A02_Drawing_files___105642.pdf
PDF 11 MB Posted
- Attached to
- Improve Maneuver Trail
- Solicitation number
- W91QVN-16-R-0129
About this file
Drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_Submittal_Register___105642.xls | XLS spreadsheet | |
| A21_W91QVN-16-R-0129.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 T - 1 1 OF 1 TITLE SHEET
CIVIL
T-1
TITLE SHEET
A
B C D
E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
ENVIRONMENT
FORCE PROTECTION
CHOE, S M.
LOCATION MAP AND GENERAL NOTES
RODRIGUEZ LIVE FIRE COMPLEX
105642
IMPROVE MANEUVER TRAIL WITH EROSION CONTROL
BETWEEN MPMG AND H-BELT
FEWR NO. 105642
RODRIGUEZ LIVE FIRE COMPLEX
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
LOCATION PLAN IN H-BELT
C - 1
C - 2
C - 3
C - 4
C - 5
C - 6
C - 7
C - 8
C - 9
C - 10
SITE LAYOUT PLAN AND SCOPE OF WORK
PCC PAVEMENT JOINT LAYOUT PLAN
PCC PAVEMENT DETAIL
GABION RETAINING WALL
GABION MATTRESS
VEHICLE GUARD RAIL
MISC. DETAILS - 1
MISC. DETAILS - 2
- 1
GENERAL NOTES :
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
SUBMISSION OF CONTRACT PROPOSAL.
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
PRIOR TO COMMENCING WORK ON THE PROJECT.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR’S
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT
OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
TO THE PROJECT CONTRACT.
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
ADDITIONAL COST.
8. THE CONTRACTOR SHALL KEEP THE REPLACEION AREA CLEAN AT
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER’S
REPRESENTATIVE.
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
ADDITIONAL COST.
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
COVERED WITH TOP SOIL AND SOLID SODDED.
POHANG
DONGDUCHON
NOT TO SCALE
L O C A T I O N M A P
N
WONJU
MOKPO
TONGYOUNG
SEOUL
UIJONGBU
CHUNCHON
OSAN
DAEJEON
E A S T S E A
BUSAN
WAEGWAN
CHINHAE
DAEGU
MUNSAN
W E S T
S E A
INCHON
KWANGJU
KUNSAN
PYONGTAEK
YONGPYONG
RODRIGUEZ LIVE
FIRE COMPLEX
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
75.402
BRIEFING ROOM
CROSSWIND CANT
HELI DROME
TR
KATUSA SNACK
CT
POL
TR
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E E
E
W
E
E
E
T
E
E
E
T
E
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E
T
E
T
E
E
E
T
T
T
T
E
E
T
T
T T
T
T
E
T
T
T
E
T
T
T
T
T
E
TT
T
T
T T
T
T
TE
E
T
E
D I A
D I A
D I A D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
D I A
E
E
EE
E
E
E
E
E
E
E
E
E
S
E
E
E
E
E
E
E
E
TKTK
E
E
T
T
T
E
TK
E
E
E
E
T
E
E
E
E
T
T
T
T
TK
TK
CONTROL CENTER
E
E
E
CT
E
E
E
E
E
E E
E
E
E
E
E
T
T
T
T
E
T
T
T
T
E
T
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
T
T
T
TT
T
T
T
T
T
T
T
T
T
E
E
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
E
T
T
T
E
T
T
T
T
E T
E
E
S
S
S
D I A
D I A
D I A
D I A
D I A
D I A
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S
T
T
T
T
T
T T
E
E
E
E
T
T
T
T
T
E
YOUNGPYOUNG ELEM
ENTARY SCHOOL
T
T
T
T
E
T
D U
S O
N G
F O
O D
S T
U F
F C
O L
T D
D E
A N
O N
G C
O L
T D
T E
A J I N
F O
O D
S T
U F
F C
O L
T D
T
T
T
T
T
E
T
T
E
E
E
T
T
T
T
T
T
T
T
T
E
YOUNGDONG OIL BANK
T
T
T
E
T
E
T
T
E
T
T
T
ET
T
T
T
T
T
T
VILLAGE HALL
T
T
TE
T
T
T
T
T
T
T
ET
E
E
T
T
T
T
E
T
E
T
T
T
T
E
E
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
ET T
TE
TE
E
CONTROL CENTER
E
E
E
E
E
E
E
6-39
5-29
4-21
3-20
2-19
1-18
54 T3
T2
52 T1
51 T4
50 T5
49 T6
55 T7
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
T
CT
T
GUARDROOM
GREENPIA HOTEL
S
S
T
T
T
T
S S A
N G
Y O
N G
M A
C H
IN
E
IN
D
U S T
R Y
C O
.,L T
D
E
E
E
E
E
E
E
E
E
E
E
E
CT
E
E
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
CT
CT
A
D
C
B
E
E
E E
E
E
E
KOREA CLEAN SYSTEM CO.,LTD.
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
CT
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
D I A
D I A
S-1241
TR
TR
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W.C
W.C
W.C
W.C
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
TR
TR
TR
D I A
D I A
D I A
D I A
D I A
D I A
E
E
E
E
E
D I A
D I A
D I A
D I A
HELIBROME TR
TR
UP
CARRIER 38AKS007
RAMP
WASHAREA
UP
UP
UP
UP DN
DN
DN
UP
RAMP DN
RAMP DN
UP DN
UP DN
S1254 S1253
S1252
S1250
S1256 S1257
S1258
S1259
S1255
S1260
S1245
S1246
S1244
S1249
S1251
S1271
S1213
S1243
S1211
S1210
S1248
S1270
S1282
S1283
S1281
S1280
S1279
S1278
S1277
S1285
S1286
S1242
S1207
S1263
S1261 S1293
S1294
S1269
S1274
T1212
S1300
S1218
S1369
S1295
TB
FT
S1351
TF
FT
TF
ELEC
S1262
S1264 FH
TF
S1215
TF
FT
FT
CH
S1336 S1337
S1339
S1338
FT
FT
FT
TB
FT
FH
TF
TB
TB
S1347
FT
TF
S1330 S1331
S1276
S1335
S1334
S1333
S1332
S1273
TFCH
CH
FT
ELEC
TF
FT
FH
CH
FT
TF
TF
GAS STATION
S1301
S1272
AAR
TOWER
BLEACHER
S1275
S1297
S1298 S1299
S1288
S1287
WATER WELL-3
WATER WELL-4
S1225
WATER WELL-2
S1224
WATER WELL-1
S1289
WATER WELL-5
S1219
BUNKER-1
S1220
BUNKER-2
S1221
BUNKER-3
S1222
BUNKER-4
BUNKER-5
S1223
1249T 14’ X 10’
1257T 14’ X 10’
1244T 14’ X 10’
1209T 11’ X 11’
S1349
S1350
S1356
S1357
S1355
S1354
S1353
S1352
S1340
S1341
S1342
S1343
S1345
S1344
S1362
S1346
S1348 S1358
S1359 S1361
S1360 S1204
S1368
S1367
S1366
S1365 S1364
CROSSWIND CANT
S1363
FUTURE
EXPANSION
STATION 1
STATION 2
STATION 4
S1373
S1374
S1375
S1379
S1380 Operation/Storage
BLOWER RM??
MAIN GATE, RODRIGUEZ LIVE FIRE COMPLEX
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
DES
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
RODRIGUEZ LIVE FIRE COMPLEX
SCALE : NONE
CIVIL
C-1
CHOE, S M.
AS SHOWN
N
LOCATION MAP
LOCATION MAP AND GENERAL NOTES
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
105642
THIS PROJECT
FEWR NO. 105642,
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
RODRIGUEZ LIVE FIRE COMPLEX, KOREA
* SPECIFIC NOTE:
1. THE CONSTRUCTION SITE IS IN FIRING ZONE.
THE CONTRACTOR SHALL BE REQUIRED TO WORK AROUND RLFC GUN
LINE AND NOT INTERFERE WITH SHOOTING SCHEDULE.
2. THE CONTRACTOR’S HAUL ROUTE, STORAGE AND OPERATIONS AREA
SHALL BE DETERMINED, DESIGNATED AND COORDINATED WITH THE
CONTRACTING OFFICER DURING THE SITE ORIENTATION.
3. THE CONTRACTOR SHALL NEED ALL WORKERS TO TAKE UXO CLASS.
4. THE CONTRACTOR SHALL CHECK IN WITH RANGE CONTROL DAILY FOR
FIRING SCHEDULE.
5. FINISH GRADES OF ALL UNPAVED AREAS DISTURBED BY CONTRACTOR
SHALL BE RESTORED WITH SOLID SODDING W/ 100MM THK TOP SOIL.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
- 2
CIVIL
C-2
AS SHOWN
CHOE, S M. RODRIGUEZ LIVE FIRE COMPLEX
N
SCALE: NONE
H-BELT
SEE "SITE LAYOUT PLAN"
LOCATION PLAN IN H-BELT
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
105642
LOCATION PLAN IN H-BELT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
- 3
SCALE: 1/350
CIVIL
C-3
AS SHOWN
CHOE, S M. RODRIGUEZ LIVE FIRE COMPLEX
N
1:350
0 40M302010
SCOPE OF WORK
SCHEDULE #1 (CONSTRUCT/ALTERATION)
.7
D1
.6
D1
.5
D1
.2
D1
.9
D1
.1
D11
.1
D1
.9
D1
.8
D1
.9
D1
.5
D1
.1
D11
.6
D1
.1
D1
.5
D1
.0
D1
.1
Y1
.0
Y1
.9
Y1
.0
Y1
.3
V1
.6
V1
.8
V1
.3
V1
.1
V5 -4
.7
X
.2
X
.0
X
.6
X
.5
X
.5
X
.5
X
.3
X
.9
X
.3
X
.3
X
.2
X
.1
X
.8
X
.9
X
.6
X
.9
X
.7
X
.9
X
.0
X
.6
X
.6
X
.7
X
.1
X
.0
X
.5
X
.3
X
.7
X
.1
X
.1
X
.9
X
.4
X
.7
X
.7
X
.7
X
.1
X
.5
D2
.4
D2
.4
D2
.3
D2
.4
D2
.7
D2
.9
D2
.2
D2
.1
D2
.5
D2
.1
D2
.7
D2
.4
D2
.0
D2
.9
D2
.1
D2
.6
D2
.9
D2
.5
Y2
.4
Y2
.5
V4 Y
V2
.4
V2
.4
V2
.1
V2
.6
V2
.2
V2
.8
V2
.6
V2
.7
V2
.8
V Y
.3
V Y
.3
V Y
.2
V Y
.3
V Y
.9
V Y
.2
V Y
.2
C
.2
C
.8
V0
.6
V0
.9
V0
.1
V0
.7
V0
.7
V0
.7
V0
.6
V0
.8
V0
.3
V0
.5
V0
.1
V0
.1
V0
.4
V5 -5
.9
S Y
.2
S Y
.0
S Y
.6
S Y
.3
D Y2
.0
V
.0
V
.9
V
.1
V
.0
V
.6
V
.6
V
.5
V
.9
V
.9
S Y1
.4
Y0
.2
V3
.2
V3
.3
V3
.4
V4
.3
V4
.2
V4 1
.5
V4
.9
V
-0
.0
V
.3
T M
.3
E M
.3
Y4
.5
Y4
.9
D Y4
.9
S Y2
.7
S Y2
.2
S Y2
.9
S Y
.6
S Y
.4
S Y
.6
S Y
.2
S Y
.5
S Y
.3
D4
.7
S Y
.7
S Y
.1
S Y
.7
S Y
.8
S Y
.0
S Y
.2
S Y
.5
S Y
.2
S Y
.3
S Y
.1
S Y
.3
S Y
.1
D V4
.1
D51
.4
D5
.4
D5
.6
D5
.5
D5
.6
D5
.4
D5
.9
D5
.0
D5
.6
D5
.8
D5
.2
D5
.0
D5
.8
D5
.7
D5
.3
D5
.8
V5
.1
V5
.1
V5
.1
V5
.7
D6
.4
D6
.2
D6
.1
D6
.6
D6
.5
D6
.6
D6
.9
D6
.2
D6
.4
D6
.5
D6
.7
D6
.1
D6
.5
D6
.5
D6
.3
D6
.9
D6
.4
D6
.2
D6
.0
D6
.5
D6
.4
D6
.2
D6
.9
D6
.6
D6
.0
D6
.4
D6
.0
D6
.6
D6
.7
D6
.6
D6
.5
D6
.4
D6
.2
D6
.7
D V5
.1
S Y
.8
S Y
.1
S Y
.9
S Y
.7
S Y
.4
S Y
.1
S Y
.4
S Y
.4
S Y
.9
S Y
.7
G P
.8
C C
.8
C C
.6
D V6
.3
C6
.1
C6
.1
C6
.2
V7
.6
V7
.5
V7
.0
V7
.4
M A6
.4
M A6
.2
M A6
.3
M A6
.3
M A6
.1
M A6
.9
M A6
.3
M A
Y
.3
Y8
.5
Y8
.4
Y8
.1
P P
.4
P P
.4
S Y8
.5
S Y8
.1
Y9
.4
Y9
.4
Y9
.1
Y9
.7
Y9 .1
Y9
.0
Y9
.1
Y9
.1
Y9
.3
Y9
.5
Y9
.2
V
.2
V
.9
S Y
.4
V8
.2
V8
.9
V8
.7
V8
.1
V8
.9
V8
.7
V8
.2
V9
.6
V9
.7
V9
.9
V9
.1
V9
.3
V9
.3
V9
.4
V9
.6
V9
.9
V9
.9
V9
.2
V9
.3
V9
.7
V9
.9
V9
.2
V9
.5
V
.4
V
.2
V
.7
V
.0
Y
.4
Y
.3
Y
.6
Y
.5
Y
.4
P P
.5
P P
.2
D V9
.7
D V9
.1
D V9
.7
D V9
.3
V Y
.1
S Y
.1
S Y
.4
X
.2
X
.1
X
S P
TMH
TOP 117.386
EMH
TOP 117.360
.5
V
.2
V
D
1200 CP
CP.26
N: 4,210,615.668
E: 344,075.560
EL. 96.070
CP.27
N: 4,210,737.645
E: 344,042.440
EL. 117.079
E C
20M
40M
60M
80M 100M
120M
140M
160M
0M
20M
40M
60M
20M
40M
M
20M
40M 0M
.6
.0
.0
.0
.0
P C
C R
O A
D
GRAVEL ROAD
GRAVEL ROAD
G R
A V
E L
R O
A D
CONSTRUCT TWO(2) SURFACE
INLET(0.8x0.8M), SEE 2
- 9
-10
CONSTRUCT 0.8M DIA RCP W/ RC
ENCASEMENT AND HEAD WALL,
APPROX. 30.0 LM. SEE
-10
- 9
CONSTRUCT 0.3M W STEEL GRATING DITCH
W/ WING WALL INFRONT OF GABION WALL,
APPROX. 80.0 LM. SEE
- 6
- 6
-10
-10
CONSTRUCT OPEN STONE DITCH
TO FIT ON SITE CONDITION,
APPROX. 250.0 SM. SEE
- 7
-10
CONSTRUCT 0.8M W CON’C OPEN DITCH,
APPROX. 58.0 LM. SEE
CONSTRUCT 0.3M THK GABION MATTRESS
ON THE SLOPE, APPROX. 250.0 SM. SEE
CONSTRUCT PCC PAVEMENT
W/ GROOVING ON THE SLOPE,
APPROX. 2,200.0 SM. SEE
- 8
-10
CONSTRUCT CON’C CURB,
APPROX. 25.0 LM. SEE
1. CONSTRUCT PCC PAVEMENT W/ GROOVING ON THE SLOPE.
2. CONSTRUCT GABION RETAINING WALL.
CONSTRUCT GABION RETAINING WALL-1
(MIN. 2.0M H, MAX. 3.0M H),
APPROX. 56.0 LM. SEE
CONSTRUCT GABION RETAINING WALL-2 & 3
(MIN. 1.0M H, MAX. 4.0M H),
APPROX. 87.0 LM. SEE
4. CONSTRUCT 0.3M THK GABION MATTRESS
ON THE SLOPE.
6. CONSTRUCT CON’C CURB.
H-BELT
CONSTRUCT 0.8M DIA RCP W/ RC
ENCASEMENT AND HEAD WALL,
APPROX. 18.0 LM.
AND RESTORE GRAVEL PAVEMENT,
APPROX. 20.0 SM. SEE
- 9
BACKFILL EARTH AND COVER
W/ SOLID SODDING,
APPROX. 250.0 SM. SEE
7. BACKFILL EARTH AND COVER W/ SOLID SODDING.
GRAVEL ROAD
SITE LAYOUT PLAN
SITE LAYOUT PLAN AND SCOPE OF WORK
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
105642
CONSTRUCT 0.8M W CON’C OPEN DITCH
W/ WING WALL, APPROX. 60.0 LM. SEE4,5
3. CONSTRUCT DRAIN SYSTEM W/ 0.8M W CON’C OPEN DITCH,
0.3M W STEEL GRATING DITCH, 0.8M DIA RCP W/ RC ENCASEMENT,
OPEN STONE DITCH AND TWO (2) SURFACE INLET(1.0x1.0M).
CONSTRUCT VEHICLE GUARDRAIL W/
DELINEATOR ON BOTH SIDES OF SLOPE ROAD,
APPROX. 280.0 LM. SEE
5. CONSTRUCT VEHICLE GUARDRAIL W/ DELINEATOR ON BOTH SIDES
OF SLOPE ROAD.
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
- 4
SCALE: 1/350
CIVIL
C-4
AS SHOWN
CHOE, S M. RODRIGUEZ LIVE FIRE COMPLEX
N
1:350
0 40M302010
S P
E C
.6
.0
.0
.0
.0
P C
C R
O A
D
GRAVEL ROAD
GRAVEL ROAD
G R
A V
E L
R O
A D
H-BELT
GRAVEL ROAD
.0
.0
5.00
.0
5.00
5.00
- 5
GALVANIZED STEEL ANGLE
ON THE EDGE OF PCC BETWEEN
PCC PAVEMENT AND EARTH,
APPROX. 7.6 LM. SEE
VEHICLE GUARDRAIL
CON’C CURB
- 5
GALVANIZED STEEL ANGLE
ON THE EDGE OF PCC BETWEEN
PCC PAVEMENT AND EARTH,
APPROX. 15.0 LM. SEE
CONSTRUCTION JOINT
CONTRACTION JOINT
EXPANSION JOINT
- 5
GALVANIZED STEEL ANGLE
ON THE EDGE OF PCC BETWEEN
PCC PAVEMENT AND EARTH,
APPROX. 5.0 LM. SEE
* LEGEND
EXPANSION JOINT
CONTRACTION JOINT
CONSTRUCTION JOINT
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
105642
CONSTRUCTION JOINT
PCC PAVEMENT JOINT LAYOUT PLAN
PCC PAVEMENT JOINT LAYOUT PLAN
NOT TO SCALE
NOT TO SCALE
SEPARATING
TAPE
SEPARATING
TAPE
PREFORMED
JOINT FILLER
PAVEMENT
SURFACE
SEPARATING
TAPE
INITIAL
SAWCUT (4mm)
JOINT BOTTOM
CRACK
PAVEMENT
SURFACE
PAVEMENT
SURFACE
NOT TO SCALE
CONTRACTION JOINT
8B
EXPANSION JOINT
8C
CONSTRUCTION JOINT
R6 (TYP)
R6 (TYP)
R6 (TYP)
8A
NEW PCC PAVEMENT NEW PCC PAVEMENT
/SEE DETAIL SEE DETAIL
D13 @ 300 OC, EW,
100 CLEARANCE
DISTANCE
CONSTRUCTION
JOINT
TRAVERSE
CONSTRACTION
JOINT
BASE COURSE BASE COURSE
BUTTED JOINT
25mm 0 x 400 LONG DOWELS
@ 300 ON CENTER
(ONE END PAINTED AND OILED)
JOINT SEALANT
JOINT SEALANT
JOINT SEALANT
NEW PCC PAVEMENT
D13 @ 300 E.W.
SURFACE COURSE
THICKENED EDGE
TRANSITION FOR
100% COMPACTION
BASE COURSE
280kgf/cm THK PCC
FNSH GRADE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
CIVIL
C-5
AS SHOWN
CHOE, S M. RODRIGUEZ LIVE FIRE COMPLEX
NOT TO SCALE
- 5
SCALE: NONE
PCC PAVEMENT DETAIL
CONTRACTION JOINT CONSTRUCTION JOINT
NOT TO SCALE
NOT TO SCALE
TYP. PCC PAVEMENT SECTION
PAVEMENT JOINTING
SEALANT DETAILS
8B
8C
PCC PAVEMENT DETAIL
D19x300 ANCHOR
@450 O.C
WELD TO ANGLE
100x100x10
NOT TO SCALE
EDGE PROTECTION DETAIL
GALVANIZED STEEL ANGLE
REBAR PLAN
COMPACTED SUBGRADE COMPACT
ALL TOP 150 CUTS TO A MIN. OF
90% OF MAX. DENISITY FOR COHESIVE
FOR COHESIONLESS MATERIALS
MATERIAL AND 95% OF LABORATORY MAX. DENSITY
DRILL & GROUT DOWEL
JOINT SEALANT
EXST PCC PAVEMENT
PAINT AND OIL
THIS END OF DOWEL
25mm DIA X 400mmL @ 380 OC
EXPANSION CAP SLIP FIT
NEW PCC PAVEMENT
200200 50
80 25
PCC SURFACE COURSE
NOTES:
1. THESE GROOVES SHALL BE CUT PERPENDICULAR TO THE CENTERLINE.
BEFORE GROOVING BEGINS, THE CONCRETE SHALL BE ALLOWED TO
STIFFEN SUFFICIENTLY TO PREVENT DISLODGING OF AGGREGATE.
GROOVES SHALL NOT BE CUT WITHIN 150 MM OF A TRANSVERSE
JOINT OR CRACK.
EXPANSION JOINT BETWEEN
NEW/EXST PCC PAVEMENT
NOT TO SCALE
8A
GROOVING
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
T=4.0(t/m) m 3 m 2
EA
SIZE
GEOTEXTILE
ITEM
STONE
QTY / 1.0 M
D=100~300mm
GABION EA
EA
2.0X1.0X1.0
1.5X1.0X1.0
1.0X1.0X1.0
1.0
2.0
1.0
4.3
6.0
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
CIVIL
C-6
AS SHOWN
CHOE, S M. RODRIGUEZ LIVE FIRE COMPLEX
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
105642
- 6
SCALE: NONE
4.00 37.00 3.00
0.30 55.00 0.30
3.00 5.00 25.00 38.00 3.00 7.00
7.00 4.00
.3
.0
.0
TURNING
POINT
TURNING
POINT
300MM THK
BASE COURSE
TURNING
POINT
.3
.0
0 1 .0
.0
300MM THK
BASE COURSE
0.30 81.00 0.30
TURNING
POINT
0.30 6.00 0.30
.3
.0
300MM THK
BASE COURSE
G.L
.3
G.L
G.L G.L
.3
4.00 2.00
G.L
1.00 0.30 0.30
.0
.3
.3
G.L G.L G.L
.3
.3
.3
.0
.3
.0
.3
.0
.3
T=4.0(t/m) m 3 m 2
EA
SIZE
GEOTEXTILE
ITEM
STONE
QTY / 1.0 M
D=100~300mm
GABION EA
2.0X1.0X1.0
1.5X1.0X1.0
1.0
2.0
3.3
5.0
T=4.0(t/m) m 3 m 2
SIZE
GEOTEXTILE
ITEM
STONE
QTY / 1.0 M
D=100~300mm
GABION
EA
EA
1.5X1.0X1.0
1.0X1.0X1.0
1.0
1.0
2.3
2.5
T=4.0(t/m) m 3 m 2
SIZE
GEOTEXTILE
ITEM
STONE
QTY / 1.0 M
D=100~300mm
GABION EA1.0X1.0X1.0 1.0
1.3
1.0
GEOTEXTILE
GEOTEXTILE
GEOTEXTILE
GEOTEXTILE
300MM THK
BASE COURSE
300MM THK
BASE COURSE
300MM THK
BASE COURSE
300MM THK
BASE COURSE
1.00 0.30 0.500.30
1.50 0.30 0.500.30
1.00 0.30 0.500.30
0.50
GABION RETAINING WALL
GABION RETAINING WALL - 1
GABION RETAINING WALL - 2
GABION RETAINING WALL - 3
SECTIONS
GABION RETAINING WALL
30~50
°¡ÀåÀÚ‚fi ˆ¶…–
Mesh size : 8.0 x 10.0 cm
`ß 85% ÀÌ»óÀ˙ µ„ÀÌ 100~200mmÀ̾î¾ß ˙Ñ·Ù. ·Ù‚‚ ‡»”˛”—À˙
ÀÛÀ” °ł°£µØÀ» ‚Þ†Ù–â À§˙Ñ ˆ⁄¿òÀç·´ 15% À̇»•˛ ˙Ñ·Ù.
* ˆ⁄¿òÀçÀ˙ ¯'–â·´ ‚¯˘fi‚fi‰” ‡ôÀÌÀ˙ 1/2ÀÌ˙ˇ¿'¾ß ˙ˇ‚ç Àüˆ… ˆ⁄¿òÀç
°¡ÀåÀÚ‚fiˆ¶…–
3. ‚ðµç „›À‰°œ ¿‹°Æˆ¶…– ‡¡‚¶„«‚fi·´ °¢ ˆ¶…–‡¡ÀÌ ‚`¾¨´˚À‚•˛ ˙â˙ˇ°Ô ˙Ô.
2. ˆ¶…–‚¯µì À” 3¨‚‚ƒ †¿¾˘…› Àüˆ…°¡ Àˇˆ…µ˙µµ•ˇ ‰ˆ°ł
`Ö) 1. „›À‰ˆ¶…–À˙ Àç`œÀ” Gabion‚`°œ µ¿Àˇ(2.2mm)
°¡ÀåÀÚ‚fiˆ¶…–
(‚¶„«‚fi »ó……)
Àý·Ü…–
°¡ÀåÀÚ‚fi ˆ¶…–(Selvedge wire)
˜›‚•ÀÌ(Diaphragms)
30~50
»ó…… "A"(‰ˆ°ł »ó……µµ ´ü`¶)
1.0
2.0
6.0m
•ÀÌ
°¡ÀåÀÚ‚fi ˆ¶…–
˜›‚•ÀÌ
¶Ñ †
°¡ÀåÀÚ‚fi ˆ¶…–
Àü °‡ µµ
Àý·Ü…–
°¡ÀåÀÚ‚fi ˆ¶…–
8.0x10.0cm
Mesh Size
°¡ÀåÀÚ‚fiˆ¶…–(3.4 mm)
°¡ÀåÀÚ‚fi ˆ¶…–
2.0m
‚`·«ˆ¶…–(2.7 mm)
C.T.C 200mm À̇»
„› À‰ ˆ¶ …–
Diaphragms (single)
°¡ÀåÀÚ‚fiˆ¶…–
„›À‰ˆ¶…–
(˜›‚•ÀÌ)
6.0 m
1.0 m
·Ü ‚Ø µµ
»ó…… "C"
»ó…… "B"
Àç •Æ –â `Ø
ˆ⁄ ¿ò Àç
ˆ¶ …–
‚`·«ˆ¶…–
˙× ‚æ
T=0.3 M
¿‹°Æˆ¶…–
°¡ÀåÀÚ‚fiˆ¶…–
ÀÚ Àç –Ô °Ý
˙× ‚æ
Mattress
¨£¾¨¿º Gabion
L
H
W
°¡ÀåÀÚ‚fiˆ¶…–
100~200mm
2.7mm
–Ô °Ý
2.2mm
3.4mm
‰ˆ ˙Ł „æ „ý
…fi »Œ °æ Àç
KS B 5202
ÀÚ ¿‹ …fi „×
¨£¾¨ –æÀÌ¿¡ µß¶ó
LxWxH `¶`⁄°¡·É
6.0m
–Ô °Ý
2.0m
”æ °í
0.3M
4. ¿ł`ö„ÝÀ» Àß ·Ù`ł ¨˜ ”˛`÷˘÷‚ƒ –ò°í …‡˜¡˙Ñ·Ù.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
CIVIL
C-11
AS SHOWN
CHOE, S M. RODRIGUEZ LIVE FIRE COMPLEX
- 7
SCALE: NONE
GABION MATTRESS
.3
.5
GABION MATTRESS
»ó…… "A" ‰ˆ°ł »ó……µµ
»ó…… "C"
»ó…… "B"
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
FILL OR CUT SLOPE
TYPICAL ELEVATION
1A
TYPICAL SECTION
1C
LAP
PLAN
RAIL ELEMENT SECTION
SAME AS
1D
ELEVATION
FLARED END
5/8 " x 2" BOLT, RAIL BOLT
W6 x 85 x 5’ - 9" MIN.
METAL POST
ONE REQUIRED
NUT & WASHER
0 ^
L
L
12 GAGE
C SYMMETRICAL
ABOUT C
RAIL ELEMENT SECTION
METAL POST WITHOUT SPACER BLOCK
1E
1B
M
IN
3MM SHEET
106 106
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
CIVIL
C-8
AS SHOWN
RODRIGUEZ LIVE FIRE COMPLEX
- 8
VEHICLE GUARD RAIL
VEHICLE GUARD RAIL
CHOE, S M.
SCALE: NONE
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
105642
LAP IN TRAFFICC POST BOLT HOLEL
DIRECTION
FLARED
SPACER BLOCK
3000 3000 3000
M
IN
METAL POST
WITHOUT
DELINEATOR
SLPSLP
STEEL GRATINGS
(SEE NOTE)
S E C T I O N
CONC WALL
(21 MPa)
CEMENT FILLER
D13 @ 200
OC, EW
SEE NOTE
SEE
DETAIL
S L
P S
L P
1B
1D
BEARING BARS CROSS BAR
GRATING FRAME ANGLE BAR
P L A N
1C
1E
EXPANSION JT
@ 15.00m OC
1A 1B
D
WIDTHD D
D
GRATING
WIDTH
D T
R E
N C
H
W
ID
T H
D13 BAR
@ 200 OC
ANGLE BAR
(SEE TABLE)
013 ANCHOR BAR
WELDED TO ANGLE
@ 600 MAX
D E T A I L
FLAT BAR
GRATE FRAME
CROSS BARS
WELD TO
BEARING BARS
BEARING BARS
WELDED TO
GRATING FRAME
FIN GR
1C
D
SEE TABLE
DISCONTINUE
GRATING SEAT
AND 013
LONGITUDINAL
REBARS
13 THK
PREMOLDED
JOINT FILLER
MATERIAL
019 PLAIN BAR DOWEL
400 LONG. ONE END
PAINTED AND OILED
SPACED SAME AS
LONGITUDINAL REBAR
D
V A
R
IE
S
P R
O F
IL
E
S E C T I O N 1D
B
STEEL GRATINGS
TYP
1E
STEEL GRATING SCHEDULE
H
B C
D
ANGLE BAR
L80x80x6
TRENCH WIDTH
NOTE:
STEEL GRATINGS FOR CONCRETE DITCHES SHALL
COMPLY WITH SPECS. MINIMUM TRAFFIC LOAD FOR
STEEL GRATINGS ON CONCRETE DITCHES SHALL BE
FOR 20-TON DESIGN TRUCK LOAD:
WHEEL LOAD = 79 KN(8.0 TONS).
V A
R
CON’C DITCH W/ STEEL GRATING1
- 9
SCALE: NONE
CIVIL
C-9
AS SHOWN
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
MISC. DETAILS - 1
SHALLOW SURFACE INLET - PLAN
D13 @ 225mm O.C. EACH WAY
BE PROVIDED
MIN. COVER TO
(TYP.)
S E C T I O N
D E T A I L
D13 DIAGONAL BAR
TYP. 4 EACH
D
IA
O U
T L E T
P
IP
E V A
R
IE
S
D E T A I L
SEE
DETAIL
D13 @ 200
O.C. E.W.
D13 @ 200
O.C. E.W.
FLAT BAR (GALV)
50x10 @ 50 O.C.
10 10
CONC 21 MPa
GALVANIZED
50x10 FLAT BAR
GRATING FRAME
FLAT BAR (GALV)
50x10 @ 50 O.C.
L50x50x6 (GALV)
W/10 0x125 L ANCHOR
BAR WELD TO ANGLE
@ 600 O.C. MAX
GALV D10 CROSS BAR
WELD TO FLAT BAR
@ 100 O.C.
FIN GRADE
D10 CROSS BAR
GRATING SHALL
BE PLACED SO
CROSS BARS ARE
PERPENDICULAR
TO DIRECTION OF
PRINCIPAL INFLOWS
DRAIN PIPE
SEE PLAN
DRAIN PIPE
SEE PLAN
NOTES :
1. ALL EXPOSED STEEL MEMBERS SHALL BE
GALVANIZED.
2. GRATING SHALL BE GALVANIZED AFTER
FABRICATION.
3. INSTALL GALV. STEEL LADDER ONLY WHEN
DEPTH FROM TOP TO COVER TO INVERT
EXCEEDS 1.20 METERS.
4. USE 1 x 1 M WIDE OPENING WHEN DEPTH IS
GREATER THAN OR EQUAL TO 1.0M.
5. INSTALL LADDER RUNG WHEN DEPTH IS
GREATER THAN 1.0 M.
100 100
10 10
100 100
150 150
C
- 9
SCALE: NONE
SURFACE INLET
2A
2B
2C
2D
800/1100
580/880
500/800
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
RODRIGUEZ LIVE FIRE COMPLEX
105642
50 THK MIN
SOLID SOD
BLANKET
100 THK MIN
TOP SOIL
SCARIFIED AND
COMPACTED SUBGRADE
- 9
SCALE: NONE
SOLID SODDING
1,100
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
CIVIL
C-10
AS SHOWN
CHOE, S M. RODRIGUEZ LIVE FIRE COMPLEX
CULVERT PIPE
MASONRY DITCH.
RIPRAP OR STONE
SEE PLANS
WIDTH OF HEADWALL "L"
B
SEE PLAN
CULVERT PIPE
SEE PLAN
SIDESLOPE
HEADWALL
SEE PLAN
PIPE DIA.
M
IN
D E
P T
H
V A
R
IE
S
S E
E P
L A
N
FOR LENGTH OF LINING
SEE PLAN 300
TOP OF DITCH 1
M
IN
POINTS OF WALL THICKNESS
PROVIDE 2-150mmBARS AT 1/3
M
IN
45%%d
MIN.
45%%d
MIN.
25mm CHAMFER
FINISH GRADE
PROVIDE 2-150mm BARS AT 1/3
POINTS OF WALL THICKNESS
M
IN
M
IN
P
IP
E
D13 HOOPS AT 250mm O.C.
LAPPED 300mm AT ENDS
M
IN
AT 300mm O.C. USE ONLY
D13 LONGITUDINAL
800MM DIA
RCP
M
M D
IA
P
IP
E D
IA
280 kgf/cm CONCRETE
-10
SCALE: NONE
NOT TO SCALE
1A
P L A N S E C T I O N 1B
NOT TO SCALE
1C
NOT TO SCALE
REINFORCED CON’C ENCASEMENT
R=13
CAST IN PLACE
CONCRETE CURB
"C"
C
NOTE ;
SCALE: NONE
CON’C CURB
INTERVALS (MATCH SIDEWALK)
2. "C" DIMENSION CONSTANT EQUALS PAVEMENT
SECTION MINUS 300.
3. CONCRETE COMPRESSIVE STRENGTH SHALL BE
21 MPa AT 28 DAYS.
200 200
D16 @ 150 O.C
D13 @ 250 O.C
SCALE: NONE
NOTE:
BELL HOLES SHALL BE EXCAVATED TO THE
NECESSARY SIZE AT EACH JOINT OR
COUPLING TO ELIMINATE POINT BEARING.
SATISFACTORY
BACKFILL
INITIAL
BACKFILL
BEDDING-SELECT
GRANULAR MATERIAL
SHALL BE FREE OF
ROCK 13 OR LARGER
UNYIELDING
MATERIAL
FIRM UNDISTURBED
EARTH (SEE NOTE)
UNYIELDING MATERIAL
TRENCH BOTTOM
EARTH TRENCH BOTTOM
TURFED OR MISC AREAS
PLASTIC
MARKING TAPE
(300 DEEP MAX)1
1.5
TRENCH WALLS CUT
TO 1.5:1 MAX
WITHOUT SHORING
150 MIN
M
IN
OD + 600
TYPICAL TRENCH SECTION
SCALE: NONE
1D
-10
-10
A V
G
IMPROVE MANEUVER TRAIL WITH EROSION
CONTROL BETWEEN MPMG AND H-BELT
MISC. DETAILS - 2
105642
WINGWALLS
C
WINGWALLS
(MIN.)1.5
SCOUR APRON
GROUTED STONE
V A
R
IE
S
M
IN
MIN
MIN. 1000
A S
R E
Q U
IR
E
D
CON’C OPEN DITCH W/ WING WALL
MIN. 1000
CON’C OPEN DITCH
PCC PAVEMENT
25 150
G.L
1. PROVIDE EXPANSION JOINTS AT MAX. 15.0 M.
CON’C OPEN DITCH
MIN
V A
R
IE
S
2A
NOT TO SCALE
CON’C OPEN DITCH - SECTION
2B
NOT TO SCALE
2C
NOT TO SCALE
WING WALL - PLAN WING WALL - SECTION
STONE DITCH AND HEAD WALL W/ RCP
| 105642-T1 |
| 105642-C1 |
| 105642-C2 |
| 105642-C3 |
| 105642-C4 |
| 105642-C5 |
| 105642-C6 |
| 105642-C7 |
| 105642-C8 |
| 105642-C9 |
| 105642-C10 |
File details come from the government source that posted it. Updated .