W91QVN-20-R-0007_AMEND0002.pdf

PDF 1 MB Posted

Attached to
MA IDIQ Contract General Building Repair and Construction, USAG Humphreys, Area III
Solicitation number
W91QVN20R0007_Amend0002
Issued by

About this file

This is an amendment to a solicitation for a multiple award indefinite delivery/indefinite quantity contract for general building repair and construction services at USAG Humphreys, Area III in Korea. The amendment seeks written questions from contractors regarding changes to the statement of work, pricing schedule, and technical specifications attachments by July 15, 2020. Questions must include the company name, CAGE/DUNS codes, and point of contact. The government will provide the final specification amendment prior to issuing the solicitation amendment. Services include general construction, civil, architectural, mechanical, and electrical work. The contracting agency is the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
W91QVN20R0007 Attachment 1 REV1-Pricing Schedule.XLS XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - CONST & SUPPLY TEAM

POC: MS. KANG, SU-CHONG

TEL: 0503-355-3394/315-755-3394

SUCHONG.KANG.LN@MAIL.MIL

APO AP 96271

UNITED STATES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to promote early exchange of information w ith industry. This amendment is only seek questions in response to changed Section C. Statement of Work, Section J. Attachment 1 REV1-Pricing Schedule and Attachment 3-2020_DPW GUIDE SPECIFICATIONS. No proposal w ill be accepted.

b. The Government intends to provide new version of Technical Specifications for subject project. Prior to issuance of f inal version of solicitation amendment, the government is seeking the vendor's questions on draft version of solicitation.

c. Your question is strictly voluntary, question shall include your company name, CAGE/DUNS codes and the primary point of contact. The Government request all questions be submitted via email at suchong.kang.ln@mail.mil and jean.k.ross.civ@mail.mil no later than 15 July 2020, 0700 hours in Korea Standard Time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 45

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN20R0007

X 9B. DATED (SEE ITEM 11)

24-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2020

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

CONSTRUCTION & SUPPLY DIV, UNIT #15289

APO AP 96271

UNITED STATES

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91QVN

FACILITY CODECODE

EMAIL:TEL:

W91QVN20R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

TECHNICAL PROVISION I

STATEMENT OF WORK

1. DESCRIPTION: The Contractor shall provide all labor, tools, equipment, transportation, materials and other necessary resources to accomplish the scope of work contained in the schedule and in accordance with the drawings, statement of work, specifications and terms and conditions of the individual task order. The type of work anticipated hereunder shall consist of but is not limited to the following: ceilings, walls, floors, doors, windows, latrines, roofing, mechanical work, civil work, and electrical work.

2. PRINCIPAL FEATURES: This project includes the following principal features; General Construction contract in accordance with the detailed specifications and drawings as provided under individual task orders. In performing work under individual task orders, contractors must comply with the following:

Schedule – Repair/Maintenance (K): All work shall be in accordance with the attached drawings and specifications.

a. General Work

1) Boiler worker

2) Carpenter (Concrete form)

3) Carpenter (Construction)

4) Carpenter (Door & window)

5) Common labor

6) Concrete worker

7) Communication worker

8) Duct worker

9) Exterior electrician

10) Glazer

11) Insulation worker

12) Interior electrician

13) Interior finish worker

14) Mason

15) Mechanical equipment installer

16) Painter

17) Plumber

18) Paving worker

19) Roof worker

20) Steel worker

21) Tile worker

22) Water proofing worker

23) Welder

24) Project manager

25) Safety manager

26) Quality controller

27) Backhoe 0.6

28) Backhoe 0.4

29) Backhoe 0.2

30) Concrete pump truck 43m

31) Crane wheel type 250t

32) Crane wheel type 200t

33) Crane wheel type 160t

34) Crane wheel type 130t

35) Crane wheel type 100t

36) Crane wheel type 80t

37) Crane wheel type 50t

38) Dump 15t

39) Fork lift 5t

40) Fork lift 7.5t

41) Trailer 20T

42) Truck, cargo 4.5T

43) Backhoe 0.6 w/ breaker

44) Backhoe 0.2 w/ breaker

45) PE (Poly Ethylene) safety fence

46) EGI (Electrolytic Galvanized Iron) Safety fence 2.4m for 3 months

47) EGI Safety fence 2.4m for 6 months

48) Double cord scaffolding with temporary stair or slope for 3 month rental, base on H30.0m

49) Double cord scaffolding with temporary stair or slope for 6 month rental, base on H30.0m

50) Rolling trestle scaffolding, 6'x4', for 3month rental, base on H2.0m

51) Rolling trestle scaffolding, 6'x4', for 6month rental, base on H2.0m

52) Rolling trestle scaffolding, 6'x4', for 3month rental, base on H4.0m

53) Rolling trestle scaffolding, 6'x4', for 3month rental, base on H4.0m

54) Shoring (h4.0m,B1.5m)

55) "General construction Site clean up"

56) Treatment of Construction waste

57) Treatment of designated landfill waste

b. CIVIL WORK

1) Fabricate standard concrete forms for pad, slab, retaining wall, cantilever wall, foundation, pedestal wall, culvert, column, beam, girder and all R.C structure, form height: below 3,048mm, included form tie, wedge fin, spacer, chamfer strip, hook, clamp and all other supporting form accessories

2) Fabricate standard concrete forms for pad, slab, retaining wall, cantilever wall, foundation, pedestal wall, culvert, column, beam, girder and all R.C structure, form height: 3,048 thru 6,096mm, included form tie, wedge fin, spacer, chamfer strip, hook, clamp and all other supporting form accessories

3) Install Metallic or Non-Metallic water stop with adhesive and sealant

4) Install dowel bar with cap on expansion joint, Below 30D, Length: 600mm

5) Install expansion/Contraction joint filler, 130mm thick

6) Fabricate deformed reinforce steel bars, D10 thru D29, for pad, slab, retaining wall, cantilever wall, foundation, pedestal wall, culvert, column, beam, girder and all R.C structure, Per 100kg of standard KS D 3629 reinforcing steel fabrication

7) Place welded wire fabric in concrete slab or pad, #4, 150 x 150mm

8) Install reinforced Conc. 4'W Step included base course and step nosing

9) Place 27MPa ready mixed concrete by backhoe, included surface finish, vibrator and operators with equipment, Below 6CM per 1 placing

10) Place 27MPa ready mixed concrete by backhoe, included surface finish, vibrator and operators with equipment, Above or equal 6CM per 1 placing

11) Place 27MPa ready mixed concrete, included surface finish and vibrator under below 100CM (Add below pump truck)

12) Place 27MPa ready mixed concrete, included surface finish and vibrator, 100CM thru 200CM (Add below pump truck)

13) Concrete pump truck rental cost less than 4 hours

14) Concrete pump truck rental cost, full days, 8 hours

15) Removal of concrete

16) Removal of reinforced concrete

17) Removal of Asphalt concrete

18) Excavation

19) Disposal of Soil

20) Engineering Fill

21) Install Gabion

22) Install 280mm thk Sub-Base Course

23) Base course levelling and compaction density 95%

24) Install 125mm thk Base Course

25) Install 150mm thk Base Course

26) AC. Surface Milling - 50mm thk.

27) AC. Surface Milling - 75mm thk.

28) AC. Surface Milling - 100mm thk.

29) Temporary Road (Gravel), 300mm thk

30) Install or Overlay 50mm thk. A/C (#78)

31) Install or Overlay 75mm thk. A/C (#78)

32) Install or Overlay 100mm thk. A/C (#78)

33) Install 100mm thk. Reinforced Conc. Slab

34) Install 100mm thk. Conc. Slab

35) Install 150mm thk. Reinforced Conc. Slab

36) Install 150mm thk. Conc. Slab

37) Install 200mm thk. Reinforced Conc. Slab

38) Install 200mm thk. Conc. Slab

39) Install 250mm thk. Reinforced Conc. Slab

40) Install 250mm thk. Conc. Slab

41) Install 300mm thk. Reinforced Conc. Slab

42) Install 300mm thk. Conc. Slab

43) Install Sidewalk with Base Course, expansion and contraction joint, bloom finish and chamfered edge

44) Install Conc. Curb

45) Install Granite Stone Curb

46) Install Conc. Gutter

47) Construct conc. Drainage/Surface Inlet including Cast Iron Grating and drain manhole

48) Install handrail

49) Install 190mm x 90mm x 57mm red brick wall

50) Paint reflective, 100mm wide pavement marking include bead

51) Paint reflective, 150mm wide pavement marking include bead

52) Paint reflective, 150mm, 300mm or/and 600mm Marking letter include bead

53) Paint reflective marking Handicap symbol

54) Paint 100mm wide stripe, reflective parking stall painting (Per EA)

55) Paint 150mm wide stripe, reflective parking stall painting (Per EA)

56) Install Traffic/Parking sign Board with 2"Dia Stl. Post & brackets

57) Install information sign Board with 2"Dia Stl. Post & brackets

58) Install Handicap parking sign 2"Dia Stl. Post & brackets

59) Install vehicle Wheel Stop

60) Install chain link fence with barbed wire on single arm, Type FE-6, Fabric width: 2,100 thru 2,400 included concrete footing

61) Install chain link fence with barbed wire on double arm, Type FE-7, Fabric width: 2,100 thru 2,400 included concrete footing

62) Install chain link fence with barbed wire and concertina wire on double arm, Type FE8, Fabric width:

2,100 thru 2,400 included concrete footing

63) Install double swing gate with gate posts, Type FE-6/7 included hinge, drop rod, latch assembly, grounding rod, wire and clamp

64) Install personnel gate with gate posts, Type FE-6/7 included hinge, drop rod, latch assembly, grounding rod, wire and clamp

65) Install Seeding

66) Replace existing Top Soil with 100mm thk. Top Soil

67) Install 100mm thk. Top Soil

68) Install Spot Sodding

69) Install Strip Sodding

70) Install Solid Sodding

71) Install Landscape Conc. Block

72) Removal of Tree

73) Plant Tree

74) Removal of Water Line & Plug, (up to 300mm Dia.) (Per LM)

75) Install 50mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)

76) Install 75mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)

77) Install 100mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)

78) Install 150mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)

79) Install 200mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)

80) Install 250mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)

81) Install 300mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)

82) Install 50mm dia. Gate valve & thrust block(Per EA)

83) Install 75mm dia. Gate valve & thrust block(Per EA)

84) Install 100mm dia. Gate valve & thrust block(Per EA)

85) Install 150mm dia. Gate valve & thrust block(Per EA)

86) Install 200mm dia. Gate valve & thrust block(Per EA)

87) Install 250mm dia. Gate valve & thrust block(Per EA)

88) Install 300mm dia. Gate valve & thrust block(Per EA)

89) Install Gate Valve Box (Per EA)

90) Install Indicator Post (Per EA)

91) Install Fire Hydrant and Guard Post (Per EA)

92) Install 100mm bend & thrust block.(Per EA)

93) Install 150mm bend & thrust block.(Per EA)

94) Install 200mm bend & thrust block.(Per EA)

95) Install 250mm bend & thrust block.(Per EA)

96) Install 300mm bend & thrust block.(Per EA)

97) Install 100 mm dia. Tee & thrust block (Per EA)

98) Install 150 mm dia. Tee & thrust block (Per EA)

99) Install 200 mm dia. Tee & thrust block (Per EA)

100) Install 250 mm dia. Tee & thrust block (Per EA)

101) Install 300 mm dia. Tee & thrust block (Per EA)

102) Install Valve Box (1.5m x 2m x 2m Depth) w/Lockable Cover for Security (Per EA)

103) Install Valve Box (3m x 5m x 2m Depth) w/Lockable Cover for Security (Per EA)

104) Install 50mm dia Check Valve (Per EA)

105) Install 100mm dia Check Valve (Per EA)

106) Install 150mm dia Check Valve (Per EA)

107) Install Flow Meter 50mm dia & Pressure Gage (Per EA)

108) Install Flow Meter 100mm dia & Pressure Gage (Per EA)

109) Install Flow Meter 150mm dia & Pressure Gage (Per EA)

110) Install 50mm dia with Valve Box (Per EA)

111) Removal of Sewer line & plug, various size ( Per LM )

112) Install Sewer Man Hole (Less than 1.8m Deep) (Per EA)

113) Install S.M.H. ( 1.8m - 2.4m Deep) (Per EA)

114) Install S.M.H. ( 2.4m - 3.0m Deep) (Per EA)

115) Install S.M.H. ( 3.0m - 3.6m Deep) (Per EA)

116) Install 100mm dia Surface Cleanout (Per EA)

117) Install 150mm dia Surface Cleanout (Per EA)

118) Install 200mm dia Surface Cleanout (Per EA)

119) Install 150mm dia VG-1 P.V.C Sewer Line & Fitting (PER LM)

120) Install 200mm dia VG-1 P.V.C Sewer Line & Fitting (PER LM)

121) Install 300mm dia VG-1 P.V.C Sewer Line & Fitting (PER LM)

122) Install Reinforced Concrete Encasement (PER LM)(100mm dia)

123) Install Reinforced Conc. Encasement (PER LM)(150mm dia)

124) Install Reinforced Conc. Encasement (PER LM)(200mm dia)

125) Install Reinforced Conc. Encasement (PER LM)(250mm dia)

126) Install Reinforced Conc. Encasement (PER LM)(300mm dia)

127) Install Reinforced Conc. Encasement (PER LM)(350mm dia)

128) Removal of Reinforced Concrete Pipe, Various Size (PER LM)

129) Install Surface inlet or Catch Basin (up to 1.5m) (Per EA)

130) Install 300mm dia Reinforced Concrete Pipe (PER LM)

131) Install 450mm dia R.C.P (PER LM)

132) Install 600mm dia R.C.P (PER LM)

133) Install 1.2m W x 1.2m L x 1.6m D Conc. Manhole include Cast Iron Frame and Cover (Per EA)

134) Install Conc. Ditch (300mm W, Various Height) (PER LM)

135) Install Conc. Ditch (450mm W, Various Height) (PER LM)

136) Install Conc. Ditch (600mm W, Various Height) (PER LM)

137) Install Conc. Ditch Cover (300mm W) (Per EA) (PER LM)

138) Install Conc. Ditch Cover (450mm W) (Per EA) (PER LM)

139) Install STL Grating Cover, 20 ton Load (300mm W) (PER LM)

140) Install STL Grating Cover, 20 ton Load (450mm W) (PER LM)

141) Install STL Grating Cover, 20 ton Load (600mm W) (PER LM)

142) Install Conc. Head Wall for 450mm dia Pipe (Per EA)

143) Install Conc. Head Wall for 600mm dia Pipe (Per EA)

144) Install Turf Swale (Per SM)

145) Install Riprap Apron (Per SM)

146) Install metal post guardrail & spacer block

147) Install Metal post guardrail w/o spacer block

148) Install conc. post guard rail & spacer block

149) Install conc. post guard rail w/o spacer block

150) General Area Survey (100m x 100m, 1Day)

151) Slope and Restricted Area Survey (100m x 100m, 1Day)

152) Digitizing and topographic design - TYP. Contour span (20mm)

c. Architectural Work

1) Remove CMU wall, 100mm-190mm thick w/re-bars & W.W.F

2) Remove lintel or sills for windows, doors and all openings

3) Remove precast coping on top of wall

4) Remove Stainless Steel Pipe Column, 25.4mm dia. Through 76.3mm dia

5) Remove Stainless Steel Pipe Column, 100mm dia. Through 125mm dia

6) Remove Stainless Steel Non-Slip on Stairway

7) Remove Guardrail and handrail with post, metal pipe

8) Remove 2Ply- Plywood Sheathing

9) Remove wood fascia board or soffit board with nailed

10) Remove Wood Molding

11) Remove mineral fiber blanket insulation or rigid insulation in wall, ceiling and roof deck

12) Remove Exterior Insulation and Finish System including metal lath EPS board etc. On Existing Wall

13) Remove Shingle Roof With 2-Ply Asphalt Felt

14) Remove Korean Cement Roof Tile With 2-Ply Asphalt Felt, Wood Strip

15) Remove Corrugated Iron Sheet Siding

16) Remove EPDM roofing with insulation, included seam tape, bonding adhesive and membrane flashings, lap sealant, edge treatment & EPDM sheet

17) Remove rubber walk board on EPDM roofing sheet

18) Remove Metal Gutter or downspout with strap and hanger

19) Remove All type of Single Steel Door without door frame

20) Remove All type of Double Steel Door without door frame

21) Remove All type of Single Steel Door With Frame, lockset, hinges, threshold, exit device and trim etc.

22) Remove All type of Double Steel Door With Frame, lockset, hinges, threshold, exit device and trim etc.

23) Remove all type of Alum. Door including Manual operated Entrance door without Door Frame

24) Remove All type of Alum. Door including Manual operated Entrance door With Door Frame, hinges, threshold, lockset, exit device and trim including fixed glasses etc.

25) Remove All type of wooden Single Door W/O Door Frame

26) Remove All type of wooden Double Door W/O Door Frame

27) Remove All type of Wooden Single Door With Frame, hinges, threshold, exit device and trim etc.

28) Remove All type of Wooden Double Door With Frame, hinges, threshold, exit device and trim etc.

29) Remove Ceiling Access Door with Frame

30) Remove All type of Alum. Auto Swing or Sliding Door With Door Frame, hinges, threshold, exit device, trim and fixed glasses, including Elec. Power and Fire alarm system disconnection etc.

31) Remove electrical powered metal rolling counter door or overhead coiling door with guide rail, insulated slot, motor operator, hand chain hoist, locking device, weather seal and wall mounted button control station etc.

32) Remove Aluminum Window with Frame, trim and insect screen

33) Remove Door hardware's(Exit device, Door check, Door stop, Threshold, weather-strip, Door Coordinator, Astragal, Kick plate, push plate, floor hinge and all type of lockset etc.)

34) Remove gypsum wall board

35) Remove gypsum ceiling board

36) Remove Metal or wood member Stud & runner 50mm-203mm W. 300mm~450mm O.C

37) Remove M-Bar type metal or wood ceiling suspension system

38) Remove Cement Plaster wall including Asphalt felt, metal lath etc.

39) Remove Ceramic wall & floor Tile

40) Remove Ceramic wall & floor Tile including setting bed

41) Remove Silicon sealants and caulking

42) Remove acoustic ceiling tile without frame

43) Remove and re-install acoustic ceiling tile

44) Remove T-bar type metal suspended ceiling system

45) Remove vinyl cove base

46) Remove vinyl composition tile

47) Remove rubber tile

48) Remove carpet or carpet tile with glue and felt

49) Remove Wallpaper

50) Remove existing paint for metal surface (By using hand & power tool machine)

51) Remove existing paint for CMU or concrete surface (By using hand & power tool machine)

52) Remove existing paint for wooden surface (By using hand & power tool machine)

53) Remove & re-install Toilet accessories (Lavatory faucet, Shower faucet, Towel bar, Mirror, Soap dish, Clotheshorse and Toilet tissue dispenser etc.)

54) Remove and re-install Toilet Fixtures (Urinal, Water Closet, Lavatory with Cabinet including drainage system)

55) Remove Blind, Vertical or venetian

56) Remove Kitchen Wall or Base Cabinet W/ Door and countertops sized wall cabinet Depth 300-400mm X

Height 640 - 770mm or base cabinet Depth 600-650mm X Height 900-1100mm

57) Remove and Reinstall Various Furniture Including Steel or Wooden Cabinets, Shelves, Book Cases, Office

Furniture, Chairs Refrigerators & Other Office Equipment's.

58) Block-up window & other opening w/CMU wall, 100mm to 190mm thk.

59) Block-up window & other opening w/#24 gage corrugated iron sheet 100mm thk insulation wood frame and interior lining

60) Install CMU wall, 100mm-190mm thick w/re-bars

61) Install stainless steel non-slip on stair

62) Install wood member with stud, furring, blocking & trim etc, at wall

63) Install 18mm thick plywood sheathing

64) Install wood fascia board & nailed incl. painting, 25mm x 250mm

65) Install soffit board, trim & paint 12mm thick plywood

66) Install 25mm x 100mm wood base board

67) Install chair rail, 100mm or 150mm oak molding

68) Install hardwood closet shelf, 600mm wide x 25mm thick Incl. stain & vanish finish

69) Install existing waterproofing materials and pressure wash roof surface, seal exposed cracks and crevices, apply concrete sealer, flash transition point, roof penetrations & install acrylic fluid applied waterproofing on existing concrete flat roof.

70) Install insulation w/aluminum foil jacket, in wall 75mm thick

71) Install exterior insulation and finish systems on concrete or CMU or metal wall including metal lath

72) Install asphalt shingle and 1-ply rubberized waterproofing membrane sheet

73) Install Korean cement roof tile, factory color finish size: 12 mm x 400 mm x 350mm with 1-ply rubberized waterproofing membrane sheet underlayment & treated battens

74) Install #24 gauge galvanized corrugated metal roof & painting

75) Install #24 gage corrugated sheet metal siding and painting

76) Install #26 gage sheet metal lining on the wall, ceiling

77) Install #24 gauge 150mm-200mm wide sheet metal rain gutter & hanger incl. painting

78) Install #24 gauge 100mm-150mm dia. sheet metal downspout & strap incl. Painting

79) Install basket strainer, 100mm dia. ~ 150mm dia.

80) Install #24 gauge galvanized sheet metal flashing incl. painting for valley flashing, drip edge, window, door, corner, smoke stack, duct and etc.

81) Install steel flush single door with steel door frame , 900 mm X 2,150 mm, 44.5 mm thick

82) Install steel flush 180mm X 670mm vision glass insulated single door with steel door frame , 900 mm X

2,150 mm, 44.5 mm thick

83) Install steel flush louvered insulated single door with steel door frame , 900 mm X 2,150 mm, 44.5 mm thick

84) Install steel flush insulated double door with steel door frame , 1,800 mm X 2,150 mm, 44.5 mm thick

85) Install steel flush insulated louvered double door with steel door frame , 1,800 mm X 2,150 mm, 44.5 mm thick

86) Install steel flush insulated 180mm X 670mm vision glasses double doors with steel door frame , 1,800 mm

X 2,150 mm, 44.5 mm thick

87) Install aluminum screen single door, 900mm x 2150mm

88) Install wood flush hollow core single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick

89) Install wood flush solid core single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick

90) Install wood flush 180mm X 670mm vision glass solid core single door with steel door frame , 900 mm X

2,150 mm, 35 mm thick

91) Install wood flush louvered solid core single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick

92) Install wood flush hollow core dutch single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick

93) Install ceiling access metal door w/metal frame swing up model, 450mm x 450mm

94) Install 90 minute fire rated steel flush insulated single door with steel door frame, 900 mm X 2,150 mm,

44.5 mm thick

95) Install 90 minute fire rated wood flush insulated single door with steel door frame, 900 mm X 2,150 mm,

44.5 mm thick

96) Install 45 minute fire rated wood flush insulated single door with steel door frame, 900 mm X 2,150 mm,

44.5 mm thick

97) Install aluminum sash sliding window & aluminum frame, insect screen & window latch 6mm glass +

12mm air space + 6mm laminated inner glass)

98) Install aluminum sash sliding window & aluminum frame6mm thick laminated glass

99) Install aluminum framed insect screen

100) Install only screen for door & window

101) Install fixed aluminum window & aluminum frame

102) Install single hung window & aluminum frame

103) Install awning with Fixed window & aluminum frame

104) Install project window & aluminum frame

105) Install 1,200x1,200 Dual action aluminum window(Turn and tilt) & aluminum frame

106) Install exit device, type 3 or 10, F-05/08 (ANSI/BHMA A156.3)

107) Install exit device, type 2, F-01 (ANSI/BHMA A156.3)

108) Install mortise lockset, F-02, F-04, F-05, F-07, F-08 or F-13 (ANSI/BHMA A156.13)

109) Install bored type lockset, F-82 or F-86 (ANSI/BHMA A156.2)

110) Install hinge butt, 4-1/2"" x 4-1/2"", A2111 or A5111 (ANSI/BHMA A156.1)

111) Install hinge butt, 4-1/2" x 4-1/2", A8111 (ANSI/BHMA A156.1)

112) Install aluminum weather strip for door

113) Install astragal for door

114) Install aluminum threshold, 100mm-150mm wide

115) Install door stopper and holder, L01361, L01371, L02141L01381, L02121, L01241 & etc.

(ANSI/BHMA A156.16)

116) Install foot bolt, 150mm long

117) Install door closer, C02021, C02011 (ANSI/BHMA A156.4)

118) Install push plate, J304 (ANSI/BHMA A156.16)

119) Install pull plate, J407 (ANSI/BHMA A156.16)

120) Install kick plate, J102 (ANSI/BHMA A156.16)

121) Install door viewer, 180 degree angle of view. L03171 (ANSI/BHMA A156.16)

122) Replace 4.5mm thick polycarbonate sheet with caulking

123) Install metal stud/runner for wall, 152mm wide 300mm - 450mm on center

124) Install M-Bar furring for wall 22mm D x 35mm W

125) Install suspended ceiling metal frame for gypsum board

126) Install suspended ceiling metal frame for acoustic tile

127) Install metal casing bead

128) Install plaster wall w/15# asphalt felt , metal lath (1.8kg per square meter) and 25mm thick cement plaster finish

129) Install wall board with 12.5mm thick gypsum board including joint taping & compound, regular type

130) Install wall board with 15mm thick gypsum board incl. joint taping & compound, type "X" (Special fire resistant )

131) Install wall board with 12.5mm thick gypsum board incl. joint taping & compound, water resistant type

132) Install ceiling board with 12.5mm thick gypsum board incl. joint taping & compound

133) Install ceiling board with 15mm thick gypsum board incl. joint taping & compound, type "X" (Special fire resistant)

134) Install ceiling board with 12.5mm thick gypsum board incl. joint taping & compound, water resistant type

135) Install ceramic mosaic floor tile or ceramic floor tile

136) Install ceramic wall tile incl. accessories (trim & corner)

137) Install 15mm thick acoustical ceiling tile

138) Install vinyl composition tile 300mm x 300mm x 3mm thick

139) Install vinyl composition tile, 450mm x 450mm x 3mm thick

140) Install rubber tile, 500mmx500mmx4mm thick

141) Install rubber stair tread with integrated riser, 480mm wide x 5mm thick

142) Install vinyl cove base, 100mm to 150mm high

143) Install Carpet, Nylon Pattern Cut/Loop Incl. Accessories

144) Install nylon carpet with level-loop, multilevel loop, cut and loop incl. accessories

145) Install carpet tile, loop, incl. accessories 500mm x 500mm x 9.5mm thick

146) Replace raised floor system, 600 mm X 600 mm including die cast panel, stringer, pedestals, non -conductive tile and accessories

147) Install wall paper (fire retardant type) Class A flame spread rating of 0-25 and smoke development rating of 0-50 when tested in accordance with ASTM E 84.

148) Install caulking for bathroom & kitchen

149) Paint, interior , 2-coats

150) Paint, interior oil modified clear urethane, stain, 3-coats

151) Paint, exterior alkyd enamel 2-coats

152) Paint on metal surface, aluminum paint, 2 coats

153) Paint, galvanized metal primer, 1 coat

154) Paint, interior primer sealer, 1 coat

155) Paint on concrete floor, epoxy paint, 2 coats

156) Paint, stain wood floor, natural finish, 3 coats

157) Repaint for exterior insulation and finish system

158) Install hardener for concrete floor slab

159) Install metal toilet partition & door

160) Install metal urinal baffle

161) Install shower bench, 300mm wide

162) Install stainless steel (SST) shower curtain rod, w/curtain 25mm dia x 900mm - 1200mm lg.

163) Install SST robe hook

164) Install soap dish (stainless or ceramic)

165) Install metal framed glass mirror, 450mm x 600mm high.

166) Install metal framed tilting glass mirror, 400mm x 750mm high.

167) Install toilet tissue dispenser

168) Install paper towel dispenser

169) Install liquid soap dispenser

170) Install #18 gauge heavy duty SST shelf incl. brackets & supports

171) Install #20 gauge light duty SST shelf incl. brackets & supports

172) Install SST towel bar 19mm dia. X 500mm lg., 1 or 2 hanger

173) Install vanity cabinet, 700 mm W x 490 mm D x 760 mm H w/marble top

174) Install medicine cabinet, 470 mm x 870 mm H

175) Install stainless steel fire extinguisher cabinet below 2 hour rated.

176) Install horizontal blind, 25mm aluminum slats incl. head channel, bracket and accessories

177) Install vertical blind, 89mm aluminum or cloth strips incl. bracket and accessories

178) Install kitchen wall cabinet with door 640mm~770mm H x 300 - 400mm D X 1,000mm W

179) Install Kitchen Hood wall cabinet with door 600mm W x 520 - 700mm H x 300 - 400mm D

180) Install Kitchen Hood wall cabinet with door 900mm -1,100mm W x 520 - 700mm H x 300 - 400mm D

181) Install kitchen base cabinet with door Incl. Artificial Marble Counter Top, Sink Faucet & Single bowl sink or double bowl sink 800mm~920mm H x 600mm - 650mm D x 1,000mm W

182) Install kitchen base cabinet with door Incl. Artificial Marble Counter Top, Sink Faucet & Single bowl sink or double bowl sink 900mm~1,200mm W x 800mm - 920 H x 600mm - 650mm D

183) Install kitchen counter top artificial marble counter top with back splash

d. Mechanical Work

1) Remove Packaged liquid chiller, air cooled or water cooled condenser type, all standard accessories, cooling capacity : any size

2) Remove air handling unit, all type, cooling/heating coil, capacity : any size

3) Remove air cooled condensing unit, any size

4) Remove cooling tower, any size

5) Remove package air conditioning unit, stand alone indoor unit, air cooled condensing outdoor unit with OA duct & piping system (cooling, heat pump type or elec. Coil include type) capacity : any size

6) Remove hot water heating boiler, or domestic hot water boiler, capacity : any size

7) Remove expansion tank, bladder or diaphragm type, capacity : any size

8) Remove unit heater, horizontal or vertical type, any capacity

9) Remove finned tube radiator, with non elec. Control valve, any capacity

10) Remove Smoke stack with barometric damper, any size

11) Remove pump, base mounted end suction, or in-lined, capacity : any size

12) Remove all type and any size valves, fittings (gate valve, glove valve or balancing cock, strainer, check valve, air separator, flexible connection, etc.

13) Remove steel pipe schedule#40 or copper tube & hanger, included all type valves, fittings, without insulation, any size"

14) Remove pipe insulation, flexible cellular(Armaflex) or glass wool including adhesive & tape cover, any size

15) Remove roof or wall ventilator, any type and any capacity

16) Remove bathroom exhaust fan, grille, backdraft damper

17) Remove duct accessories (grille, louver, smoke damper, smoke louver, fire damper, volume damper or turning vane, register diffuser)

18) Remove all Air duct,

19) Remove duct insulation, flexible cellular or glass wool

20) Remove sanitary ware (water closet, urinal, lavatory, service sink, kitchen sink) & accessories,

21) Remove shower, wall mounted, single lever, head,

22) Remove galvanized steel vent pipe w/ fittings, hanger

23) Remove cast iron soil pipe, any size

24) Remove sprinkler head, pendent or upright, chrome, fusible link type,

25) Remove Sprinkler pipe, including fittings, hangers, black steel schedule # 40, size : any size

26) Remove all type sensor (temperature. Thermostat, detectors)

27) Remove inside equipment concrete pad, 50mm THK.

28) Remove outside equipment concrete pad, 300mm THK.

29) Remove fan coil unit, floor mount or ceiling mounted type, any size

30) Install Sprinkler head, pendent or upright, quick response, chrome, fusible link type

31) Install Sprinkler pipe, including fittings, hangers, black steel schedule # 40, size 25mm

32) Ditto, 32 mm

33) Ditto, 40 mm

34) Ditto, 50 mm

35) Ditto, 100 mm

36) Install Water closet, tank type,1 piece, vitreous china, siphon jet flushing & accessories, (American std.

2403.128-1.28 gpf)

37) Install Water closet, FV type, vitreous china, siphon jet flushing & accessories, except F.valve(American std. 2403.128-1.28 gpf)

38) Install Urinal, flush valve type, wall hung, vitreous china, except F. valve(American std. 6590.001-0.5 gpf)

39) Install Lavatory, counter top, single lever, vitreous china, accessories, 0.5 gpm

40) Install Lavatory, 2 handle lever, vitreous china, accessories, wheelchair, (American std. 9141.011.020 &

6531.145)

41) Install Service sink, enameled cast iron with accessories(American std. 2696.102 & 7295.252)

42) Install Kitchen sink, double bowl, faucet, accessories, 33" x 21"

43) Install Kitchen sink, single bowl, accessories, 33" x 19" (American std. 14SB331900 & 6409.180)

44) Install Shower, wall mounted, single lever, head,(American std. T508.507)

45) Install toilet flush valve, manual type (American std. 6047.122.002)

46) Install toilet flush valve, sensor type (American std. 606B721)

47) Install Electric water cooler, incl. piping & accessories

48) Install Backflow preventer valve, w/ pressure reducing principle, bronze body, 20 mm DIA

49) Install domestic gas burner type hot water heater, 30, 000Kcal/hr. or under (ΔT 100 оF, 115 GPH)

50) Ditto, 50, 000Kcal/hr. (192GPH)

51) Ditto, 65, 000Kcal/hr. (250 GPH)

52) Ditto, 90, 000Kcal/hr. (360 GPH)

53) Install Electric domestic water heater, 100 L, 1.6 KW

54) Ditto, 450 L, 4.5 KW

55) Ditto, 1000 L, 10 KW

56) Install Galvanized steel pipe, schedule#40 w/ fitting & hanger, for sewer vent pipe, 32mm DIA

57) Ditto, 40mm DIA

58) Ditto, 50mm DIA

59) Ditto, 65mm DIA

60) Ditto, 80mm DIA

61) Ditto, 100mm DIA

62) Install Cast iron soil pipe, hub type, 50 mm DIA

63) Ditto, 75 mm DIA

64) Ditto, 100 mm DIA

65) Ditto, 125 mm DIA

66) Install Floor cleanout with 45 DEG. Bend, extension pipe, with Y-branch,100 mm DIA

67) Ditto, 75 mm DIA

68) Ditto, 50 mm DIA

69) Install Floor drain, with P-trap, 50 mm DIA

70) Ditto, 100 mm DIA

71) Install Faucet/ hose bibb, 15 mm DIA

72) Install Water hammer arrester , PDI unit "A" type

73) Ditto, "B" type

74) Ditto, "C" type

75) Install sump/submersible pump, cast iron, single stage, vertical W/control panel, water level switch and pump guide, below or equal 25GPM/1HP

76) Ditto, 75GPM, 1-1/2HP

77) Ditto, 100GPM, 2HP

78) Ditto, 150GPM, 3HP

79) Ditto, 200GPM, 5HP

80) Ditto, 300GPM, 10HP

81) Ditto, 500GPM, 15HP

82) Ditto, 800GPM, 20HP

83) Install sump/submersible pump, cast iron, single stage, explosion proof type vertical W/control panel, water level switch and pump guide, below or equal 25GPM

84) Ditto, 75GPM

85) Ditto, 100GPM

86) Ditto, 150GPM

87) Ditto, 200GPM

88) Ditto, 300GPM

89) Ditto, 500GPM

90) Ditto, 800GPM

91) Install Air handling unit, all type, cooling/heating coil, 3,400 CMH(2,000 CFM)

92) Ditto, 8,500 CMH(5,000 CFM)

93) Ditto, 17,000 CMH(10,000 CFM)

94) Ditto, 25,500CMH(15,000 CFM)

95) Ditto, 34,000 CMH(20,000 CFM)

96) Ditto, 51,000CMH(30,000 CFM)

97) VAV or CAV terminal w/ hot water reheat, damper, actuator, thermostat, control valve & controller, 1,000CFM or under

98) Ditto, 1,500CFM or under

99) Ditto, 3,000CFM or under

100) Install Fan coil unit, floor mounted, 3 row coil, manual air vent, 3 speed switch,UL motor, washable filter, fresh air intake grille, 400 CFM

101) Ditto, 600 CFM

102) Ditto, 800 CFM

103) Ditto, 1200 CFM

104) Install Fan coil unit, above ceiling mounted, UL motor, 400 CFM

105) Ditto, 600 CFM

106) Ditto, 800 CFM

107) Ditto, 1200 CFM

108) Install Liquid filter dryer for refrigeration line

109) Install Sight glass for refrigeration line

110) Install Roof ventilator, direct or belt driven, 815 CFM under, 1/4" SP

111) Ditto, direct driven, 2050 CFM under, 1/4" SP

112) Ditto, belt driven, 1650 CFM under, 1/4" SP

113) Ditto, belt driven, 2750 CFM under, 1/4" SP

114) Ditto, belt driven, 3500 CFM under, 1/4" SP

115) Install Wall ventilator, direct or belt driven, 1320 CFM, 1/4 HP

116) Ditto, direct driven, 1983 CFM, 1/4 HP

117) Ditto, direct driven, 2900 CFM, 1/2 HP

118) Install Utility fan, centrifugal, V belt driven, pedestal, 2,000 CFM, 1 HP, 1/4" SP or under

119) Ditto, 3,600 CFM, 3/4 HP or under

120) Ditto, 4,800 CFM, 1 HP or under

121) Ditto, 15,000 CFM, 5 HP or under

122) Ditto, 20,000 CFM, 7.5 HP or under

123) Install Ceiling fan, right angle, extra quiet, 0.1" SP, 385 CFM

124) Ditto, 855 CFM

125) Install Bathroom exhaust fan, grille, backdraft damper,260 CFM

126) Install Paddle blade ceiling fan, 52"blade,3-5ea bade, fan cap.: 25,500CFM,1/8 HP

127) Install Grille, louver, smoke damper, smoke louver, fire damper, volume damper or turning vane, 300mm x 300mm or under

128) Ditto, 400 x 400 or under

129) Ditto, 500 x 500 or under

130) Ditto, 600 x 600 or under

131) Ditto, 700 x 700 or under

132) Ditto, 800 x 800 or under

133) Ditto, 900 x 900 or under

134) Ditto, 1000 x 1000 or under

135) Install Register or backdraft damper, 300mm x 300mm or under

136) Ditto, 400 x 400 or under

137) Ditto, 500 x 500 or under

138) Ditto, 600 x 600 or under

139) Ditto, 700 x 700 or under

140) Ditto, 800 x 800 or under

141) Ditto, 900 x 900 or under

142) Ditto, 1000 x 1000 or under

143) Install Ceiling diffuser, round or square type w/damper, 200 mm neck DIA or under, aluminum

144) Ditto, 250 mm DIA

145) Install Air duct, 0.5mm THK.(#26GA), without insulation

146) Install Air duct, 0.6mm THK.(#24GA), without insulation

147) Install Air duct, 0.8mm THK.(#22GA), without insulation

148) Install Air duct, 1mm THK.(#20GA), without insulation

149) Install Air duct, 1mm THK.(#16GA), without insulation

150) Install Residential type range hood, 30"W, 2-speed, 210 CFM

151) Install insulated flexible duct for diffuser conn. 150 mm DIA, 3m LG

152) Ditto, 300 mm DIA, 3m LG

153) Install Dryer vent kit, flexible hose / duct, weather cap

154) Install Pipe insulation, flexible elastomeric cellular (Armaflex) or glass wool, 40mm THK. including adhesive & tape cover, 15 mm DIA

155) Ditto, 20mm DIA

156) Ditto, 25mm DIA

157) Ditto, 32mm DIA

158) Ditto, 40mm DIA

159) Ditto, 50mm DIA

160) Ditto, 50 mm THK, 65mm DIA

161) Ditto, 50 mm THK, 80mm DIA

162) Ditto, 50 mm THK, 100mm DIA

163) Ditto, 50 mm THK, 125mm DIA

164) Ditto, 50 mm THK, 200mm DIA

165) Install Duct insulation, glass wool or flexible elastomeric cellular, 50 mm THK

166) Install aluminum jacket on insulation, 50 mm DIA pipe or under

167) Ditto, 150 mm DIA pipe or under

168) Install LONWORK Translator on existing equipment

169) Install new DDC program on existing CPU, multi-user, GUI, report output & historical data record function, included emergency back up/restoration disk or movable storage, MFR: Johnson Control, METASYS or approved equal

170) Register Control Point on new DDC program (300 CP or below), 1 EA per Control Point (PC).

171) Register Control Point on new DDC program (Above 300 CP), 1 EA per CP.

172) Test and Inspect DDC Communication, 1EA per DDC.

173) Test and Inspect Control point, 1 EA per CP.

174) Install hot water heating boiler, 30,000Kcal/hr. (119,000 btuh), gas burner, steel body

175) Ditto, 50,000 Kcal/hr(200,000BTUH)

176) Ditto, 70,000 Kcal/hr.(280,000BTUH)

177) Ditto, 100,000 Kcal/hr.(400,000BTUH)

178) Ditto, 131,000 Kcal/hr. (525,000 BTUH)

179) Ditto, 183,000 Kcal/hr.(735,000 BTUH)

180) Ditto, 262,000 Kcal/hr.(1,050,000 BTUH)

181) Ditto, 577,000 Kcal/hr.(2,310,000 BTUH)

182) Install Air separator, 32 mm

183) Ditto, 40 mm

184) Ditto, 50 mm, with strainer

185) Ditto, 65 mm, with strainer

186) Ditto, 80 mm, with strainer

187) Ditto, 100 mm, with strainer

188) Install Unit heater, horizontal or vertical type, hot water heating coil, 8,000 Kcal/hr.

189) Ditto, 12,000 Kcal/hr.

190) Install Unit heater, Electric, 5 KW

191) Install Finned tub radiator, with non elec. Control valve, 1 row-1m L

192) Ditto, 1 row-2 m L

193) Ditto, 2 row-1 m L

194) Ditto, 2 row-2 m L

195) Ditto, 3 row-1 m L

196) Install 15mm automatic air vent with stop valve

197) Install Packaged liquid chiller, air cooled condenser type, ARI 550/590, conform ASHRAE 15, Safety control with automatic reset, all standard accessories, cooling capacity : 20 R/T

198) Ditto, 30 R/T

199) Ditto, 40 R/T

200) Ditto, 60 R/T

201) Ditto, 80 R/T

202) Ditto, 100 R/T

203) Ditto, 130 R/T

204) Ditto, 175 R/T

205) Install Packaged liquid chiller, water cooled condenser type, w/o cooling tower ARI 550/590, conform

ASHREA 15, Safety control with automatic reset, all standard accessories, cooling capacity : 75 R/T

206) Ditto, 95 R/T

207) Ditto, 115 R/T

208) Ditto, 125 R/T

209) Ditto, 145 R/T

210) Ditto, 200 R/T

211) Install Air cooled refrig. Condensing unit, direct drive, compressor, 3 Ref.ton or under

212) Ditto, 5 TON or under

213) Ditto, 10 TON or under

214) Ditto, 15 TON or under

215) Ditto, 20 TON or under

216) Ditto, 25 TON or under

217) Replace water chiller part: Scroll type hermetic compressor, R410A, nominal 20RT, Brazed connection, included compressor contactor, electronic motor protection, terminal block, Comp. control board and protection cover, Carrier SH240 series or equal

218) Ditto, nominal 25RT,Carrier SH295 or SH300 series or equal

219) Ditto, Nominal 10 thru 15RT

220) Install Chemical feeder, 150mm dia X450 L with fittings

221) Install Pump, base mounted end suction, mechanical seal, cap. : 1-1/2HP, 40GPM, 60FT head, 1800

RPM

222) Ditto, 2 HP, 50 GPM or under

223) Ditto, 3 HP, 150 GPM or under

224) Ditto, 5 HP, 350 GPM or under

225) Ditto, 7.5 HP, 350 GPM or under

226) Ditto, 10 HP, 600 GPM or under

227) Ditto, 25 HP, 1,550 GPM or under

228) Install Pump, in-line, 1/12 HP, 20~40mm

229) Ditto, 1/8 HP, 20~40mm

230) Ditto, 1/3 HP, 20~40mm

231) Ditto, 1/2 HP, 80 mm

232) Install Gate valve, glove valve or balancing cock, threaded bronze body, 15 mm DIA

233) Ditto, 20 mm DIA

234) Ditto, 25 mm DIA

235) Ditto, 32 mm DIA

236) Ditto, 40 mm DIA

237) Ditto, 50 mm DIA

238) Ditto, 65 mm DIA

239) Install Gate valve, glove valve, flanged, cast iron body, OS & Y. 80 mm DIA.

240) Ditto, 100 mm

241) Ditto, 125 mm

242) Ditto, 150 mm

243) Ditto, 200 mm

244) Install Check valve, threaded bronze body, 15 mm DIA

245) Ditto, 20 mm DIA

246) Ditto, 25 mm DIA

247) Ditto, 32 mm DIA

248) Ditto, 40 mm DIA

249) Ditto, 50 mm DIA

250) Ditto, 65 mm DIA

251) Install Check valve, flanged, cast iron body, 80 mm DIA.

252) Ditto, 100 mm

253) Ditto, 125 mm

254) Ditto, 150 mm

255) Ditto, 200 mm

256) Install Expansion tank, bladder or diaphragm type, tank cap. : 100 liter(26.4gal)

257) Ditto, 200 liter(52.8 gal)

258) Suction diffuser, cast iron body, 50mm DIA

259) Ditto, 65mm DIA

260) Ditto, 80mm DIA

261) Ditto, 100mm DIA

262) Ditto, 125mm DIA

263) Ditto, 150mm DIA

264) Ditto, 200mm DIA

265) Triple duty valve, cast iron body, 50mm DIA

266) Ditto, 65mm DIA

267) Ditto, 80mm DIA

268) Ditto, 100mm DIA

269) Ditto, 125mm DIA

270) Ditto, 150mm DIA

271) Ditto, 200mm DIA

272) Install Strainer, 15~25 mm DIA

273) Ditto, 32~40 mm

274) Ditto, 50~65 mm

275) Ditto, 80 mm

276) Ditto,100 mm

277) Ditto, 125 mm

278) Ditto, 150 mm

279) Install Flexible joint, 25~40 mm DIA

280) Ditto, 50~65 mm

281) Ditto, 80~100 mm

282) Ditto, 125~150 mm

283) Install Circuit setter, 25 mm DIA under

284) Ditto, 32~40 mm DIA

285) Ditto, 50 mm DIA

286) Ditto, 65 mm DIA

287) Install Black steel pipe schedule #40 w/ fitting & hanger, without insulation, 15mm DIA

288) Ditto, 20mm DIA

289) Ditto, 25mm DIA

290) Ditto, 32mm DIA

291) Ditto, 40mm DIA

292) Ditto, 50mm DIA

293) Ditto, 65mm DIA

294) Ditto, 80mm DIA

295) Ditto, 100mm DIA

296) Ditto, 125mm DIA

297) Ditto, 150mm DIA

298) Ditto, 200mm DIA

299) Install Copper tube type L w/ fitting & hanger, without insulation, 15mm DIA

300) Ditto, 20mm DIA

301) Ditto, 25mm DIA

302) Ditto, 32mm DIA

303) Ditto, 40mm DIA

304) Ditto, 50mm DIA

305) Ditto, 65mm DIA

306) Ditto, 80mm DIA

307) Ditto, 100mm DIA

308) Install cooling tower, 75 REF/TON or under

309) Ditto, 100 R/T, or under

310) Ditto, 125 R/T. or under

311) Ditto, 200 R/T, or under

312) Install rooftop package air conditioner, electric cool-7.5 R/T, gas heat-170 MBH or under

313) Ditto, electric cool-10 R/T, gas heat-200 MBH or under

314) Ditto, electric cool-17.5 R/T, gas heat-330 MBH or under

315) Ditto, electric cool-20 R/T, gas heat-360 MBH or under

316) Install Package air conditioning unit, 50,000 kcal/hr (16.5 R/T), stand alone indoor unit, air cooled condensing outdoor unit with OA duct & piping system (cooling, heat pump type or elec. Coil include type)

317) Ditto, 40,000 Kcal/hr 13.2 R/T)

318) Ditto, 25,800 Kcal/hr (8.5 R/T)

319) Ditto, 18,060 Kcal/hr (6 R/T)

320) Ditto, 12,470 Kcal/hr. (4 R/T)

321) Ditto, 8,600 Kcal/hr. (3 R/T)

322) Ditto, 6,192 Kcal/hr. (2R/T)

323) Ditto, 4,472 Kcal/hr. (1.5 R/T)

324) Computer room air conditioning unit w/ air cooled condensing unit, 5 R/T or under

325) Ditto, 8 R/T or under

326) Ditto, 12 R/T or under

327) Ditto, 18 R/T or under

328) Ditto, 22 R/T or under

329) Ditto, 30 R/T or under

330) Install Smoke stack, 250 mm DIA with barometric damper, stainless stl. Double wall.

331) Install 2 or 3 way Mixing valve, bronze body, proportioning motor & valve linkage, 120Vac, 15~40 mm size

332) Ditto, 50 mm

333) Ditto, 65mm

334) Install Thermometer, 7"LG,30 ~240 F range with shutoff cock (DPW Guide Spec. Sec.23 09 13)

335) Install Pressure gage, 3-1/2""dial,aluminium case, 0-100 PSIG with shutoff cock (DPW Guide Spec.

Sec.23 09 13)

336) Install Pressure and temp. relief valve, 25 mm DIA

337) Install Outdoor reset temperature control with dual bulb, 70 to 140 оF range (DPW Guide Spec. Sec.23

09 13)

338) Install Room thermostat, heating or cooling, with tamper proof cover(DPW Guide Spec. Sec.23 09 13)

339) Install Room thermostat, heating / cooling, with tamper proof cover(DPW Guide Spec. Sec.23 09 13)

340) Install Carbon monoxide detector

341) Install Freeze stat

342) Install Motorized damper actuator with motor for ventilation(DPW Guide Spec. Sec.23 09 13)

343) Install Sensor for temperature(DPW Guide Spec. Sec.23 09 13)

344) Install Detector for smoke(DPW Guide Spec. Sec.23 09 13)

345) Install Water flow switch, paddle-actuated type(DPW Guide Spec. Sec.23 09 13)

346) Install Inside equipment concrete pad, 50mm THK.

347) Install Outside equipment concrete pad, 300mm THK.

e. Electrical Work

1) Remove rigid galvanized steel or EMT(Electrical Metallic Tubing) conduit included fittings, 1/2"(16mm)

2) Remove rigid galvanized steel or EMT conduit included fittings, 3/4"(22mm)

3) Remove rigid galvanized steel or EMT conduit included fittings, 1"(28mm)

4) Remove rigid galvanized steel or EMT conduit included fittings, 1-1/4"(36mm)

5) Remove rigid galvanized steel or EMT conduit included fittings, 1-1/2"(42mm)

6) Remove rigid galvanized steel or EMT conduit included fittings, 2"(54mm)

7) Remove rigid galvanized steel conduit included fittings, 2-1/2"(70mm)

8) Remove rigid galvanized steel conduit included fittings, 3"(82mm)

9) Remove rigid galvanized steel conduit included fittings, 3-1/2"(92mm)

10) Remove rigid galvanized steel conduit included fittings, 4"(104mm)

11) Remove electrical wire, THHN/THWN(Thermoplastic High Heat-resistant Nylon/Thermoplastic Heat water resistant), size #16 through #12 AWG(American Wire Gauge)

12) Remove electrical wire, THHN/THWN, size #10 or #8 AWG

13) Remove electrical wire, THHN/THWN, size #6 AWG

14) Remove electrical wire, THHN/THWN, size #4 AWG

15) Remove electrical wire, THHN/THWN, size #2 AWG

16) Remove electrical wire, THHN/THWN, size #1 AWG

17) Remove electrical wire, THHN/THWN, size #1/0 AWG

18) Remove electrical wire, THHN/THWN, size #2/0 AWG

19) Remove electrical wire, THHN/THWN, size #3/0 AWG

20) Remove electrical wire, THHN/THWN, size #4/0 AWG

21) Remove electrical wire, THHN/THWN, size 250MCM (Million Circular Mils)

22) Remove electrical wire, THHN/THWN, size 300MCM

23) Remove electrical wire, THHN/THWN, size 350MCM

24) Remove electrical wire, THHN/THWN, size 400MCM

25) Remove electrical wire, THHN/THWN, size 500MCM

26) Remove three way toggle switch, with box and cover plate 20Amp

27) Remove toggle/tumbler switch, with box and cover plate 20Amp

28) Remove duplex receptacle, with box and cover plate NEMA5-20R(National Electrical Manufacturers

Association)

29) Remove existing LAN(Local Area Network) & telephone box & cover

30) Remove junction box, 2" x 4" & 4" x 4", steel or mallable iron

31) Remove junction box, 2" x 4" & 4" x 4", Weather proof type

32) Remove junction box, 6" x 6", Weather proof type

33) Remove branch circuit breaker, 1Pole, 20 - 60Amp, 240V Max.(Maximum)

34) Remove branch circuit breaker, 2 or 3 Pole, 20 - 60Amp, 240V Max.

35) Remove branch circuit breaker, 1Pole, 80 - 100Amp, 240V Max

36) Remove branch circuit breaker, 2 or 3 Pole, 80 - 100Amp, 240V Max

37) Remove branch circuit breaker, 3Pole, 60 - 150Amp, 600V Max

38) Remove panel board, 120/240V NEMA 1 enclosed, up to 225A-2P, main Circuit Breaker, up to 42 spaces, including main lug, Neutral/Ground Bar

39) Remove panel board, 120/208V NEMA 1 enclosed, up to 225A-3P, main Circuit Breaker, 24 spaces, including main lug, Neutral/Ground Bar

40) Remove load center, 120/208V, Max. 125A, 2P, 12 spaces

41) Remove load center, 120/208V, Max. 60A, 2P, 8 spaces

42) Remove Safety Switch Non-Fusible 3P-100A

43) Remove Safety Switch Non-Fusible 3P-60A

44) Remove Safety Switch Non-Fusible or Fusible 3P-30A

45) Remove Safety Switch Fusible 3P-60A, W/fuses, Max 240V

46) Remove Safety Switch Fusible 3P-100A, W/fuses, Max 240V

47) Remove Safety Switch Fusible 3P-200A, W/fuses

48) Remove Safety Switch Fusible 3P-400A, W/fuses

49) Remove Safety Switch Fusible 3P-600A, W/fuses

50) Remove Safety Switch Fusible 3P-30A, W/fuses, Max 600V

51) Remove Safety Switch Fusible 3P-60A, W/fuses, Max 600V

52) Remove Safety Switch Fusible 3P-100A, W/fuses, Max 600V

53) Remove toggle manual motor starter W/fuses & pilot lamp

54) Remove combination magnetic motor starter w/overload relay

55) Remove toggle switch and receptacle cover

56) Remove duplex receptacle, GFCI.(Ground…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .