0010965737

a. This is Non-Work Plan Task Order for the follow ing MATOC Contractors only. Contract No# W91QVN-14-D-0031,0032, 0033, 0035, 0036, 0037, 0038, 0039, 0040, 0041, 0044, 0045, 0046, 0047,0048,0049, and 0050.

b. If the Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit the "No-Offer Letter" by date and time specif ied in this solicitation.

MR. SON, U KAP 02-7914-3354

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

14-Mar-2017

(RFP)

(IFB)

X

CALL:

Repair Bldg# 2607

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________210 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________28 Mar 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

130954

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W91QVN-17-R-0075 24

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W91QVN-17-R-0075

Section A - Solicitation/Contract Form

SUBJECT TO THE AVAILABILITY OF END-OF YEAR FUNDS (SAEF)

"FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD

WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE."

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair Bldg #2607, Casey

FFP

Work Class: K, FEWR #130954 FOB: Destination

PURCHASE REQUEST NUMBER: 0010965737

NET AMT

0002 1 Job Repair Bldg #2607, Casey

FFP

Work Class: L , FEWR #130954

PURCHASE REQUEST NUMBER: 0010965737

Estimated Cost for War Hazzard

FFP

is zero (0).

Section C - Descriptions and Specifications

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

130954 Repair building No. 2607 Camp Casey

1. DESCRIPTION: The work to be performed to repair building No. 2607 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project..

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace 1.8m width sidewalk.

2.1.1.2. Replace 1.8m width concrete step including handrail.

2.1.1.3. Replace concrete curb with granite curb.

2.1.1.4. Replace concrete open ditch with 0.3m width steel grating ditch and connect to existing concrete covered ditch with 150mm diameter Polyvinyl Chloride (PVC) pipe.

2.1.1.5. Restore Asphalt Concrete (AC) pavement.

2.1.1.6. Replace solid sodding including top soil.

2.1.2. Architectural Work

2.1.2.1. Replace existing floor coating with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on new floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.

2.1.2.2. Replace existing ceiling with new acoustical ceiling tile including metal suspension systems as shown on interior finish schedule.

2.1.2.3. Replace existing ceiling with new gypsum wall board (GWB, normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.

2.1.2.4. Replace existing gravel bed and concrete curb with new 100mm deep gravel bed and granite curb (minimum 300mm height) around building as shown on floor plans and detail drawing.

2.1.2.5. Replace existing Floor Tile (FT) and Glazed Ceramic Wall Tile (GCWT) with new including toilet accessories, metal lath, mortar bed, and waterproofing in bathrooms and toilets as shown on floor plans and detail drawings.

2.1.2.6. Replace existing concrete slab to replace mechanical piping work.

2.1.2.7. Replace interior and exterior signages with new for all rooms as shown on elevations and signage schedule.

2.1.2.8. Paint all existing exterior exposed Exterior Insulation and Finish System (EIFS), Concrete Masonry Unit (CMU), metal, woods, concrete surfaces, fascia, soffit and other components (trash bins, guard walls, bicycle rack, fuel tank) of exterior surface of the building including minor repair EIFS as shown on floor plan and picture.

2.1.2.9. Replace existing vanity cabinets including wall hung cabinet with new as shown on floor plans and detail drawing.

2.1.2.10. Paint existing steel handrails and guardrails including sanding and primer in all stairs.

2.1.2.11. Replace existing pipe chases and pipe cover with new CMU, waterproof or X type of GWB pipe chases and metal cover including access door in each rooms for new mechanical piping system and duct as per floor plans, sections and detail drawings.

2.1.2.12. Replace existing Fire Extinguisher Cabinets (FEC) with new as shown on new floor plans and detail drawing.

2.1.2.13. Replace existing all doors and door frames with new including hardware sets as shown on new floor plans and door schedule.

2.1.2.14. Replace existing wooden sill for all windows with new as shown on door and window schedule (natural color, oak).

2.1.2.15. Replace existing window horizontal mini blinds with news.

2.1.2.16. Replace existing windows including insect screen with new aluminum thermal breaker type blast windows including insulating glass with 8.75mm thick clear laminated glass + 12mm thick air space + 6mm thick tinted low-e tempered glass as shown on floor plans and window schedule.

2.1.2.17. Replace existing mop rack with new in janitor room.

2.1.2.18. Replace existing wooden hanging rails in each bed room and chair rails in each day room with new as shown on floor plans (natural color, oak).

2.1.2.19. Replace rubber tiles with new including tread and riser in stair 1 and 2 as shown on floor plans and interior finish schedule.

2.1.2.20. Replace existing aluminum louvers with new as shown on floor plans and louver schedule.

2.1.2.21. Replace existing all access doors on wall and ceiling with new.

2.1.2.22. Apply epoxy coating with non-slip grits on existing floors as shown on interior finish schedule.

2.1.2.23. Replace wooden shelf, Stainless Steel (SST) rod with new in each closet as shown on floor plan and details.

2.1.2.24. Paint on all interior surfaces including ceiling and wall as shown on interior finish schedule and elevations.

2.1.2.25. Replace plexi-info holder and card holder with new as shown on detail drawings and signage schedule.

2.1.2.26. Replace existing quarry tile with new including wood base board as shown on floor plans and interior finish schedule.

2.1.2.27. Replace existing concrete stoops with new as shown on floor plans.

2.1.2.28. Replace counter table with new in admin office as shown on floor plans.

2.1.2.29. Replace existing metal door frame with new wooden molding in corridors as shown on floor plan.

2.1.2.30. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on exterior section.

2.1.2.31. Replace existing exterior bulletin board with new as shown on signages schedule.

2.1.2.32. Replace kitchenette and wall hung cabinet in each dayroom on 2nd, 3rd, and 4th floor as shown on floor plans and detail drawing.

2.1.3. Mechanical Work

2.1.3.1. HVAC system

2.1.3.1.1. Replace existing hot and chilled water circulation pump, expansion tank with concrete pad, air separator, carbon monoxide detector, detection controller, alarm gong, systems and associated piping with new.

2.1.3.1.2. Replace existing drain and hot and chilled water piping throughout the building with new.

2.1.3.1.3. Replace existing air handling units and associated ductwork in laundry room with new.

2.1.3.1.4. Replace existing fan coil units, motorized outside air intake boxes, controls and associated piping with new.

2.1.3.1.5. Replace existing exhaust fans within the mechanical room, laundry room and toilet and associated duct with new.

2.1.3.1.6. Replace existing bathroom exhaust fans and ducts with new.

2.1.3.1.7. Replace existing electric cabinet unit heaters, thermostat and energy recovery ventilation associated ductwork with new.

2.1.3.1.8. Replace existing fin-tube radiator, split air conditioning unit and associated piping with new.

2.1.3.1.9. Replace existing unit heater, range hood, fire extinguisher and 100mm dryer connect to dryer with new.

2.1.3.1.10. All mechanical systems shall be tested, adjusted, and balanced by the contractor in strict accordance with applicable sections of division 15 - mechanical O&MA standard technical specifications for miscellaneous projects, Korea. The HVAC Testing, Adjusting, and Balancing (TAB) report shall be submitted to the project COR for government review and approval.

2.1.3.2. Plumbing system

2.1.3.2.1. Replace existing domestic hot water storage tank with concrete pad, domestic hot water circulation pump, domestic hot water re-circulation pump, expansion tank, thermostatic mixing valve and associated accessories with new.

2.1.3.2.2. Replace existing all domestic hot and cold water piping with new.

2.1.3.2.3. Replace existing all sewer, vent, floor drain and cleanout piping with new.

2.1.3.2.4. Replace existing bathroom plumbing fixtures and associated piping with new.

2.1.3.2.5. Replace existing electric water cooler, sink, dryer vent and valve box within the laundry room with new.

2.1.3.2.6. Replace existing Back Flow Preventer (BFP) and Pressure Reducing Valve (PRV) assembly, including pipe supports and hose bibb with new.

2.1.3.3. Sprinkler work

2.1.3.3.1. Replace existing fire protection system with wet type sprinkler system and associated piping.

2.1.4. Electrical Work

2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, photocell, lighting contactor, wires and conduits with new.

2.1.4.2. Replace existing main distribution switchboard, panelboards, panelboard front covers, receptacles and cover plates, circuit breaker, and associated wiring and conduit with new.

2.1.4.3. Replace existing safety switches, master control panel, combination motor starters, magnetic motor starters, manual motor starters, junction boxes, control system, wires and conduits for HVAC system with new.

2.1.4.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, building transmitter, antenna, visual signal strobes, microphone, speaker device, local operating console and associated wiring and conduit.

2.1.4.5. Replace existing telephone terminal board, equipment rack and accessories, outlets including cover plates and associated wiring and conduit with new.

2.1.4.6. Replace existing CATV cabinets and pull boxes, outlets including cover plates, and associated wiring and conduit with new.

2.1.4.7. Replace existing exterior power distribution line including pad mounted transformer, watt hour meter, and underground cable riser set with new.

2.1.4.8. Replace existing exterior underground telecommunication line, hand hole and accessories with new.

2.1.4.9. Remove and reinstall existing CCTV cameras and monitoring system with associated accessories.

2.1.4.10. Remove existing public address system including speakers.

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

2.2.1. Civil Work

2.2.1.1. Install 150mm diameter PVC water line including Post Indicator Valve (PIV).

2.2.1.2. Construct bike shed.

2.2.2. Architectural Work

2.2.2.1. Install new Gypsum Wall Board (GWB, normal) ceiling including ceiling suspension system in each bed room as shown on floor plans, sections and finish schedule.

2.2.2.2. Remove CMU walls, doors, toilets, closets, vanity cabinets in room No. 101, 102, and 105 as shown on floor plan.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

Changes to the Standard Technical Detail Specifications: None

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

1. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

2. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention

Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.

Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

B. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

D. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 210 calendar days after notice to proceed (NTP) is issued. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

LIST OF APPLICABLE CONTRACT DRAWINGS

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No. Sheet No. Description Date

1 T-1 TITLE SHEET

25 NOV 16

CIVIL

2 C-1 LOCATION PLAN AND GENERAL NOTES 25 NOV 16

3 C-2 SITE LAYOUT PLAN AND SCOPE OF WORK 25 NOV 16

4 C-3 BIKE SHED DETAILS 25 NOV 16

5 C-4 MISC. DETAILS - 1 25 NOV 16

6 C-5 MISC. DETAILS - 2 25 NOV 16

ARCHITECTURAL

7 A-1 1ST FLOOR PLAN AND GENERAL NOTES 25 NOV 16

8 A-2 2ND-4TH FLOOR PLAN AND SCOPE OF WORKS 25 NOV 16

9 A-3 EXT/INTERIOR WALL SECTIONS AND DETAILS 25 NOV 16

10 A-4 TYPICAL AND PARTIAL PLANS AND ELEVATIONS 25 NOV 16

11 A-5 CABINET DETAILS AND NOTES 25 NOV 16

12 A-6 INTERIOR, EXTERIOR FINISH SCHEDULE AND

MATERIAL/COLOR SCHEDULE

25 NOV 16

13 A-7 DOOR/WINDOW SCHEDULE, ELEVATIONS AND

NOTES

25 NOV 16

14 A-8 HARDWARE SCHEDULE AND DETAILS 25 NOV 16

15 A-9 SIGNAGES SCHEDULE 25 NOV 16

MECHANICAL

16 M-1 MECHANICAL MATERIAL INDICATIONS AND

SYMBOLS AND ABBREVIATIONS

25 NOV 16

17 M-2 GENERAL NOTES AND SCOPE OF WORK 25 NOV 16

18 M-3 MECHANICAL EQUIPMENT SCHEDULE-1 25 NOV 16

19 M-4 MECHANICAL EQUIPMENT SCHEDULE-2 25 NOV 16

20 M-5 1ST FL HVAC PLAN 25 NOV 16

21 M-6 2ND FL HVAC PLAN 25 NOV 16

22 M-7 3RD FL HVAC PLAN 25 NOV 16

23 M-8 4TH FL HVAC PLAN 25 NOV 16

24 M-9 MECH RM HVAC PARTIAL PLAN, EXHAUST DUCT

ISOMETRIC DIAGRAM (TYP) AND NOTE

25 NOV 16

25 M-10 LAUNDRY RM HVAC PARTIAL PLAN(TYP), TYP

MODULE HVAC PARTIAL PLAN (1ST THRU 4TH

FLOOR), ISOMETRIC DIAGRAM AND SPECIFIC

NOTES

25 NOV 16

26 M-11 CONTROLS AND CHILLED/HOT WATER PIPING

SYSTEM DIAGRAM

25 NOV 16

27 M-12 OUTSIDE AIR SUPPLY UNIT SINGLE ZONE, FCU

CONTROL DIAGRAM AND MULTIZONE AND UNIT-

ADMIN AREA(AHU-1)

25 NOV 16

28 M-13 VENT SYS CONTROL DIA, DOMESTIC HOT WATER

SYSTEM CONTROL DIAGRAM, EF-4 AND EF-1

CONTROL CIRCUIT (TYP FOR EF-5) AND CO

DETECTION SYSTEM

25 NOV 16

29 M-14 1ST & 2ND FL PLUMBING PIPING PLAN, SPECIFIC

NOTES AND NOTES

25 NOV 16

30 M-15 3RD & 4TH FL PLUMBING PIPING PLAN, SPECIFIC

NOTES AND NOTES

25 NOV 16

31 M-16 MECH ROOM PLUMBING PARTIAL PLAN AND NOTES 25 NOV 16

32 M-17 TYP MODULE PLUMBING PARTIAL PLANS-1 AND 2

AND NOTES

25 NOV 16

33 M-18 LAUNDRY PLUMBING PARTIAL PLANS AND NOTES 25 NOV 16

34 M-19 TOILET PLUMBING PARTIAL PLANS ,PLUMBING

FIXTURE SCHEDULE AND NOTES

25 NOV 16

35 M-20 FIRE PROTECTION LEGEND & ABBREVIATION

SPRINKLER Q'TY LIST, GENERAL NOTES AND NOTE

25 NOV 16

36 M-21 1ST FLOOR FIRE PROTECTION PIPING PLAN 25 NOV 16

37 M-22 2ND FLOOR FIRE PROTECTION PIPING PLAN 25 NOV 16

38 M-23 3RD FLOOR FIRE PROTECTION PIPING PLAN 25 NOV 16

39 M-24 4TH FLOOR FIRE PROTECTION PIPING PLAN 25 NOV 16

40 M-25 MECH ROOM FIRE PROTECTION PIPING PARTIAL

PLAN AND FIRE PROTECTION REQUIREMENTS

41 M-26 DETAILS 25 NOV 16

ELECTRICAL

42 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 25 NOV 16

43 E-2 EXIST/NEW EXTERIOR ELECTRICAL DISTRIBUTION

PLAN

25 NOV 16

44 E-3 1ST, 2ND, 3RD AND 4TH FLOOR LIGHTING PLAN 25 NOV 16

45 E-4 LIGHTING FIXTURE DETAILS 25 NOV 16

46 E-5 LIGHTING FIXTURE SCHEDULE 25 NOV 16

47 E-6 1ST, 2ND, 3RD & 4TH FLOOR POWER PLAN 25 NOV 16

48 E-7 EXIST/NEW POWER ONE-LINE DIAGRAM 25 NOV 16

49 E-8 PANELBOARD "P" & LOAD CENTER "L1","L2", "L3 &"L4"

LOAD SCHEDULE

50 E-9 TYPICAL BEDROOM ELECTRICAL MODULE PLAN &

MECH. RM PARTIAL POWER PLAN

25 NOV 16

51 E-10 1ST, 2ND, 3RD & 4TH FLOOR LAN/TEL PLAN 25 NOV 16

52 E-11 TELECOMMUNICATION SYSTEM DIAGRAM 25 NOV 16

53 E-12 1ST, 2ND ,3RD AND 4TH FLOOR CATV PLAN 25 NOV 16

54 E-13 CATV SYSTEM DIAGRAM 25 NOV 16

55 E-14 1ST, 2ND, 3RD, AND 4TH FL FIRE ALARM AND MASS

NOTIFICATION SYSTEM PLAN

56 E-15 FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM 25 NOV 16

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

252.209-7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX

LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-O0004) (JAN 2012)

(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012,(Pub. L.

112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that—

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that—

(1) It is [ ___ ] is not [ ___ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability,

(2) It is [ ___ ] is not [ ___ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

(End of provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215- 1(f)(4).

b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPOSAL:

a. Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to ukap.son1.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem. All questions should be emailed to ukap.son1.ln@mail.mil within five (5) days after the solicitation is issued. The electronic offer shall be submitted by 1500 hrs on the closing date of RFP.

b. The PRICING PROPOSAL with the detailed cost breakdown shall be submitted by 1500 hours on the closing date of RFP through https://www.fbo.gov/. The cost breakdown should clearly identify all the significant costs associated with the level of effort prescribed in the statement of work. Any omission of such data may result in the offeror not being considered for award.

c. Section K : Offerors must complete all portions of Section K and submit it through https://www.fbo.gov/ by 1500 hours on the closing date of RFP. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.

Failure to submit the above requirements may be grounds for determining the proposal to be non compliant and not eligible to be considered for award.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions

Affecting the Work, will be included in any contract awarded as a result of this solicitation.

Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

a. Date & Time: 21 Mar 2017 at 0900 hours

b. POC: So, Ki Chong, DSN:730‐3713, Cell: 010‐2718‐7476

c. Location: Bldg#617, Cp Casey.

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $1,000,000 and $5,000,000.

Section M - Evaluation Factors for Award

BASIS OF AWARD

Award shall be made to the responsible offeror submitting the lowest priced, technically acceptable offer and completed Section K that satisfies all terms and conditions of this solicitation. The Government reserves the right to make a technical acceptability determination without any discussion with the offeror.

The tax exemptions stated in Section K will be reviewed by the contracting officer for reasonableness and necessity to complete the Task Order. The contracting officer may reject a proposal if the offeror appears to improperly overstate any proposed tax exemptions.