W91QVN-17-R-0115.pdf

PDF 1 MB Posted

Attached to
Cleaning/Maintenance Boilers Osan ROK Federal contract opportunity
Solicitation number
W91QVN-17-R-0115
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

Solicitation No. W91QVN-17-R-0115

View the file

Other files for this federal contract opportunity

Other files attached to Cleaning/Maintenance Boilers Osan ROK, newest first.
File Type Posted
Technical_Exhibit__1_Punched.xls XLS spreadsheet
Technical_Exhibit__2_Industrial_Water_Treatment.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QVN-17-R-0115 24-May-2017

b. TELEPHONE NUMBER

02-7914-7539

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 26 Jun 2017

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. PAK, NAM-YE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

F3J3CE7066A001

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE F3J3CE 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

51 CES

NO, HYONG HO

UNIT #2129, BLDG#600

APO AP 96278-2129

UNITED STATES OF AMERICA (THE)

TEL: 784-6644 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$7,500,000

NAICS:

811310

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA FAR (48 CFR) 53 212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91QVN-17-R-0115

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Scheduled Boiler Cleaning/ Maintenance

FFP

service for the hot water boilers, water heating boilers, steam boilers, and warm air furnaces in various facilities (Technical Exhibit (TE) #1) at Osan AB as specified in the paragraph 5 of the Performance Work Statement (PWS) .

FOB: Destination

PURCHASE REQUEST NUMBER: F3J3CE7066A001

NET AMT

0001AA 196 Each Hot Water Boilers (Semi-annually)

FFP

98 Ea x 2 (Semi-annual) = 196 Ea/Yr

0001AB 225 Each Hot Water Heating Boilers (Annually)

FFP

0001AC 9 Each Steam Boilers (Annually)

FFP

0001AD 41 Each Warm Air Furnaces (Annually)

FFP

Industrial Water Treatment Services

FFP

For heating and cooling systems located in various facilities (TE) #2) at Osan AB as specified in the Paragraph 5 of the PWS.

0002AA 52 Each Hot Water Systems

FFP

water volume Less than 1 ton, 13 Ea x 4 (Quarterly) = 52 Ea

0002AB 404 Each Hot Water Systems

FFP

water volume 1 - 1.9 ton, 101 Ea x 4 (Quarterly) = 404 Ea

0002AC 204 Each Hot Water Systems

FFP

water volume 2 - 2.9 ton, 51 Ea x 4 (Quarterly) = 204 Ea

0002AD 76 Each Hot Water Systems

FFP

water volume 3 - 3.9 ton, 19 Ea x 4 (Quarterly) = 76 Ea

0002AE 80 Each Hot Water Systems

FFP

water volume 4 - 4.9 ton, 20 Ea x 4 (Quarterly) = 80 Ea

0002AF 60 Each Hot Water Systems

FFP

water volume 5 - 5.9 ton, 15 Ea x 4 (Quarterly) = 60 Ea

0002AG 28 Each Hot Water Systems

FFP

water volume 6 - 6.9 ton, 7 Ea x 4 (Quarterly) = 28 Ea

0002AH 16 Each Hot Water Systems

FFP

water volume 7 - 7.9 ton, 4 Ea x 4 (Quarterly) = 16 Ea

0002AJ 40 Each Hot Water Systems

FFP

water volume 12 - 12.9 ton, 10 Ea x 4 (Quarterly) = 40 Ea

0002AK 4 Each Chilled Water Systems

FFP

water volume Less than 1 ton, 1 Ea x 4 (Quarterly) = 4 Ea

0002AL 64 Each Chilled Water Systems

FFP

water volume 1 - 1.9 ton, 16 Ea x 4 (Quarterly) = 64 Ea

0002AM 108 Each Chilled Water Systems

FFP

water volume 2 - 2.9 ton, 27 Ea x 4 (Quarterly) = 108 Ea

0002AN 64 Each Chilled Water Systems

FFP

water volume 3 - 3.9 ton, 16 Ea x 4 (Quarterly) = 64 Ea

0002AP 80 Each Chilled Water Systems

FFP

water volume 4 - 4.9 ton, 20 Ea x 4 (Quarterly) = 80 Ea

0002AQ 60 Each Chilled Water Systems

FFP

water volume 5 - 5.9 ton, 15 Ea x 4 (Quarterly) = 60 Ea

0002AR 36 Each Chilled Water Systems

FFP

water volume 6 - 6.9 ton, 9 Ea x 4 (Quarterly) = 36 Ea

0002AS 16 Each Chilled Water System s

FFP

water volume 7 - 7.9 ton, 4 Ea x 4 (Quarterly) = 16 Ea

0002AT 40 Each Chilled Water Systems

FFP

water volume 12 - 12.9 ton, 10 Ea x 4 (Quarterly) = 40 Ea

0002AU 270 Each Steam Boilers

FFP

(Jan - Apr & Oct - Dec): 9 Ea x 30 Weeks = 270 Ea

0002AV 208 Each Steam Boiler at Bldg 1750 & 733

FFP

4 Ea x 52 Weeks = 208 Ea

0003 1 Job Contract Data Requirement List (CDRL)

FFP

IAW PWS, Paragraph 5.17, Contract Data Requirement List (CDRL), the contractor shall provide documents in contractor's format subject to Gov't review and approval. This is a Not Separately Priced CLIN. The contractor shall not propose any amount.

