Product_Description.pdf
PDF 836 KB Posted
- Attached to
- Refurbished 3 phase 100 KVA Pad Mounted Transformer Federal contract opportunity
- Solicitation number
- W91QV1-19-R-5268
- Issued by
- Department of the Army
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_Answer_-_Deta_Wye_transformer.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Directorate of Public Works
Fort Detrick, MD.
Supply Contract Building 539, 1000 kVA Pad-Mount Transformer Supply
1. Objective
To provide the supply of a (Reconditioned) 3 phase 1000 KVA Pad-Mount transformer at jobsite:
Building 539 Boyles St, Fort Detrick, Maryland located in Area A, Main Post.
2. Scope
To provide the supply of a (Reconditioned) 3 phase 1000 KVA Pad-Mount Transformer with necessary accessories. Transformer provided should be a turnkey process with no added work at job site. The reconditioned transformer has to match or retrofit to the existing configuration. The existing transformer
(being replaced) will be disconnected by government personnel. Contractor will pick up existing transformer and dispose of off-site. Contractor will deliver their own reconditioned, transformer to jobsite. (Do not return existing transformer) The retrofit or reconditioned, matching transformer will be connected by government personnel. Delivery time of retrofit transformer and disposal of existing transformer will be no later than 12 weeks after award of contract.
3. Specific Requirements To provide the supply of a (Reconditioned) 3 phase 100 KVA Pad-Mount Transformer at jobsite:
Building 539 Boyles St, Fort Detrick, Maryland located in Area A, Main Post. Contractor, after production, will submit all electrical tests to COR. Contractor is to provide any equipment warranty information in their bid.
Transformer Specifications: 1000 KVA, Phase 3, High Voltage/Primary - 4160 Delta, Low
Voltage/Secondary- 480 Delta, Pad-Mount, with Taps. Three feeders via a nearby aerial pole.
Reconditioned w/ Accessories includes:
o Primary Bushings, Live Front, Radial Feed; Secondary Bushings, St. Stud Connections with Spades, o Bayonet Fusing, Oil Level Gauge, Pressure/Vacuum Gauge, Temperature Gauge, pressure relief device o Pentahead entry assembly, mineral oil, non-PCB label, Drain valve with sampler o Bell Green Paint, Undercoating o Perform full electrical test(s)
Delivery includes:
o Standard Freight in the United States o Coordinating (retrofit transformer) drop-off and (existing transformer) pick-up on same day to minimize downtime for utility connection. (performed by government personnel) o Contractor will provide delivery no later than 12 weeks after award of contract.
Contractor shall be able to safely unload and safely load transformer(s) by a suitable means (tractor trailer) at jobsite. Coordinate gaining access to jobsite location with COR:
John McKnight
4. Unsatisfactory Performance Items listed in section two (2.) and (3.) Scope, must be provided / supplied to the jobsite location, Building 539 Boyles St, Fort Detrick Maryland in a safe and secure manner and shall be one hundred percent operational. Failure to perform to this scope would mean possible termination for default of the contract or nonpayment for services rendered due to the provision of a faulty product by the contracted party.
5. Hours of Operation
The contractor is responsible for conducting business, between the hours of 7:30 a.m. and 3:30 p.m., Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The
Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
6. Period of Performance Contractor shall deliver equipment no later than 12 weeks after award of contract.
7. Place of Performance
FOB Destination: Building 539. Boyles St, Frederick, Maryland.
John McKnight will direct contractor delivery.
8. Type of Contract
Firm Fixed Price Supply Contract
9. Recognized-Holidays
The contractor is not required to perform services on Federal holidays (as listed below).
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
10. Government Furnished Items and Services
The government is responsible for services listed under Section 2 and 3 of this SOW.
11. Contractor Furnished Items and Responsibilities
The Contractor shall furnish all supplies listed under Section 2 and 3 of this SOW.
12. Contracting Officer’s Representative/Recipient
John McKnight, General Engineer – 301-619-0327 john.e.mcknight.1.civ@mail.mil
13. Division Chief/Supervisor
Alan Lowson, Operations and Maintenance Chief – 301-619-2234, alan.lowson.civ@mail.mil mailto:john.e.mcknight.1.civ@mail.mil mailto:alan.lowson.civ@mail.mil