H1_Drawing_files___172323_01.pdf

PDF 818 KB Posted

Attached to
Repair drainage ditch near building No. 770, Camp Casey
Solicitation number
W91QVN17R0207
Issued by

About this file

Drawing

View the file

Other files

File Type Posted
W91QVN17R0207_Final.docx DOCX document
A2_Submittal_Register___172323.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR’G DIV

FORCE PROTECTION

CHK’D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YICH CAMP CASEY

CIVIL

AS SHOWN

SCALE IN METERS

PROJECT LOCATION PLAN

PROJECT LOCATION PLAN

C-1

65-A

12 CM

ST

STREAM

ST

S T

P V C

227.5

J-4

ST

36 CM

.5

.9

W A

L L

W A

L L

W A

L L

WALL

W A

L L

WALL

228.4

ST

GAL275

MATCH LINE ’C’

MATCH LINE ’C’

00-49341

3-48PN

00-49341

4-200PN

00-49341

4-200PN

01-49550

00-49341

LAUNDRY

KSC

PEST

647667

UTIL

B&G

WH-1

WH-2

DPW HQ

A

B

629 685

651A

833T

808 811

746 715 726

A B

00-49341

A

B

1149 1151

10291144

A

B

1918 1879

A

B

A

B

A

B

2372A

2373T

A C

2451 2400

A

B

A

B

2648 2605

2609T

2514 2540

8008T

2540T

26462645

1991 1963

A B

18331832

1962 1812

456A

CCTT

CCTT

SIMNET

463Z

SSSC

TSAK MILES 2000

549 546

8114T

560G

A B

86M

48T

A

B

39 55

134 133

186 192

202A

208 215 214

213 212

258252

249 262

1785 235

237 238

FOOT BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR 1821

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

1158A

1158B

RAILHEAD

.8

.5

S T

R C

6 PVC

ST

T

C M

S T

268.6

STREAM

DISCHARGE TO

65-A

12 CM

ST

STREAM

MATCH LINE ’C’

MATCH LINE ’C’

447A

F

F

497A

497B

458Z

2372?

QA00894-0J

QA00893-0J

QA00892-0J

ADMIN

EXER W/LAT

EXER W/LAT

QA00138-9J

QA01300-8J

00-54151 BUP 020122

00-54152 BUP 020122

00-54132 BUP 010801

00-54127 BUP 040430

00-54158 BUP 030104

00-54129 BUP 011109

00-54157 BUP AFTER 2026

00-54156 BUP 031030

00-54130 BUP 020330

00-54131 BUP 020929

00-54155 BUP 030506

03-57200 REPAIR 041007

99-47353

4-200PN

01-QA00604 BUP

XX-QA00606 BUP 0310XX

95-44142

4-184PN

95-44066

4-184PN

96-QA00466 BUP

95-44066

4-184PN

95-44066

4-184PN

95-44066

4-184PN

01-55893 BUP

99-QA00603 BUP

XX-QA00602 BUP 0310XX

99-47353

4-200PN

96-43269

4-184PN

97-44592

4-200PN

XX-QA00287 BUP

01-55894 BUP

99-51682

4-200PN

99-51820

3-48PN

97-44592

4-200PN

99-51682

4-200PN

99-51682

4-200PN

01-55882 BUP

A

B

A B

2022(?)

VEH BR

VEH BR

472?

455?

1839T

1840T

BARRIER

1564 1566

635A

2002B

A B

48A

A

B

A B

A B

A

B

A

B

A

B

174 Z

GRAVES

GRAVES

BA

SK

ET

BA

LL

CO

UR

T

T E

N N I

C O

U R

T

706(707A)

(2298)

1071?

A B

1760?

VEH BR?

VEH BR?

BARRIER

BARRIER

FLAG

FO

O

TBALL FIELD

(SYN

TH

ETIC

TU

RF AREA)

1919LIFT STATION

0100 300

N

172323

THIS PROJECT

NEAR BLDG S-770

REPAIR DRAINAGE DITCH

NEAR BLDG S-770

REPAIR DRAINAGE DITCH

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR’G DIV

FORCE PROTECTION

CHK’D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

C-2

YICH CAMP CASEY

CIVIL

SITE PLAN

SCOPE OF WORK

SITE PLAN, NOTE AND

AS SHOWN

SCALE IN METERS

172323

C

E

D

D

S

S

S

N

S-770

SCOPE OF WORK

SCHEDULE #1 (MAINTENANCE AND REPAIR : K)

OC EW

D13 @ 200 MM

CONCRETE DITCH

NEAR BLDG S - 770

REPAIR DRAINAGE DITCH

5 5 10

APPROX.125 LM. SEE DET 2

CONCRETE OPEN DITCH (2100 MM WIDTH x 1100 mm AVERAGE DEPTH).

REPAIR BY REPLACE EXISTING STONE DITCH (2100mm x 1100mm DEPTH) WITH

4. PROVIDE CONNECTIONS FOR ALL EXISTING LATERAL DRAINS AND WHERE DESIGNATED BY THE COR.

3. REMOVE AND REINSTALL EXISTING GUARDRAIL (KEEP EXISTING AS MUCH AS POSSIBLE).

2. RESTORE EXISTING TURF AREA DAMAGED BY THIS PROJECT WITH SOLID SOD AND TOP SOIL.

1. REPLACE A PORTION OF FAILED OR FAILING STONE DITCH WITH CONCRETE DITCH.

SUBMIT SHOP DRAWING

APPROX 125 LM

(REUSE EXISTING AS MUCH AS POSSIBLE)

REMOVE AND REINSTALL EXISTING VEHICLE GUARDRAIL

BACKFILL

RESTORED TURF

SUBMIT SHOP DRAWING

PROVIDE CONNECTION FOR EXISTING LATERAL DRAIN

UNDETAILD PORTION

2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR

CONCRETE PAVEMENT FOR SUFFICIENT DRAIN.

THE DITCH LOWER THAN THE EDGE TOP OF THE EXISTING

1. THE CONTRACTOR SHALL KEEP THE TOP ELEVATION OF

NOTE:

C-1
C-2

File details come from the government source that posted it. Updated .