A02_Drawing_files___120338___CIVIL.pdf
PDF 6 MB Posted
- Attached to
- Repair generator and building #5042, Yawolsan
- Solicitation number
- W91QVN-17-R-0088
About this file
Drawing CIVIL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A02_Submittal_Register___120338.xls | XLS spreadsheet | |
| A02_Drawing_files___120338___MECH.pdf | ||
| A02_Drawing_files___120338___Title.pdf | ||
| A02_Drawing_files___120338___ARCH.pdf | ||
| Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
S E
T
ID
S c a le
A p p ro v e d b y
D w n b y
C k d b y
D e s ig n e d b y
D a te
P ro je c t n o
S u b m it te d b y
D ra w in g n o
M
A R
F E
W R
R
E P
A
IR
G E
N E
R A
T O
R A
N D
R e v ie w e d b y D
A T
E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
U s in g A g e n c y
S a fe ty O ff ic e r
B ld g s
G ro u n d s
U ti li ti e s
F ir e P re v
P ro t
In s p e c ti o n
O th e rs
R e v
D a te
IN
S
T A
L L
A T
IO
N
M A
N A
G E
M E
N T
C O
M M
A N
D -P
A C
IF
IC
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
U N
IT
A
P O
A P
-5
U S
A R
M Y
G A
R R
IS
O
N R
E D
C L
O U
D
D P
W U
S A
G -R
E D
C L
O U
D A
N D
A R
E A
I
B L
G
Y
A W
O L
S A
N
C H
O E
S
M
1 PATCH EXIST RETAINING WALL AND CONC PAVED AREA
GENERAL NOTES
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AS SHOWN ON THE
DRAWINGS PRIOR TO THE START OF CONSTRUCTION.
ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION
OF THE CONTRACTING OFFICER.
2. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL
NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES
AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY
PRECAUTIONS FOR THE PROTECTION AND SAFETY OF THE PUBLIC
AND/OR MILITARY TRAFFIC AND OPERATIONS.
3. THE EXISTING TOPOGRAPHIC INFORMATION SHOWN ON THE DRAWINGS
IS FROM SURVEY.
- ELEVATIONS ARE ASSUMED.
- THE ORIGINAL FIELD SURVEY FOR PROJECT WAS COMPLETED
5 OCT 2016.
4. THE CONTRACTOR SHALL RESTORE ALL IMPROVEMENTS, DAMAGED OR
REMOVED AS A RESULT OF CONSTRUCTION TO ITS ORIGINAL OR BETTER
CONDITION, UNLESS OTHERWISE NOTED. THESE ITEMS INCLUDE, BUT
ARE NOT LIMITED TO PAVEMENTS, CONCRETE SIDEWALKS AND CURBS,
AND UTILITIES.
5. THE CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE
CONTRACTING OFFICER.
UTILITY NOTES
1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES,
APPURTENANCES AND STRUCTURES SHOWN ARE BASED ON AVAILABLE
RECORDS, AND APPLICABLE UTILITY MAPS, VERIFIED WHENEVER
POSSIBLE BY FIELD SURVEYS. HOWEVER THIS INFORMATION MAY NOT BE
COMPLETE AND ACCURATE.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
SIZE AND INVERTS OF ALL EXISTING UTILITIES AND SHALL PROTECT
ALL SUCH UTILITIES AT ALL TIMES, UNLESS OTHERWISE INDICATED.
EXISTING UTILITIES WHETHER SHOWN ON THE DRAWINGS OR NOT
WHICH HAVE BEEN DAMAGED AS A RESULT OF THE CONSTRUCTION
WORK, SHALL BE RESTORED IMMEDIATELY TO THEIR ORIGINAL OR BETTER
CONDITION AND SHALL BE PAID FOR BY THE CONTRACTOR.
2. WHENEVER CONNECTIONS TO EXISTING UTILITIES OR WHERE NEW
UTILITIES CROSS EXISTING UTILITIES ARE SHOWN, THE CONTRACTOR
SHALL CAREFULLY EXPOSE THE UTILITY BY HAND EXCAVATION TO
VERIFY THEIR LOCATIONS AND DEPTHS PRIOR TO EXCAVATING
TRENCHES FOR THE NEW UTILITY LINES.
3. WHENEVER ANY CHANGE IN ALIGNMENT OR GRADE FOR THE PROPOSED
UTILITIES ARE REQUIRED DUE TO UNFORESEEN CONFLICT WITH OTHER
UTILITIES, THE CONTRACTOR SHALL INFORM THE CONTRACTING
OFFICER IMMEDIATELY FOR REMEDIAL ACTION.
4. INTERRUPTION OF UTILITY SERVICE AND/OR OPERATIONS OF ADJACENT
FACILITIES WILL BE KEPT TO A MINIMUM. ANY INTERRUPTION OF
UTILITY SERVICE AND/OR OPERATIONS WILL BE COORDINATED WITH
THE CONTRACTING OFFICER AND THE AFFECTED USING AGENCIES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF
ALL WATER LINES DURING CONSTRUCTION. THE CONTRACTOR SHALL
BE ESPECIALLY CAREFUL WHEN EXCAVATING BEHIND WATER LINES,
TEES AND BENDS WHEREVER THERE IS A POSSIBILITY OF WATER LINE
MOVEMENT DUE TO REMOVAL OF THE SUPPORTING EARTH BEYOND THE
EXISTING REACTION BLOCKS. THE CONTRACTOR SHALL TAKE
WHATEVER MEASURES IS NECESSARY TO PROTECT THE WATER LINES,
SUCH AS CONSTRUCTING SPECIAL REACTION BLOCKS AND/OR
MODIFYING HIS/HER CONSTRUCTION METHOD, WITH THE APPROVAL
OF THE CONTRACTING OFFICER.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SEWAGE SPILLS
CAUSED DURING CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY
THE CONTRACTING OFFICER AND UTILIZE APPROPRIATE MEASURES TO
CONTAIN AND ADEQUATELY CLEANUP THE SPILL. THE CONTRACTING
OFFICER SHALL OVERSEE THE CLEANUP EFFORT AND RENDER THE SITE
CLEAN. ALL COSTS INCURRED FOR SPILL CONTAINMENT AND CLEANUP
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
7. USE 1.22 METER FOR THE FROST DEPTH.
PROJECT LIMIT
1. THE PROJECT LIMIT IS GENERALLY DEFINED BY THE GRADING LIMITS
SHOWN ON THE SITE DEVELOPMENT PLAN.
FOR THE PURPOSES OF DEFINING THE PROJECT LIMIT TO DETERMINE
LOCATIONS OF TEMPORARY FENCING OR BARRICADES THE CONTRACTOR
SHALL PREPARE A WORK PLAN SHOWING THE PROPOSED PROJECT
LIMIT FOR APPROVAL BY THE CONTRACTING OFFICER AND THE USING
AGENCY.
GRADING NOTES
1. THE FINISH GROUND ELEVATION AT THE BUILDING LINE SHALL BE A MINIMUM OF
200mm (8 INCHES) BELOW FINISH FLOOR ELEVATION, UNLESS OTHERWISE SHOWN.
2. ALL EXPOSED AREA SHALL BE SOLID SODDED. SODDING SHALL BE PLACED WITH
NO GAPS, AS SOON AS FINAL GRADES HAVE BEEN ESTABLISHED.
SODDING SHALL NOT BE DELAYED UNTIL ALL GRADING WORK HAS BEEN COMPLETED.
GRADING TO FINAL GRADE SHALL BE CONTINUOUS, AND ANY AREA WITHIN WHICH WORK
HAS BEEN INTERRUPTED OR DELAYED, SHALL BE SODDED.
ALL NEWLY GRADED AREAS SHALL BE TOP SOILED 100mm (4 INCHES)
THICK PRIOR TO SODDING.
3. FINISH GRADES ALONG PAVED AREAS AS SHOWN ON THE DRAWINGS ARE TOP OF
PAVEMENT ELEVATIONS, UNLESS OTHERWISE INDICATED.
ADJUSTMENTS MAY BE REQUIRED AT CONNECTION OF NEW WORK TO EXISTING PAVED
OR UNPAVED AREAS TO PROVIDE A SMOOTH RIDING CONNECTION.
4. TOPS OF MANHOLES TO BE RETAINED SHALL BE ADJUSTED TO MATCH FINISH GRADE
ELEVATION.
5. THE CONTRACTOR SHALL REMOVE ALL SILT AND DEBRIS RESULTING FROM HIS WORK
AND DEPOSITED IN DRAINAGE FACILITIES, ROADWAYS AND OTHER AREAS.
THE COSTS INCURRED FOR ANY NECESSARY REMEDIAL ACTION BY
THE CONTRACTING OFFICER SHALL BE PAYABLE BY THE CONTRACTOR.
DEMOLITION NOTES
1. ALL DEMOLITION WORK SHALL BE CONFINED WITHIN THE PROJECT
LIMITS INDICATED, UNLESS OTHERWISE NOTED.
2. PROJECT LIMITS SHOWN ARE APPROXIMATE. EXISTING GROUND
FEATURES AND ROADWAYS SHALL BE USED AS A DEMARCATION
FOR THE PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF
ROADWAY, EXISTING CHAIN-LINK FENCE, ETC.
3. ALL TREES, SHRUBBERY, AND ORNAMENTAL PLANTING NOT
SPECIFICALLY SCHEDULED TO BE RETAINED AND/OR TRANSPLANTED
SHALL BE CLEARED, GRUBBED AND REMOVED FROM THE SITE.
TREES, SHRUBBERY AND ORNAMENTAL PLANTINGS TO BE RETAINED
SHALL BE CAREFULLY REMOVED AND TRANSPLANTED AT LOCATIONS
ON CAMP DETERMINED BY THE CONTRACTING OFFICER.
4. ALL STRUCTURES WITHIN THE PROJECT BOUNDARY SHALL BE
DEMOLISHED AND REMOVED, UNLESS OTHERWISE INDICATED.
5. EXISTING ASPHALTIC CONCRETE PAVEMENT WITHIN THE PROJECT
LIMITS SHALL BE DEMOLISHED AND REMOVED, UNLESS OTHERWISE
INDICATED.
6. SIDEWALKS, CONCRETE PADS, CURBING AND OTHER ITEMS WITHIN
THE PROJECT LIMITS SHALL BE DEMOLISHED AND REMOVED,
UNLESS OTHERWISE INDICATED.
7. WATER AND SEWER LINES WITHIN THE PROJECT LIMITS SHALL BE
REMOVED, UNLESS OTHERWISE INDICATED. MANHOLES AND PITS MAY
BE ABANDONED AND SHALL BE FILLED WITH STRUCTURAL BACKFILL.
THE BOTTOM OF MANHOLES AND PITS SHALL BE CRACKED TO
ALLOW SEEPAGE OF WATER THROUGH THE ABANDONED MANHOLE.
TOP OF MANHOLES AND PITS SHALL BE DEMOLISHED WITHIN
900mm (3 FEET) OF THE FINAL GRADE.
8. EXISTING DRAIN LINES AND DRAINAGE STRUCTURES WITHIN THE
PROJECT LIMITS SHALL BE REMOVED, UNLESS OTHERWISE INDICATED.
9. ALL UTILITIES, STRUCTURES AND/OR IMPROVEMENTS IDENTIFIED
AS TO REMAIN SHALL BE MAINTAINED IN GOOD CONDITION TO
RECEIVE THE PROPOSED UTILITIES, STRUCTURES AND/OR IMPROVEMENTS.
SHOULD THESE ITEMS BECOME DAMAGED DUE TO CONTRACTOR’S
NEGLIGENCE OR CONSTRUCTION OPERATIONS, THE CONTRACTOR
SHALL RESTORE THESE ITEMS TO THEIR ORIGINAL OR BETTER
CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT AND TO
THE SATISFACTION OF THE CONTRACTING OFFICER.
10. ALL DISPOSAL WORK, SHALL BE IN ACCORDANCE WITH
APPLICABLE KOREAN ENVIRONMENTAL LAWS AND THE
ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK
REGULATION 201-1.
11. PRIOR TO DEMOLITION WORK THE CONTRACTOR SHALL PROVIDE
A LIST OF SALVAGEABLE MATERIALS IN COORDINATION WITH CONTRACTING OFFICER.
SCOPE OF WORK:
REPAIR MAINTENANCE WORK:
C I V I L A B B R E V I A T I O N S
C I V I L L E G E N D
PORTLAND CEMENT CONCRETE
CRM
BOT,B
CMS
CLR
CONSTR
CW
CV
CTRJ
C TO C
CTG
CRV
CP
CORR
COR
CONT
CONN
CONC
COL
CMU
CMP
CLKG
CLJ
CL OR C
CJ
CI-CIP
CHAN
CAP
C
BS
BRK
ACM
BO
BLK
BLDG(S)
BKS
BH
BCE
BARR
AVG
AUTO
AT/FP
ASPH
ASAP
ARCH
APPROX(.)
ALT
AL
AKR
A/G
ADJ
ADH
ADD
AD
ACS
ACP
ACFT
AC
AB
MATERIALMAT(’)L
PROPERTY (MATERIAL)
HEXAGON
HARDWARE
HOSE BIBB
HIGH, HEAD, HORIZONTAL
GALVANIZED
GREASE TRAP
GATE VALVE
GALVANIZED STEEL PIPE
GRADE LINE
GOVERNMENT FURNISHED
GENERATOR
FLOOR DRAIN
FOUNDATION
FIRE HYDRANT
FLOOR LEVEL
FUEL OIL RETURN
FUEL OIL SUPPLY
FIRE WATER
EACH WAY
ENTERING, ENTRANCE
ESTIMATE
ETCETERA
EXPANSION JOINT
EXISTING
EXTERIOR
CONCRETE RUBBLE MASONRY
COATING, CUTTING
CLEARANCE
CONSTRUCTION
COLD WATER
CHECK VALVE
CONTRACTION JOINT
CENTER TO CENTER
CONCRETE PIPE
CORRUGATED
CONTINUOUS
CONNECTION
CONCRETE
CORNER
COLUMN
CURVE
GALV
HDW
HGT
HEX
H
HB
HEIGHT
GS-GSP
GND
GR
GT
GV
GEN
GFP(M)
GL
GROUND
GRADE
CUBIC METER PER SECOND
CEMENT MASONRY UNIT
CORRUGATED METAL PIPE
CONTROL JOINT
CENTER LINE
CONSTRUCTION JOINT
CAST IRON PIPE
CAULKING
CHANNEL
L
BOTTOM
BOTH SIDES
CAPACITY
CONDUIT
BLOW-OFF
BUILDING(S)
BRICK
BLOCK
FD
FIN OR FNSH
FOR
FW
FOS
FL
FHY
FDN
FINISH
EXIST
EW
EXT
ENT
EST
ETC
EXP JT
NOMENCLATURENOMEN
O TO O
PC
PCC
P
PAV
OUTL
OD
ORIG
O/H
OPNG
OPTL
O(.)C(.)
OA
OUT TO OUT
POINT OF CURVATURE
POLE
PAVEMENT
OUTLET
OUTSIDE DIAMETER
ON CENTER
ORIGINAL
OVERHEAD
OPENING
OPTIONAL
OVERALL
NO(.) OR #
NGL
MTG
NIC
MJ
N
NFSM
mm, MM
MISC
MIN(.)
MLD
MET
MAX(.)
MDL
MECH
MOUNTING
NUMBER
MECHANICAL JOINT
NON FROST SUSCEPTIBLE
NOT IN CONTRACT
MATERIAL
NATURAL GAS LINE
NORTH
MILLIMETERS
MISCELLANEOUS
MILLION LITERS PER DAY
MECHANICAL
MINIMUM
METAL
MAXIMUM
MIDDLE
PUBLIC WORKS
DRAINAGE MANHOLE
U/G ELECTRICAL CABLE LINE
ELEVATION
ELECTRICAL
ELECTRICAL MANHOLE
ENCLOSURE
ENGINEERING
DETAIL(S)
DRINKING FOUNTAIN
DIAMETER
DIMENSION
DUCTILE IRON PIPE
DISTRIBUTION
DROP MANHOLE
DRAIN OR DOOR
DWELLING
DRAWING(S)
DIRECTORATE OF
DRAIN LINE
ADHESIVE
DMH
AVERAGE
AS SOON AS POSSIBLE
ASPHALT
BARRACKS
BOILER HOUSE
BASE CIVIL ENGINEER
ANTITERRORISM/FORCE PROTECTION
BARRIER
AUTOMATIC
ARCHITECTURAL
APPROXIMATE
ALUMINUM
ABOVEGROUND
ALTITUDE
ANCHOR
ADJACENT
EL
ELEC
EMH
ENCL
ENGRG
E
EA
ECL
EAST
EACH
DSGN
DWEL
DWG(S)
DPW
DN
DP
DR
DESIGN
DOWN
DROP
ASBESTOS CONTAINING
ASBESTOS CEMENT PIPE
MATERIAL
AREA DRAIN
ASPHALTIC CONCRETE
ANCHOR BOLT
ADDITION
ACCESS
AIRCRAFT
DIAG
DIM
DI-DIP
DISTR
DL
D
DET(S)
DF
DIA
DIAGRAM
DEPTH
IJ ISOLATION JOINT
KSC
L
M
LONG
LYT
LG
L
INVT
KPH
JT
IS
INTR
INSUL
INSTL
INL
KILOGRAMS PER SQUARE
CENTIMETER
LONGITUDINAL
LITERS
METERS
LAYOUT
LENGTH
LONG, LENGTH
KILOMETERS PER HOUR
INSECT SCREEN
INSTALLATION
INVERT
JOINT
INTERIOR
INSULATION
INLET
HORIZ
HWL
IE
ID
HW
HP
HM
INVERT ELEVATION
INSIDE DIAMETER
HIGH WATER LEVEL
HEADWALL, HOT WATER
HORSEPOWER, HIGH POINT
HORIZONTAL
HOLLOW METAL
RD ROAD
WOOD,
OR DITTO
WIRE MESH
WELDED
WELDED WIRE MESH
WATER
WEIGHT
WOODEN POLE
WITHOUT
TRANSFORMER
PERCENT
AND
AT
EQUAL
NUMBER
PLATE
PLUS OR MINUS
SAME AS ABOVE
WALL HYDRANT
WASTE DRAIN
WEST, WIDTH
WIND LOAD, WATER LINE
VERTICAL
VELOCITY
VALVE BOX
VARIOUS
STAINLESS STEEL
SPECIFICATION(S)
POWERLINE, STATIC PRESSURE
STEEL PIPE, OVERHEAD SECONDARY
SOLENOID VALVE
SEWER MANHOLE
SPEC(S)
STANDARD
SEPTIC TANK
STATION
SQUARE
STD
ST
STA
SST
SQ
SQUARE METER
SLOPE
SIMILAR
SHEET
SEWER LINE
SM, M2
SP
SOLV
SMH
SLP, S
SIM
SHT
SL
L
P
¡¾
XFMR
SURFACE CLEANOUT
REINFORCING BAR
SHOULDER
SOUTH
SCALE
SADDLE
SECTION
RAW WATER, RETAINING WALL
SC
SHLDR
SCO
SDL
SECT
RW
S
REPLACE
REQUIRED
REVIEW, REVISE
ROOM
REPAIR
RECTANGULAR
REFERENCE
RELOCATED
REPL
REQ’D
REV
RM
RPR
RE-BAR
RECT
REF
RELOC
W/O
WWM
WTR
WT
WP
WM
WLD
WH
WL
WD
W/
W
WITH
VERT
VEL
VB
VAR(.)
CABLE LINE
TELEPHONE
TELEPHONE MANHOLE
TOTAL
TOP OF STEEL
STAIRWAY
STRUCTURAL
STORAGE
STEEL
SUSPEND(ED)
SWITCH
SYSTEM
TYPICAL
THROUGH
THICK
TITLE BLOCK
UNDERGROUND
TELEPHONE
TEMPORARY
THREAD
UNDERGROUND
UNIFORM
PERFORATED STEEL PLATE
REINFORCED CONCRETE PIPE
REINFORCED CONCRETE
POINT OF VERTICAL TANGENCY
POINT OF VERTICAL INTERSECTION
POLYVINYL CHLORIDE
POINT OF TANGENT
RUBBER
RADIUS
RIGHT
RCP
R(.)C
RBR
RAD, R
R
PARTITION
POWER
QUANTITY
PWR
PT
Q
PSP
PVT
PVI
PVC
PTN TMH
UNIF
U/G
TOS
TOT
TYP
THD
THRU
TEMP
THK(.)
TEL
T/B
TCL
PRESSURE REDUCING VALVE
POINT OF INTERSECTION
OVERHEAD PRIMARY POWER LINE
PROJECT
PRESSURE
PREFABRICATED
PERMANENT
PRESSURE GATE
PAINT
PP
PRV
PROJ
PRESS
PREFAB
PERM
PG
PNT
PI
STWY
SUSP
SW
SYS
STRL
STOR
STL
SUB DRAINSD
AIR VACUUM RELIEF VALVEAVRV
ACU AIR CONDITIONING UNIT
POST INDICATOR VALVEPIV
NEWEXIST REMOVALNEWEXIST REMOVAL
NOT TO SCALENTS
CONC STEPS W/ HANDRAILS
CONC SLAB & CONC SIDEWALK
BUILDING
SDx D600
DRAIN LINE W/ SURFACE INLET
DRAIN LINE W/ DMH
CONC DITCH, CONC COVERED
CONC OPEN DITCH
W/ DIRECTION OF FLOW
GROUTED STONE OPEN DITCH
DIRT ROAD
CULVERT W/ HEADWALL & ENDWALL
ASPHALTIC CONC PAVED ROAD W/ CURB
(TO BE ABANDONED)
RICE PADDY
WATER LEVEL
DRY FARM
CONTOUR LINE
GRAVE & CEMETERY
EXIST U/G PIPE
SPOT ELEVATION
S
U/GA/G
23.60
S
B95-359
EL 88.06
NORTH DIRECTIONAL ARROW
A/G & U/G FUEL OIL STORAGE TANK
EVERGREEN OR DECIDUOUS TREE
D200 S
S
A
RWx
WOODEN FENCE
CHAIN LINK FENCE
CMU WALL FENCE W/ BARBED WIRE
CHECK VALVE
WATER LINE W/ AIR & VACUUM RELIFE VALVE
RAW WATER LINE
POST INDICATOR VALVE
WATER LINE W/ FIRE HYDRANT
WATER LINE W/ GATE VALVE W/ GATE VALVE BOX
WATER LINE W/ VALVE & VALVE BOX AND MANHOLE
GREASE TRAP
SEWER LINE W/ SEPTIC TANK
SEWER LINE W/ SMH
SEWER LINE W/ SCO
N
RC RETAINING WALL
D200
D200 S
Wx D200
Wx D150
A
RWx
D200 S
D200
D200 S
S
D200 D200
D SDx D600
D
SDx D600
SI SDx D600
SI
Sx
Wx D150
Wx D150
Wx D150
Wx D150
DRAIN LINE W/ JUNCTION BOXSDx D600
JB SDx D600
JB
Sx
SxSx
Wx D150
Wx D150
Wx D150
Wx D150
Sx Sx
Sx Sx
XX
DRAIN LINE W/ CURB INLETSDx D600
CI SDx D600
CI
LOCATION OF SOIL BORING
W/ BORING NUMBER
AND EXISTING GROUND ELEVATIONGx D50
Gx D50
NATURAL GAS LINE
23.60
S-1504
W D150
RW
D150 W A
D150 W
W D150
W D150
SS
SS
D200
SS
SSTGTWWW X
D150
D200
D200
SD
D600
SD
D600
SI
SD
D600
SD
D600
CI
CP
J
D50
A AREA
CI CURB INLET, CAST IRON
CO COMPANY
COMM COMMUNICATION
COMP COMPACTION
DUCTILE IRONDI
EXPANSION JOINTEJ, EXPJJ
ETHLENE PROPYLENE DIENE M-CLASSEPDM
FENCEFE
FIRE WATER LINEFWL
MFR MANUFACTURE
MH MANHOLE
NA NOT APPLICABLE
POLYETHYLENE PIPEPE
SURFACE INLETSI
SIGN POST
WELDED WIRE MESHWWMF
FABRIC
DIAMETER¥Õ
CURVE LENGTHCL
CONCRETE F’ck
COMPRESSIVE
STRENGTH
NEWREMOVALEXIST
REPLACE GROUND REINFORCING BY COMPACTION GROUTING SYSTEM
AND MICRO PILE.
REPLACE EXIST 0.30M W CONC OPEN DITCH WITH 0.3M W CONC DITCH W/ STEEL
GRATINGS.
4 REPLACE EXIST 0.30M W CONC DITCH W/ STEEL GRATINGS.
5 REPLACE EXIST FILTER FABRIC AND COMPOSITE DRAIN.
C-001
N O
T E
S L
E G
E N
D
S C
O P
E O
F W
O R
K
C
IV
IL
A
B B
R E
V
IA
T
IO
N S
1. FOR CIVIL ABBREVIATIONS, GENERAL NOTES & LEGEND,
SEE SHEET NO. C-001.
NOTES;
CS101
SITE LAYOUT PLAN
SCALE 1:100
EXIST ELEC MANHOLE
EXIST ELEC MANHOLE
EXIST CONC PAD FOR HVAC
4m210
SCALE: 1:100
REPLACE EXIST 0.30M W CONC DITCH
W/ STEEL GRATINGS (L=8.50M)
EXIST RC RETAINING WALL
W/ CHAIN LINK FENCE
EXIST BLOCK RETAINING WALL
EXIST CHAIN LINK FENCE FOR
SITE PERIMETER FENCE SECURITY SYSTEM
SEE NOTE NO. 10
APPROX. PROJECT LIMIT
FOR ENLARGED PLAN
SEE SHEETS NO. CS401
REPLACE GROUND REINFORCING
BY COMPACTION GROUTING SYSTEM
AND MICRO PILE
SEE SHEETS NO. CS401
2. THE CONTRACTOR SHALL PATCH EXISTING RETAINING WALL AND CONCRETE PAVED AREA,
AS SHOWN ON THIS SHEET WITHIN PROJECT LIMIT WHICH ARE DAMAGED AROUND BUILDING.
GENERATOR BUILDING
EXIST CONC STEP W/ HANDRAIL
REPLACE EXIST 0.30M W CONC OPEN
DITCH WITH 0.3M W CONC DITCH W/ STEEL
GRATINGS (L=16M)
9. PRIOR TO START THE MICRO DRILLING WORK, THE CONTRACTOR SHALL COORDINATE WITH
THE USING AGENCY FOR THE EXISTING UNDERGROUND ELECTRICAL CONDUITS AND ENSURE
THE NEW MICRO DRILLING CONSTRUCTION WORK WILL NOT DAMAGE THE EXISTING
UNDERGROUND ELECTRICAL CONDUITS. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
AND INDICATE THE EXACT LOCATION OF EXISTING CONDUITS AND NEW MICRO DRILLING
LOCATIONS FOR THE USING AGENCY’S REVIEW AND APPROVAL. DAMAGE DUE TO THE WORK
PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR.
PATCH EXIST RETAINING WALL AND
CONC PAVED AREA
EXIST WATER LINE
10. PRIOR TO START THE MICRO DRILLING WORK, THE CONTRACTOR SHALL COORDINATE WITH
USING AGENCY FOR THE EXISTING FENCE POLES AND FENCE SECURITY SYSTEM AND
ENSURE THE NEW MICRO DRILLING WORK WILL NOT DAMAGE THE EXISTING FENCE POLES
AND SECURITY SYSTEM. DAMAGE DUE TO THE WORK PERFORMED UNDER THIS CONTRACT
SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR.
11. THE CONTRACTOR SHALL NOT OBSTRUCT TRAFFIC BETWEEN SOUTH GATE AND NORTH
GATE TO ROK. THE CONTRACTOR SHALL COORDINATE WITH USING AGENCY FOR THE
EQUIPMENT LOCATION OR MATERIAL LAYDOWN AREA NOT TO BE SHUT DOWN SITE ROAD.
IF THE CONTRACTOR NEEDS TO UTILIZE AREA AT NORTH OF SITE GATE, THE CONTRACTOR
SHALL COORDINATE WITH ROK AND BE AUTHORIZED BY ROK.
EXIST UNDERGROUND ELEC CONDUITS.
EXACT LOCATION SHALL BE VERIFIED
IN FIELD. SEE NOTE NO. 9
EXIST UNDERGROUND ELEC CONDUITS.
EXACT LOCATION SHALL BE VERIFIED
IN FIELD. SEE NOTE NO. 9
PATCH RETAINING WALL CORNER SEPARATION1
3. FOR DETAIL OF CONSTRUCTION FLOW CHART, SEE SHEET
C-501
5. FOR DETAIL OF ECO CGS, SEE SHEET
C-502
6. FOR DETAIL OF MICRO PILE, SEE SHEET
C-502
7. FOR DETAIL OF PATCHING CONC PAVED AREA, SEE SHEET
C-503
8. FOR DETAIL OF CONC DITCH W/STEEL GRATINGS, SEE SHEET
C-503
4. FOR DETAIL OF SEQUENCE OF COMPACTION GROUTING, SEE SHEET
C-501
12. THE CONTRACTOR SHALL REPLACE EXIST FILTER FABRIC AND COMPOSITE DRAIN BEHIND
EXIST RC RETAINING WALL AFTER CURING OF CGS. THE CONTRACTOR SHALL CHECK
DEFORMATION OR MOVEMENT OF BUILDING AND RETAINING WALL DURING REPLACEMENT
OF FILTER FABRIC AND COMPOSITE DRAIN. IF THERE IS DEFORMATION OR MOVEMENT,
THE CONTRACTOR SHALL PERFORM REMEDIAL ACTION.
REPLACE EXIST FILTER FABRIC AND
COMPOSITE DRAIN
(H=1.50M FROM TOP OF RETAINING WALL)
SEE NOTE NO.12
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
S E
T
ID
S c a le
A p p ro v e d b y
D w n b y
C k d b y
D e s ig n e d b y
D a te
P ro je c t n o
S u b m it te d b y
D ra w in g n o
M
A R
F E
W R
R
E P
A
IR
G E
N E
R A
T O
R A
N D
R e v ie w e d b y D
A T
E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
U s in g A g e n c y
S a fe ty O ff ic e r
B ld g s
G ro u n d s
U ti li ti e s
F ir e P re v
P ro t
In s p e c ti o n
O th e rs
R e v
D a te
IN
S
T A
L L
A T
IO
N
M A
N A
G E
M E
M M
A N
D -P
A C
IF
IC
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
U N
IT
A
P O
A P
-5
U S
A R
M Y
G A
R R
IS
O
N R
E D
C L
O U
D
D P
W U
S A
G -R
E D
C L
O U
D A
N D
A R
E A
I
B L
Y
A W
O L
S A
N
C H
O E
S
M
1. FOR CIVIL ABBREVIATIONS, GENERAL NOTES & LEGEND,
SEE SHEET NO. C-001.
NOTES;
CS401
GROUND REINFORCING PLAN
SCALE 1:60
EXIST ELEC MANHOLE
EXIST CONC PAD FOR HVAC
2.4m1.20.60
SCALE: 1:60
EXIST RC RETAINING WALL
W/ CHAIN LINK FENCE
EXIST BLOCK RETAINING WALL
APPROX. PROJECT LIMIT
REPLACE GROUND REINFORCING
BY COMPACTION GROUTING SYSTEM
AND MICRO PILE
REPLACE GROUND REINFORCING
BY COMPACTION GROUTING SYSTEM
AND MICRO PILE
ECO C.G METHOD + MICRO PILE
ECO C.G METHOD
QUANTITYDESCRIPTIONSYMBOL
GROUND REINFORCING SCHEDULE
REMARK
79 HOLES
85 HOLES
GROUND REINFORCING METHOD;
1. ECO CG METHOD (COMPACTION GROUTING)
- BORING DIAMETER : 73mm
- GROUTING DEPTH : 6.0M (ASSUMED, SEE NOTE NO.3)
- PRESSURE : 10~20 KG/CM2 (POSSIBLE TO CONTROL PRESSURE)
- DIRECTION : 10 DEGREE FROM VERTICAL TO WEST DIRECTION
2. MICRO PILE
- MAXIMUM C.T.C 1.0M
- BORING DEPTH : 6.5M (ASSUMED, SEE NOTE NO.3)
- PILE MATERIAL : SD350 D32mm STEEL BAR
2. THE GROUND REINFORCEMENT DESIGN IS BASED ON GROUND REINFORCING
BY COMPACTION GROUTING SYSTEM(ECO CGS) AND MICRO PILE.
THE OWNER OF THE DESIGN RIGHT IS HANMI CORP & HGTC & HMFC.
AND DESIGN IS REGISTERED IN THE KOREAN INTELLECTUAL PROPERTY OFFICE,
THE REGISTRATION NUMBER IS 10-1372357. (TEL : 02-858-4530)
GROUND REINFORCING SHALL BE ECO CGS AND MICRO PILE OR APPROVED EQUAL.
EXIST PCC PAVED ROAD
GENERATOR BUILDING
EXIST CONC STEP W/ HANDRAIL
3. THE DEPTH OF ECO CGS AND MICRO PILE SHALL BE INTO THE BEDROCK.
THE DEPTH OF ECO CGS AND MICRO PILE ON DRAWINGS ARE ASSUMED.
ACTUAL DIMENSION SHALL BE DETERMINED DURING THE DRILLING WORK.
3. THE STRENGTH OF GROUTING(CGS AND MICRO PILE) SHALL NOT BE LESS THAN 80KG/CM
REPLACE EXIST 0.30M W CONC DITCH
W/ STEEL GRATINGS
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
S E
T
ID
S c a le
A p p ro v e d b y
D w n b y
C k d b y
D e s ig n e d b y
D a te
P ro je c t n o
S u b m it te d b y
D ra w in g n o
M
A R
F E
W R
R
E P
A
IR
G E
N E
R A
T O
R A
N D
R e v ie w e d b y D
A T
E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
U s in g A g e n c y
S a fe ty O ff ic e r
B ld g s
G ro u n d s
U ti li ti e s
F ir e P re v
P ro t
In s p e c ti o n
O th e rs
R e v
D a te
IN
S
T A
L L
A T
IO
N
M A
N A
G E
M E
M M
A N
D -P
A C
IF
IC
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
U N
IT
A
P O
A P
-5
U S
A R
M Y
G A
R R
IS
O
N R
E D
C L
O U
D
D P
W U
S A
G -R
E D
C L
O U
D A
N D
A R
E A
I
B L
Y
A W
O L
S A
N
C H
O E
S
M
GROUND REINFORCING SECTION
VERT 1 : 30
HORIZ 1 : 60SCALE
S-5042
FNSH FL EL 471.53
.0
.5
EXIST PCC PAVEMENT
REPLACE EXIST 0.3M W CONC DITCH
W/ STEEL GRATINGS
EXIST CHAIN LINK FENCE
& RETAINING WALL
REPLACE GROUND REINFORCING BY
COMPACTION GROUTING SYSTEM AND MICRO PILE
10¢“
.5
REPLACE EXIST FILTER FABRIC
AND COMPOSITE DRAIN
SEE DETAIL
SUBDRAIN OF RETAINING WALL
NOT TO SCALE
.5
COMPOSITE DRAIN ATTACHED
FLUSH TO BACK OF WALL
CUT BACK OF DRAIN CORE TO
MATCH SIZE OF WEEP HOLE
DO NOT CUT FILTER FABRIC.
6.5x100 SQUARE POLYVINYL
CHLORIDE PLATE OVER EACH
WEEP HOLE
FILTER FABRIC
PERFORATE
EXIST WEEPHOLE
CONC DITCH
W/ STEEL GRATINGS
CS301
NOTES:
1. THE COMPOSITE DRAINS SHALL BE INSTALLED CONTINUOUSLY ALONG THE ENTIRE
LENGTH OF THE WALLS.
2. COMPOSITE DRAINS SHALL CONSIST OF A NONWOVEN POLYESTER OR POLYPROPYLENE
FILTER FABRIC WHICH IS FACTORY BONDED TO ONE SIDE OF A THREE-DIMENSIONAL
DRAINAGE CORE PANEL OR STRIP.
3. DRAINAGE CORE OF COMPOSITE DRAINS SHALL BE FOLLOWS
A. THICKNESS: MINIMUM 11.5 MM (0.45 INCH) (0.45 INCH) PER ASTM D1777.
B. MINIMUM COMPRESSIVE STRENGTH: 2.69 KG/CM2 AT MAX 10 PERCENT DEFLECTION
PER ASTM D1621 OR KS M ISO 844.
C. COMPOSITION: HIGH DENSITY POLYETHYLENE OR HIGH-IMPACT RESISTANT POLYSTYRENE.
4. FILTER FABRIC SHALL BE FOLLOWS
A. COMPOSITION: NONWOVEN POLYESTER OR POLYPROPYLENE.
B. GRAB TENSILE STRENGTH: MINIMUM 59 KG PER ASTM D4632 OR KS K 0520.
C. GRAB TENSILE ELONGATION (ALL DIRECTIONS): MINIMUM 50 PERCENT PER ASTM D4632 OR
KS K 0743.
D. TRAPEZOIDAL TEAR STRENGTH: MINIMUM 18 KG PER ASTM D4533 OR KS K 0537.
E. MULLEN BURST STRENGTH: MINIMUM 95 KG PER ASTM D3786/D3786M OR KS K 0351.
F. PUNCTURE STRENGTH: MINIMUM 18 KG PER ASTM D4833 OR KS K 0350.
G. APPARENT OPENING SIZE (AOS): 70 TO 80 U.S. SIEVE SIZE PER ASTM D4751 OR KS K 0754.
H. WATER FLOW RATE: MINIMUM 150 GAL/MIN/FT2 FOOT PER ASTM D4491 OR KS F 2322.
I. COEFFICIENT OF PERMEABILITY: MINIMUM 0.2 CM/SEC PER ASTM D4491.
J. MOISTURE ABSORPTION: NOT LESS THAN 0.05 PERCENT PER ASTM D570 OR KS M ISO 62.
BUT SQUARE TEST SPECIMEN FOR HOMOGENEOUS PLASTICS, TEST SPECIMEN FOR RODS,
OR TEST SPECIMEN FOR TUBES SHALL BE APPLIED IN CASE OF KS M ISO 62.
K. UV RESISTANCE: AT LEAST 70 PERCENT OF MINIMUM GRAB TENSILE STRENGTH RETAINED
AFTER 150 HOURS EXPOSURE PER ASTM D4355.
1.2m0.60.30
SCALE: 1:30
2.4m1.20.60
SCALE: 1:60
G R
O U
N D
R E
IN
F
O R
C
IN
G S
E C
T
IO
N
CS301
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
S E
T
ID
S c a le
A p p ro v e d b y
D w n b y
C k d b y
D e s ig n e d b y
D a te
P ro je c t n o
S u b m it te d b y
D ra w in g n o
M
A R
F E
W R
R
E P
A
IR
G E
N E
R A
T O
R A
N D
R e v ie w e d b y D
A T
E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
U s in g A g e n c y
S a fe ty O ff ic e r
B ld g s
G ro u n d s
U ti li ti e s
F ir e P re v
P ro t
In s p e c ti o n
O th e rs
R e v
D a te
IN
S
T A
L L
A T
IO
N
M A
N A
G E
M E
M M
A N
D -P
A C
IF
IC
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
U N
IT
A
P O
A P
-5
U S
A R
M Y
G A
R R
IS
O
N R
E D
C L
O U
D
D P
W U
S A
G -R
E D
C L
O U
D A
N D
A R
E A
I
B L
Y
A W
O L
S A
N
C H
O E
S
M
CONSTRUCTION FLOW CHART
NOT TO SCALE
PREPARATION OF WORKS
PLANT SETTING SET OUT GROUTING POSITION
SLUMP TEST
DRILLING
MIXING OF MATERIAL
TEST OF PUMPING VOLUME CHECK OF DRILLING DEPTH
INJECTION BY STEP
FINISH OF INJECTION
END OF WORKS
SEQUENCE OF COMPACTION GROUTING
NOT TO SCALE
1. PLANT SETTING & TAKE IN MATERIALS
2. INJECTION HOLE DRILLING WORK
3. GROUTING INJECTION WORK
4. COMPLETION & MOVING NEXT HOLE, REPETITION WORK
MATERIALS GROUT MIXING PLANT GROUTING PUMP
S T
R U
C T
U R
E O
F M
O R
T A
R
PRESSURE
GAGE
JACKY
DRILLING MACHINE
NOTES:
C-501
G R
O U
N D
R E
IN
F
O R
C
IN
G D
E T
A
IL
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
S E
T
ID
S c a le
A p p ro v e d b y
D w n b y
C k d b y
D e s ig n e d b y
D a te
P ro je c t n o
S u b m it te d b y
D ra w in g n o
M
A R
F E
W R
R
E P
A
IR
G E
N E
R A
T O
R A
N D
R e v ie w e d b y D
A T
E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
U s in g A g e n c y
S a fe ty O ff ic e r
B ld g s
G ro u n d s
U ti li ti e s
F ir e P re v
P ro t
In s p e c ti o n
O th e rs
R e v
D a te
IN
S
T A
L L
A T
IO
N
M A
N A
G E
M E
M M
A N
D -P
A C
IF
IC
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
U N
IT
A
P O
A P
-5
U S
A R
M Y
G A
R R
IS
O
N R
E D
C L
O U
D
D P
W U
S A
G -R
E D
C L
O U
D A
N D
A R
E A
I
B L
Y
A W
O L
S A
N
C H
O E
S
M
ECO CGS DETAIL
NOT TO SCALE
MICRO PILE DETAIL
NOT TO SCALE
ECO CGS
¥Õ=400mm
MICRO PILE
SD350 D32mm
NOTES FOR COMPACTION GROUTING SYSTEM(CGS):
1. GENERAL
ECO COMPACTION GROUTING IS THE GROUND IMPROVEMENT METHOD THAT INJECTS SPECIAL MORTAR INTO THE GROUND.
INJECTED MORTAR WILL BE MIXED WITH THE EXISTING UNSTABLE SOIL AND MAKE THE SOIL CEMENT COLUMN IN THE GROUND.
THE COAGULATED MORTAR BY MIXING WITH SOIL WILL REINFORCE UNSTABLE SOIL.
DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE NOTED.
NOTE:
SD350 D32mm
2. SUBMITTAL
THE CONTRACTOR SHALL SUBMIT CONSTRUCTION PLAN FOR APPROVAL BY CONTRACTING OFFICER BEFORE CONSTRUCTION.
3. DELIVERY, STORAGE, AND HANDLING
THE CONTRACTOR SHALL PROTECT COMPONENTS PLACED IN STORAGE FROM THE WEATHER, HUMIDITY, AND TEMPERATURE
VARIATION,
DIRT AND DUST, OR OTHER CONTAMINANTS.
4. WORK PROCEDURE
4.1 DRILLING WORK FOR CGS
1) BORING BY 73mm DIAMETER ROTARY BORING MACHINE TO INJECT MORTAR INTO THE GROUND.
2) THE BORING LOCATIONS ARE BASED ON PLAN. WHENEVER ANY CHANGE IN BORING LOCATION, IT SHALL INFORMED AND
APPROVED
BY THE CONTRACTING OFFICER.
3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING SITE CONDITION AND UTILITIES.
4) DRILLING SHALL BE PERFORMED TO 0.5M OF BED ROCK.
4.2 PLANT & EQUIPMENT OF CGS
1) THE EQUIPMENT SHALL MIX THE MORTAR WITH UNIFORM QUANTITY AND QUALITY.
2) THE INJECTING PRESSURE CAPABILITY OF GROUT PUMP MACHINE SHALL BE OVER 70KG/CM2.
4.3 GROUT INJECTION WORK OF CGS
1) THE SLUMP OF THE MIXTURE SHALL BE LESS THAN 5 CM.
2) THE MIXING CRITERIA OF GROUTING MORTAR IS AS BELOW.
CEMENT
MORE THAN 280KG
COARSE AGGREGATE
(MAX. 10mm)
0.5 M3
FINE AGGREGATE
(MAX. 4mm)
0.5 M3
WATER
0.2 M3
3) THE GROUTING SHALL BE INJECTED EVERY 30 CM HIGH. RAISING HEIGHT SHALL BE LESS THAN 30CM FOR CONTINUOUS
COAGULATED MORTAR COLUMN.
5. QUALITY CONTROL
5.1 TEST DURING CONSTRUCTION
CLASS
CONTENTS
VERTICALITY
DRILLING WORK
DEPTH
¡¾3 DEGREE
5.2 TEST AFTER CURING
1) THE CONTRACTOR SHALL CONDUCT CGS CORE SAMPLING FOR COMPRESSION STRENGTH TEST AND CHECK GROUTING CONDITION.
2) CORE SAMPLING OF CGS SHALL NOT BE LESS THAN 3 HOLES FOR EACH BUILDINGS AND SAMPLING LOCATION SHALL BE SELECTED
BY CONTRACTING OFFICER OR USING AGENCY.
3) THE COMPRESSION STRENGTH OF COAGULATED CGS MORTAR SHALL NOT BE LESS THAN 80KG/CM2.SPACER
EVERY 2.0M
LESS THAN 5CM
(EVERY DAY)
SLUMP TEST
INJECTION WORK
REMARK
(EVERY HOLE)
¡¾0.2 M
(EVERY HOLE)
NOTES FOR MICRO PILE:
1. GENERAL
MICRO PILE IS GROUND REINFORCING METHOD THAT INSERT STEEL BAR WITH CEMENT MILK INTO THE GROUND.
MICRO PILE WILL INCREASE TENSILE AND COMPRESSIVE STRENGTH OF REINFORCED GROUND.
2. WORK PROCEDURE
2.1 DRILLING WORK FOR MICRO PILE
1) DRILLING SHALL BE CONDUCTED 3 DAYS AFTER INJECTION OF CGS.
2) BORING BY 73mm DIAMETER ROTARY BORING MACHINE TO INSTALL MICRO PILE.
3) THE BORING LOCATIONS ARE BASED ON PLAN.
4) DRILLING SHALL BE PERFORMED TO 0.5M DEEPER THAN PLANNED FOR FALLING DEBRIS.
5) USING BENTONITE SUSPENSION SHALL NOT BE PERMITTED.
2.2 MICRO PILE INSTALLATION
1) SD350 D32mm STEEL BAR SHALL BE DELIVERED AND STORED STRAIGHTLY.
2) THE MICRO PILE SHALL BE INSERTED IMMEDIATELY AFTER DRILLING.
3) THE BOTTOM OF MICRO PILE SHALL BE INSERTED INTO 0.5M OF BED ROCK.
4) EACH STEEL BAR SHALL BE CONNECTED BY COUPLER WHENEVER NEEDED.
5) SPACER SHALL BE INSTALLED EVERY 2M TO LOCATE PILE IN THE MIDDLE OF HOLE.
2.3 GROUTING AND MIXER FOR MICRO PILE
1) GROUT CONSISTS OF PORTLAND CEMENT, WATER AND ADMIXTURE.
2) THE BLEEDING SHALL BE LESS THAN 4% AND IT SHALL BE 0% AFTER 14 HOURS.
3) GROUTING SHALL BE INJECTED CONTINUOUSLY FROM BOTTOM AND NOT FINISHED UNTIL OVERFLOW AT SURFACE.
4) CASING SHALL BE BURIED WHERE GROUTING IS NOT OVERFLOWING OR IS LOST CONTINUOUSLY AT CERTAIN SOIL LAYER.
5) MIXER SHALL BE OPERATED MIXING AND INJECTING AT THE SAME TIME TO INJECT CONTINUOUSLY.
6) THE STRENGTH OF GROUTING SHALL NOT BE LESS THAN 80KG/CM2.
3. QUALITY CONTROL
CLASS
CONTENTS
VERTICALITY
DRILLING WORK
DEPTH
¡¾2.5 DEGREE
REMARK
(EVERY HOLE)
¡¾0.5 M
(EVERY HOLE)
(PER 1M3)
C-502
E C
O C
G S
M
IC
R
O P
IL
E
D E
T A
IL
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
S E
T
ID
S c a le
A p p ro v e d b y
D w n b y
C k d b y
D e s ig n e d b y
D a te
P ro je c t n o
S u b m it te d b y
D ra w in g n o
M
A R
F E
W R
R
E P
A
IR
G E
N E
R A
T O
R A
N D
R e v ie w e d b y D
A T
E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
U s in g A g e n c y
S a fe ty O ff ic e r
B ld g s
G ro u n d s
U ti li ti e s
F ir e P re v
P ro t
In s p e c ti o n
O th e rs
R e v
D a te
IN
S
T A
L L
A T
IO
N
M A
N A
G E
M E
M M
A N
D -P
A C
IF
IC
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
U N
IT
A
P O
A P
-5
U S
A R
M Y
G A
R R
IS
O
N R
E D
C L
O U
D
D P
W U
S A
G -R
E D
C L
O U
D A
N D
A R
E A
I
B L
Y
A W
O L
S A
N
C H
O E
S
M
2C
2A
2D
2B
FNSH GRADE
SEE DETAIL
COMPACTED NFSM
EXPANSION JOINT
NOTES:
EXPANSION JOINT FILLER
10 PREMOLED JOINT SEALER
C DITCHL
W
TYP PANEL
5mm
5mm
DIMENSION TABLE
DIMENSION(mm)
W
BEARING BARh
GRATINGT
H ANGLE SIZE
SUPPORT FRAME
8mmX8mm CROSS BAR @ 100mm OC
BEARING BAR SEE TABLE
ANCHOR 6mm
THKX150mm@500mm OC
8mmX8mm CROSS BARS 100mm OC
S E
E D
IM
E
N S
IO
N
T A
B L
E
5mm
CLR
SUPPORT SEE TABLE
T W T 150
300 50150 50X7X4 @ 30 L-56X61X656
WELDED TO BEARING BARS
D13 @ 300mm
OC EW
D13 @ 300mm
OC EW
2B
PLAN
SECTION
DETAIL
CONC DITCH W/STEEL GRATINGS
NOT TO SCALE
5mm
CLR
1. STEEL GRATINGS SHALL BE GALVANIZED AFTER FABRICATION.
2. PROVIDE EXPANSION JOINT AT MAX 15M INTERVALS.
BEARING BAR
SEE DIMENSION TABLE95% COMPACTION
CONC
PAVEMENT
3R
JOINT SEALER
JOINT FILLER
3R
100MM P.C.C W/ WWM #8
CENTERED IN SLAB
X
E.J
BLDG
E.J
MANHOLE
NOTE:
NOTE:
PATCHING CONC PAVED AREA
NOT TO SCALE
1A
SECTION
1B
CONTRACTION JOINT
1C
EXPANSION JOINT
1D
LATERAL TRANSITION
1E
LONGITUDINAL TRANSITION
TRANSVERSE CONTRACTION JOINTS SHALL BE SPACED SO
THAT THE RATIO OF SLAB LENGTH TO WIDTH WILL NOT
EXCEED 1.25. THE DEPTH OF THE CONTRACTION JOINT WILL
BE AT LEAST ONE-FOURTH (1/4) OF THE PCC SLAB THICKNESS,
BUT NOT LESS THAN THE MAXIMUM NOMINAL SIZE OF THE
AGGREGATE USED.
PROVIDE EXPANSION JOINTS AT MAX 15M INTERVALS
FOR STRAIGHT SECTIONS, AT ALL RETURNS OF WALKS,
AND WHERE WALKS ABOUT OTHER CONC STRUCTURES.
12.5
2C
CONC
PAVEMENT
H
T h
5mm
995mm
T V
A R
C-503
M
IS
C D
E T
A
IL
| 120338C-001--- |
| 120338CS101--- |
| 120338CS401--- |
| 120338CS301--- |
| 120338C-501--- |
| 120338C-502--- |
| 120338C-503--- |
File details come from the government source that posted it. Updated .