A02_5-2._Drawings_(B83)_Part1.pdf

PDF 5 MB Posted

Attached to
THAAD Barracks Bldg Repair
Solicitation number
W91QVN17R0169
Issued by

About this file

Drawing 5-2 Part 1

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND AND ABBREVIATIONS

NAM, TAE CHIN

SCH

SA

SAN

QTY

R12, R22

RA

RDTR

RPM

RT

PG

PH

POC

POL

PPM

PRV

QT

OA

OAIL

OD

OS&Y

Pa

NTS

BUTTERFLY

CUBIC METER PER HOUR

AIR CONDITION (-ING,-ED)

AIR CONDITION UNIT (S)

AIR COOLED CONDENSING UNIT

CHILLED/HOT WATER RETURN

CHILLED/HOT WATER SUPPLY

REFRIGERANT LIQUID

CAP CAPACITY

CUBIC METER

COMPRESSOR

CONTINUE

CONNECTION

CPRSR

CU M

CONT

CONN

COUNTER CLOCKWISE

COEFFICIENT

CIRCUIT

CAST IRON PIPE

CHILLED WATER

CKT

CMH

COEF

CHW

CCW

CIP

ALARM CHECK VALVEACV

AVG AVERAGE

BAROMETER(-TRIC)

CENTIGRADEC

BARO

AMPERE(AMP, AMPS)

ALUMINUM

APPROX

AMP

AIR COND

AHU

AL

AIR COOLED

ACU

ACLD

ACCU

CHWS

CHWR

CHR

CHS

D

RL

DRAIN

KILOCALORIE PER HOUR

KILOGRAM PER SQ. CENTIMETER

KILOGRAM

THERMAL CONDUCTIVITY

IRON PIPE SIZE

ISOMETRIC

DIAMETER, INSIDE

FACE AREA OR FRESH AIR

EXTERNAL STATIC PRESSURE

EVAPORAT (-E,-ING,-ED,-OR)

ENTERING WATER TEMP

FIRE HOSE CABINET

EXPLOSION PROOF

FHC

FA

ESP

EVAP

EWT

EFF

ENT

EQPT

EP

EFFICIENCY

ENTERING

EQUIPMENT

KG

K

IPS

ISO

ID

NIC

N.O.

NO

MPS

N.C.

N/A

MM

MPH

MIN

MAX

NOT IN CONTRACT

NORMALLY OPEN

NUMBER

NORMALLY CLOSED

METERS PER SECOND

METERS PER HOUR

MINIMUM OR MINUTE

NOT APPLICABLE

MILLIMETER

MAXIMUM

HERTZ

HOSE BIBB

HEAD

HORSEPOWER

HOUR(S)

HOT WATER

HOT WATER HEATER

HORIZONTAL

FIBERGLASS REINFORCED PLASTIC

FREQUENCY

FLUSH VALVE

FEED WATER PUMP

FIXTURE

GAGE OR GAUGE

GALVANIZED STEEL

FUEL OIL

FEMALE PIPE THREAD

CIRCULATING WATER PUMPCWP

FRP

DECIBEL OR DRY BULB

DRY BULB TEMPERATURE

ENTERING AIR TEMPERATURE

DRY PIPE VALVE

DIRECT EXPANSION

DO DIESEL OIL

EAT

DPV

DX

DIV

DIAG

DIFF

DB

DBT

DIVISION

DIAMETER

DIAGRAM

DIFFERENCE

DEGREE

HR

HZ

HW

HWH

HORIZ

HB

HD

HP

GA

GALVS

FV

FWP

FXTR

CLOCKWISE OR COLD WATERCW

PLUG VALVE

THREE WAY

FREQ

FO

FPT

GATE, GLOBE

GATE, ANGLE

GLOBE

CONTROL

GATE

M

LPS

LWT

LT

LPH

LPD

LL

LG

LBS

LAT

LAV

L

KWH

KW

LITERS PER SECOND

LITERS PER HOUR

LEAVING WATER TEMPERATURE

METERS

LAUNDRY TRAY

LITERS PER DAY

LIQUID LINE

LEAVING AIR TEMPERATURE

POUNDS

LAVATORY

LENGTH

KILOWATT HOUR

KILOWATT

LITERS

P

STRAINER, BLOW OFF

STRAINER

PUMP (INDICATE USE)

KG/ SM KILOGRAM PER SQ. METER

REFRIGERANT SUCTION

REFRIGERANT DISCHARGE

PIPE TO BE REMOVED

MEDIUM TEMPERATURE HOT WATER RETURN

MEDIUM TEMPERATURE HOT WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

RS

RD

(NAME)

(NAME)E EXISTING PIPE

HWR

HWS

MTWR

MTWS

CR

CS

PIPING

SANITARY DRAIN

CHECK, SWING

PIPE SLEEVE WITH FIRE STOPPING

VENT THRU ROOF

BFP

PLAN

HOSE BIBB

BALL

ELEV.

PIPE SLEEVE

BACKFLOW PREVENTER

FLOOR DRAIN

FLOOR CLEANOUT

FD

FCO

FLEXIBLE CONNECTOR

ANCHOR, INTERMEDIATE

ANCHOR, MAIN

EXPANSION JOINT

EXPANSION LOOP

EJ

RELIEF

SAFETY

HOSE END DRAIN

LOCK SHIELD

NEEDLE

PRESSURE REDUCING

CONTROL, PNEUMATIC-ELECTRIC

CONTROL, ELECTRIC-PNEUMATIC

CHECK, NON-SLAM

S

R

EP

PE

COLD WATER

VENT

AD FD

QUANTITY

TEMPERATURE DIFFERENCE

TONS OF REFRIGERATION

SCHEDULE

SUPPLY AIR

SANITARY

REFRIGERANT (12, 22, ETC)

RETURN AIR

REVOLUTIONS PER MINUTE

REFRIGERATION TON

RADIATOR

TYP TYPICAL

UNIT HEATER

URINAL

UH

UR

SYMBOL

TEMPERATURE

THICKNESS

TONS

THK

TEMP

SYM

TD

OUTSIDE AIR INTAKE LOUVER

PRESSURE REDUCING VALVE

PHASE (ELECTRIC)

PETROLEUM, OIL AND LUBRICANTS

POINT OF CONNECTION

PARTS PER MILLION

PERCENT/

QUART

PRESSURE GAGE

DIAMETER, OUTSIDE

OUTSIDE SCREW & YOKE

PASCAL

POLE

SPR SPRINKLER

STAINLESS STEEL

SQUARE

STEAM

STANDARD

STEEL

ST

STD

STL

SQ

SST

SPECIFICATION

SQUARE METER

STATIC PRESSURE

SPEC

SP

SM

OUTSIDE AIR

NOT TO SCALE

SECONDSEC

VAV VARIABLE AIR VOLUME

WATER CLOSET

VENTILATION

W/

WT

WC

WD

WITH

WEIGHT

WIDTH

W

WB

VOL

VEL

VENT

VERT

WATT

WET BULB

VOLUME

VELOCITY

VERTICAL

SMOKE DAMPER (PROVIDE ACCESS DOOR)

MANUAL VOLUME DAMPER

VAC

V

VACUUM

VOLT

SPLITTER DAMPER

AD

SD

VD

TEE, SINGLE SWEEP

TEE, OUTLET DOWN

REDUCER, ECCENTRIC (STRAIGHT, DOWN)

REDUCER, ECCENTRIC (STRAIGHT, INVERT)

ELBOW, TURNED DOWN

UNION, FLANGED

UNION, SCREWED

TEE, OUTLET UP

TEE

LATERAL

ELBOW, TURNED UP

CONNECTION, TOP

CONNECTION, BOTTOM

BUSHING

CAP

FIRE DAMPER (PROVIDE ACCESS DOOR)

BDD

TURNING VANES

TRANSITION

FLEXIBLE CONNECTION

FLEXIBLE DUCT

FC

DUCT WORK

A B B R E V I A T I O N S

L E G E N D

PG

TM

AAV

FOS

3-WAY VALVE (MOTORIZED)

PRESSURE GAUGE

THERMOMETER

AUTOMATIC AIR VENT

GATE VALVE

CHECK VALVE

FUEL OIL SUPPLY

FLEXIBLE JOINTFJ

& STRAINER

M

CS

SD

SHOWER DRAIN

DEG

DIA or o

CEAT CONDENSER ENTERING AIR TEMP

LCWT LEAVING CHILLED WATER TEMP

FAIL FRESH AIR INTAKE LOUVER

EXPANSION JOINTEXPJT

EXST EXISTING

A / C AIR CONDITIONING

APPROXIMATELY

ARCH ARCHITECTURAL

BLDG BUILDING

CONC CONCRETE

DWG DRAWING

EA EACH

F.C.U. FAN COIL UNIT

MECH MECHANICAL

KCAL/ HR

KG/ SQ CM

HOT WATER SUPPLY

HOT WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

V

DOMESTIC HOT WATER SUPPLY

DOMESTIC HOT WATER RETURN

AAV

ED EXHAUST DUCT

AUTOMATIC AIR VENT

AIR HANDLING UNIT

GROUND LEVELGL

REGISTER, SIDEWALL

SUPPLY AIR GRILLE OR

REGISTER, CEILING

SUPPLY AIR GRILLE OR

(200mm NECK DIAMETER)

CEILING DIFFUSER, ROUND TYPE

REGISTER, CEILING

EXHAUST AIR GRILLE OR

GRILLES, REGISTERS AND DIFFUSERS

SQUARE TYPE

CEILING DIFFUSER,

EG

ER

SG

SR

SG

SR

RG

RR

CD

200mm NCD

COWL, (GOOSENECK) AND FLASHING

(810mm WIDTH x 400mm DEPTH)

DUCT SIZES SHOWN810mm x 400mm

M

ELECTRIC MOTOR OPERATED DAMPER

S

MOTORIZED DAMPER

MD

SUPPLY AIR DUCT RISER

RETURN OR EXHAUST AIR DUCT RISER

SUPPLY AIR DUCT SECTION

RETURN AIR DUCT SECTION

GATE, GLOBE OR BALL VALVE

CHECK VALVE (FLOW)

ANGLE VALVE

STRAINER

DRIP CHECK VALVE

RESTRICTED ORIFICE

FILL CUP

PRESSURE GAUGE

SOLENOID VALVE

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLEXIBLE PIPE CONNECTION

RELAY

HOSE VALVE

TEST HEADER

SMOKE DAMPER

R

SD

S

: WATER MOTER ALARM GONG

SPRINKLER SYSTEM

: UP-RIGHT TYPE SPRINKLER

: PENDENT TYPE SPRINKLER

: SIDE WALL TYPE SPRINKLER

REMOVAL WORK

RELOCATED WORK

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

SA

RA

EA

DEMPERS

VALVES, SPECIAL DUTY

HEATING

AIR CONDITIONING & REFRIGERATION

PLUMBING

VALVES : (for selective actuators)

BACK DRAFT DAMPER

CIRCUIT SETTER

POINT OF CONNECTIONPOC

POR POINT OF REMOVAL

TcH THERMOSTAT HEATING/COOLING

THERMOSTAT OF HEATING

REGISTER, CEILING

RETURN AIR GRILLE OR

Th

REDUCER, CONCENTRIC

12 JUN 17

YI, TONG KI CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

32 73

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-1

D - 17 - 11

G

D E S C R I P T I O N

E Q U I P M E N T S C H E D U L E

Q’ TY

NO.

ITEM

Q’ TY

NO.

ITEM

D E S C R I P T I O N Q’ TY

NO.

ITEM

D E S C R I P T I O N

1 1

2 1

HOT WATER HEATING BOILER

DOMESTIC HOT WATER HEATER

2 EXPANSION TANK

PIPE TAPPING.

PRESSURE, EQUIPPED W/ HEAVY DUTY REMOVABLE BLADDER AND NECESSARY

AND PRESSURE VESSEL CODE (ASME BPVC SEC VIII D1), MAX. 125 PSI WORKING

CLOSED ROUND DIAPHRAGM TYPE, SHELL CONFORMING TO ASME CODE

TANK SIZE: 12" DIA x 57" LG

TANK CAPACITY: 19 GALLONS (ACCEPTANCE VOLUME)

AIR SEPARATOR2

GALVANIZED STEEL STRAINER, BLOWDOWN AND COLD WATER CONNECTION.

CONNECTION CONSIST OF STAINLESS STEEL AIR COLLECTOR TUBE,

PIPE MOUNTED, ASME CODE AND STAMPED FOR 125 PSI @ 350 F, THREADED

FAN COIL UNIT (FOR 2 PIPE SYSTEM)

8.1 8.3

(CFM)

AIR CAP

COOLING CAP (MBH)

3005.9 110W

SENSIBLE TOTAL

(GPM)

FLOW RATE

REMARK

11 1.5

8.8 11.6 2.4 135W

13.4 18.7 3.0 600

200W8004.020.814.4

275W10004.830.231.721.1

190W

INPUT

POWER

ELECTRIC DATA : 115V, 1PH, 60HZ

110 BACKFLOW PREVENTER & PRESSURE REDUCING STATION

CONFORM TO PL 93-523 AND NSF/ANSI 61

STEEL COVER BOLTS, AIR GAP, ASSE APPROVED, AWWA STANDARD

SILICONE RUBBER DISK, REPLACEABLE POLYMER CHECK SEATS, STAINLESS

REDUCE PRESSURE ZONE BACKFLOW ASSEMBLY, LEAD FREE BRONZE BODY,

SIZE: 2 1/2 (65 mm)

MAX. WORKING PRESSURE: 175 PSI (12.1 BAR)

TEMP. RANGE: 33 F~180 F (0.5 C ~ 82 C)

COOLING :

TEMP. RISE

EWT 45 F AT 10 F

DB 80 F, WB 67 F,

21 12

(MBH)

MIN.

HEATING

20.8

(KW)

OUTPUT

GROSS

111.6

(LPH)

RECOVERY

HEAT

ELEC. POWER

FLA: 2, 120 V, 1 PH, 60 HZ

TEMP.

SUPPLY

RISE

TEMP.

60 C 16.7 C

(KW)

OUTPUT

GROSS

ELEC. POWER

TEMP.

SUPPLY

80 C

(CMH)

INPUT

GAS

PRESS

WORKING

ROOF EXHAUST VENTILATOR

12 JUN 17

MOTOR POWER: 28 W, 115 V, 1 PH, 60 HZ

VALVE SIZE: 2 1/2"

CAPACITY: 63 CV

TEMPERATURE RANGE.

MOTOR, SPRING RETURN, 250 PSI MAX. PRESSURE, 36 TO 337 F WATER

THREE-WAY THREADED GLOBE MIXING VALVE, LINKAGE & PROPORTIONAL

PIPE SIZE: 2 1/2" DIA

BODY SIZE: 6.3" DIA x 19"H

WATER FLOW RATE: MAX. 90 GPM

MOTOR: 1 HP, 115 V, 1 PH, 60 HZ, 1,760 RPM

CAPACITY: 46 GPM AT 32 FT TDH

EQUAL.

SIMILAR TO "KYUNGDONG NAVIEN" MODEL NO. NHB-150 x 3EA OR APPROVED

121.5 10.8 FLA: 13.5, 120 V, 1 PH, 60 HZ 206.84 KPA

EQUAL.

SIMILAR TO "KYUNGDONG NAVIEN" MODEL NO. NPE-240S x 2EA OR APPROVED

MOTOR: 1/4 HP, 115 V, 1 PH, 60 HZ, 1,750 RPM

CAPACITY: 8 GPM AT 18 FT TDH

MOTOR: 1/8 HP, 115 V, 1 PH, 60 HZ, 1,750 RPM

CAPACITY: 6 GPM AT 10 FT TDH

DOMESTIC HOT WATER STORAGE TANK

HEAT LOSS SHALL CONFORM TO ASHRAE 90.1 - SI

AND COMBINATION TEMP. & PRSSURE RELIEF VALVE W/ STEEL TANK SUPPORT.

TAPPINGS, ASME SPECIFICATION INSPECTION OPENING, SADDLES, THERMOMETER

PRESSURE (AWWA D100), 150 PSI, TANK SHALL BE COMPLETED WITH REQUIRED

GLASS LINED, MANUFACTURED CONFORMING TO ASME CODE, MAX. WORKING

VERTICAL ROUND TYPE, WELDED STEEL CONSTRUCTION, CEMENT LINED OR

TANK SIZE: 36" DIA x 71" LG

TANK CAPACITY: 300 GALLONS

HOT WATER CIRCULATING PUMP

ACCESSORIES.

ALIGNING FLEXIBLE COUPLING BY AN OIL LUBRICATED MOTOR AND STANDARD

MAGNETIC MOTOR STARTER, THERMAL OVERLOAD PROTECTORS, SELF

IN-LINE TYPE BOOSTER PUMP W/ DIRECT DRIVEN THRU A SPRING-LOADED,

ACROSS-THE-LINE MAGNETIC CONTROLLER IN A NEMA 250 AND NEMA MG 1.

ALL BRONZE CONSTRUCTION. MOTORS SHALL BE EQUIPPED WITH AN

IN-LINE CLOSED COUPLED CENTRIFUGAL TYPE, FLANGE CONNECTION AND

ACROSS-THE-LINE MAGNETIC CONTROLLER IN A NEMA 250 AND NEMA MG 1.

ALL BRONZE CONSTRUCTION. MOTORS SHALL BE EQUIPPED WITH AN

IN-LINE CLOSED COUPLED CENTRIFUGAL TYPE, FLANGE CONNECTION AND

3-WAY MIXING VALVE

PIPE TAPPING.

PRESSURE, EQUIPPED W/ HEAVY DUTY REMOVABLE BLADDER AND NECESSARY

AND PRESSURE VESSEL CODE (ASME BPVC SEC VIII D1), MAX. 125 PSI WORKING

CLOSED ROUND DIAPHRAGM TYPE, SHELL CONFORMING TO ASME CODE

ELECTRIC UNIT HEATER

BRACKET AND STANDARD ACCESSORIES.

DISCONNECT SWITCH, UNIT MOUNTED THERMOSTAT, WALL MOUNTING

MOTOR, THERMAL OVERLOAD PROTECTION, WALL MOUNTED

AND OUTLET DIFFUSER, CONSIST OF HEATING ELEMENTS, FAN AND

HORIZONTAL DISCHARGE, TOTALLY ENCLOSED, INLET LOUVER, VENTURI

ACCESSORIES.

BODY COMPLETED WITH BACK DRAFT DAMPER, BIRD SCREEN AND STANDARD

ROOF CURB MOUNTED, GRAVITY TYPE RELIEF VENT, WEATHER PROOF, ALUMINUM

CAPACITY SIZE

600 CFM AT 1/4" S.P 12" x 12"

400 CFM AT 1/4" S.P 12" x 12"

WALL EXHAUST FAN

FAN MOTOR: 1/6 HP, 115 V, 1 PH, 60 HZ

CAPACITY: 660 CFM AT 1/8" SP

CEILING EXHAUST FAN

DRAFT DAMPER.

MOTOR MOUNTED WITH RESILIENT ANTI-VIBRATION MOUNTS, AUTOMATIC BACK

TYPE BLOWER WHEEL, PERMANENTLY LUBRICATED AND THERMALLY PROTECTED

HOUSING W/ ACOUSTIC INSULATION, DYNAMICALLY BALANCED CENTRIFUGAL

CEILING MOUNTED, VERTICAL DISCHARGE, METAL GRILLE, GALVANIZED STEEL

RANGE HOOD

FAN MOTOR: 80 W, 115 V, 1 PH, 60 HZ

CAPACITY: 100 CFM AT 3/8" SP

DUCTED INSTALLATION AND PROVIDED WITH WALL CAP.

ANTI-BACKDRAFT DAMPER, FAN AND LIGHT. UNIT SHALL BE SUITABLE FOR

INTEGRAL CORROSION RESISTANT ALL METALLIC FILTER, CONTROL PANEL,

UL-LISTED STANDARD MANUFACTURED RESIDENTIAL KITCHEN HOOD WITH

MOTOR POWER: 2.0 AMP, 115 V, 60 HZ, 1 PH

HOOD SIZE: 30"(W) x 6"(H) x 17"(D)

AIR CAPACITY: 160 CFM AT 0.67" SP

DOMESTIC HOT WATER RE-CIRCULATING PUMP

DOMESTIC HOT WATER CIRCULATING PUMP

ACCESSORIES. CONFORMANCE TO AHRI.

GRILLE, LEVEL LEGS, DIELECTRIC UNION, INSECT SCREEN AND STANDARD

MANUAL FRESH AIR DAMPER, FRESH AIR WALL BOX & INCLUDES LOUVER AND

PERMANENT SPLIT CAPACITOR MOTOR AND CENTRIFUGAL FAN, CLEANABLE FILTER,

TOP STEEL CABINET, 3-SPEED FAN SWITCH W/ OVERLOAD PROTECTION

UNIT, 3WAY VALVE, BALL VALVES, AUTO AIR VENT, BAKED ENAMEL FINISH FLAT

FLOOR MOUNTED, VERTICAL AIR DISCHARGE, COMBINATION COOLING/ HEATING

APPROVED EQUAL

SIMILAR TO "CARRIER AIR CONDITIONER" MODEL NO. 40MFC012- - -3 OR

SPLIT TYPE A/C UNIT

BACK DRAFT DAMPER AND EXHAUST GRILLE.

ALUMINUM HOUSING EQUIPPED WITH DISCONNECT SWITCH, BIRD SCREEN,

WALL MOUNTED, DIRECT DRIVEN CENTRIFUGAL FAN, WEATHERPROOF,

ELECTRICAL DATA: 10 A, 208 V, 1 PH, 60 HZ

940 / 935 (OUTDOOR)

MOTOR RPM / CFM: 1200 / 232 (INDOOR)

COOLING CAPACITY: 12,000 BTU/H

YI, TONG KI

FAN MOTOR: 1/100 HP, 208 V, 1 PH, 60 HZ

FAN CAPACITY: 350 CFM, 1,600 RPM

HEATING COIL: 3 KW

HEATING CAPACITY: 7,500 BTU/H

CAMP CARROLL

HS-00658-5J

PRODUCT.

REDUCER, WATER SOFTENER AND STANDARD ACCESSORIES, ASME CERTIFIED

CASCADE SYSTEM, MODULE TYPE CONDENSING WATER BOILER WITH SCALE

PRODUCT.

REDUCER, WATER SOFTENER AND STANDARD ACCESSORIES, ASME CERTIFIED

CASCADE SYSTEM, MODULE TYPE CONDENSING WATER HEATER WITH SCALE

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

33 73

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

EQUIPMENT SCHEDULE

M-2

D - 17 - 11

NAM, TAE CHIN

G

GENERAL NOTES

DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.

4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND

AS DIRECTED BY THE CONTRACTING OFFICER.

EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS

5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO

CEILING, ROOF, EQUIPMENT, PIPE, DUCT AND ELECTRICAL ITEMS.

PREVENTION SYSTEM WITH NO ADDITIONAL COST TO THE GOVERNMENT SUCH AS WALLS,

ITEMS TO MAKE WAY FOR THE INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE

18. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE AND REINSTALL THE OBSTRUCTED

SPECIFICATIONS.

CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT

OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON

SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS

17. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL

9. ANY PIPES THAT PENETRATE FIRE RATED WALLS (EXISTING/ NEW) SHALL BE SEALED PER SPEC.

TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.

EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED

14. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW

AND SHALL BE VERIFIED AT THE JOB SITE.

2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC, ARE APPROXIMATE

PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.

ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER

FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR

3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE

CONTRACTING OFFICER’S APPROVAL.

REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR

IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S

PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.

EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R

1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,

A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.

10. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.

THE REQUIREMENTS OF SEAL CLASS C.

TO SMACNA STATIC PRESSURE CONSTRUCTION CLASS 500PA AND DUCTWORK SHALL MEET

7. THE SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING

START OF CONSTRUCTION.

PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW AND THE USER, PRIOR TO THE

USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING

SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE

FACILITY BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR

19. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, IF IT IS REQUIRED THAT THE

CONTRACTOR.

THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS

THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCT WORK, PIPING AND ETC. DAMAGES DUE TO

11. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE

NEEDED LOCATIONS.

13. ENSURE TO INSTALL LABELED ACCESS DOORS FOR ALL THE TEST AND MAINTENANCE

THE BUILDING AS SHOWN ON THE DRAWINGS.

5. AUTOMATIC WET PIPE SPRINKLER PROTECTION SYSTEM SHALL BE PROVIDED THROUGHOUT

ARE NEW AND ARE TO BE PROVIDED BY THE CONTRACTOR.

6. UNLESS OTHERWISE NOTED AS EXISTING, THE ITEMS SHOWN ON THE DRAWINGS

FOR APPROVAL.

DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION

12. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE

REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO INSTALLATION.

A COMPLETE FIRE SPRINKLER SHOP DRAWINGS BASED ON NFPA 13 AND SPECIFICATION

MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER CONTRACTOR SHALL SUBMIT

2. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS PERFORMANCE BASED WHICH

SPRINKLERS WITH O-RINGS ARE NOT PERMITTED.

SEISMIC BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS:

10. PROVIDE EARTH QUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND

14. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.

SMOKE DETECTORS AND ALL OTHER TRADES.

11. FINAL SPRINKLER HEADS LOCATIONS SHALL BE COORDINATE WITH CEILING FANS,

FIRE PREVENTION OFFICE PRIOR TO IMPLEMENTATION.

PLAN, THE CHANGE SHALL BE APPROVED TO DESIGN & TECHNICAL REVIEW BRANCH AND

15. IF FIELD CONDITIONS NECESSITATE SIGNIFICANT CHANGE FROM APPROVED

VERIFICATION.

FAILURE TO DO THIS WILL REQUIRE THE CONTRACTOR TO RE-EXPOSE THE PIPING FOR

PIPE THAT SUPPLIES THE AUTOMATIC FIRE EXTINGUISHING SYSTEM / STANDPIPE SYSTEM.

16. THE FIRE INSPECTOR SHALL PERFORM A VISUAL INSPECTION OF ALL UNDERGROUND

SPRINKLER HEAD IN THE SYSTEM.

RISER WILL RESULT IN FLUSHING THE ABOVEGROUND SPRINKLER SYSTEM THROUGH EVERY

SYSTEM. FAILURE TO FLUSH UNDERGROUND FIRE LINE PRIOR TO "STACKING" THE SPRINKLER

GROUND PIPES WHICH SUPPLY THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM/ STANDPIPE

18. THE FIRE INSPECTOR MUST WITNESS A HYDROSTATIC TEST AND FLUSH OF ALL UNDER-

PREVENTION OFFICE TO COORDINATE INSPECTION OF MATERIAL.

PRIOR TO INSTALLATION TO VERIFY COMPLIANCE WITH STANDARDS. CONTACT FIRE

20. ALL EQUIPMENT AND PIPING MUST BE INSPECTED BY THE FIRE PREVENTION OFFICE

SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".

15. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL

ADDITIONAL COST TO THE PROJECT CONTRACT.

THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO

O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.

16. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR

PROJECTS, KOREA (REVISION 1 - 20151030)".

ENGINEERING AS INDICATED ON "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA

BY A REGISTERED PROFESSIONAL ENGINEER LICENSED TO PRACTICE FIRE PROTECTION

AND SEALED BY A U.S. FIRE PROTECTION ENGINEER (NICET), LEVEL III OR IV AND STAMPED

SYSTEM COMPLETE WITH HYDRAULIC CALCULATIONS AND FINAL DESIGN DRAWINGS SIGNED

8. THE FIRE SPRINKLER SYSTEM CONTRACTOR IS TO PROVIDE A COMPLETE ENGINEERED

REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.

13. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL

FIRE PROTECTION GENERAL NOTES

SUCH AS ANCHORS, HANGERS, SUPPORTS, ETC.

8. ALL PIPES, DRAINS AND DUCTWORK TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES

SYSTEM THROUGHOUT THE BUILDING TO FULLY PROTECT THIS FACILITY.

1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER

YI, TONG KI

12 JUN 17

DRAWINGS AND SPECIFICATIONS.

7. THE FIRE SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET THE INTENT OF THE

LIGHTING AND HVAC OUTLETS FOR THE SPRINKLER’S EXACT LOCATION.

4.THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL’S CEILING PLAN,

ETC. FAILURE TO INSPECTION WILL RESULT IN RESCHEDULING INSPECTION.

SPRINKLER PIPE, NAIL PLATES IF REQUIRED, LOCATION OF FIRE DEPARTMENT CONNECTIONS, CLIPS IF REQUIRED, PLACEMENT & TYPE OF SPRINKLER HEADS, FIRE CAULKING AROUND

19. AT THE TIME OF THE TEST, THE INSPECTOR SHALL CHECK PIPE SIZE, PIPE HANGERS, SURGE

AND EQUIPMENT LISTINGS.

ACCORDANCE WITH NEPA 13 & 13R, UFC 3-600-1, MANUFACTURER’S RECOMMENDATIONS

SHOWN IN SUGGESTED LOCATIONS. FINAL QUANTITY AND LAYOUT SHALL BE IN

3. THE EQUIPMENT, VALVES, PIPING, HEADS AND OTHER ACCESSORIES & PARTS ARE

SHOP DRAWINGS.

SYSTEM. THE HYDRANT LOCATIONS, FLOW TESTS AND DATE SHALL BE INDICATED ON THE

BASED ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATE TO DESIGN THE SPRINKLER

17. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT

AS ORIGINALLY INTENDED.

AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY DUCT CONNECTION TO FUNCTION

ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION, REMOVE THE EXISTING DUCTWORK

& LOCATION PRIOR TO INSTALL NEW HAVC AND PLUMBING PIPING. IF THE EXISTING DUCT

6. THE CONTRACTOR SHALL COORDINATE WITH THE EXISTING DUCTWORK AND PIPING ELEVATION

PANELS AND DOORS.

TO BE VISIBLE AND ACCESSIBLE FROM THE FLOOR WITHOUT HAVING TO REMOTE CEILING

FOR MECH. ROOMS AND OTHER UTILITY ROOMS. SHUT-OFF VALVES SHALL BE INSTALLED

12. ALL SPRINKLER PIPING IN FINISHED AREAS SHALL BE CONCEALED FOR VIEW EXCEPT

TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".

9. ALL EQUIPMENT SHALL BE UL LISTED AND/ OR FM APPROVED AS INDICATED ON "STANDARD

CONSTRUCTION.

20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

34 73

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

GENERAL NOTES

M-3

D - 17 - 11

NAM, TAE CHIN

G

7. THE CONTRACTOR SHALL PERFORM THE TRAINING ABOUT GAS SUPPLY SYSTEM TO O&M DIVISION.

AND GAS PIPING LINES TO DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.

5. THE CONTRACTOR SHALL SUBMIT THE DETAILED SHOP DRAWING OF GAS DISTRIBUTION SYSTEM

NAM, TAE CHIN

US ORIGIN MATERIALS:

AS INDICATED ON THE DRAWINGS.

INTERNET SITE HTTP:// WWW.CCKBID.COM). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE

DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT

REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS",

ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL

NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION.

TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)" SECTION 33 51 15,

1. GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE AS WELL AS "STANDARD

20151030)" SECTION 33 51 15, PART 2 PRODUCTS.

AS WELL AS "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 -

2. ALL MATERIALS OF GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE

THE DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.

6. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION OF GAS DISTRIBUTION SYSTEM TO

GAS DISTRIBUTION GENERAL NOTES

ADJUSTMENTS, RELOCATIONS AND/ OR REPAIRS WILL BE MADE AT THE CONTRACTOR’S COST.

AS A RESULT OF THE CONTRACTOR’S CONSTRUCTION. ALL DAMAGE TO GAS FACILITIES REQUIRING

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO GAS FACILITIES DURING OR

SCOPE OF WORK

WORK CLASS: "L" (CONSTRUCTION / ALTERATION WORK)

ACCESSORIES.

8. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR THE INSTALLATIONS OF GAS PIPING AND

9. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR GAS PIPING SIZE.

TO D&TR BRANCH THROUGH THE COR.

10. THE CONTRACTOR SHALL PERFORM A GAS LEAKING TEST AND SUBMIT THE GAS LEAKING TEST REPORT

GENERAL NOTES AND SCOPE OF WORK

YI, TONG KI

12 JUN 17

5. CONTRACTOR SHALL REMOVE ALL DDC SYSTEM INSTALLED BY JOHNSON CONTROL.

COSTS WITH EXISTING (OR NEW) DDC SYSTEM INSTALLED BY JOHNSON CONTROL.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL & REINSTALLATION AND ALL ASSOCIATED

4. INSTALL NEW WET PIPE FIRE SPRINKLER SYSTEM WITH ALL NECESSARY ACCESSORIES AND PARTS.

CODES AND REGULATIONS TO COMPLETE SUBJECT PROJECT CONSTRUCTION. )

FROM NOT SHOWN OR/AND INDICATED IN THE CONCEPTUAL DRAWINGS TO MEET WITH APPLICABLE

PURPOSE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL OTHER ADDITIONAL COST CAUSED

(THE FIRE SPRINKLER SYSTEM ROUTING AND PIPE SIZES SHOWN ARE CONCEPTUAL FOR IGCE

WALL CAPS, INSULATION AND ALL NECESSARY ACCESSORIES AND PARTS.

CEILING EXHAUST FANS, ROOF VENTILATORS, RANGE HOODS, ASSOCIATED DUCTWORK, DAMPERS,

2. REPLACE EXISTING VENTILATING SYSTEM WITH NEW ONE INCLUDING WALL EXHAUST FANS,

ASSEMBLY, DAMPERS, PIPING AND ALL NECESSARY ACCESSORIES AND PARTS.

HEATERS, CONCRETE PADS, INSULATION, SMOKE STACKS, VALVES, GAUGES, GAS LINE & TRAIN

UNITS, A/C UNIT, THERMOSTATS, AIR INTAKE LOUVERS, OARC, ACCESS DOORS, ELECTRIC UNIT

HEATING BOILER, WATER CIRCULATING PUMP, EXPANSION TANKS, AIR SEPARATORS, FAN COIL

1. REPLACE EXISTING HEATING AND COOLING SYSTEM WITH NEW ONE INCLUDING HOT WATER

AND PARTS.

SERVICE BOXES, ACCESS DOORS, VALVES, GAUGES, WATER PIPING AND ALL NECESSARY ACCESSORIES

ASSEMBLY, BACKFLOW PREVENTER & PRESSURE REDUCING STATION, CONCRETE PADS, WASHER

VENT PIPING, DOMESTIC WATER PIPING, SMOKE STACK, DAMPERS, INSULATION, GAS LINE & TRAIN

HOT WATER CIRCULATING PUMPS, DOMESTIC WATER STORAGE TANK, PLUMBING FIXTURES, SEWER &

3. REPLACE EXISTING PLUMBING SYSTEM WITH NEW ONE INCLUDING DOMESTIC WATER HEATER, CAMP CARROLL

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FACILITY SHARE OF THE EXPENSES.

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

35 73

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-4

D - 17 - 11

G

MECHANICAL

EXISTING / REMOVAL HVAC PLAN

UP

DN.

UP

UP

T

T

T

T

T T

T T T

T

T

T T

TTT

T

T

T

T T

T T

TT

REMOVE EXISTING CEILING EXHAUST FANS & DUCTWORK

ROOF VENTILATORS & DUCTWORK

REMOVE EXISTING CEILING EXHAUST FANS,

P-1

EXISTING / REMOVAL HVAC PIPING PLAN

SCALE : 1 / 100

1st FLOOR

2nd FLOOR

EXISTING CONC. PAD AND FENCE TO REMAIN

36 73

M-5

P-1

M-7

SEE FOR MECH. ROOM HVAC REMOVAL PLAN

N

YI, TONG KI

12 JUN 17

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

LEGEND

TO BE REMOVED

SPECIFIC NOTES

& PIPING SHALL BE VERIFIED IN FIELD.

THEREFORE, EXACT SIZE, LOCATION AND DIRECTION OF HVAC DUCT

1. EXISTING HAVC PLANS MAY NOT EXACTLY MATCH THE FIELD AND

SHALL BE PATCHED AND FILLED OR RESTORED.

2. THE OPENING RESULTING FROM THE REMOVAL OF HVAC UNITS

FRESH AIR INTAKE DUCTWORK AND PIPING

REMOVE EXISTING FAN COIL UNITS, THERMOSTATS

PIPING & ACCESSORIES TO REMAIN

EXISTING AIR COOLED CHILLER W/ ASSOCIATED

FRESH AIR INTAKE DUCTWORK AND PIPING

REMOVE EXISTING FAN COIL UNITS, THERMOSTATS

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-5

D - 17 - 11

SHEET OF

DN. DN.

4"

MECHANICAL

UP UP

DOMESTIC WATER PIPING, SEWER & VENT PIPING

REMOVE EXISTING PLUMBING FIXTURES,

P-1

P-1 EXISTING / REMOVAL PLUMBING PIPING PLAN

SCALE : 1 / 100

1ST FLOOR

2ND FLOOR

DOMESTIC WATER PIPING, SEWER & VENT PIPING

REMOVE EXISTING PLUMBING FIXTURES,

TO REMAIN

EXISTING SEWER LINE

37 73

M-6

EXISTING / REMOVAL PLUMBING PLAN

M-7

SEE FOR MECH. ROOM PLUMBING REMOVAL PLAN

N

YI, TONG KI

12 JUN 17

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

SPECIFIC NOTES

SEWER, VENT AND DOMESTIC WATER PIPING SHALL BE VERIFIED IN FIELD.

FIELD AND THEREFORE, EXACT SIZE, LOCATION AND DIRECTION OF

1. EXISTING PLUMBING PIPING PLANS MAY NOT EXACTLY MATCH THE

PIPING SHALL BE PATCHED AND FILLED OR RESTORED.

2. THE OPENING RESULTING FROM THE REMOVAL OF SMOKE STACK AND

LEGEND

TO BE REMOVED

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-6

D - 17 - 11

EXISTING CONC. PAD AND FENCE TO REMAIN

N

EXISTING MAIN GAS PIPING TO REMAIN

EXISTING AUTO EMERGENCY SHUT-OFF VALVE TO REMAIN

EXISTING GAS METER & REGULATOR ASSEMBLY CABINET TO REMAIN

EXISTING GAS ALARM GONG TO REMAIN

P-1

SCALE : 1 / 20

EXISTING / REMOVAL MECH. ROOM PARTIAL PLAN

UP UP

KEY PLAN

REMOVE AND REINSTALL EXISTING CIRCULATING PUMP

ACCESSORIES AND PARTS.

OARC, GAS LINE & TRAIN ASSEMBLY, INSULATION AND ASSOCIATED

GAUGES, VALVES, SMOKE STACK & DAMPER, EXHAUST FAN, THERMOSTATS,

CONC. PAD, PUMP, EXPANSION TANK, AIR SEPARATOR, PIPES, UNIT HEATER,

REMOVE EXISTING HVAC SYSTEM INCLUDING HOT WATER BOILER &

EXISTING GAS LEAK DETECTION CONTROL PANEL TO REMAIN

M

SPECIFIC NOTES

SEE SPECIFIC NOTES

REMOVE EXISTING MAIN WATER LINE (FROM WATER GATE VALVE TO MECH. ROOM)

THE WATER LINE.

2. TURN OFF THE EXISTING WATER GATE VALVE BEFORE REMOVING

EXISTING GAS LEAK DETECTOR TO REMAIN

38 73

MECH. ROOM PARTIAL PLAN

EXISTING / REMOVAL

M-7

YI, TONG KI

12 JUN 17

GRAPHIC SCALE

SCALE: 1 : 20

200 400 800mm

& PIPING SHALL BE VERIFIED IN FIELD.

THEREFORE, EXACT SIZE, LOCATION AND DIRECTION OF HVAC DUCT

1. EXISTING HAVC PLANS MAY NOT EXACTLY MATCH THE FIELD AND

AND PARTS.

GAS LINES & TRAIN ASSEMBLY, INSULATION AND ASSOCIATED ACCESSORIES

VALVES, HOT WATER STORAGE TANK, BACKFLOW PREVENTION ASSEMBLY,

HEATER & CONC. PAD, PUMPS, PIPES, GAUGES, SMOKE STACK & DAMPER,

REMOVE EXISTING PLUMBING SYSTEM INCLUDING DOMESTIC WATER

PIPING & ACCESSORIES TO REMAIN

EXISTING AIR COOLED CHILLER W/ ASSOCIATED

SHALL BE PATCHED AND FILLED OR RESTORED.

3. THE OPENING RESULTING FROM THE REMOVAL OF UNITS & PIPES

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-7

D - 17 - 11

2ND FLOOR

1ST FLOOR

D-1

NOT TO SCALE

REFRIGERANT PIPE DETAIL

12"x2" FAIL

60 CFM

10"x2" FAIL

30 CFM

10"x2" FAIL

30 CFM

12"x2" FAIL

60 CFM

10"x2" FAIL

30 CFM

10"x2" FAIL

30 CFM

10"x2" FAIL

30 CFM

12"x2" FAIL

60 CFM

12"x2" FAIL

60 CFM

12"x2" FAIL

60 CFM

10"x2" FAIL

30 CFM

11 11 13

11 1113 13 13

SPLIT TYPE A/C UNIT

L E G E N D

(SIZE : 600 x 600)

CEILING ACCESS DOOR

4" PVC PIPE

INSULATED SUCTION LINE

LIQUID LINE

D-1

-SEE

DN.DN.

UP UP

ELECTRIC UNIT HEATER

12"x2" FAIL

60 CFM

39 73

P-1

M-8

NEW HVAC PIPING PLAN

NEW HVAC PIPING PLAN

SCALE : 1 / 100

M-8

M-8

25, 25, 25 25, 20, 20

25, 25, 25

20, 20

65, 65

25, 20, 20

20, 20, 25 25, 25, 25

25, 20, 2025, 25, 2525, 25, 252525, 25, 2520, 20, 25

Tch

TchTch

Tch

Tch

Tch

Tch

Tch

Tch Tch

TchTch

(TYP. OF 24EA)

FOR FCU

THERMOSTAT

N

YI, TONG KI

12 JUN 17

P-1

- M-17

PIPING PARTIAL PLAN

SEE NEW MECH. ROOM

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

SPECIFIC NOTES

FROM / TO 2ND FLOOR CEILING (TYP.)

HVAC WATER PIPES

10"x2" FAIL

30 CFM

12"x2" FAIL

60 CFM

12"x2" FAIL

60 CFM

10"x2" FAIL

30 CFM

10"x2" FAIL

30 CFM

12"x2" FAIL

60 CFM

10"x2" FAIL

30 CFM

12"x2" FAIL

60 CFM

10"x2" FAIL

30 CFM

10"x2" FAIL

30 CFM

12"x2" FAIL

60 CFM

12"x2" FAIL

60 CFM

13 13

12 14 13

11 11

LOOP

EXPANSION

CH / HWS

CH / HWR

CH / HWS

CH / HWR

C H

/ H

W S

C H

/ H

W R

CH / HWS

CH / HWR

CH / HWS

CH / HWR

CH / HWS

CH / HWR

C H

/ H

W S

C H

/ H

W R

CH / HWS

CH / HWR

CH / HWS

CH / HWR CH / HWR

65, 65

32, 3232, 3220, 2032, 32

25, 25

32, 32

25, 25

32, 32

25, 20, 2025, 25, 25

25, 25, 25

20, 20

20, 20

25, 20, 20

25, 25

20, 20, 25

32, 32

25, 25, 25

25, 20, 2025, 25, 2525, 25, 252525, 25, 2520, 20, 25

50, 65 40, 65

25 32

Tch Tch

Tch Tch

Tch

Tch

Tch

TchTch

TchTchTch

TO / FROM MECH. RM (TYP.)

HVAC WATER PIPES

25 2525

25 25 25 25 25

UNIT HEATER

ELECTRIC

COLOR AND KEY-TYPE.

2. THERMOSTAT GUARDS FOR FAN COIL UNITS IN EACH ROOM SHALL BE TRANSPARENT

MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.

1. SIZES AND LAYOUTS OF FRESH AIR INTAKE LOUVERS MAY CHANGE DEPENDING ON

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-8

D - 17 - 11

NOTES

M

IN

m m

SHALL BE PLACED 2000mm ABOVE THE GROUND LEVEL.

FRESH AIR INTAKE LOUVERS FOR FAN COIL UNITS ON THE 1ST FLOOR WALL

12" x 2"

12" x 2"

12" x 2"10" x 2"

10" x 2"

10" x 2"

10" x 2"

12" x 2" 10" x 2"

10" x 2" 12" x 2"

12" x 2"

12" x 2"

12" x 2"

12" x 2"

12" x 2"12" x 2"

12" x 2"

10" x 2"

10" x 2"

10" x 2"10" x 2"

10" x 2"

10" x 2"

40 73

ELEVATION FOR FRESH AIR INTAKE LOUVERS

- M-9 SCALE : 1 / 50

E-2

- M-9 SCALE : 1 / 50

E-1 ELEVATION FOR FRESH AIR INTAKE LOUVERS - FRONT

ELEVATION FOR FRESH AIR INTAKE LOUVERS - REAR

KEY PLAN

M-9

-E-2

-E-1 M-9

W/ INSECT NET (TYP.)

FRESH AIR INTAKE LOUVER

YI, TONG KI

12 JUN 17

GRAPHIC SCALE

1000 2000mm

SCALE: 1 : 50

CAMP CARROLL

S-83

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-9

D - 17 - 11

65, 25

65, 32

, 6

40, 65

50, 65

50, 50

50, 50

65, 50

50, 50

, 6

40, 65

32, 65

20, 65

20, 20

, 2

, 2 0, , 2

, 2

, 2 0, , 2 5, , 3

, 2

, 2 0, , 2 5, , 3

, 2 5, , 3

EXP

ANSIO

N

LO

OP

, 2

, 2 5, , 3

, 2 0, , 2

, 2 5, , 3

, 2 0, , 2

, 3

, 2 5, FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

11FCU

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

FC

U

SP

LIT

T

YP

E

A/C U

NIT

CH

/ H

WS

CH

/ H

WR

CH

/ H

WS

CH

/ H

WR

CH

/ H

WS

CH

/ H

WR

CH

/ H

WS

CH

/ H

WR

CH

/ H

WS

CH

/ H

WR

CH

/ H

WR

CH / HWS

CH / HWR

CH / HWS

CH / HWR

, 6

, 3

EXISTING / REMOVAL HVAC PLAN

MECHANICAL-

HVAC PIPING ISOMETRIC DIAGRAMI-1

NOT TO SCALEM-10

YI, TONG KI

12 JUN 17

TO

FR

OM

MEC

H.

RM

(TY

P.)

HVAC

WAT

ER

P

IPE

S

CH / HWS

CH / HWR

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

41 73

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-10

D - 17 - 11

1ST FLOOR

2ND FLOOR

MECHANICAL

D

D

D D

DD

D

D

D

DD

D

(TYP. OF 12 EA)

CEILING EXHAUST FAN 18 ROOF EXHAUST VENTILATOR 18 ROOF EXHAUST VENTILATOR

FROM 1ST FLOOR

DUCT RISER

300x150 EXHAUST

VENTILATOR

ROOF EXHAUST

DUCT RISER UP TO

300x200 EXHAUST

UP TO 2ND FLOOR

300x150 EXHAUST DUCT RISER

UP TO 2ND FLOOR

DUCT RISER

300x150 EXHAUST

UP TO 2ND FLOOR

DUCT RISER

300x150 EXHAUST

300x100

VENTILATOR

ROOF EXHAUST

DUCT RISER UP TO

300x200 EXHAUST 300x100

300x100300x100

300x100

300x100300x200

19 ROOF EXHAUST VENTILATOR

J

DUCT W/ WALL CAP

150 RANGE HOOD EXHAUST

J

W/ WALL CAP

200 FLEXIBLE DUCT

(TYP. OF 12 EA)

RANGE HOOD

20 WALL EXHAUST FAN

T

THERMOSTAT FOR WALL EXHAUST FAN

DN.DN.

UP UP

- NOT TO SCALE

TYPICAL SECTION FOR EXHAUST DUCT

BATH ROOM BATH ROOM

BATH ROOMBATH ROOM

2nd FL

1st FL

ROOF EXHAUST VENTILATOR

CEILING EXHAUST FAN

CEILING LINE

CEILING LINE

ROOF TOP

P-1

M-11

NEW VENTILATION PLAN

SCALE : 1 / 100

M-11

S-1

NEW VENTILATION PLAN AND SECTION

N

YI, TONG KI

12 JUN 17

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

SPECIFIC NOTES

2. INSTALL VOLUME DAMPER AT EACH BRANCH DUCT CONNECTION.

3. FIRE DAMPER SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 90A.

MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.

1. SIZES AND LAYOUTS OF DUCTWORK MAY CHANGE DEPENDING ON

BE PROVIDED IN CEILING FOR DUCT ACCESS DOORS, DAMPERS, ETC.

4. WHERE DUCTS ARE INSTALLED ABOVE CEILING, ACCESS PANELS SHALL

DIMENSION AT THE ELBOW EQUALS OR EXCEEDS 300MM.

VANES SHALL ALSO BE INSTALLED AT ROUND ELBOWS WHEN A DUCT

5. TURNING VANES SHALL BE INSTALLED IN ALL SQUARE ELBOWS. TURNING

BY ASHRAE HANDBOOKS, AND NFPA 90-A.

DUCT CONSTRUCTION STANDARDS BY SMACNA, INDUSTRIAL VENTILATION

6. OTHER DUCT WORK DETAILS NOT SHOWN SHALL CONFORM TO HVAC

J

W/ WALL CAP

(UL 2158A LISTED)

100 FLEXIBLE DUCT

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

42 73

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-11

D - 17 - 11

1ST FLOOR

2ND FLOOR

VTR

80x100

VTR

80x100

VTR

80x100

VTR

80x100

DN.DN.

UP UP

100 100

P-5

P-11

P-4

P-1

P-3

P-10

P-10

P-5 P-5

P-5

P-5 P-5

P-5

P-5

P-5

P-5

P-5

P-5

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1 P-1

P-1

P-4

P-3

P-3

P-3

P-3

P-3

P-3

P-3

P-3

P-3

P-3

P-3

P-11

P-11

P-11 P-11

P-11

50 FCO

100 100100

150 FCO

100 FCO

80 FCO

80 FCO

50 FD

100 FCO

P-4

50 50

50 FCO

100 FCO

80 FCO

80 FCO

80 FCO

50 FD

50 FD

50 FD 50 FD

50 FD

50 FD

50 FD

100, 80

100, 80 100, 80

100, 80

50, 50

P-11P-11

P-11

P-11 P-11

P-11

50 FD

TO REMAIN

EXISTING SEWER LINE

FOR CONT., SEE CIVIL DWG

6" SEWER MAIN PIPE

50 50

50 50

100, 80

100, 80

100, 80

100, 80

50, 50

50100

100 FCO

100 FCO

50 FD

100 FCO

50 FD

100 FCO

FD

100 FCO

50 FD

43 73

NEW SEWER AND VENT PIPING PLAN

P-1

SCALE : 1 / 100

NEW SEWER AND VENT PIPING PLAN

M-12

N

YI, TONG KI

12 JUN 17

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

SYMBOL DESCRIPTION QTY. REMARKS

P-1

P-5

C.W. H.W. WASTE

VENT

WATER CLOSET

15 50

PLUMBING FIXTURE SCHEDULE

P-4 50

(NOT EXCEED 3.5 LITERS PER FLUSH /

FLUSH TANK TYPE

WATER EFFICIENT TOILET)

COUNTER TOP TYPELAVATORY

BATHTUBP-3

SINK, KITCHEN

P-10

P-11

SINK, LAUNDRY

CLOTHES WASHER 15 50

WHITE VITREOUS CHINA OR 302 STAINLESS STEEL TYPE

15 20 50 50

80 FCO

100 FCO

100 FCO100 FCO

ACRYLIC BATHTUB CONFORMING TO KS F 4806,

EXPOSED TYPE FAUCET

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-12

D - 17 - 11

P-5

P- 3 P-

P-4

P-11

50 FD

F

D P-

P-

P-4

P-11

P-

5 100 FCO

P-

F

D

F

CO

F

CO

F

CO

F

CO

P-5 50 F

CO

F

CO

F

CO

P-11 80 F

CO

P-4

P-

P-

P-

P-1

50 FD

50 FD

F

COP-11

P-4

P-5

P-5

P-10

P-10

F

D

100 FCO

P-

P-

P-

F

CO

F

CO

P-11

P-

50 FD

F

CO

F

CO

P-

P-

50 FD

TO REMAIN

SEWER LINE

EXISTING

P-5

P-11

P-4 P-

P-

P-

P-

50 FD

50 FD

100 FCO

100 FCO

P-11

P-4

P-5

F

CO

P-

F

D

P-4 P-5

P- 11 P-11

P-3

P-1

P-4

50 FD

P-5

P-11

P-

P-

P-

P-

F

D

F

CO

50 FD

F

CO

P-4

P-5

P-11

P-5

P-5

50 50

100, 80

100, 80

50 50

P-

V

TR

RE

DUCER

x80

V

TR

RE

DUCER

TR

RE

DUCER

TR

RE

DUCER

100, 80

100, 80

100, 80

100, 80

100, 80

100, 80

50 50

100 FCO

, 5

, 5

F

CO

8050 50

P-

F

D

44 73

SEWER & VENT PIPING ISOMETRIC DIAGRAM

I-1

NOT TO SCALE

SEWER & VENT PIPING ISOMETRIC DIAGRAM

M-13

YI, TONG KI

12 JUN 17

SYMBOL DESCRIPTION QTY. REMARKS

P-1

P-5

C.W. H.W. WASTE

VENT

WATER CLOSET

15 50

PLUMBING FIXTURE SCHEDULE

P-4 50

(NOT EXCEED 3.5 LITERS PER FLUSH /

FLUSH TANK TYPE

WATER EFFICIENT TOILET)

COUNTER TOP TYPELAVATORY

BATHTUBP-3

SINK, KITCHEN

P-10

P-11

SINK, LAUNDRY

CLOTHES WASHER 15 50

WHITE VITREOUS CHINA OR 302 STAINLESS STEEL TYPE

15 20 50 50

ACRYLIC BATHTUB CONFORMING TO KS F 4806,

EXPOSED TYPE FAUCET

CAMP CARROLL

HS-00658-5J

THAAD/ 2-1 ADA BATTERIES

REPAIR BARRACKS BLDG. #83 FOR

HGF

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-13

D - 17 - 11

File details come from the government source that posted it. Updated .