRIC
(SEE NOTE 1)
GATE DOUBLE SWING
WIRE
TIES
SEE DETAIL
CONCRETE BASE
TRUSS ROD BAND
FENCE POST
TRUSS ROD
(10 0 MIN) FENCE POST
BRACE RAIL
BAND
10 TRUSS ROD
FLEXIBLE
COPPER
BRAID
NOT TO SCALE
STRETCHER
BAR
TRUSS
ROD
PLUNGER
BAR
GATE
LATCH
WIRE
TIES
STRETCHER
BAR
TRUSS ROD
10 0 MIN
TRUSS ROD
10 0 MIN
50 LINE POST
(TYP)
40 0
BRACE
100 0
GATE POST
50 0 PIPE
(GATE FRAME)
60 0
CORNER
POST
CONCRETE
21 MPa
(CAST-IN-PLACE)
#8 AWG SOLID
COPPER WIRE
POST
HINGE
COPPER CLAD STEEL
GROUND ROD
19 0x3050 LENGTH/
10 0 STD
TRUSS ROD
CONNECTOR
FABRIC TOP SELVAGE TO
BE TWISTED AND BARBED
40 0 TOP RAIL-
EXPANSION COUPLING
@ 6000 OC MAX
3 STRANDS
4 POINTS
STRETCHER
BAR
9 GAGE WIRE
FABRIC 50 MESH
STRETCHER
BAR BAND
STANDARD
TRUSS ROD
BAND
TRUSS ROD
10 0 MIN
40 0 TOP RAIL-EXPANSION COUPLING
@ 6000 OC. MAX
13x50x363 STRAP BENT
AS SHOWN
FABRIC
TIE WIRES
TIE WIRE
(375 OC MAX AND
WITHIN 100 FROM
TOP AND BOTTOM
OF FABRIC)
FENCE
POST
FABRIC
9-GAGE TIE WIRES
(600 OC MAX)
FABRIC
TOP & BOTTOM
KNUCKLED
P L A N 5A
ELEVATION
5B
NOT TO SCALE
LINE POST ATTACHMENTS
NOT TO SCALE
WIRE TIES FOR
TOP OR BRACE RAIL
HANDLE
GATE FRAME HANDLE 25x100
STEEL BAR
/32 0 HOLE
(2 EA)
32 0 HOLE
PLUNGER-25x500 MIN
STEEL BAR
M
IN
P L A N 4A
ELEVATION
4B
NOT TO SCALE
PLUNGER BAR
GATE FRAME
(TYP)
013x85 BOLT
W/NUT
7 0 REMOVABLE
PIN (TO LOCK IN
UP POSITION)
CORNER POST
7A
GATE
7B
NOT TO SCALE
GROUNDING DETAILS
NOT TO SCALE
GATE FRAME
NOT TO SCALE
TRUSS ROD & BAND
NOT TO SCALE
CLAMP FOR BRACE RAIL
FABRIC
FENCE POST
TENSION BAND
(375 OC MAX AND
WITHIN 100 FROM
TOP AND BOTTOM
OF FABRIC)
NOT TO SCALE
STRETCHER BAR BAND
6x20
STRETCHER BAR
TO ENGAGE EACH
FABRIC LINK
NOT TO SCALE
LINE POST DETAIL
100 GATE POST
50 PIPE
GATE FRAME
25 P L 100 0
GATE POST
13x25x138 STRAP
13x38 STRAP BENT
AS SHOWN-2EA-LEGEND
VARIES
13 0 HOLE FOR PADLOCK
(EACH SIDE)
LATCH MOVEMENT
DIRECTION
GATE FRAME
(TYP)
GATE FRAME
(TYP)
2 WASHER
(TYP)
LATCH
PEEN END (TYP)
DRILL 14 FOR
013 BOLT
P L A N 2A
ELEVATION
2B
NOT TO SCALE
POST HINGE
P L A N 3A
ELEVATION
3B
NOT TO SCALE
GATE LATCH
013x100 BOLT WITH
NUT & 6 WASHERS
013x88 BOLT WITH
NUT & 3 WASHERS
13x88x50 PLATE
NOTCHED EACH SIDE
013 BOLT USS THREAD
100 LONG, HEX HEAD
W/NUT
6 5
R16
FENCE
FABRIC
NOTES :
1. ALL FABRIC SHALL BE #9 GAGE GALVANIZED STEEL
WOVEN IN A 50 MESH.
2. ALL DIMENSIONS SHOWN HEREON ARE IN MILLIMETERS.
3. FENCE GROUNDING
a. ALL FENCES SHALL BE GROUNDED AT EACH TERMINATION, EACH CORNER (EXCEEDING 60^), EACH SIDE OF EACH
GATE, AND AT 300 METER INTERVALS.
b. FENCE CROSSED BY PRIMARY POWER LINES IN EXCESS OF
600 VOLTS SHALL BE GROUNDED AT A POINT DIRECTLY
BELOW THE CROSSING AND 45 METER ON EACH SIDE
OF CROSSING.
c. FENCES PARALLEL TO OR WITHIN 30 METER OF A PRIMARY
POWER LINE IN EXCESS OF 600 VOLTS SHALL BE GROUNDED
EVERY 150 METER.
4. ALL CHAIN-LINK FENCING MATERIALS SUCH AS FABRIC,
POSTS, RAILS, ETC. SHALL BE GALVANIZED FINISHED,
UNLESS OTHERWISE NOTED.
BOLTED
SOLDERLESS
CLAMP
FUSION WELDING
100 0 GATE POST/
GROUNDING
BAND
WIRE TIES
BAND
LINE POST
GATE
FIN GR
BOT RAIL
MULTIPLES OF 3000SEE PLAN3000
.0
30003000
CHAIN LINK FENCE
600 DIA-(3)CONCERTINA
BARBED TYPE WIRE
BARBED TYPE WIRE
600 DIA-(3)CONCERTINA
G.L
100 100
D13 @200 O.C
NOT TO SCALE
SECURITY CURB
ELEVATION
SECTION
CHAIN LINK FENCE AND GATE/CONCERTINA WIRE
ORIGINAL CONDITION AFTER VEGETATION REMOVAL
REPAIR / RETURN PERIMETER FENCE TO IT’S
CHAIN LINK FABRIC FENCE AND GATE
CAMP CASEY
C-8
CHO, MC
1744661 8
(WHERE DESIGNATED)
SEURITY CURB
File details come from the government source that posted it. Updated .