0004 1 Job Contractor Manpower Report (CMR)

FFP

IAW PWS, Paragraph 6, Contractor Manpower Report (CMR) must be reported by 31 October of each calendar year during the life of the contract.

NOTE: Not to exceed 20 man hours for data collection and report.

UIC: TBD, Organization: 51st Civil Engineer Squadron (CES) Unit 2129, APO

AP 96278-2129

0005 1 Months Phase-in Period: 1 - 31 Aug 2017

FFP

The Contractor shall develop and incorporate a plan for transition. The transition period plan shall include management structure, logistics support, human resouce management, and initial entry training plans specified in Paragraph 5.19 of this

PWS.

Estimated Costs for War Hazard Losses is

FFP

zero (0).

OPTION Scheduled Boiler Cleaning/ Maintenance

FFP

service for the hot water boilers, water heating boilers, steam boilers, and warm air furnaces in various facilities (Technical Exhibit (TE) #1) at Osan AB as specified in the paragraph 5 of the Performance Work Statement (PWS) .

1001AA 196 Each OPTION Hot Water Boilers (Semi-annually)

FFP

98 Ea x 2 (Semi-annual) = 196 Ea/Yr

1001AB 225 Each OPTION Hot Water Heating Boilers (Annually)

FFP

1001AC 9 Each OPTION Steam Boilers (Annually)

1001AD 41 Each OPTION Warm Air Furnaces (Annually)

OPTION Industrial Water Treatment Services

FFP

For heating and cooling systems located in various facilities (TE) #2) at Osan AB as specified in the Paragraph 5 of the PWS.

1002AA 52 Each OPTION Hot Water Systems

FFP

water volume Less than 1 ton, 13 Ea x 4 (Quarterly) = 52 Ea

1002AB 404 Each OPTION Hot Water Systems

FFP

water volume 1 - 1.9 ton, 101 Ea x 4 (Quarterly) = 404 Ea

1002AC 204 Each OPTION Hot Water Systems

FFP

water volume 2 - 2.9 ton, 51 Ea x 4 (Quarterly) = 204 Ea

1002AD 76 Each OPTION Hot Water Systems

FFP

water volume 3 - 3.9 ton, 19 Ea x 4 (Quarterly) = 76 Ea

1002AE 80 Each OPTION Hot Water Systems

FFP

water volume 4 - 4.9 ton, 20 Ea x 4 (Quarterly) = 80 Ea

1002AF 60 Each OPTION Hot Water Systems

FFP

water volume 5 - 5.9 ton, 15 Ea x 4 (Quarterly) = 60 Ea

1002AG 28 Each OPTION Hot Water Systems

FFP

water volume 6 - 6.9 ton, 7 Ea x 4 (Quarterly) = 28 Ea

1002AH 16 Each OPTION Hot Water Systems

FFP

water volume 7 - 7.9 ton, 4 Ea x 4 (Quarterly) = 16 Ea

1002AJ 40 Each OPTION Hot Water Systems

FFP

water volume 12 - 12.9 ton, 10 Ea x 4 (Quarterly) = 40 Ea

1002AK 4 Each OPTION Chilled Water Systems

FFP

water volume Less than 1 ton, 1 Ea x 4 (Quarterly) = 4 Ea

1002AL 64 Each OPTION Chilled Water Systems

FFP

water volume 1 - 1.9 ton, 16 Ea x 4 (Quarterly) = 64 Ea

1002AM 108 Each OPTION Chilled Water Systems

FFP

water volume 2 - 2.9 ton, 27 Ea x 4 (Quarterly) = 108 Ea

1002AN 64 Each OPTION Chilled Water Systems

FFP

water volume 3 - 3.9 ton, 16 Ea x 4 (Quarterly) = 64 Ea

1002AP 80 Each OPTION Chilled Water Systems

FFP

1002AQ 60 Each OPTION Chilled Water Systems

FFP

1002AR 36 Each OPTION Chilled Water Systems

FFP

water volume 6 - 6.9 ton, 9 Ea x 4 (Quarterly) = 36 Ea

1002AS 16 Each OPTION Chilled Water System s

FFP

1002AT 40 Each OPTION Chilled Water Systems

FFP

1002AU 270 Each OPTION Steam Boilers

FFP

(Jan - Apr & Oct - Dec): 9 Ea x 30 Weeks = 270 Ea

1002AV 208 Each OPTION Steam Boiler at Bldg 1750 & 733

FFP

4 Ea x 52 Weeks = 208 Ea

1003 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

IAW PWS, Paragraph 5.17, Contract Data Requirement List (CDRL), the contractor shall provide documents in contractor's format subject to Gov't review and approval. This is a Not Separately Priced CLIN. The contractor shall not propose any amount.

1004 1 Job OPTION Contractor Manpower Report (CMR)

FFP

IAW PWS, Paragraph 6, Contractor Manpower Report (CMR) must be reported by 31 October of each calendar year during the life of the contract.

NOTE: Not to exceed 20 man hours for data collection and report.

UIC: TBD, Organization: 51st Civil Engineer Squadron (CES) Unit 2129, APO

AP 96278-2129

OPTION Estimated Costs for War Hazard Losses is

FFP

zero (0).

OPTION Scheduled Boiler Cleaning/ Maintenance

FFP

service for the hot water boilers, water heating boilers, steam boilers, and warm air furnaces in various facilities (Technical Exhibit (TE) #1) at Osan AB as specified

2001AA 196 Each OPTION Hot Water Boilers (Semi-annually)

FFP

2001AB 225 Each OPTION Hot Water Heating Boilers (Annually)

2001AC 9 Each OPTION Steam Boilers (Annually)

2001AD 41 Each OPTION Warm Air Furnaces (Annually)

OPTION Industrial Water Treatment Services

FFP

For heating and cooling systems located in various facilities (TE) #2) at Osan AB

2002AA 52 Each OPTION Hot Water Systems

FFP

2002AB 404 Each OPTION Hot Water Systems

FFP

2002AC 204 Each OPTION Hot Water Systems

FFP

2002AD 76 Each OPTION Hot Water Systems

FFP

2002AE 80 Each OPTION Hot Water Systems

FFP

2002AF 60 Each OPTION Hot Water Systems

FFP

2002AG 28 Each OPTION Hot Water Systems

FFP

2002AH 16 Each OPTION Hot Water Systems

FFP

2002AJ 40 Each OPTION Hot Water Systems

FFP

2002AK 4 Each OPTION Chilled Water Systems

FFP

2002AL 64 Each OPTION Chilled Water Systems

FFP

2002AM 108 Each OPTION Chilled Water Systems

FFP

2002AN 64 Each OPTION Chilled Water Systems

FFP

2002AP 80 Each OPTION Chilled Water Systems

FFP

2002AQ 60 Each OPTION Chilled Water Systems

FFP

2002AR 36 Each OPTION Chilled Water Systems

FFP

2002AS 16 Each OPTION Chilled Water System s

FFP

2002AT 40 Each OPTION Chilled Water Systems

FFP

2002AU 270 Each OPTION Steam Boilers

FFP

2002AV 208 Each OPTION Steam Boiler at Bldg 1750 & 733

FFP

2003 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

IAW PWS, Paragraph 5.17, Contract Data Requirement List (CDRL), the contractor shall provide documents in contractor's format subject to Gov't review and approval. This is a Not Separately Priced CLIN. The contractor shall not

2004 1 Job OPTION Contractor Manpower Report (CMR)

FFP

IAW PWS, Paragraph 6, Contractor Manpower Report (CMR) must be reported by 31 October of each calendar year during the life of the contract.

NOTE: Not to exceed 20 man hours for data collection and report.

UIC: TBD, Organization: 51st Civil Engineer Squadron (CES) Unit 2129, APO

OPTION Estimated Costs for War Hazard Losses is

FFP

OPTION Scheduled Boiler Cleaning/ Maintenance

FFP

service for the hot water boilers, water heating boilers, steam boilers, and warm air furnaces in various facilities (Technical Exhibit (TE) #1) at Osan AB as specified

3001AA 196 Each OPTION Hot Water Boilers (Semi-annually)

FFP

3001AB 225 Each OPTION Hot Water Heating Boilers (Annually)

3001AC 9 Each OPTION Steam Boilers (Annually)

3001AD 41 Each OPTION Warm Air Furnaces (Annually)

OPTION Industrial Water Treatment Services

FFP

For heating and cooling systems located in various facilities (TE) #2) at Osan AB

3002AA 52 Each OPTION Hot Water Systems

FFP

3002AB 404 Each OPTION Hot Water Systems

FFP

3002AC 204 Each OPTION Hot Water Systems

FFP

3002AD 76 Each OPTION Hot Water Systems

FFP

3002AE 80 Each OPTION Hot Water Systems

FFP

3002AF 60 Each OPTION Hot Water Systems

FFP

3002AG 28 Each OPTION Hot Water Systems

FFP

3002AH 16 Each OPTION Hot Water Systems

FFP

3002AJ 40 Each OPTION Hot Water Systems

FFP

3002AK 4 Each OPTION Chilled Water Systems

FFP

3002AL 64 Each OPTION Chilled Water Systems

FFP

3002AM 108 Each OPTION Chilled Water Systems

FFP

3002AN 64 Each OPTION Chilled Water Systems

FFP

3002AP 80 Each OPTION Chilled Water Systems

FFP

3002AQ 60 Each OPTION Chilled Water Systems

FFP

3002AR 36 Each OPTION Chilled Water Systems

FFP

3002AS 16 Each OPTION Chilled Water System s

FFP

3002AT 40 Each OPTION Chilled Water Systems

FFP

3002AU 270 Each OPTION Steam Boilers

FFP

3002AV 208 Each OPTION Steam Boiler at Bldg 1750 & 733

FFP

3003 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

IAW PWS, Paragraph 5.17, Contract Data Requirement List (CDRL), the contractor shall provide documents in contractor's format subject to Gov't review and approval. This is a Not Separately Priced CLIN. The contractor shall not

3004 1 Job OPTION Contractor Manpower Report (CMR)

FFP

IAW PWS, Paragraph 6, Contractor Manpower Report (CMR) must be reported by 31 October of each calendar year during the life of the contract.

NOTE: Not to exceed 20 man hours for data collection and report.

UIC: TBD, Organization: 51st Civil Engineer Squadron (CES) Unit 2129, APO

OPTION Estimated Costs for War Hazard Losses is

FFP

OPTION Scheduled Boiler Cleaning/ Maintenance

FFP

service for the hot water boilers, water heating boilers, steam boilers, and warm air furnaces in various facilities (Technical Exhibit (TE) #1) at Osan AB as specified

4001AA 196 Each OPTION Hot Water Boilers (Semi-annually)

FFP

4001AB 225 Each OPTION Hot Water Heating Boilers (Annually)

4001AC 9 Each OPTION Steam Boilers (Annually)

4001AD 41 Each OPTION Warm Air Furnaces (Annually)

OPTION Industrial Water Treatment Services

FFP

For heating and cooling systems located in various facilities (TE) #2) at Osan AB

4002AA 52 Each OPTION Hot Water Systems

FFP

4002AB 404 Each OPTION Hot Water Systems

FFP

4002AC 204 Each OPTION Hot Water Systems

FFP

4002AD 76 Each OPTION Hot Water Systems

FFP

4002AE 80 Each OPTION Hot Water Systems

FFP

4002AF 60 Each OPTION Hot Water Systems

FFP

4002AG 28 Each OPTION Hot Water Systems

FFP

4002AH 16 Each OPTION Hot Water Systems

FFP

4002AJ 40 Each OPTION Hot Water Systems

FFP

4002AK 4 Each OPTION Chilled Water Systems

FFP

4002AL 64 Each OPTION Chilled Water Systems

FFP

4002AM 108 Each OPTION Chilled Water Systems

FFP

4002AN 64 Each OPTION Chilled Water Systems

FFP

4002AP 80 Each OPTION Chilled Water Systems

FFP

4002AQ 60 Each OPTION Chilled Water Systems

FFP

4002AR 36 Each OPTION Chilled Water Systems

FFP

4002AS 16 Each OPTION Chilled Water System s

FFP

4002AT 40 Each OPTION Chilled Water Systems

FFP

4002AU 270 Each OPTION Steam Boilers

FFP

4002AV 208 Each OPTION Steam Boiler at Bldg 1750 & 733

FFP

4003 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

IAW PWS, Paragraph 5.17, Contract Data Requirement List (CDRL), the contractor shall provide documents in contractor's format subject to Gov't review and approval. This is a Not Separately Priced CLIN. The contractor shall not

4004 1 Job OPTION Contractor Manpower Report (CMR)

FFP

IAW PWS, Paragraph 6, Contractor Manpower Report (CMR) must be reported by 31 October of each calendar year during the life of the contract.

NOTE: Not to exceed 20 man hours for data collection and report.

UIC: TBD, Organization: 51st Civil Engineer Squadron (CES) Unit 2129, APO

OPTION Estimated Costs for War Hazard Losses is

FFP

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Cleaning and Maintenance Services on Boilers, Warm Air Furnaces, and Industrial Water Treatment on Heating and Chilled Water Systems for Osan Air Base

1. GENERAL: This is a non-personal services contract to perform cleaning and maintenance services on boilers, warm air furnaces, and industrial water treatment on hydronic heating and chilled water systems as defined in this Performance Work Statement (PWS) at Osan Air Base (AB). The heating and chilled water systems are located in various facilities as listed in Technical Exhibit #1 and Technical Exhibit #2. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn in responsible to the Government.

1.1. Description of Services: The Contractor shall provide all personnel, management, supervision, system testing equipment, tools, supplies, and transportation to provide clean and maintenance services on boilers, warm air furnaces, and industrial water treatment on hydronic heating and chilled water systems as defined in this PWS at Osan AB. The heating systems located in various facilities are listed in Technical Exhibit# 1 (TE) and Technical Exhibit# 2. The contractor is responsible for complying with all existing Korean Environmental Laws and Regulations.

1.2. Period of Performance:

Phase-In: 1 Aug 2017 - 31 Aug 2017 Base Year: 1 Sep 2017 - 31 Jul 2018 1st Option Year: 1 Aug 2018 - 31 Jul 2019 2nd Option Year: 1 Aug 2019 - 31 Jul 2020 3rd Option Year: 1 Aug 2020 - 31 Jul 2021 4th Option Year: 1 Aug 2021 - 31 Jul 2022

1.3. General Information:

1.3.1. Quality Control: The Contractor shall be responsible for performing inspections and submit the inspection report to COR within five (5) calendar days from completion of inspection to ensure that the services conform to the requirements specified herein. However, the Government reserves the right to perform random inspections and tests, which are deemed to assure that the services conform to the prescribed requirements in this PWS.

1.3.1.1. Quality Control Plan (QCP): The contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract. The contractor shall submit a written QCP within ten (10) working days after contract award to Contracting Officer (KO) and Contracting Officer’s Representative (COR). Additionally, changes to the QCP shall be submitted to the KO and COR within five (5) working days when changes are made thereafter. After acceptance of the QCP the contractor will receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.

1.3.1.2. The contractor shall keep records of inspections and make them available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract. The contractor shall collect data, perform self-evaluation, and document performance against standards associated with each specific requirement. The contractor shall address all tasks in the PWS based on the example below:

Performance Objective (Contract requirement)

Performance Standards (What level of performance is required to meet the Performance Objective or Task?)

Performance Threshold Or (Acceptable Quality Level (AQL))

What/Data Source (What is the Contractor going to inspect?)

Calculation (How will The Contractor determine if the AQL and Standard are being achieved?)

This information comes from the

PWS.

This information comes from the

PWS.

This information comes from the

PWS.

Contractor shall submit

Contractor shall submit

1.3.2. Quality Assurance: The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance and Surveillance Plan (QASP) created and managed by the COR. This plan will primarily focus on what the government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.3.3. Recognized Holidays: The contractor is not required to provide service on Korean National holidays and US Government holidays, except in emergency situations.

U.S. Holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

Korean Holidays:

1 and 2 January (New Year) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar) 1 March (Independence Movement Day) 1 May (Labor Day) 5 May (Children's Day) Buddha's Birthday (8 April on the Lunar Calendar) 6 June (Memorial Day) 15 August (Liberation Day) Chu-Suk (14, l5 and 16 August on the Lunar Calendar) 3 October (National Foundation Day) 25 December (Christmas Day)

1.3.4. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730 to 1630, Monday thru Friday except Korean National holidays and US Government Holidays as listed above Para 1.3.3 and when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.3.5. Place of Performance: All services required within the scope of this contract shall be performed at Osan AB, ROK.

1.3.6. Type of Contract: The Government will award a Requirements with Firm Fixed Price CLINs type Contract.

1.3.7. Security Requirements: Due to a nature of working on military installation, the contractor is required to observe Physical Security while engaged in this contract operation. The contractor shall not photograph the vehicles, equipment, materials, and facilities without an explicit written approval by the COR.

1.3.7.1. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.3.8. Special Expertise:

1.3.8.1. The prime contractor shall have a valid Business Permission Certificates in Mechanism Facility Construction Permission (기계설비공사업 허가증) issued by the ROK Government authorities. The contractor shall have a minimum of three (3) years of experience in the same or similar type of services for cleaning and maintenance service on boilers, warm air furnaces, and industrial water treatment on heating and chiller water systems. The subcontractor’s Mechanism Facility Construction Permission and Business Registration cannot be substituted for the prime contractor’s document. The experience of a subcontractor cannot be substituted for the prime contractor’s experience

1.3.8.2. Staffing Plan: The contractor shall submit a written staffing plan include the organizational chart that identifies personnel and configuration of adequate size and qualifications which reflects the capability to manage and perform the PWS requirements

1.3.8.3. Personnel: Contractor personnel shall act in a professional manner (Professionalism implies the proper handling of oneself in the workplace, adhering to regulations and policies, doing the job diligently and conscientiously, fulfilling duties to the best of ability, punctuality, time management and maintaining a certain businesslike attitude and demeanor, holding oneself to the highest possible standards of character and behavior proper to the field of employment, and presenting a neat, clean appearance. Identification of all employees shall be accomplished by wearing distinctive clothing bearing the individuals name and company name. The contractor shall provide distinctive clothing at contractor’s expense. The Government reserves the right to request replacement of any contractor employee that does not meet these professional standards.

1.3.8.3.1. Key Personnel: The follow personnel are considered key personnel by the Government: Contract Manager (CM), Heating Mechanic(s), Water treatment Mechanic(s), and Quality Control Inspector(s). Before removing, replacing, or diverting the key personnel, the Contractor shall submit notification to the COR reasonably in advance (14 calendar days is considered reasonable).

The list of key personnel may, with the consent of the contracting parties, be amended from time to time during the course of the contract to add or delete personnel so long as the aforementioned items are addressed.

The Contractor shall continuously meet or exceed the minimum qualifications for this requirement that were established in the solicitation evaluation criteria during the entire performance of this contract.

1.3.8.3.2. Personnel Qualification:

1.3.8.3.2.1. Contract Manager (CM): The Contractor shall provide a CM who shall be responsible for the performance of the work, and have full authority to act on behalf of Contractor. The CM shall be available within 30 minutes during normal duty hours from Monday through Friday to meet the COR to discuss work related issues.

After normal duty hours, the CM shall be available within 2 hours, 24 hours a day, and seven days a week. The CM shall have a minimum of three (3) years of experience as a CM in maintenance of heating systems and industrial water treatment on heating and chillers system within the last five (5) years.

1.3.8.3.2.2. Heating Mechanic(s): The contractor shall provide at least one (1) licensed Water Heating Mechanic.

The contractor shall provide Heating Mechanic(s)who shall possess a Craftsman Energy Management (에너지관리기능사) or Craftsman Boiler license (보일러기능사 자격증(구), 에너지관리기능사(현)) issued by ROK Government with a minimum of three (3) years of experience in mechanical repair and maintenance of Heating, Ventilation, and Air Conditioning (HVAC) systems within the last five (5) years.

1.3.8.3.2.3. Water Treatment Mechanic(s): The contractor shall provide at least one (1) licensed Water Treatment Mechanic. The contractor shall provide Water Treatment Mechanic(s) who shall possess Industrial Engineer Water Pollution Environmental license (수질환경산업기사 (수질환경기사2급(구)) 자격증) issued by ROK Government with a minimum of three (3) years of experience in industrial water treatment of HVAC systems within the last five

(5) years.

1.3.8.3.2.4. Quality Control Inspector: The contractor shall provide Quality control inspector who shall possess an Industrial Engineer Industrial Safety license (산업안전 산업기사 (산업안전기사2급(구)) 자격증) issued by ROK Government with a minimum of two (2) years of experience in mechanical quality inspection of mechanical quality control within the last five (5) years. The Quality Control Inspector shall be responsible for conducting inspections of all equipment, materials, and resources used by the Contractor, as well as reviewing all records, receipts, and reports used in conjunction with PWS. All inspection reviews shall ensure compliance with existing commercial standards.

1.3.8.3.3. Contractor Language for English Requirements: Personnel working on this contract shall be able to communicate in the English language at the intermediate level as exemplified in their written and verbal skills in the performance of their duties under this contract. Government will assess language skills of all Contract employees who are required by terms of this PWS to be proficient at speaking English through performance of services. If the Government, at its sole discretion, determines that the language skills of a Contractor employee does not meet the language proficiency skills required of the position, the Government reserves the right to require the Contractor to provide a new Contract employee that does possess the required language proficiency skills required of the position, at no additional cost to the Government.

1.3.8.3.4. Quality Control Inspector shall accurately document the results of the inspections and testing, and maintain all controlled document files and test records in a timely and accurate manner.

1.3.8.3.5. The Contractor shall ensure that employees performing the aforementioned types of work have the required current and valid professional licenses (if applicable). The Contractor shall be responsible for ensuring employees maintain required licenses and certifications throughout the duration of this contract.

1.3.9. Base access: The contractor shall comply with all installation security requirements. Security and base access requirements are contained in clause AFFAR 5352.242-9000 “Contractor Access to Air Force Installations.”

Contractor employees shall be required to obtain and display identification badges. Anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base. Procedures for commercial vehicle access to the base are subject to change without prior notice. It shall be the contractor’s responsibility to arrange for base passes and necessary vehicle permits required for entry onto this installation prior to performing any work under this contract. The COR will not be responsible for providing escorts for the contractor.

1.3.10. Escort Privileges: Escort privileges will be authorized only for the CM with a limit of three (3) persons per base pass. It is the contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual removed from this installation shall not be authorized further access to this installation.

1.3.11. Contractor Personnel Conduct: The contractor’s personnel shall observe and obey all U.S., and Air Force installation laws and regulations while working on the installations. The contractor personnel shall not wear any military uniforms (U.S. or ROK), and shall not wear any clothing that has or depicts derogatory messages to other personnel, U.S. Government. The contractor personnel shall not engage in any type of altercation or violent activities with U.S and other personnel. Any personnel in violation of this paragraph shall be promptly removed from the installation under the Military Police escort if applicable, and shall not be permitted to access the U.S Army installations until the matter is resolved and re-entrance is permitted by the servicing COR.

1.3.8.11.1. Contractor personnel conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance.

1.3.8.11.2. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.

1.3.8.11.3. The Contractor is responsible for ensuring that any contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner.

1.3.8.11.4. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/gratuities, and on non-disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41 U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no contractor employees conduct political related activities or events on the U.S. installation.

1.3.8.12. Emergency Services; The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall, in turn, notify the KO or COR within 30 minutes of the incident.

1.3.8.12.1. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.

1.3.8.12.2. The contractor shall provide certificates of all employees First Aid Training and Cardiopulmonary Resuscitation (CPR) Training within one month of contract award and award of each option.

1.3.8.12.3. The employees are not authorized to work for other interests or third parties, or use government equipment for such purposes.

1.3.8.13. Fire Safety: Contractor’s personnel are not authorized to use electrical appliances, prepare, warm, or store food or drinks except in Government supplied office/warehouse space. The Contractor shall not allow any obnoxious behavior that disturbs the well-being of neighbors.

1.4. Safety Program: The contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of contractor personnel, the property of the U.S. Government and the Republic of Korea, as well as the private individuals and firms who may be exposed to or be endangered by the contractor’s actions.

The contractor shall provide a written safety plan with policies, procedures and safety checklist within 15 calendar days after contract award. The program shall comply with the Korean Occupational Safety and Health Act (KOSHA). The Contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program shall be submitted to the Contracting Officer or his/her duly authorized representative for coordination and review.

1.4.1. Risk Management Process: The safety plan shall include detailed job related hazards and controls measures and an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools or equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk Assessment Code is an assessment of the probability of the hazard occurring and its potential impact). The contractor shall assure that the safety control measures are implemented. The contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx or develop their own.

1.4.2. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 4 hours of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. The contractor shall implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum:

(1) Contract number and contract name/description.

(2) Name of contractor

(3) Date/time of accident

(4) Date report was completed

(5) Detail description of events that lead to the accident

(6) Root cause of accident

(7) Contributing factors of accident

(8) Corrective action(s) to prevent recurrence

(9) Specific dates when the corrective actions will be implemented

1.4.3. The following require immediate accident notification and written accident report:

(1) A fatality;

(2) A permanent total or permanent partial disability;

(3) The hospitalization of three or more people resulting from a single occurrence;

(5) Property damage of $200 or more.

1.5. Antiterrorism (AT) and Operations Security (OPSEC) Requirements:

1.5.1. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Air Force controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Air Force installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.

1.5.2. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language text required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13.

Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

2. DEFINITIONS AND ACRONYMS:

2.1. Job Order: A form used to document the work activity at a facility, and tracks time, parts used, technician’s name, etc. Different numbering systems are used for each type of job order: service calls, preventative maintenance, etc.

2.2. Contract Officer Representative (COR): A government person who is responsible for the surveillance of the Contractor performance of the contract.

2.3. Customer Complaint: A means of documenting certain kinds of contract service problems. A Government program that is explained to every organization that receives service under this contract, which is used to evaluate the Contractor’s performance.

2.4. Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.5. Deliverable: Anything that can be physically or electronically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.6. Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.

2.7. Government Furnished Property: Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

2.8. Government Property: All property owned or leased by the Government. Government property includes both Government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

2.9. Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.10. Material: Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.

2.11. Performance Requirement: The point that divides acceptable and unacceptable performance. In the case of surveillance by random sampling, the performance requirement is the maximum number of defectives in the random sampling chosen that may occur before the government will affect the price computation system in accordance with the performance requirements summary and the inspection of services clause. When the method of surveillance is other than random sampling, the performance requirement is the number of defectives or maximum percent defective in the lot before the government will affect the price computation system in accordance with the PRS and the Inspection of Services clause

2.12. Performance Requirements Summary: Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.

2.13. Physical Security: Actions that prevent the loss or damage of Government property.

2.14. Property: All tangible property, both real and personal.

2.15. Provide: To furnish, as in Government-furnished property, or to acquire, as in contractor-acquired property

2.16. ACRONYMS:

ACOR Alternate Contracting Officer's Representative COR Contracting Officer Representative COTR Contracting Officer's Technical Representative DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer OCI Organizational Conflict of Interest PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance

QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

3. GOVERNMENT FURNISHED PROPERTY AND SERVICE:

3.1. Services: The Government will provide water, sewage, electricity, and heat at no cost to the Contractor.

3.2. Security Police and Fire Protection: The Government will provide security police and fire protection to the extent necessary to ensure a secure and safe installation. The emergency phone number for Fire, Security Police, and Medical assistance is 911.

3.3. Fire Prevention and Protection: Contractor shall comply with the requirements set forth in 51st Fighter Wing Instruction (FWI) 32-2001, Fire Prevention and Protection. A copy of this regulation may be obtained from the COR. Base fire prevention personnel may make periodic routine inspections for regulation compliance. The Contractor shall provide suitable fire extinguishers at any material storage and their office. The Contractor shall check fire extinguisher monthly in common area (hallway, etc.) and report any discrepancy to COR.

3.4. No Smoking Policy: Smoking is prohibited within any Air Force facility. Furthermore smoking is only authorized in designated tobacco use areas.

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Vehicle:

4.2.1. The Contractor shall provide vehicles that are equipped with the required safety devices. The Contractor shall not use open-box trucks, with or without canvas cover, except for collection of debris or bulky items. It is the Contractor’s responsibility for loading and off-loading these refuse at pick-up points.

4.2.2. The Contractor shall provide and maintain vehicles in an operational condition for transportation to meet the requirements of this contract in accordance with applicable local vehicle standards, Air Force installation regulations.

4.2.3. The Contractor shall display its company name, and telephone number on all vehicles to be used in the performance of pick-up and transportation of regular and food waste trash.

4.2.4. If the vehicle is at any time deemed unsafe or unserviceable by the COR/ACOR/QAR, the Contractor shall remove equipment from the post and replace the defective vehicle with a serviceable one within 24 hours. Vehicular repairs shall not be performed on post.

5. SPECIFIC TASKS:

5.1. Cleaning/Maintenance Oil Fired Boilers and Warm Air Furnaces:

5.1.1. The Contractor shall provide cleaning/maintenance service for domestic hot water boilers, water heating boilers, steam boilers and warm air furnaces IAW this PWS, the appropriate equipment manufacture’s recommendations, and commercial practices. The boilers and warm air furnaces with approximate capacities located in various facilities are listed in TE #1.

5.1.2. The contractor shall inspect boilers for air leaks, erosion, missing flue dampers, noisy motors, noisy pumps, cracked refractory and integrity of the combustion chamber to increase the boilers and warm air furnaces efficiency and prevent heat loss. The contractor shall clean baffles, tubes and stack. The contractor shall remove soot outside and/or inside boiler pipes and flush out boiler scale and sludge. The contractor shall make necessary minor repairs if the cost is under the cost threshold outlined in paragraph 5.1.8.2. Replace the fuel filter at the time maintenance is performed. Otherwise document conditions and notify the 51 CES HVAC shop in writing.

5.1.3. Visually inspect corrosive status of the anodes and if required, replace them with new anodes provided by the Government for domestic hot water heaters only. The contractor shall supply the COR a report stating the condition of the anode and shall annotate whether the anode was replaced. Anode needs replaced before it reaches 75% loss, see picture below. If there is not enough room above water heater, buy anode rod that has sausage links.

5.1.4. Perform internal inspection, including water side metal surfaces, stays, braces, fire tube sheds, manholes, hand holes plugs, and fireside surfaces ligaments. After inspection the contractor shall provide and install new handhold and manhole gaskets.

5.1.5. Check blower and motor for proper alignment, vibrations, and undue noise. Lubricate bearings and replace belt if necessary. If the motor cannot be aligned properly document the condition and notify the 51 CES HVAC in writing.

5.1.6. Use CO2 gas detector for evidence of a combustion gas leak into heated air space for furnace maintenance.

Document the CO2 levels recorded in the heated air space and if out of tolerance immediately shutdown the furnace and notify the 51 CES HVAC shop in person on the unsafe condition.

5.1.7. Combustion Analysis and Documentation: The contractor shall provide combustion analysis and documents after completing systems cleaning/maintenance. The documentation shall consist of one (1) electronic format and one (1) paper copy and shall contain the following items; combustion report ( printout from flue gas analyzer is sufficient), detailed listing of deficiencies (i.e. missing flue dampers, noisy motor, refractory falling/spilled etc.).

The contractor shall use the following specifications as a basis for performing the combustion analysis and report any deviation from these parameters.

5.1.7.1. Excess oxygen levels at high firing rates shall be 2% - 4% for liquid fuels.

5.1.7.2. Carbon monoxide emissions shall be below 400 ppm.

5.1.7.3. Sulfur oxides emissions shall be below 400 ppm.

5.1.7.4. Nitrogen oxides emissions shall be below 250 ppm.

5.1.7.5. Flame conditions: Flame shall be stable and not impinge on furnace walls or burner parts.

5.1.8. Replacement Parts:

5.1.8.1. Quality of replacement parts shall be of equal or better than original manufactured parts.

5.1.8.2. The contractor shall provide all minor repair and consumables that are common wear and tear components of the boiler and warm air furnace systems. These are limited to minor repairs for example fuel filters, belts, couplings, strainers, and gaskets necessary to perform this requirement if the cost does not exceed $100 per minor repair and repair time is limited to four (4) hours.

5.1.8.3. Failed major components should be documented by the contractor and the 51 CES HVAC shop notified of the condition in writing.

5.2. Quarterly Industrial Water Treatment and Analysis Service:

5.2.1. Contractor shall perform water treatment of heating and chilled water closed loop systems. Five (5) working days to prior to commencing work the contractor shall provide the COR with a written work plan.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .