W91QVN-20-R-0105 SOLICITATION 8_14_2020.pdf
PDF 1 MB Posted
- Solicitation number
- W91QVN-20-R-0105
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-20-R-0105 SOLICITATION 8_14_2020.pdf | ||
| TE03_Historical Service Calls.pdf | ||
| TE01_ELEVAOTOR-ESCALATOR-LIST_20200722.pdf | ||
| TE02_CHECKLIST.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN20R0105 14-Aug-2020
b. TELEPHONE NUMBER
315-755-3355
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 15 Sep 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. FALLS, CARMEN N.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011455916
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
SERVICES DIV, UNIT #15289
APO AP 96271
UNITED STATES
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE WT4KBR 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W3BH USA GARRISON HUMPHREYS
W3BH USA GARRISON HUMPHREYS
STOCK RECORD DPW
UNIT 15716
APO AP 96271-5716
TEL: 011-82-53-470-65 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$41,500,000
NAICS:
561210
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
NOTICE TO OFFERORS
All sources may submit a proposal as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any offeror, for this requirement. All sources submitting a proposal, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea as a local source, must submit adequate verification in its initial proposal, that it has the requisite authorization and capacity to compete for the requirement as a local source, and to perform the contract as a local source. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies as a local source shall be determined by the Contracting Officer. “All offerors interested in competing for this local requirement are required to submit their price proposal, as applicable, in Korean Won (KW) only. A proposal submitted in currency other than Korean Won will not be considered for award.”
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 10 Months Monthly Elevator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all elevators to ensure reliable and continuous safe operation of elevators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated by the contractor in accordance with latest version of ASME 17.1, 17.2 and 17.3 without additional payment.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011455916
PSC CD: Z1JZ
NET AMT
0002 10 Months Monthly Escalator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all escalators to ensure reliable and continuous safe operation of escalators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated by the contractor in accordance with latest version of ASME 17.1, 17.2 and 17.3 without additional payment.
FOB: Destination
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Unscheduled Maintenance & Repair
FFP
Services that are not identified as Monthly Preventative Maintenance; generally, repair works including replacement of major parts/material that incurred in excess of W250,000 per one repair is interpreted as unscheduled Maintenance Work.
EMERGENCY CALLS ARE CONSIDERED:
- All elevators in building are inoperable.
- Safety Issue /Hazardous conditions
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AA 900 Job Service Call After Duty Hour
FFP
Service Call After Duty Hour. - Emergency service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government. EMERGENCY CALLS ARE CONSIDERED:
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AB 80 Job Service Call Holiday
FFP
Service Call During Holiday - Emergency Holiday Service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government.
- All elevators in building are inoperable.
- Safety Issue/Hazardous Conditions
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AC 1,600 Hours Elevator Engineer
FFP
Labor Cost for Elevator System Engineer
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AD 100 Hours Electric Technician
FFP
Labor Cost for Electrical Technician
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AE 400 Hours Common Labor
FFP
Labor Cost for Common Labor
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 Lot Repair Parts and Material Cost
FFP
Direct Cost of Parts & Materials to repair elevators and escalators in accordance with the paragraph 7.4 of PWS.
This CLIN has Not to Exceed (NTE) amount KW270,000,000. Do not propose a price for this CLIN (Requirements Portion) FOB: Destination
KRW 270,000,000
0005 1 Job War Hazzard Losses
FFP
Estimated Cost for War Hazard Losses is zero .
0006 2 Months Phase-In
FFP
Includes two(2)Month phase-in period after initial contract award.
The contractor shall meet all requirements IAW the contractor’s phase-in plan and shall meet periodically with the government (COR) to assess progress as identified in the Paragraph 3.2. of PWS
FOB: Destination
1001 12 Months OPTION Monthly Elevator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all elevators to ensure reliable and continuous safe operation of elevators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated
1002 12 Months OPTION Monthly Escalator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all escalators to ensure reliable and continuous safe operation of escalators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated by the contractor in accordance with latest version of ASME 17.1, 17.2 and 17.3 without additional payment.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Maintenance & Repair
FFP
Services that are not identified as Monthly Preventative Maintenance; generally, repair works including replacement of major parts/material that incurred in excess of W250,000 per one repair is interpreted as unscheduled Maintenance Work.
EMERGENCY CALLS ARE CONSIDERED:
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AA 900 Job OPTION Service Call After Duty Hr
FFP
Service Call After Duty Hour. - Emergency service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government. EMERGENCY CALLS ARE CONSIDERED:
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AB 80 Job OPTION Service Call Holiday
FFP
Service Call During Holiday - Emergency Holiday Service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government.
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AC 1,600 Hours OPTION Elevator System Engineer
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AD 100 Hours OPTION Electrical Technician
FFP
1003AE 400 Hours OPTION Common Labor
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 Lot OPTION Repair Parts and Material Cost
FFP
Direct Cost of Parts & Materials to repair elevators and escalators in accordance with the paragraph 7.4 of PWS.
This CLIN has Not to Exceed (NTE) amount KW270,000,000. Do not propose a price for this CLIN (Requirements Portion)
KRW 270,00,000
1005 1 Job OPTION War Hazzard Losses
FFP
2001 12 Months OPTION Monthly Elevator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all elevators to ensure reliable and continuous safe operation of elevators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated
2002 12 Months OPTION Monthly Escalator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all escalators to ensure reliable and continuous safe operation of escalators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated by the contractor in accordance with latest version of ASME 17.1, 17.2 and 17.3 without additional payment.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Maintenance & Repair
FFP
Services that are not identified as Monthly Preventative Maintenance; generally, repair works including replacement of major parts/material that incurred in excess of W250,000 per one repair is interpreted as unscheduled Maintenance Work.
EMERGENCY CALLS ARE CONSIDERED:
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AA 900 Job OPTION Service Call After Duty Hr
FFP
Service Call After Duty Hour. - Emergency service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government. EMERGENCY CALLS ARE CONSIDERED:
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AB 80 Job OPTION Service Call Holiday
FFP
Service Call During Holiday - Emergency Holiday Service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government.
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AC 1,600 Hours OPTION Elevator Engineer
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AD 100 Hours OPTION Electric Technician
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AE 400 Hours OPTION Common Labor
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004 Lot OPTION Repair Parts and Material Cost
FFP
Direct Cost of Parts & Materials to repair elevators and escalators in accordance with the paragraph 7.4 of PWS.
This CLIN has Not to Exceed (NTE) amount KW270,000,000. Do not propose a price for this CLIN (Requirements Portion)
2005 1 Job OPTION War Hazzard Losses
FFP
3001 12 Months OPTION Monthly Elevator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all elevators to ensure reliable and continuous safe operation of elevators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated
3002 12 Months OPTION Monthly Escalator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all escalators to ensure reliable and continuous safe operation of escalators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated by the contractor in accordance with latest version of ASME 17.1, 17.2 and 17.3 without additional payment.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Maintenance & Repair
FFP
Services that are not identified as Monthly Preventative Maintenance; generally, repair works including replacement of major parts/material that incurred in excess of W250,000 per one repair is interpreted as unscheduled Maintenance Work.
EMERGENCY CALLS ARE CONSIDERED:
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AA 900 Job OPTION Service Call After Duty Hr
FFP
Service Call After Duty Hour. - Emergency service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government. EMERGENCY CALLS ARE CONSIDERED:
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AB 80 Job OPTION Service Call Holiday
FFP
Service Call During Holiday - Emergency Holiday Service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government.
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AC 1,600 Hours OPTION Elevator Engineer
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AD 100 Hours OPTION Electric Technician
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AE 400 Hours OPTION Common Labor
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3004 Lot OPTION Repair Parts and Material Cost
FFP
Direct Cost of Parts & Materials to repair elevators and escalators in accordance with the paragraph 7.4 of PWS.
This CLIN has Not to Exceed (NTE) amount KW270,000,000. Do not propose a price for this CLIN (Requirements Portion)
3005 1 Job OPTION War Hazzard Losses
FFP
4001 12 Months OPTION Monthly Elevator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all elevators to ensure reliable and continuous safe operation of elevators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated
4002 12 Months OPTION Monthly Escalator Maintenance
FFP
The Contractor shall perform monthly preventive maintenance, minor repair, cleaning, and lubricating the equipment for all escalators to ensure reliable and continuous safe operation of escalators in accordance with Technical Exhibit 02, Periodic Inspection Task List, but the periodic inspection task list shall be updated by the contractor in accordance with latest version of ASME 17.1, 17.2 and 17.3 without additional payment.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Maintenance & Repair
FFP
Services that are not identified as Monthly Preventative Maintenance; generally, repair works including replacement of major parts/material that incurred in excess of W250,000 per one repair is interpreted as unscheduled Maintenance Work.
EMERGENCY CALLS ARE CONSIDERED:
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AA 900 Job OPTION Service Call After Duty Hr
FFP
Service Call After Duty Hour. - Emergency service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government. EMERGENCY CALLS ARE CONSIDERED:
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AB 80 Job OPTION Service Call Holiday
FFP
Service Call During Holiday - Emergency Holiday Service calls after normal duty hours, the contractor shall respond within two (2) hours after notification from the government.
- All elevators in building are inoperable.
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AC 1,600 Hours OPTION Elevator System Engineer
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AD 100 Hours OPTION Electrical Technician
FFP
4003AE 400 Hours OPTION Common Labor
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4004 Lot OPTION Repair Parts and Material Cost
FFP
Direct Cost of Parts & Materials to repair elevators and escalators in accordance with the paragraph 7.4 of PWS.
This CLIN has Not to Exceed (NTE) amount KW270,000,000. Do not propose a price for this CLIN (Requirements Portion)
4005 1 Job OPTION War Hazzard Losses
FFP
PWS
Performance Work Statement (PWS)
Elevator and Escalator Repair and Maintenance Service at USAG Humphreys
1. Introduction: This is non-personal services contract to provide Repair and Maintenance service of Elevator and Escalator. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.
1.1. Background: US Army Garrison Humphreys is located in Pyongtaek City, Kyonggi Province, South Korea and has three hundred twenty seven (327) elevators and two (2) escalators. The number of elevators is expected to reach approximately four hundred (400) after the constructed buildings are turned over to USAG Humphreys.
1.2. Objectives: The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, , regulations, and directives to include, but not limited to, the publications in Section 7, Related Documents. Preventive maintenance includes regular cleaning, visual inspection, and maintenance in accordance with American Society of Mechanical Engineers (ASME) A17.1, A17.2, and A17.3.
The Contract shall perform periodic inspection twice a year (frequency: semi-annually) under ASME qualified elevator inspector (QEI)’s attendance and the inspection report shall be certified and signed by the QEI. (Note) Qualified Elevator Inspector (QEI) will be separately contracted by the government
The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost effective ways to fulfill repair and maintenance of elevator and escalator and their component needs, emphasizing innovation and commercial best practices.
1.3. Facility Access: The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Fire Department will reset alarm systems to operational status.
2. Requirements
2.1. Description of Services: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to repair and maintenance for elevators and escalators at US Army Garrison Humphreys as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.
2.1.1. General Information
2.1.1.1. Period of Performance. The period of performance shall be for twelve months (12) months Base Period, which consists of two (2) month Phase In period and ten (10) months of full service and four (4) 12-month
Option Periods.
Base Period: Phase-In: 15 November 2020 – 14 January 2021 (2 Month) Base Period Full Performance: 15 January 2021 – 14 November 2021 (10 Months) Option Period I : 15 November 2021 – 14 November 2022 Option Period II : 15 November 2022 – 14 November 2023
Option Period III : 15 November 2023 – 14 November 2024 Option Period IV : 15 November 2024 – 14 November 2025
2.1.2. Place of Performance and Hours of Operation
2.1.2.1. Place of Performance: The work to be performed under this contract will be performed at the locations listed in Technical Exhibit (TE) 01, Elevator and Escalator List. (22 Jul 2020)
2.1.2.2. Hours of Operation: The Government's regular (normal) hours are from 0800 – 1700 hours, except Korean National holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours. The contractor shall be available to respond emergency service calls and provide required service for emergency calls twenty four (24) hours a day, seven (7) days a week for elevators and escalators.
2.1.3. Holidays:
ROK legal holidays are as follows:
New Year's Day (January 1) Lunar New Year’s Day Independence Movement Day Buddha's Birthday Children's Day Memorial Day Liberation Day Chuseok National Foundation Day Hangeul Day Christmas Day (December 25)
All Korean Public Holidays can be found by year via https://publicholidays.co.kr/ as Korean Holidays change dates based on the year.
2.1.3.1. Installation Closures: When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
a. Reschedule the work to be performed the following day unless the following day is a legal Korean public holiday as listed above, and when routine work is not scheduled for that day; or
b. Reschedule the work on any day that is satisfactory between the COR or the appropriate DPW representative.
2.1.3.2. Inclement Weather Delay: If the Government determines unsafe weather conditions for continued operations, then the Contractor shall be notified by the COR if inclement weather suspends operations within (2) hours. The Contractor shall resume operations with COR approval.
2.1.4. Emergency Services: Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
2.1.4.1. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR immediately, not later than (NLT) two
(2) hours of the incident.
2.1.5. Contractor Employees and Qualification
2.1.5.1. Key Personnel. The following personnel are considered key personnel by the Government. The resume and required license of Key Personnel shall be submitted to the COR and the key-personnel shall be a full-time employee for only this contract and shall not be allowed to work other contracts during normal duty hours. The contractor shall notify the KO and COR in writing of any proposed changes in Key Personnel. Upon notification of a vacancy of Key Personnel, the contractor shall notify the KO within 15 calendar days of proposed substitution.
All individuals shall meet or exceed the requirements for key positions as detailed in this PWS. The Contractor shall obtain Government concurrence of key personnel replacement.
https://publicholidays.co.kr/
• Contract Manger
• Elevator Engineer
• Electrical Technician
2.1.5.1.1. Contract Manager (CM): The Contractor shall provide a Contract Manager who is responsible for the performance of the work. The Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of the Contract Manager shall be provided by the Contractor to the KO. The Contract Manager shall be available between 0800 - 1700 hours, Monday through Friday except ROK holidays or when the Government facility is closed for administrative reasons. During Normal duty hours, Monday thru Friday, the CM shall respond within thirty (30) minutes from the time notified by the Contracting Officer’s Representative (COR) to meet on the installation at the location specified by the COR. After duty hours and including weekends, and holiday, the CM shall respond within four (4) hours from the time notified by the COR to meet on the installation at the location specified by the COR. The Contract Manager shall have at least two (2) years of experience as a Contract Manager within the last seven (7) years in Maintenance and Repair of Elevator with over 100 each elevator per year. The Contract Manager shall be able to understand and communicate in English with government representatives. Any replacements shall meet or exceed qualifications of proposed personnel listed under paragraph 2.1.5.1. Key Personnel. The Government will review and approve the resume of new Contract Manager, prior to their employment with the contractor therefore, the contractor is required to obtain the approval from the Contracting Officer through COR before Contract Manager’s replacement
2.1.5.1.2. Elevator Engineer: The Elevator Engineer shall have valid Certificate of Elevator Inspector Safety Training (승강기자체점검자 수료증) issued by the ROK Government and at least two (2) years of experience within last seven (7) years in the repair and maintenance of elevator after date of issuance of certificate of Elevator Inspector Safety Training.
• Note - Minimum Number of Elevator Engineers: One Two-Person team Per Sixty (60) Elevators. Based upon elevator quantities current minimum is 6 – Two person teams.
2.1.5.1.3. Electrical Technician: The Electrical Technician shall have a certified Craftsman Electrical license (전기기능사자격증) issued by the ROK Government with at least two (2) of experience within last seven (7) years in Electrical Repair.
• Note - Minimum Number of Electrical Craftsman: One Person Per One hundred (100) Elevators. Based upon elevator quantities current minimum is 4 electrical craftsman.
2.1.5.2. Contractor’s Qualification. The prime contractor shall have a minimum two (2) years of experience within the last seven (7) years in Maintenance and Repair of Elevator with over 200 each per year. The prime contractor shall have a valid license in Elevator installation Work Business (승강기설치공사업면허증) and
Business Registration of Elevator Maintenance and Repair (승강기 보수업 등록증) issued by the ROK Government. The license and registration of subcontractor cannot be substituted for the prime contractor’s license and registration.
2.1.5.3. Contractor Identification: The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves by wearing uniform or high visibility vest with company name from Government employees.
The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
2.1.5.4. Standards of Conduct: Contractor personnel’s conduct shall not reflect discredit upon the Government.
The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
2.1.5.5. Contractor Hiring Restrictions: The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct
2.1.5.6. Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the
OCI.
2.1.6. Coordination: The Contractor shall schedule and coordinate with the CORto minimize disruptions to the facility mission.
2.2. Special Requirements
2.2.1. Security
2.2.1.1. Access and General Protection/Security Policy and Procedures: The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes. Motor Vehicle Operators: Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
2.2.1.2. Contractor Vehicle Registration: The Contractor shall submit required documents to register Contractor-owned or operated vehicles and trailers operating on the installation within 7 working days from the beginning of Phase-In Period for COR review and sponsor’s approval. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.
2.2.1.3. Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. The Contractor shall maintain a physical security checklist or log (e.g., Standard Form (SF) 701, Activity Security Checklist), which will be forwarded to the COR, NLT the tenth (10th) of each month, following the month of surveillance. The Contractor shall secure Government facilities, equipment, and materials at the close of each work period
2.2.2. Antiterrorism (AT)iWATCH Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
2.2.2.2. AT Level I Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within thirty (30) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within five (5) calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
2.2.2.3. Access and general Protection/Security Policy and Procedures: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security http://jko.jten.mil/
Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204- 9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
2.2.2.3.1. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
2.2.2.4. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
2.2.3. Safety: The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.2.3.1. Safety Plan: The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.
2.2.3.2. Occupational Safety and Health: The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards as they apply to Elevator Safety. The Contractor shall comply with all applicable Federal, local laws, and regulations, as well as Safety as it applies to building residents while elevators are undergoing maintenance/repair.
2.2.3.3. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 30 minutes of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum.
Contract number and contract name/description Name of contractor Date/Time of accident Date report was completed.
Detail description of events that lead to the accident Root cause of accident Corrective action(s) to prevent recurrence.
The following require immediate accident notification and written accident report
• A fatality
• A permanent total or permanent partial disability
• The hospitalization of three or more people resulting from a single occurrence. Property damage of $200 or more
The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the COR/ Quality Assurance Representative (QAR), and shall notify the COR of the corrective action to be taken.
2.2.4. Training, Physical Requirements, or other Expertise Required
2.2.4.1. The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed, as appropriate in South Korea, in the specific areas required by the South Korean National, Provincial, Municipal, or local governmental organizations. The Contractor shall ensure employees are certified or licensed in the appropriate areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR within twenty-four (24) hours prior to employees commencing performance.
2.2.5. Environmental Requirements
2.2.5.1. Environmental Compliance: The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. All solutions, chemicals and other potentially dangerous products must be stored in their original or labeled container or in vessel/containers in English and Hangul if not in the original container. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR. The Contractor shall provide upon request from the COR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR.
2.2.5.2. Spill Plan: The Contractor shall notify the COR within one (1) hour, if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.
The Contractor shall submit a Spill Plan to the KO for approval within thirty (30) days of contract award IAW Spill Prevention Control and Countermeasure Plan.
3. Performance Requirements and Standards
3.1. Reserved
3.1.1. Performance Task Requirements, Standards and Acceptable Quality Thresholds.
3.1.1.1 Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR and return the damaged area to its previous condition. The
Contractor shall furnish all labor, materials, and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod. The Contractor shall maintain all turf repair work to ensure successful growth.
3.1.1.1.1. Damage Report: The Contractor shall submit a monthly damage report to the COR that annotates the damage, corrective action, and date corrected.
3.2. Transition (Phase In/Phase Out): The Contractor shall prepare and submit a Phase In/Phase Out Plan to be implemented by the Contractor. The Contractor shall have key personnel on board, during two (2) Month transition period. The plan shall specify a training program and a date for transferring responsibilities for each division of work described in the plan. The Contractor shall provide sufficient experienced staff during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency. The phase out plan shall be submitted to the COR for approval 120 days prior to contract expiration.
3.2.1. Phase-In: This requirement includes a two (2) Month phase-in period after initial contract award. The contractor shall meet all requirements IAW the contractor’s phase-in plan and shall meet periodically with the government (COR) to assess progress. The contractor shall perform contract requirements the first day of contract full performance. Contract staffing readiness will include successful completion of PWS and requirements plus meeting all contract requirements. Government transition actions include, but are not limited to, processing the contract and contractor personnel for processing to access installations to perform contract services. There shall be no negative impact on scheduled performance due to contractor phase-in. The contractor will participate in a joint inventory of all property provided by the government. The joint inventory, property control plan and safety plan will be complete and accurate by final day of phase-in period. Prior to the start of performance, the contractor shall submit to the KO and COR, in writing, a list of all employees who will perform under this contract. The list shall include the full name of each employee and his/her position. During this time, the new Contractor's management personnel will be permitted to observe any on-going operations, as coordinated by the COR. During the phase-in period, the new Contractor shall, at a minimum, accomplish the following tasks during the phase-in period. See the below table for summary of Phase-In schedule:
Task Description Days to comply once Phase-In is started
Phase-In meeting with incumbent contractor and COR (Bi Weekly) (Initial Meeting: Within Seven (7) Calendar days after phase-in start
On Going
Request of Base Pass, Decal, List of Personnel and equipment for phase-in 10 days
Submit Quality Control Plan / Safety Plan 10 days
Submit Management Plan (including Organization Charts with technician’s Name & License)
20 days
Request of Base Pass, Decal for all employees for full-performance 20 days
Submit the inspection checklist with the detail standard per each check items based on ASME 17-1 and 17.2 (English and Korean Version)
30 days
Survey to acknowledge the location and condition of all elevators and escalators (50 %) and submit report on survey to the COR
45 days
Submit the initial elevator maintenance schedule (Date&Time, Building No, Elevator or Escalator No, Technician Name shall be included)
45 days
Survey to acknowledge the location and condition of all elevators and escalators (80 %) and submit report on survey to the COR
50 days
Complete Survey to acknowledge the location and condition of all elevators and escalators and submit report on survey to the COR
61 days
Complete training for employees’ understanding the contract and inspection items (Submit the training material and trainee’s roster with signature)
61 days
Progress Meeting with the COR Weekly
3.1.1.1 Prepare for assumption on first date of full performance; assume full responsibility for all areas of operation.
3.1.1.2 Ensure that phase-in operations do not interfere with Government performance of essential services.
3.1.1.3 Mobilize, train, orient and in-process (vehicle registration, identification cards, licensing) the work force.
3.1.1.4 Develop a recruitment plan that provides for “full” manning level by the first date of full performance. The new Contractor shall be 100% staffed for the first full day of contract performance.
3.1.1.5 Identify all personnel during phase-in, by position, functional area labor category, and certifications and be prepared for full performance at completion of phase-in.
3.1.1.6 Attend the pre-performance orientation briefings and on-site tour of facilities.
3.1.1.7 Provide all contract-required plans to the COR for review and comment on acceptability prior to the end of the Phase-In period.
3.1.1.8 The Contractor shall train and educate elevator engineers and technicians to understand and perform the inspection checklist in accordance with the standard of checking items during inspection.
3.2.2. Phase-Out: The contractor shall retain full responsibility for meeting contract requirements until completion of the contract. The contractor shall provide access to the sites and to all documentation generated as a result of performing services on this contract to the new contractor during the new contract phase-in period. The contractor shall conduct a joint inventory with the government of all sub hand-receipted equipment during the phase out period.
The contractor shall certify the inventory after completion of each site inventory. The contractor shall be responsible for replacing missing items.
Phase out transition conference. The contractor shall participate in the phase out transition conference, and periodic follow on meetings, to begin phase out planning and to address the status and issues of the transition. The date and time of the conference will be determined by the government in coordination with the contractor.
Transition of data and items. During phase-out, the contractor shall also account for turn-in all cards, keys, and badges.
4. Performance Requirement Summary (PRS) Matrix
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success
Required Services Performance
Standard
Acceptable Quality
Threshold
Method of Surveillance
Incentive (Positive and/or
Negative) # 1.
Contractor shall ensure all work accomplished meets all applicable Federal, , regulations and directives to include, but not limited to applicable publications in Section 7, Related Documents.
The Contractor shall provide services IAW PWS, para. 1.2.
Zero Deviation from performance standard
100% - Verification confirmation by the COR during surveillance.
Non-conforming services will result in Non- Conforming Reports issued to Contractor and potential negative CPARS report.
# 2.
The Contract Manager shall be available after normal duty hours to serve as the central point of contact for Contractor operations.
The Contractor shall provide a central point of contact IAW PWS, para.
2.1.5.1.1.
Zero Deviation from performance standard
100% - Verification, confirmation by the COR.
Non-conforming services will result in Non- Conforming Reports issued to Contractor and potential negative CPARS report.
# 3.
The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.
Employee conduct complies with 41 U.S.C. 423, Procurement Integrity, IAW PWS para.
2.1.5.4.
Zero Deviation from performance standard.
100% - COR will review all Contractor reported occurrences of Contractor employee misconduct, including but not limited to violations of any provision indicated at 41 U.S.C. 423, and/or security violation to ensure the offending employee is removed from the job site.
Non-conforming services will result in Non- Conforming Reports issued to Contractor and potential equitable adjustment by the Contracting Officer.
#4.
Damages caused by Contractor employees shall be repaired at no cost to the Government.
The Contractor shall notify the COR and return the damaged area to its previous condition AW PWS, para.
3.1.1.1.
Zero Deviation from performance standard
100% - COR will review all damage reports.
Non-conforming services will result in Non- Conforming Reports issued and a potential negative CPARS narrative.
#5.
The Contractor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .