MOSITPWS.doc
DOC document 131 KB Posted
- Solicitation number
- W91QVN-16-R-0051
About this file
Attachment 1-PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AppendixAProjectedTraining.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Military Occupational Specialty Individual Training (MOSIT) General Information
Introduction: The purpose of this requirement is to provide critical non-credit technical/occupational skills training in job-related military specialty training to small groups of trainees. This training must relate to the Military Occupational Specialty (MOS). The Government will provide the course material for military specific classes. The Government user will coordinate the course length with the provider. The provider determines whether the course is delivered in traditional or mixed format.
1. General: This is a non-personnel services contract to provide critical technical training to specific MOS specialties. Specific training includes: Unit Armorer Courses, Digital Training Management system (DTMS) Training, and DTMS Master Trainer. This training is critical to maintaining core proficiencies to support the war-fighter and accurately report readiness. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform MOS Individual Training as defined in this Performance Work Statement. Except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: This a reoccurring requirement that requires the instruction of three technical training courses. The technical training are DTMS Training, DTMS Master Trainer and Unit Armorer Class given to military individuals stationed at various locations within South Korea. The contractor shall provide critical technical training essential to mission readiness.
1.3 Objectives: To provide Job-Related Training – (On Duty) Traditional/Mixed and Alternative Instruction. Provide non-credit technical/occupational skills training in job-related military specialty courses to small groups. Training must relate to the Military Occupational Specialty (MOS) technical training specific to: Unit Armorer Course; DTMS Training; and DTMS Master Trainer. This training is critical to maintaining core proficiencies to support the war-fighter and accurately report readiness.
1.4 Scope: To provide specific MOSIT in; DTMS, DTMS Master; and Unit Armorer training that is pertinent to the continuation of 8A’s mission of providing quality and MTOE required qualifications to support the Army’s mission on the South Korean Peninsula. Historically, the DTMS classes are 3 days in Duration Approximately 24 hours, the DTMS Master classes are 4 days in duration and about 2832 hours and the Unit Armorer courses are about 2 weeks in duration and about 80 hours. The contractor shall accomplish the required hours of training in accordance with the attached projected class list in Appendix A.
1.5 Courses Description: the contractor shall conduct DTMS, DTMS Master and Unit Armorer training courses in various locations and period of performance in accordance with provided schedule. The course will provide instruction for training on the full capabilities of DTMS so that students can effectively and accurately manage DTMS for their unit.
1.5.1 DTMS: The Digital Training Management System (DTMS) is a web-based training management system that assist units with mission essential task list (METL) development; training planning and management; and track unit training and Soldiers Individual Training Records (ITR) in accordance with AR 350-1 Army Training and Leader Development and by implementing the doctrine, tactics, techniques, and procedures outlined in FM 7-0 Training Units and Developing Leaders for Full Spectrum Operations.
1.5.2 DTMS Unit Armorer Master Courses: This course provides instruction for training and operations personnel on the full capabilities of DTMS so they can accurately manage DTMS for their unit.
1.5.3 Unit Armorer Course: Course provides performance-oriented training on administrative and technical tasks required of a Unit Armorer. Training includes inspection, disassembly, assembly, required operator/organizational maintenance, parts ordering, PLL maintenance for small arms, and turn-in procedures for direct support maintenance. Course also covers physical security and security inspections conducted by the PMO.
1.6 Period of Performance: 01 August 2016 – 31 July 2017. The period of performance shall be for one (1) Base period of six (6) months and four (4) twelve 12-month option years. In accordance with the PWS, the contractor shall conduct instruction at any time during the basic contract period on military installations listed within this PWS. The Period of Performance reads as follows:
Base Year:
01 August 2016 – 31 July 2017
Option Year 1:
01 August 2017 – 31 July 2018
Option Year 2:
01 August 2018 – 31 July 2019 Option Year 3:
01 August 2019 – 31 July 2020
Option Year 4:
01 August 2020 – 31 July 2021 The Government reserves the right to exercise or not exercise the options.
1.7 Work Coordination: It shall be the responsibility of the contractor to coordinate with the COR, the class schedule and location of performance for any of the required MOSIT training.
1.8 Recognized Holidays: The contractor shall not be required to perform services on the following recognized holidays, however if required services fall on one of the following holidays the service shall be completed the following day.
New Year’s Day
Labor Day
Martin Luther King Jr.’s Birthday
Columbus Day
President’s Day
Veteran’s Day
Memorial Day
Thanksgiving Day
Independence Day
Christmas Day
1.9 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0900 - 1800 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
2. Place of Performance: The work to be performed under this contract will be performed at:
| DTMS &DTMS MASTER |
| USAG YONGSAN |
| BUILDING NUMBER 1192 |
| DTMS & DTMS MASTER |
| CAMP HOVEY |
| BUILIDNG NUMBER 3671 |
| DTMS & DTMS MASTER |
| USAG HUMPHREYS |
| BUILDING NUMBER S302 |
| DTMS |
| USAG CARROLL |
| BUILDING NUMBER S205 |
| UNIT ARMORER |
| USAG CASEY |
| BUILIDING NUMBER 0546 |
| UNIT ARMORER |
| USAG HENRY |
| BUILDING NUMBER 1840 |
| UNIT ARMORER |
| USAG YONGSAN |
| BUILDING NUMBER 2212 |
| UNIT ARMORER |
| USAG HUMPHREYS |
| BUILDING NUMBER 300 |
2.1 Type of Contract: The government will award a Firm Fixed Price Contract with a base year and up to a 4 year option contract with a requirement FFP CLIN for as needed services.
2.3 Security Requirements: All contractor personnel performing work under this contract shall have a background investigation completed with favorable results within 10 days of contract award and submitted to the Contracting Officer for acceptance. All contractor personnel must complete Level 1 Anti-Terrorism Training within 10 days of contract award. Prerequisite to Common Access Card (CAC) issuance is proof of completed background investigation and a positive result from an FBI fingerprint check. New employees must coordinate with the Responsible Officer (RO) to schedule appointment with the base Information Protection and Security offices to process required paperwork or as required by local installation policy.
2.3.1 Background Investigation: If the background Investigation is completed with other than favorable results, the Contractor shall not allow the employee to provide further instruction or support services unless prior written approval from the local Security Officer and the Contracting Officer is obtained. Certified employees who complete their assignments or terminate employment with the Contractor shall relinquish the Common Access Card and/or the United States DoD/Uniformed Services Identification and Privilege Card and related individual support, turn in Government furnishings, ration control cards, etc., to the designated contract official/Trusted Agent within 15 days of term completion or assignment termination date.
2.4 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. Ensure that safety and health standards of the installation are maintained while classes are being conducted.
2.5 Key Control: The contractor will coordinate with the COR or designated government official to obtain access to government owned facility.
2.6 Special Qualifications: Any of the nationally accreditation recognized by the US Department of Education Institution. The Contractor shall furnish a copy of their most recent accreditation reports to the Contracting Officer (KO).
2.6.1 Prior Experience as Contractor: The Prime Contractor shall have at least three (3) years’ experience within the last five (5) years in training and instruction of DTMS, DTM and Unit Armorer training.
2.6.2 The offeror(s) shall provide evidence of prior experience as required below:
2.6.3 The title of the contract number/project for the Commercial or Government requirement
2.6.4 A clear description of qualifying work experience
2.6.5 Length of contract/project ( From: year/month/date – To: year/month/date)
2.6.6 Value of contract/project in KW for total amount
2.6.7 Complete name of point of contact at Client Organization (including name, phone number and email
2.7 Accreditation: The Contractor shall have a U.S Recognized accreditation by an organization certified to grant accreditation in the US and recognized by the U.S. Government to include; Department of Education or DoD/DA. The Accreditation shall be current and not with six months of expiration.
2.8 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Following personnel is considered key personnel:
2.8.1. Contract Manager (CM): the contractor shall provide a contract manager and alternate contract manager (responsible in the absence of the contract manager) who shall be responsible for the performance of the services. The contract manager and alternate(s) shall have good command of English, be able to read, write, speak, and understand without repeated effort. Provide evidence of prior experience in DOD military service.2.8.1.1 The contract manager or alternate shall be available between of 0900-1800 hours Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The CM shall be available within two (2) hours to meet with government personnel (designated by the Contracting Officer) to discuss issues or concerns pertaining to contract or personnel performance. After normal duty hours the CM or alternate shall be available within four (4) hours. Qualifications for all key personnel are listed below:
2.8.1.2 The Contract Manager shall have a minimum of five (5) years of prior military experience in the specified MOS requested training and at least one (1) year as an instructor within the last five (5) years. The alternate contract manager shall possess the same qualifications as the contract manager. The contractor shall not change key personnel without the notification and consent of the Contracting Officer. The personnel who is to replace a key personnel shall have the same qualifications as the key personnel evaluated at contract award.
2.8.2 Instructor(s): The contractor shall employ qualified instructors with a minimum of an associate’s degree in any field and prior military experience in DTMS, DTMS Master or Unit Armorer training. The Instructor shall have basic computer expertise and familiarity with Microsoft Office Suite. The Instructor for the DTMS Master shall have prior experience as a DTMS Master trainer (instructor) in the military within the last 3 years.
2.9 Contractor personnel
2.9.1 Contractor Employees: The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the facility and its population.
2.9.2 Contractor personnel shall present a professional appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.
2.9.3 The contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Department of Army, either military or civilian, unless such person seeks and receives approval according to DOD 5500-7-R Joint Ethics Regulation.
2.9.4 The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
2.9.5 All contractor personnel shall be provided a minimum of 3hrs site specific training at the contractor’s expense.
2.9.6 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
2.9.7 Remove employees who endanger persons or property, or whose continued employment is inconsistent with the interests of military security or who might place the privileges, immunities, or status of the United States Forces in the host nation country in jeopardy.
2.9.8 Remove objectionable employees from the work site, area, or base. Objectionable employees include those employees not properly attired or those employees using profane language, or abusing or disobeying base/host country conduct rules or regulations.
2.9.9 Ensure full-time employees (faculty members, staff, field representatives, etc.) who receive foreign country tax free privileges (exchange, commissary, etc.) abide by country Status of Forces Agreement (SOFA) and local installation commander’s directives concerning their employment on the local economy.
2.10 Ensure all employees adhere to the laws of the country in which the program is being conducted and such local command directives as may be applicable to them, such as standards of conduct on military installations and in the foreign country. Ensure employees do not represent themselves as Government employees.
2.10.1 Submit an Employee Report every quarter after the first quarter of the Basic Period of performance to the COR which lists all employees provided a Common Access Card (CAC). The report shall list the name, citizenship, work status, primary assignment location, and last four digits of Social Security Number of the employee. Include in the report, names and citizenship, date of birth, and relationship to Contractor’s employee of family members.
CAC. The report also shall contain the names of the individuals who are no longer employed and the disposition of their identification cards. Report is due 31 Dec, 31 Mar, 30 June, and 30 September of each year.
2.10.2 Conduct orientation training to all new staff/instructors. Orientation shall include host nation customer and culture and local installation information. New employees who work at specific installations shall be introduced to government education office personnel.
2.10.3 Certified personnel are subject to the liabilities and responsibilities set forth in the SOFA and host country agreements and to local command directives.
2.10.4 Employees shall acquire SOFA status with the host country by reason of his or her employment with the Contractor.
2.10.5 Certified employees and authorized dependents shall not engage in any off base/post local business activities in the host country not permitted under the country SOFA. Entering into business activities not specifically permitted shall be a basis for Withdrawal of an individual’s certification.
2.10.6 The Contractor shall advise the COR by written communication when an individual ceases to be a full-time employee of the Contractor and remains in the host country.
2.10.7 Terminate certification of the employee by revoking the published certifying document The Contractor shall be responsible for surrendering the former employee’s Common Access Card to the COR.
3. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which the contractor assures that the work complies with the requirement of the contract.
3.1. The contractors Quality Control Plan (QCP) shall maintain a Quality Control Log in the local CM’s office by training event. Deviations should be annotated on the log. Submit a Quality Control Plan within 30 days after contract award that addresses all areas covered in the Service Delivery Summary. Maintain quality control documents in electronic format by site, date and term. Upon request by the COR provide a copy of current or historical quality control documents. The COR may also request logs by site in a consolidated manner via electronic format in Microsoft Word or Excel.
3.2. At least once a year the contractor shall monitor the teaching performance of instructors in the classroom to assure quality control. Identify the person(s) responsible for implementing the Quality Control Plan by name and title.
3.3. Provide a Contractor Evaluation Report. The Contractor will provide a candid evaluation of the Contractor’s performance for the past contract period. The report should be tied to the Contractor’s Quality Control Plan and Inspection System. The report shall include deficiencies and corrective action(s) taken to resolve the deficiencies. The report shall also include the following: Executive Summary; Description of Administrative Organization; Summary of Student Surveys; Measures of Student and Administrative Services performance; Annual Summary of Institutions Quality Control Evaluations conducted each term at each site. Distribute government quality assurance student surveys and have surveys completed at or near the end of the training. The surveys will be provided to the COR upon completion and Participate in Quality Assurance visits.
3.4. Three copies of a comprehensive written QCP shall be submitted to the KO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
3.5. Records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
3.6. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
3.7 General Information
3.7.1 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
3.7.2 Contracting Officer Representative (COR): The COR will be identified by a separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, reflects the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
3.8 Contractor Travel: Contractor will be required to travel to several installations throughout Eighth Army during the performance of this contract to conduct the training. The contractor may be required to travel to off-site training locations and to ship training aids to these locations in support of this PWS. Authorized travel expenses are not included or part of the contract and is the contractors’ expense.
3.8.1 Be responsible for all local transportation and for all travel arrangements for contract personnel. Be responsible for the transfer of supplies, materials, and equipment to the appropriate USPACOM instructional sites and return to the home campus and between USPACOM instructional sites.
3.9 Other Direct Costs: N/A.
4. Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
4.1 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
4.2 SAFETY REQUIREMENTS: In performing work under this contract, the contractor shall:
4.2.1 Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
4.2.3 Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910)
4.2.4 Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel. To include Material Safety Data Sheets for all chemicals used in the performance of this contract in accordance with OSHA standards.
4.2.5 Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
4.2.6 Record and report promptly (within one hour) to the contracting officer or COR, all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
4.2.8 In the event of an accident or mishap, take reasonable and prudent action to establish control of the accident or mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident and mishap investigative authority through the contracting officer.
5. INVITED CONTRACTOR OR TECHNICAL REPRESENTATIVE STATUS UNDER U.S. –REPUBLIC OF KOREA (ROK)
5.1. Invited Contractor(IC) and Technical Representative (TR) status shall be governed by the U.S.-ROK Status of Forces Agreement (SOFA) as implemented by United States Forces Korea (USFK) Reg 700-19, which can be found under the “publications” tab on the US Forces Korea home page http://www.usfk.mil.
5.2. No relocation Cost Reimbursement: Relocation costs such as air travel and household goods and privately owned vehicle Shipments for contractor personnel and/or dependents shall not be reimbursed by the Government and shall be the responsibility of the contractor.
DEFINITIONS & ACRONYMS
6. Definitions and Acronyms:
6.1. DEFINITIONS:
6.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
6.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
6.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
6.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
6.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
6.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
6.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
6.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
6.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
6.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
6.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
6.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
6.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
6.2. ACRONYMS:
ACOR
Alternate Contracting Officer's Representative
AFARS
Army Federal Acquisition Regulation Supplement
AR
Army Regulation
CCE
Contracting Center of Excellence
CFR
Code of Federal Regulations
CONUS
Continental United States (excludes Alaska and Hawaii)
COR
Contracting Officer Representative
COTR
Contracting Officer's Technical Representative
COTS
Commercial-Off-the-Shelf
DA
Department of the Army
DD250
Department of Defense Form 250 (Receiving Report)
DD254
Department of Defense Contract Security Requirement List
DFARS
Defense Federal Acquisition Regulation Supplement
DMDC
Defense Manpower Data Center
DOD
Department of Defense
MOSIT
Military Occupational Specialty Individual training
DTMS
Digital Training Management System
FAR
Federal Acquisition Regulation
HIPAA
Health Insurance Portability and Accountability Act of 1996
KO
Contracting Officer
OCI
Organizational Conflict of Interest
OCONUS
Outside Continental United States (includes Alaska and Hawaii)
ODC
Other Direct Costs
PIPO
Phase In/Phase Out
POC
Point of Contact
PRS
Performance Requirements Summary
PWS
Performance Work Statement RO Responsible Officer
QA
Quality Assurance
QAP
Quality Assurance Program
QASP
Quality Assurance Surveillance Plan
QC
Quality Control
QCP
Quality Control Program
TE
Technical Exhibit
UA
Unit Armorer
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
7. GOVERNMENT FURNISHED ITEMS AND SERVICES:
7.1. Services: N/A
7.2 Facilities: The Government will provide the necessary workspace for the contractor staff to provide the support outlined in the PWS to include desk space, telephones, computers, and other items necessary to conduct the training.
7.3 Utilities: The Government will provide: Electricity and water in sufficient amounts to meet the requirements of this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
7.4 Equipment: The Government will provide computers to conduct DTMS training and specific weapons to conduct Unit Armorer training. All equipment will be provided at the site of training by designated units.
7.5 Materials: The Government will provide Standard Operating Procedures, Policies, and Technical Manuals.
PART 8
CONTRACTOR FURNISHED ITEMS AND SERVICES
8. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
8.1 General: The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of this PWS.
8.2 Secret Facility Clearance: N/A
8.3. Materials: N/A
8.4. Equipment: N/A
SPECIFIC TASKS
9. Specific Tasks:
9.1. Basic Services. The contractor shall provide services for specific MOS Individual Training for Unit Armor, DTMS, and DTMS Master Trainer.
9.2. Task Heading. All training will be conducted IAW Unit SOP’s, Policies and Regulations. The training time frame will be adhered to as indicated in section 1.4.
9.3. CONTRACTOR MANAGEMENT REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also know as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
APPLICABLE PUBLICATIONS
10 APPLICABLE Publications (Current Editions)
10.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
a. Army Regulation (AR) 25-1, Army Knowledge Management and Information Technology Management, 15 July 2005.
b. AR 350-1, Army Training and Leader Development, 18 December 2009.
c. AR 380-5, Department of the Army Information Security Program, 29 September 2000.
d. Department of the Army Memorandum, Implementation of the Digital Training Management System, 11 January 2006.
e. Field Manual 7.0, Training for Full Spectrum Operations, 12 December 2009.
f. Army Training Network (ATN), https://atn.army.mil (supersedes FM 7-1).
g. AA&E and Privately Own Weapons (POW)
h. USFK Reg. 190-16
i. DA PAM 750-8
j. AR 190-11, Physical Security of Arms, Ammunition, and Explosives (30 Sep 93).
k. AR 190-13, The Army Physical Security Program (30 Sep 93).
l. AR 710-2, Supply Policy below the Wholesale Level (28 Feb 94).
m. USFK 700-19, the Invited Contractor and Technical Representative Program.
ATTACHMENT/TECHNICAL EXHIBIT LISTING
11. Technical Exhibit List:
11.1 Technical Exhibit 1 – Performance Requirements Summary
11.2. Technical Exhibit 2 – Deliverables Schedule
11.3. Technical Exhibit 3 – Estimated Workload Data
TECHNICAL EXHIBIT 1
Performance Requirements Summary Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor in accordance with PWS.
| Performance Objective/PWS Para |
| Performance Standard |
| AQL |
| Method of Surveillance |
| Correction Remedy) |
| Job Related training Para 1.3 |
| Contractor shall ensure course content is current and directly related to the occupational series |
| 98% |
| Periodic/Validated customer comments |
| Contractor shall update course content within 5 days of notification from the COR |
| Contractor Evaluation report Para 3.3 |
| Contractor shall ensure the reports are submitted within the specified timeframe and student surveys are distributed to every student upon class completion |
| 98% |
| Periodic/Validated customer comments |
| Contractor shall submit a missed report within 1 day of notification from the COR |
Contractor shall re-distribute student surveys to any student that did not receive one within 1 day of notification from the COR
Methods of QA Surveillance
Various methods exist to monitor performance. The COR may use the surveillance methods listed below.
a. RANDOM SAMPLING.
When actual inspections are to be performed, this is the most appropriate method for frequently recurring tasks. It is also the preferred method for evaluation of contractor quality data and overall “attribute sampling.” In random sampling the inspection results of a sample selected randomly from a lot is statistically the same in the entire lot. Using the lot size and Maximum Error Rate (MER) or Acceptable Quality Level (AQL), the sample size and criteria for determining acceptable performance are determined from an a random sampling system (Indifference Quality Level Sampling and ANSI Z1.4 are acceptable systems). The MER and AQL are complimentary to the Performance Threshold. That is, if the Performance Threshold is 90%, then the MER/AQL is 10%. Next, a random number generator is used to identify the units in the lot to be chosen for the sample (www.randomizer.org is the recommended web site for obtaining random numbers). There can be neither bias nor the possibility of bias in selecting the sample. Each unit in the lot must have an equal chance of being selected as part of the sample. Once the sample has been determined, each unit in it is inspected and determined to be satisfactory or unsatisfactory. If the number of unsatisfactory units observed in the sample is equal to or less than the number permitted by the accept/reject criteria, then the lot is considered to be satisfactory. Otherwise the lot is considered as unsatisfactory and the percentage of the entire lot that is unsatisfactory is statistically the same as the percentage of unsatisfactory work in the sample. The observed defect rate is calculated by dividing the number of observed defects in the sample by the sample size.
b. PERIODIC INSPECTION.
(Evaluate outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
c. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the customer to identify deficiencies, complaints are then investigated and validated.)
d. 100% INSPECTION.
This surveillance type is preferred for those tasks that occur infrequently, have high visibility, or are critical for mission accomplishment. It is also used frequently for those tasks having very stringent performance requirements. When this type surveillance is used, COR will inspect and evaluate the contractor's performance each time it is performed. This method may, on occasion, be appropriate for some special cuts; otherwise, it will not be used very often.
e. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
| Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
| Class attendance roster by course name and date. |
| By the 1st day and last day of class. |
1 copy by the 1st day of class and the last day of class.
Emailed in Excel Spreadsheet.
ATTN: TDB
| Course Packet to include final roster, student comments (AAR), Monitored training review results, and Contractor’s Performance Rating. |
| On the last day of class. |
| 1 copy on the last day of class. |
| Emailed in PDF format |
| ATTN: TDB |
ATTN: TDB
| MOSIT monthly training schedule report. |
| By the 1st of every month. Reflecting the previous month. |
| 1 copy by the 1st of every month. |
| Emailed in Excel Spreadsheet. |
ATTN: TDB
ATTN: TDB
TECHNICAL EXHIBIT 3
ESTIMATED WORKLOAD DATA
| ITEM |
| NAME |
| ESTIMATED QUANTITY |
| 1 |
| Contractor: DTMS Training |
| 3 days |
| 24 hours |
| 2 |
| Contractor: DTMS Master Trainer |
| 4 days |
| 32 hours |
| 3 |
| Contractor: Unit Armorer Course |
| 10 days |
| 80 hours |
File details come from the government source that posted it. Updated .