1 T - 1 1 OF 1 TITLE SHEET
CIVIL
T-1
A
B C D
E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
ENVIRONMENT
FORCE PROTECTION
CHOE, S M.
SITE LAYOUT PLAN - 1
SITE LAYOUT PLAN - 2
REPAIR SIDEWALK/STEPS BETWEEN THE BLUE BRIDGE
AND AC PAVEMENT
FEWR NO. 110884
CAMP SWISS-SWEDE
INDEX PLAN AND SCOPE OF WORK
MISC. DETAILS
C - 1
C - 2
C - 3
C - 4
AS SHOWN
CIVIL
CAMP SWISS-SWEDE
110884
INDEX PLAN AND SCOPE OF WORK
REPAIR SIDEWALK/STEPS BETWEEN THE BLUE
BRIDGE AND AC PAVEMENT
AS SHOWN
C-1
SCOPE OF WORK
CHOE, S M.
CIVIL
- 1
1:1500
0 80M604020
SCHEDULE #1 (REPAIR/MAINTENANCE)
CAMP SWISS-SWEDE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
110884
T
SHED
PATIO
B U
N K
E R
B A
D M
IN
T
O N
C O
U R
T
A C
C
BELL TOWER
FLAGPOLE
W A
L L
W A
L L
WALL
WALL
W A
LL
WALL
WALL
PLANTER
W A
L L
W A
L L
W A
L
LW
A L
L
WALL
W A
L L
WALL
WALL
PLANTER
WALL
W A
L L
W A
L L
N
W A
L L
W A
L L
DMH
T-1022
K P
A
K P
A
K P
A K
P A
T -1
K P
A
PEA
C
E H
O U
SE
S
- 4
HELI PAD
MINE FILED
CONCRETE
(N
O
RTH
K O
REA
N
CO
N
STRU
CTIO
N
S
MINE FIELD
U N C S-43
GUARD
HOUSE
CP#4
N O
R T
H K
O R
E A
D E
M A
R C
A T
IO
N
S O
U T
H K
O R
E A
B R
ID
G
E O
F
N O
R E
T U
R N
S -5S
-6
S-1005
T -2
T -3
T-47
CHECK POINT #3
F R E E D
O M
H O
U S E
3-25KVA
K
PA
TENNIS COURT
M
IL
IT
A
RY
D
EM
A
RCA
TIO
N L
IN
E
1. REPLACE 1.2M W SIDEWALK W/ NEW.
3. REPLACE CON’C CURB W/ NEW.
4. PAINT EXST WOODEN BRIDGE W/ SAME COLOR AS EXIST.
5. MILL/OVERLAY EXST DETERIORATED AC ROAD SURFACE.
6. PAINT REFLECTIVE WHITE 150MM W ROAD EDGE LINE.
SCALE: 1 / 1500
INDEX PLAN
C-2
C-3
INDEX PLAN AND SCOPE OF WORK
BLUE BRIDGE
2. REPLACE 1.4M W CON’C STEP W/ HANDRAIL.
REPAIR SIDEWALK/STEPS BETWEEN THE BLUE
BRIDGE AND AC PAVEMENT
NORTH KOREA
SOUTH KOREA
C-2
CHOE, S M.
CIVIL
- 2
SCALE: 1 / 500
1:500
0 40M302010
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
HELI PAD
S -5S
-6
S-1005
T -3
K
PA
NORTH KOREASOUTH KOREA
GRADE LIM
IT LINE
REPLACE 1.2M W SIDEWALK,
APPROX. 185.0 SM.
N
PAINT 1.2 M W WOODEN BRIDGE
W/ SAME COLOR AS EXIST,
APPROX. 69.0 LM
BLUE BRIDGE
REPLACE 1.4M W CON’C STEP W/ HANDRAIL,
APPROX. 35.0 LM
REPLACE CON’C CURB,
APPROX. 60.0 LM
BLUE BRIDGE
SITE LAYOUT PLAN - 1
SITE LAYOUT PLAN - 1
REPAIR SIDEWALK/STEPS BETWEEN THE BLUE
BRIDGE AND AC PAVEMENT
CAMP SWISS-SWEDE
110884
C-3
CHOE, S M.
CIVIL
- 3
SCALE: 1 / 800
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
REPLACE 1.2M W SIDEWALK,
APPROX. 20.0 SM.
N
SITE LAYOUT PLAN - 2
SITE LAYOUT PLAN - 2
REPAIR SIDEWALK/STEPS BETWEEN THE BLUE
BRIDGE AND AC PAVEMENT
CAMP SWISS-SWEDE
110884
T
SHED
PATIO
B U
N K
E R
B A
D M
IN
T
O N
C O
U R
T
A C
C
BELL TOWER
FLAGPOLE
W A
L L
W A
L L
WALL
WALL
W A
LL
WALL
PLANTER
W A
L L
W A
L L
W A
L
LW
A L
L
WALL
W A
L L
WALL
WALL
WALL
W A
L L
W A
L L
W A
L L
W A
L L
DMH
TENNIS COURT
1:800
0 40M302010
MILL/OVERLAY EXST DETERIORATED AC SURFACE
(MILLING - 38mm THK, OVERLAY - 50mm THK)
APPROX. 6,500 SM
AND PAINT REFLECTIVE WHITE 150MM W ROAD EDGE LINE,
APPROX. 300.0 SM
SEE STD DWG NO. C-2123 & 2127
SCALE: NONE
SIDEWALK
JOINT
SEALER
JOINT
FILLER
R=3
TYP
R=3
TYP
TRANSVERSE CONTRACTION JOINTS
SHALL BE SPACED SO THAT RATIO
OF SLAB LENGTH TO WIDTH WILL
NOT EXCEED 1.25. THE DEPTH OF
THE CONTRACTION JOINT WILL BE
AT LEAST ONE-FOURTH OF THE
SIDEWALK SLAB THICKNESS,BUT NOT
LESS THAN THE MAXIMUM NOMINAL
SIZE OF THE AGGREGATE USED.
PROVIDE EXP JOINTS AT MAX 9.0 M
INTERVALS FOR STRAIGHT SECTIONS,
AT ALL RETURNS OF WALKS,
AND WHERE WALKS ABUT OTHER
CONCRETE STRUCTURES.
BROOM
FINISH FIN GRADE
2A S E C T I O N
2B
EXPANSION JOINT
2C
CONTRACTION JOINT
COMPACTED
NON-FROST-SUSCEPTIBLE
MATERIAL BASE
0.06
#8-150X150 WWF
2D
SIDEWALK ON DITCH
D13 @200 O.C
CON’C DITCH
FNSH GRADE
- 4
SCALE: NONE
CON’C STEP W/ HANDRAIL
CIVIL
C-4
AS SHOWN
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
NFSM
R=13
CAST IN PLACE
CONCRETE CURB
21 MPa
SEE PLAN FOR FINISH
NOTE ;
"C"
C
R R
15025
10 THICK EXPANSION
JOINT W/ SEALER
SCALE: NONE
CON’C CURB
AC PAVEMENT
1. PROVIDE EXPANSION JOINTS AT MAX. 15.0 M.
INTERVALS (MATCH SIDEWALK)
2. "C" DIMENSION CONSTANT EQUALS PAVEMENT
SECTION MINUS 300.
3. CONCRETE COMPRESSIVE STRENGTH SHALL BE
21 MPa AT 28 DAYS.
- 4
- 4
COMPACTED BASE COURSE (NFSM)
MAX. 2,100 TYP
RISER
SEE TABLE
ABRASIVE AGGREGATE FINISH
HEAD CLEARANCE-"Y"
OF STEPS UNLESS OTHERWISE NOTED ON PLANS
HANDRAILS TO BE INSTALLED BOTH SIDES
WELLED ALL CONNECTION
SEE TABLE ON
DWG. NO. C0104
38mm STD. STEEL PIPE
,2
M A
X
SIDEWALK
BY CONTRACTING OFFICER TO CONFORM
PAINT HANDRAIL-COLOR TO BE CHOSEN
4 BARS @150 O.C.
13R
SEE DETAIL
4 BARS @300 O.C.
SEE DETAIL
SAFETY NOSING W/
CONC. STAIR
ABRASIVE SURFACE
ANCHOR PER
MFR STD.
SAFETY NOSING DETAILS
13 R
R
IS
E R 2
TREAD
38mm%%C STEEL PIPE
EPOXY CAULKING
63mm%%C STAINLESS STL. SLEEVE
POST DETAIL
STOOP
DRILL & GROUT DOWEL
25mm DIA X 400mmL
@ 300 OC
1,200
13mm JOINT FILLER
W/ SEALANT
,2
M A
X
REPAIR SIDEWALK/STEPS BETWEEN THE BLUE
BRIDGE AND AC PAVEMENT
CAMP SWISS-SWEDE
110884
MISC. DETAILS
3A 3B
3A
3B