PWS_Attachments.xls
XLS spreadsheet 719 KB Posted
- Solicitation number
- W91QVN17R0149
About this file
Attachment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-17-R-0149.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8.2 ATT#1
| LOADING DATE | LOADING JULIAN DATE | OFFLOADING DATE | OFFLOADING JULIAN DATE | PRODUCT | GALLON | NO# | FROM | TO | REMARKS | DISTANCE (KM) |
| 1"-"Oct"-"13 | 3274 | 4"-"Oct"-"13 | 3277 | JP8 | 54,000 | 4 | YECHON | WAEGWAN | SLUDGE FOUND | 123.8 |
| 7"-"Oct"-"13 | 3280 | 10"-"Oct"-"13 | 3283 | JP8 | 112,000 | 8 | WAEGWAN | DAEGU | 51.1 | |
| 14"-"Oct"-"13 | 3287 | 16"-"Oct"-"13 | 3289 | JP8 | 112,000 | 8 | WAEGWAN | DAEGU | 51.1 | |
| 21"-"Oct"-"13 | 3294 | 23"-"Oct"-"13 | 3296 | JP8 | 112,000 | 8 | WAEGWAN | DAEGU | 51.1 | |
| 5"-"Nov"-"13 | 3309 | 8"-"Nov"-"13 | 3312 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 12"-"Nov"-"13 | 3316 | 15"-"Nov"-"13 | 3319 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 19"-"Nov"-"13 | 3323 | 22"-"Nov"-"13 | 3326 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 26"-"Nov"-"13 | 3330 | 29"-"Nov"-"13 | 3333 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 3"-"Dec"-"13 | 3337 | 6"-"Dec"-"13 | 3340 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 10"-"Dec"-"13 | 3344 | 30"-"Dec"-"13 | 3364 | JP8 | 84,000 | 6 | YECHON | OSAN | KORAIL STRIKE | 277.5 |
| 7"-"Jan"-"14 | 4007 | 10"-"Jan"-"14 | 4010 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 15"-"Jan"-"14 | 4015 | 17"-"Jan"-"14 | 4017 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 21"-"Jan"-"14 | 4021 | 25"-"Jan"-"14 | 4025 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 5"-"Feb"-"14 | 4036 | 7"-"Feb"-"14 | 4038 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 12"-"Feb"-"14 | 4043 | 14"-"Feb"-"14 | 4045 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 18"-"Feb"-"14 | 4049 | 21"-"Feb"-"14 | 4052 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 25"-"Feb"-"14 | 4056 | 28"-"Feb"-"14 | 4059 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 3"-"Mar"-"14 | 4062 | 7"-"Mar"-"14 | 4066 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 11"-"Mar"-"14 | 4070 | 14"-"Mar"-"14 | 4073 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 17"-"Mar"-"14 | 4076 | 21"-"Mar"-"14 | 4080 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 25"-"Mar"-"14 | 4084 | 28"-"Mar"-"14 | 4087 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 1"-"Apr"-"14 | 4091 | 4"-"Apr"-"14 | 4094 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 8"-"Apr"-"14 | 4098 | 11"-"Apr"-"14 | 4101 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 15"-"Apr"-"14 | 4105 | 18"-"Apr"-"14 | 4108 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 22"-"Apr"-"14 | 4112 | 28"-"Apr"-"14 | 4118 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 7"-"May"-"14 | 4127 | 9"-"May"-"14 | 4129 | JP8 | 98,000 | 7 | YECHON | OSAN | 277.5 | |
| 14"-"May"-"14 | 4134 | 16"-"May"-"14 | 4136 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 21"-"May"-"14 | 4141 | 23"-"May"-"14 | 4143 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 28"-"May"-"14 | 4148 | 30"-"May"-"14 | 4150 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 5"-"Jun"-"14 | 4156 | 9"-"Jun"-"14 | 4160 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 13"-"Jun"-"14 | 4164 | 16"-"Jun"-"14 | 4167 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 23"-"Jun"-"14 | 4174 | 27"-"Jun"-"14 | 4178 | JP8 | 70,000 | 5 | YECHON | DONGDUCHON | 273.7 | |
| 2"-"Jul"-"14 | 4183 | 8"-"Jul"-"14 | 4189 | JP8 | 70,000 | 5 | YECHON | DONGDUCHON | 273.7 | |
| 14"-"Jul"-"14 | 4195 | 18"-"Jul"-"14 | 4199 | JP8 | 70,000 | 5 | YECHON | DONGDUCHON | 273.7 | |
| 23"-"Jul"-"14 | 4204 | 25"-"Jul"-"14 | 4206 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 12"-"Aug"-"14 | 4224 | 14"-"Aug"-"14 | 4226 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 18"-"Aug"-"14 | 4230 | 20"-"Aug"-"14 | 4232 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 22"-"Aug"-"14 | 4234 | 28"-"Aug"-"14 | 4240 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | 353.0 | |
| 16"-"Sep"-"14 | 4259 | 19"-"Sep"-"14 | 4262 | JP8 | 112,000 | 8 | YECHON | OSAN | 277.5 | |
| 23"-"Sep"-"14 | 4266 | 26"-"Sep"-"14 | 4269 | JP8 | 112,000 | 8 | YECHON | OSAN | 277.5 | |
| 8"-"Oct"-"14 | 4281 | 10"-"Oct"-"14 | 4283 | JP8 | 112,000 | 8 | YECHON | OSAN | 277.5 | |
| 14"-"Oct"-"14 | 4287 | 17"-"Oct"-"14 | 4290 | JP8 | 112,000 | 8 | YECHON | OSAN | 277.5 | |
| 24"-"Oct"-"14 | 4297 | 30"-"Oct"-"14 | 4303 | JP8 | 112,000 | 8 | YECHON | OSAN | 277.5 | |
| 4"-"Nov"-"14 | 4308 | 7"-"Nov"-"14 | 4311 | JP8 | 112,000 | 8 | YECHON | OSAN | 277.5 | |
| 18"-"Nov"-"14 | 4322 | 21"-"Nov"-"14 | 4325 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 2"-"Dec"-"14 | 4336 | 5"-"Dec"-"14 | 4339 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 16"-"Dec"-"14 | 4350 | 19"-"Dec"-"14 | 4353 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 23"-"Dec"-"14 | 4357 | 26"-"Dec"-"14 | 4360 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 5"-"Jan"-"15 | 5005 | 8"-"Jan"-"15 | 5008 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | 353.0 | |
| 13"-"Jan"-"15 | 5013 | 16"-"Jan"-"15 | 5016 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 21"-"Jan"-"15 | 5021 | 23"-"Jan"-"15 | 5023 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 3"-"Feb"-"15 | 5034 | 6"-"Feb"-"15 | 5037 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 9"-"Feb"-"15 | 5040 | 12"-"Feb"-"15 | 5043 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 10"-"Feb"-"15 | 5041 | 11"-"Feb"-"15 | 5042 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 23"-"Feb"-"15 | 5054 | 25"-"Feb"-"15 | 5056 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 24"-"Feb"-"15 | 5055 | 25"-"Feb"-"15 | 5056 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 2"-"Mar"-"15 | 5061 | 4"-"Mar"-"15 | 5063 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 3"-"Mar"-"15 | 5062 | 4"-"Mar"-"15 | 5063 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 9"-"Mar"-"15 | 5068 | 11"-"Mar"-"15 | 5070 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 10"-"Mar"-"15 | 5069 | 11"-"Mar"-"15 | 5071 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 16"-"Mar"-"15 | 5075 | 19"-"Mar"-"15 | 5078 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | 353.0 | |
| 18"-"Mar"-"15 | 5077 | 20"-"Mar"-"15 | 5079 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 23"-"Mar"-"15 | 5082 | 25"-"Mar"-"15 | 5084 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 24"-"Mar"-"15 | 5083 | 25"-"Mar"-"15 | 5084 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 30"-"Mar"-"15 | 5089 | 2"-"Apr"-"15 | 5092 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 31"-"Mar"-"15 | 5090 | 2"-"Apr"-"15 | 5092 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 6"-"Apr"-"15 | 5096 | 8"-"Apr"-"15 | 5098 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 7"-"Apr"-"15 | 5097 | 8"-"Apr"-"15 | 5098 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 13"-"Apr"-"15 | 5103 | 15"-"Apr"-"15 | 5105 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 14"-"Apr"-"15 | 5104 | 15"-"Apr"-"15 | 5105 | JP8 | 112,000 | 8 | WAEGWAN | GWANGJU AB | 324.6 | |
| 20"-"Apr"-"15 | 5110 | 24"-"Apr"-"15 | 5114 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 21"-"Apr"-"15 | 5111 | 23"-"Apr"-"15 | 5113 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 19"-"May"-"15 | 5139 | 22"-"May"-"15 | 5142 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 26"-"May"-"15 | 5146 | 29"-"May"-"15 | 5149 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 9"-"Jun"-"15 | 5160 | 12"-"Jun"-"15 | 5163 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 16"-"Jun"-"15 | 5167 | 19"-"Jun"-"15 | 5170 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 23"-"Jun"-"15 | 5174 | 26"-"Jun"-"15 | 5177 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 14"-"Jul"-"15 | 5195 | 17"-"Jul"-"15 | 5198 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 21"-"Jul"-"15 | 5202 | 24"-"Jul"-"15 | 5205 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 4"-"Aug"-"15 | 5216 | 7"-"Aug"-"15 | 5219 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 11"-"Aug"-"15 | 5223 | 13"-"Aug"-"15 | 5225 | JP8 | 98,000 | 7 | WAEGWAN | YECHON | 123.8 | |
| 17"-"Aug"-"15 | 5229 | 20"-"Aug"-"15 | 5232 | JP8 | 98,000 | 7 | WAEGWAN | YECHON | 123.8 | |
| 25"-"Aug"-"15 | 5237 | 28"-"Aug"-"15 | 5240 | JP8 | 98,000 | 7 | WAEGWAN | YECHON | 123.8 | |
| 1"-"Sep"-"15 | 5244 | 3"-"Sep"-"15 | 5246 | JP8 | 98,000 | 7 | WAEGWAN | YECHON | 123.8 | |
| 15"-"Sep"-"15 | 5258 | 18"-"Sep"-"15 | 5261 | JP8 | 98,000 | 7 | WAEGWAN | YECHON | 123.8 | |
| 13"-"Oct"-"15 | 5286 | 16"-"Oct"-"15 | 5289 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 20"-"Oct"-"15 | 5293 | 23"-"Oct"-"15 | 5296 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 4"-"Nov"-"15 | 5308 | 6"-"Nov"-"15 | 5310 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 10"-"Nov"-"15 | 5314 | 13"-"Nov"-"15 | 5317 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 1"-"Dec"-"15 | 5335 | 4"-"Dec"-"15 | 5338 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 8"-"Dec"-"15 | 5342 | 11"-"Dec"-"15 | 5345 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 15"-"Dec"-"15 | 5349 | 18"-"Dec"-"15 | 5352 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 19"-"Jan"-"16 | 6019 | 22"-"Jan"-"16 | 6022 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | 353.0 | |
| 2"-"Feb"-"16 | 6033 | 5"-"Feb"-"16 | 6036 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 23"-"Feb"-"16 | 6054 | 26"-"Feb"-"16 | 6057 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 8"-"Mar"-"16 | 6068 | 14"-"Mar"-"16 | 6074 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | delayed due to KORAIL's schedule | 353.0 |
| 16"-"Mar"-"16 | 6076 | 18"-"Mar"-"16 | 6078 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 22"-"Mar"-"16 | 6082 | 25"-"Mar"-"16 | 6085 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 5"-"Apr"-"16 | 6096 | 8"-"Apr"-"16 | 6099 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | 353.0 | |
| 12"-"Apr"-"16 | 6103 | 15"-"Apr"-"16 | 6106 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 19"-"Apr"-"16 | 6110 | 22"-"Apr"-"16 | 6113 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 27"-"Apr"-"16 | 6118 | 29"-"Apr"-"16 | 6120 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 3"-"May"-"16 | 6124 | 6"-"May"-"16 | 6127 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 10"-"May"-"16 | 6131 | 13"-"May"-"16 | 6133 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | 353.0 | |
| 17"-"May"-"16 | 6138 | 20"-"May"-"16 | 6141 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 7"-"Jun"-"16 | 6159 | 10"-"Jun"-"16 | 6162 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 14"-"Jun"-"16 | 6166 | 17"-"Jun"-"16 | 6169 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 5"-"Jul"-"16 | 6187 | 8"-"Jul"-"16 | 6190 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 12"-"Jul"-"16 | 6194 | 15"-"Jul"-"16 | 6197 | JP8 | 112,000 | 8 | WAEGWAN | GIMHAE AB | 126.3 | |
| 19"-"Jul"-"16 | 6201 | 19"-"Jul"-"16 | 6204 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 9"-"Aug"-"16 | 6222 | 12"-"Aug"-"16 | 6225 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 16"-"Aug"-"16 | 6229 | 19"-"Aug"-"16 | 6232 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 23"-"Aug"-"16 | 6236 | 26"-"Aug"-"16 | 6239 | JP8 | 70,000 | 5 | WAEGWAN | DONGDUCHON | 353.0 | |
| 2"-"Sep"-"16 | 6246 | 7"-"Sep"-"16 | 6251 | JP8 | 112,000 | 8 | WAEGWAN | OSAN | 242.4 | |
| 5"-"Sep"-"16 | 6249 | 7"-"Sep"-"16 | 6251 | JP8 | 28,000 | 2 | WAEGWAN | OSAN | 242.4 | |
| 5"-"Sep"-"16 | 6249 | 8"-"Sep"-"16 | 6252 | JP8 | 70,000 | 5 | WAEGWAN | OSAN | 242.4 | |
| Waegwan DFSP will be closed in December 2017. | ||||||||||
| Gunsan AB rail line construction will be finished at the end of 2020. |
&A Page &P of &N LaMontagne, Marc E DLA CIV ENERGY:
How many trucks
8.3. ATT#2
&A Page &P of &N
8.4.ATT#3
8.5.ATT#4
| MIL-STD-3004D w/Change 1 | ||
| TABLE XXVI | ||
| Conversion Chart for Truck Tank (TT) Cars, Truck Tank wagons (TW), Tank & Trailer (TRR), and Intermodal Containers (IMC)) 1, 2 | ||
| LAST PRODUCT CARRIED | PRODUCT TO BE LOADED | |
| JP-4,Jet B: | ||
| Gasolines GASOHOL, MOGAS, E85,AVGAS, | Jet Fuels: |
Jet A/A-1
JP-8, F-24, JP-5,
TS-1-KS-1/R/N Jet Fuel3: JPTS RP1/RP24 JP-10/PF-14 F-76 Biodiesel Blends (< B15) DF1,DF2,DS1, DS2, ASTM D975 Biodiesel Blends (> B15) DF1,DF2,DS1, DS2, ASTMD975 FSII Lubricating Oils ULS:
DS-1,
F-76 ULS
| Lubricating Oils | NO LOAD | NO LOAD | NO LOAD | NO LOAD | NO LOAD | Steam/Dry | Stream/Dry | Stream/Dry | NO LOAD | Drain/Empty8 | Steam/Dry |
| Biodiesel Blends(<B15) |
DF1,DF2,DS1,DS2,
| ASTM D975 | Steam/Dry | Steam/Dry | NO LOAD | NO LOAD | NO LOAD | Steam/Dry | Drain/Empty | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | |
| Biodiesel Blends(>B15) DF1,DF2,DS1,DS2, | ||||||||||||
| ASTM D975 | NO LOAD | NO LOAD | NO LOAD | NO LOAD | NO LOAD | NO LOAD | Steam/Dry | Drain/Empty | NO LOAD | NO LOAD | Steam/Dry | |
| Heavy Fuel Oils, Distillate Fuels, |
ASTM D975, (No.4D),D396,(FS4,FS5, FS6), Residual Fuel Oils,
| ISO 8217,class F (IFOs) | NO LOAD | NO LOAD | NO LOAD | NO LOAD | NO LOAD | NO LOAD | Steam/Dry | Steam/Dry | NO LOAD | NO LOAD | Steam/Dry | ||
| Naphtha | Drain/Empty | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | ||
| Petroleum Solvent/Paint | |||||||||||||
| Thinner | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | Steam/Dry | ||
| NOTES: | |||||||||||||
| 1. | General Instructions for Tank Cars and Trucks : | ||||||||||||
| a. Conveyances (all) shall be dry and free from loose rust, scale, and dirt | |||||||||||||
| b. Saran lined equipment should not be steam cleaned; water wash should suffice. | |||||||||||||
| c. Petroleum products shall not be loaded into the conveyances whose previous cargo was caustic, acid, or chlorinated solvents. | |||||||||||||
| d. Trucks in liquid fertilizer service shall not load aviation turbine fuels directly, but shall carry out at least two loads of commercial gasoline prior to the aviation turbine fuel load. | |||||||||||||
| e. Conversion of Government-owned tank cars from liquid fertilizer service to aviation turbine fuel service shall only be done when no other alternative exists. | |||||||||||||
| Tank cars being converted from liquid fertilizer service to a petroleum product shall be adequately cleaned to remove all traces of liquid fertilizer. | |||||||||||||
| free from loose rust, scale, and dirt. After cleaning, equipment with unlined compartments should have its compartments lined with an approved coating at this time. Conveyances carrying | |||||||||||||
| their initial load of aviation turbine fuel following conversion shall not be released from the loading until they have been sampled a minimum of 24 hours after loading point. | |||||||||||||
| The sample shall undergo Type B-2 tests plus Thermal Stability Test (if required by the product specification). After Type B-2 tests indicate compliance with specification requirements, | |||||||||||||
| the conveyance can be released pending results of the Thermal Stability tests. The conveyance shall not be unloaded until the loading point notifies the destination that | |||||||||||||
| the Thermal Stability test (when required) has passed. When the above condition applies, the DD- 250 or equivalent form shall be so noted. | |||||||||||||
| 2. | Each Military Service shall provide specific guidance for conversion of refueling equipment which exclusively handles Service petroleum products, e.g.: Air Force guidance is contained in | ||||||||||||
| T.O. 42B- 1-1, Table 3-1. | |||||||||||||
| 3. | To be loaded only in aluminum or stainless steel conveyance, or other conveyance lined with an approved epoxy coating. If equipment is coated, clean with hot fresh water not exceeding | ||||||||||||
| 58°C (136 °F) and dry thoroughly. | |||||||||||||
| 4. | For previous cargoes not listed, contact DLA Energy DQA for acceptability/cleaning procedures. | ||||||||||||
| 5. | For an additional policy on steam cleaning for JP-8 see 5.3.1.2. | ||||||||||||
| 6. | If previous cargo contained dye marker, all traces of color must be removed. | ||||||||||||
| 7. | If product to be loaded does not contain dye, then the vehicle shall not contain any traces of dye prior to loading. | ||||||||||||
| 8. | Applicable only when loading same specification products; otherwise, steam and dry. | ||||||||||||
| 9. | Prior to Loading the aviation fuels listed, the conveyance must have carried a previous non-FAME cargo and then be steam cleaned and dried. Trucks that have previously carried | ||||||||||||
| biodiesel create a risk of cross-contamination of Jet Fuel with residual biodiesel components. Diesel Fuel may contain up to 5% FAME without reporting it as Biodiesel. Because of | |||||||||||||
| the difficulties in making a determination at the load rack of the presence of FAME in the previous load, the more stringent “Steam/Dry is required. | |||||||||||||
| 10. | Drain and Empty if loading Biodiesel Blends |
&A Page &P of &N
8.6. ATT#5
| DLA ENERGY KOREA Date of Inspection: . | |||||||||||||||||||||
| Commercial Tank Truck/Rail Tank Car Inspection/Evaluation Sheet | |||||||||||||||||||||
| TRUCK (RTC) NUMBER | |||||||||||||||||||||
| TRAILER NUMBER | |||||||||||||||||||||
| QUANTITY USG/Ltrs | |||||||||||||||||||||
| LAST PRODUCT CARRIED | |||||||||||||||||||||
| INSPECTION ITEMS | YES | NO | YES | NO | YES | NO | YES | NO | YES | NO | YES | NO | YES | NO | YES | NO | YES | NO | YES | NO | YES NO |
| Crude/Black Oil (reject) | |||||||||||||||||||||
| 4 Inch Clean Hoses | |||||||||||||||||||||
| Camlock Fittings | |||||||||||||||||||||
| Bottom Loading | |||||||||||||||||||||
| Are Placards on 3 sides | |||||||||||||||||||||
| Fire Extinguishers | |||||||||||||||||||||
| Tires in Good Shape | |||||||||||||||||||||
| Calib. Strapping Chart | |||||||||||||||||||||
| MANIFOLD | |||||||||||||||||||||
| 1. Valves Seat Properly | |||||||||||||||||||||
| 2. Can Valves be Sealed | |||||||||||||||||||||
| 3. Air Brake Inter Lock | |||||||||||||||||||||
| 4. Off-Loading Pump | |||||||||||||||||||||
| 5. Off-Loading Meter | |||||||||||||||||||||
| 6. Filter/Basket Strainer | |||||||||||||||||||||
| Safe Ladder | |||||||||||||||||||||
| Dome Hatch can be Sealed | |||||||||||||||||||||
| Dome Hatch Gasket | |||||||||||||||||||||
| Dip Stick/Clear Marking | |||||||||||||||||||||
| Gauging Tube (#) | |||||||||||||||||||||
| Affixed Safe Fill Marker | |||||||||||||||||||||
| Scully (Safe Fill) System | |||||||||||||||||||||
| Tank Venting System | |||||||||||||||||||||
| Epoxy Coating | |||||||||||||||||||||
| Does Tank have Baffles | |||||||||||||||||||||
| Steam Cleaning Requi. | |||||||||||||||||||||
| Accepted (Y) or Rejected (N) | |||||||||||||||||||||
| REMARKS | |||||||||||||||||||||
| Notes: |
1. See MIL-STD 3004 Table XXVI (Conversion Chart)
2. Conveyances that have ever carried crude or black oil will be rejected.
3. Conveyances with slug build-up not removed during normal cleaning should be rejected. DLA Energy Rep. Signature:
Print Name:
File details come from the government source that posted it. Updated .