W91QVN16R01550002.docx

DOCX document 42 KB Posted

Attached to
Chinhae Fencing
Solicitation number
W91QVN16R0155
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
W91QVN16R01550001.docx DOCX document
Specification.pdf PDF
Drawings.pdf PDF
W91QVN16R0155.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91QVN-16-R-0155

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

eProjects #: 1380673 PWD CODE, PRC1 17 MAY 2016

STATEMENT OF WORK FOR

BACKYARD FENCE REPLACEMENT AND EXTERIOR LIVING SPACE IMPROVEMENT

AT ALL HOUSING AREA, CFA CHINHAE, KOREA

1. GENERAL: The Contractor shall furnish all labor, materials, equipment, transportation and supervision necessary to perform backyard fence replacement and exterior living space improvement at all housing area at CFA Chinhae, Korea in accordance with the specifications and drawings.

2. LOCATION: The job site is located in COMFLEACT CHINHAE. The exact locations will be indicated by the Contracting Officer.

3. TERM OF CONTRACT: This project shall be completed in 360 calendar days after date of order.

Only 2 buildings will be allowed to be under construction at any one time

4. APPLICABLE PUBLICATION: The following publications are applicable to this specification:

a.Safety and Health Requirements Manual, EM 38511 U. S. Army Corps of Engineers.
b.NAVFACPAC Instruction 5100.4D, Section 01525, Safety and Occupational Health Requirements.

HIGH-VISIBILITY SAFETY APPAREL: The Contractor’s workers, sub-contractor’s workers, and visitors on construction jobsites shall wear vest with retro reflective and fluorescent material (i.e. ANSI/SEA 107-2004 Class II compliant orange mesh vests) in accordance with NAVFACPAC INSTRUCTION 5100.4D.

c.Korean Standards (KS), NEC & UL.
d.USFK Regulation 201-1, dated 18 June 2012.

5. MATERIALS: The materials not specified herein shall be subject to the approval of the Contracting Officer.

6. SUBMITTALS: Prior to start of work, the Contractor shall submit 1 electronic set of the following submittals to the Contracting Officer for approval before installation or procurement:

a.Material Safety Data Sheets (MSDS)
b.Accident Prevention Plan (APP)
c.Activity Hazard Analysis (AHAs)
d.Qualifications for Site Safety and Health Officer
e.Accident Reporting Procedures
f.Quality Control Plan and Safety Plan
g.Shop Drawings and Catalog or Samples of Material
h.Work Schedule (including Power/Water Outage schedule)

7. ENVIRONMENTAL:

a.Prior to start of work, the Contractor shall obtain approval of all hazardous materials to be used from the Environmental Office. All excess hazardous materials if any shall be removed and/or disposed of in accordance with USFK Regulation 201-1, Environmental Governing Standards and local Korean laws and regulations, unless directed otherwise in the contract.
b.Solid Waste Management Report: The Contractor shall submit a solid waste disposal report (Attachment A) to the Contracting Officer on a monthly basis. If the period is less than one month, a final report will be submitted at the end of the contract period.

c. Inadvertent Discovery Clause: In the event that any previously unidentified archaeological sites or remains (Such as artifacts, shells, bone or, charcoal deposits human burials, rock or coral alignments, paving, or walls) are encountered, immediately suspend work and notify the contracting officer.

8. SCOPE OF WORK: The contractor shall perform following works as shown and indicated on Public Works Drawing PW-15-4037. The contractor is responsible to check and verify all dimensions prior to commencement of work.

a. Remove and dispose existing 1,100mm high chain link fence (Approx. 580LM), 2,000mm high CMU patio wall (Approx. 355LM), 1,200mm wide concrete side walk (Approx. 550LM), and trees (Approx. 45EA) which are located within new fence line.

b. Provide synthetic resin fence (Approx. 1,752LM), synthetic resin partition fence (Approx. 67LM), single gates (900mm wide, Total: 46EA) and synthetic resin deck (Approx.1, 196M2)

c. Provide new lawn area, and restore damaged existing lawn area (Approx. 1,460M2) including all associated construction works necessary to complete the work required by the drawings and specifications.

d. Perform other minor work as shown and indicated on Public Works drawing PW-15-4037. The contractor is responsible to check and verify all dimensions prior to commencement of work.

9. GOVERNMENT FURNISHED MATERIALS: The following materials listed below shall be provided by the Government to the Contractor: N/A

10. PERFORMANCE STANDARDS: Unless otherwise specified, all work shall conform to the standards described in the paragraph entitled "APPLICABLE PUBLICATIONS". The work not specified therein shall be subject to approval of the Contracting Officer.

11. LIQUIDATED DAMAGES: If the Contractor fails to complete the work in the time specified in the contract, or any extension, the Contractor shall pay the U.S. government as liquidated damages the amount of 465,205 Korean Won per calendar day.

12. WORKING HOURS: From 08:00 to 17:00, Monday through Friday, except for U.S. Federal holidays and other days specifically designated by the Contracting Officer (Training holidays, etc.). Requests for work outside of regular hours may be made in writing 5 days in advance to the Contracting Officer.

13. WORKING SCHEDULE: Within five working days after the date of order, the Contractor shall submit a work schedule in writing to the Contracting Officer for approval. In no event shall the Contractor change the approved work schedule without prior written approval of the Contracting Officer. The contractor shall not start any works until the schedule is received and accepted by the FEAD Chinhae.

14. PREPERFORMANCE CONFERENCE: Prior to commencing work, the Contractor shall meet in conference with the Contracting Officer, at a time determined by the Contracting Officer, to discuss and develop a mutual understanding relative to scheduling and administering the work.

15. SAFETY REQUIREMENTS: All work shall be conducted in a safe manner and shall comply with the current safety requirements as indicated in EM 38511, Safety and Health Requirements Manual issued by the U. S. Army Corps of Engineers and NAVFACPAC INSTRUCTION 5100.4D.

16. STATION REGULATIONS: The Contractor and his employees shall become acquainted with and obey all Base and/or Station regulations as posted or as requested by the Contracting Officer.

17. EXAMINATION OF PREMISES: Contractors are expected to satisfy themselves as to the general and local conditions that may affect the cost of the performance of the work to the extent that such information is reasonably obtainable. It is considered impractical to determine, without inspection, the exact nature of the work and site conditions under which the work is to be performed. Arrangements to visit the site will be made by separate notice.

18. EXISTING WORK: All portions of existing work which have been altered in any way during the Contractor's operations shall be repaired or replaced in kind and in a manner to match existing or adjoining work, as approved by the Contracting Officer. All work of this nature shall be performed at the Contractor's expense and shall be performed as directed by the Contracting Officer. At the completion of all operations, existing work shall be in a condition equal to or better than that which existed before the work started.

19. PROJECT IDENTIFICATION:

Project Identification Signboard (Navy)

A project identification signboard shall be provided in accordance with attached Plates [1, 2, 3, and 4]. Provide preliminary drawing indicating layout and text content. The signboard shall be provided at a conspicuous location on the job site where directed by the Contracting Officer.

a. The field of the sign shall consist of a 1200 by 2400 mm or 4 by 8 foot sheet of grade B-B medium density overlaid exterior plywood.

b. Lumber shall be B or better Southern pine, pressure-preservative treated in accordance with AWPA C1 and AWPA C2. Nails shall be aluminum or galvanized steel.

c. The entire signboard and supports shall be given one coat of exterior alkyd primer and two coats of exterior alkyd enamel paint. The lettering and sign work shall be performed by a skilled sign painter using paint known in the trade as bulletin colors. The colors, lettering sizes, and lettering styles shall be as indicated. Where preservative-treated lumber is required, utilize only cured pressure-treated wood which has had the chemicals leached from the surface of the wood prior to painting.

d. Use spray applied automotive quality high gloss acrylic white enamel paint as background for the NAVFAC logo. NAVFAC logo shall be an applied 2 millimeter film sticker/decal with either transparent or white background or paint the logo by stencil onto the sign. The weather resistant sticker/decal film shall be rated for a minimum of 2-year exterior vertical exposure. The self-adhering sticker shall be mounted to the sign with pressure sensitive, permanent acrylic adhesive. Shop cut sticker/decal to rectangular shape and provide pull-off backing sheet on adhesive side of design sticker for shipping.

e. Sign paint colors (manufacturer's numbers/types listed below for color identification only)

(1) Blue = To match dark blue color in the NAVFAC logo.

(2) White = To match Brilliant White color in the NAVFAC logo.

f. NAVFAC logo must retain proportions and design integrity. NAVFAC logos in electronic format may be obtained from the NAVFAC web portal via the following link:

https://portal.navfac.navy.mil/portal/page?_pageid=181,3465071&_dad=portal&_sceh

Use the following to choose color values for the paint to be used:

(1) Dark Blue = equivalent to CMYK values 100, 72, 0, 8.

(2) Light Blue = equivalent to CMYK values 69, 34, 0, 0.

(3) Cyan = equivalent to CMYK values 100, 9, 0, 6.

(4) Yellow = equivalent to CMYK values 0.9,94, 0.

20. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

The Contractor shall perform work under this contract consistent with the policy and objectives identified in the Commander, Fleet Activities (COMFLEACT), Chinhae Environmental Management System (EMS). In addition to compliance with the Korea Environmental Governing Standards (EGS), the Contractor shall perform work in a manner that conforms to the objectives and targets, environmental programs and operational controls identified by the EMS. The Contractor shall provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall assume legal and financial liability for the noncompliance and take corrective action immediately to remedy the noncompliance. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the Contracting Officer. In addition, the Contractor shall ensure that its employees are aware of their roles and responsibilities under the EMS and how these EMS roles and responsibilities affect work performed under the contract.

The Contractor is responsible for ensuring that their employees receive applicable environmental and occupational health and safety training, and keeping up to date on regulatory required specific training for the type of work to be conducted onsite. All on-site Contractor personnel, and their subcontractor personnel, performing tasks that have the potential to cause a significant environmental impact shall be competent on the basis of appropriate education, training or experience. Upon contract award, the Contracting Officer's Representative (COR) will notify the COMFLEACT Chinhae EMS program manager (EPM) to arrange EMS training unless instructed otherwise in the Supplemental Temporary Environmental Controls. The EPM will identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. The Contractor shall provide training documentation to the Contracting Officer. The EPM will retain associated records.

21. KEY PERSONNEL: The following key personnel shall be employed by prime contractor during the performance of the contract.

a. Project Superintendent

b. Project Manager

c. QC Manager

d. Site safety and Health Officer

22. PERFORMANCE OF WORK BY THE PRIME CONTRACTOR: The Contractor shall perform on the site, and with its own organization, work equivalent to not less than 25 percent of the total amount of work to be performed under this task order. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government (See FAR 52.236-1)

23. Contracting Officer’s Representative (COR). The Contraction Officer may appoint and designate a Contracting Officer’s Representative (COR) with respective responsibilities and authority as cited in the base contract during the performance of this task order (See DFARs 252.201-7000)

END OF STATEMENT OF WORK

Solid Waste Report Construction & Demolition - Disposal & Recyclables

Provide the following information in the blanks below. Be sure to show final destination and method of disposal and recycling of all construction and demolition debris/wastes and sign at the bottom of the page. Paperwork from the disposal and/or recycling facility to be provided along with this completed form for each individual waste.

________________________________________________________________________
Company NameContract NumberPhone Number

Report each weight using the table below. Indicate whether the weight is in kilograms or pounds. The information is required to be segregated by landfill, incineration, or recycling. If a type of waste is not listed in the table, note the wastes along with weights and cost in the blanks of the table below. All attempts should be made to recycle as much of the wastes as possible.

Weight (kg or lb.)

Location of

Disposal

Cost
Disposal or
Type of Waste
(Landfill or Incineration)
Recycling
(KW, $)
Recycling
Date

Food

Wood

Metals

Paper/Cardboard

Soil

Gravel

Plastic

Glass

Concrete

Asphalt

TOTAL

In accordance with Commander, Fleet Activities Chinhae (CFAC) Environmental Management System (EMS), this form (or equivalent) documents that the individual listed above is aware of the responsibility to report accurate solid waste disposal and recycle weights to the Public Works Department, Environmental Division in a timely manner.

________________________________
SignatureDate

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .