This is a 100% submittal of construction documents for Building 246 Renovation at Fort Leavenworth, Kansas, a U.S. Army Corps of Engineers (USACE) project under Contract W912DQ-14-C-4015 and Solicitation W912DQ-14-R-4029. The project involves comprehensive renovation of a two-story, 7,783 square-foot office building classified as Business Group B, Type V-B construction. The renovation includes structural modifications to accommodate a new machine-less electric traction elevator installation, reconfiguration of interior spaces, updated mechanical and electrical systems, fire alarm system expansion, and sprinkler system modifications. The submittal date is December 19, 2014, and the contractor is Vazquez Commercial Contracting, LLC, located in Kansas City, Missouri.
The construction documents encompass detailed architectural, structural, mechanical, electrical, plumbing, and fire protection drawings. Key work scope includes basement foundation and underpinning requirements, first and second floor framing plans with structural steel details, elevator shaft construction with multiple detail sheets, new gypsum wall assemblies and partition systems, resilient flooring and ceiling installations, door and frame specifications with hardware schedules, HVAC ductless split systems with boiler modifications, plumbing fixture and water heater installations, comprehensive lighting and power distribution plans for all three floors, fire alarm system expansion with smoke detection in elevator lobbies, and fire sprinkler system modifications including riser assembly replacement and head relocation. Construction is designed per 2012 International Building Code, NFPA 101 Life Safety Code, ADA accessibility standards, and applicable mechanical, plumbing, and electrical codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers ®
D
C
B
A
KANSAS CITY DISTRICT
G G
-0
BUILDING 246 RENOVATION
Biddle Avenue Fort Leavenworth, KS 66027
100% SUBMITTAL:
DECEMBER 19, 2014
USACE
CONTRACT NUMBER : W912DQ-14-C-4015
SOLICITATION NUMBER : W912DQ-14-R-4029
DRAWING INDEX
SHEET
NO. SHEET TITLE IN
TE
R
IM
1/ 6/
0%
C D
2/
/1
G-001 COVER SHEET X X
A-000 GENERAL NOTES X X
A-001 EGRESS PLANS X X
D-100 BASEMENT DEMO PLAN X X
D-101 FIRST FLOOR DEMO PLAN X X
D-102 SECOND FLOOR DEMO PLAN X X
A-100 BASEMENT FLOOR PLAN X X
A-101 FIRST FLOOR PLAN X X
A-102 SECOND FLOOR PLAN X X
A-400 ELEVATOR DETAILS X X
A-500 BASEMENT REFLECTED CEILING PLAN X X
A-501 FIRST FLOOR REFLECTED CEILING PLAN X X
A-502 SECOND FLOOR REFLECTED CEILING PLAN X X
A-600 DOOR TYPES & SCHEDULES X X
S-001 GENERAL NOTES X X
S-002 TYPICAL DETAILS X X
SB100 BASEMENT FOUNDATION PLAN X X
SF101 FIRST FLOOR FRAMING PLAN X X
SF102 SECOND FLOOR FRAMING PLAN X X
S-501 DETAILS X X
MPE-001 MEP SYMBOLS X X
M-100 BASEMENT MECHANICAL X X
M-101 FIRST FLOOR MECHANICAL X X
M-102 SECOND FLOOR MECHANICAL X X
M-200 MECHANICAL DETAILS X X
M-300 MECHANICAL SCHEDULES X X
E-100 BASEMENT, 1ST FLOOR LIGHTING X X
E-200 BASEMENT POWER X X
E-201 FIRST FLOOR POWER X X
E-202 SECOND FLOOR POWER X X
E-400 ELECTRICAL SCHEDULES X X
FA001 FIRE ALARM GENERAL NOTES AND DETAILS X
FA100 FIRE ALARM BASEMENT FLOOR PLAN X
FA101 FIRE ALARM FIRST FLOOR PLAN X
FA102 FIRE ALARM SECOND FLOOR PLAN X
FX001 FIRE SPRINKLER GERNERAL NOTES AND DETAILS X
FX100 FIRE SPRINKLER BASEMENT FLOOR PLAN X
FX101 FIRE SPRINKLER FIRST FLOOR PLAN X
FX102 FIRE SPRINKLER SECOND FLOOR PLAN X
DRAWING ABBREVIATIONS INDEX OF DRAWINGS WALL TYPES
LEGEND
NUMBERING SYSTEM:
A2.10/01
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
SERIES NUMBER
SHEET NUMBER WITHIN SERIES
NUMBER OF PLAN, DETAIL, ETC.
ON SHEET
CONCRETE/ PRECAST
CONCRETE
SOIL
SAND, EIFS FINISH COAT,
OR CEMENT PLASTER
BRICK
CMU
STONE
FIBERGLASS SEMI RIGID
INSULATION
FIBERGLASS BATT
INSULATION
MINERAL WOOL SEMI RIGID
INSULATION
EXPANDED POLYSTYRENE
RIGID INSULATION
EXTRUDED POLYSTYRENE
RIGID INSULATION
POLYISOCYANURATE RIGID
INSULATION
GYPSUM BOARD
EXTERIOR GYPSUM
SHEATHING
EXTERIOR CEMENT
BOARD
COATED GLASS MAT
WATER RESISTANT
GYP BD
PLYWOOD
COVER BOARD
MATERIALS
ANNOTATION CALLOUTS/DRAWING SYMBOLS
CEILING SYMBOLS
GENERAL NOTES
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED
INSTALLED BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
1i
0 GRID / COLUMN
LINE DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
EXIT LIGHT
INTERIOR ELEVATION
1i
WALL TYPE
WINDOW TYPE
SECTION
Room name
101 ROOM NAME/NUMBER
A101
Ref
A101
Ref
EXTERIOR ELEVATION
1 REVISION TAG
A-101
SIM
PLAN, BLOW-UP DETAIL
PLAN NORTH
NORTH ARROW w/
TRUE NORTH INDICATION
SPOT ELEVATION
SHEET NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET NUMBER WHERE
SECTION/DETAIL IS DRAWN
H -------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED INSTALLED
BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RMMACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RMMECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
2' x 2' ACT CEILING
4' x 4' ACT CEILING
A
S
1 HR FIRE
S S S
1 HR FIRE/SMOKE WALL
4 HR FIRE
4 HR FIRE/SMOKE WALL
2 HR FIRE
2 HR FIRE/SMOKE WALL
3 HR FIRE
3 HR FIRE/SMOKE WALL
FIRE RATED WALL SYMBOLS:
SHEET KEYNOTE
GYP. BD. CEILING
1' x 1' ACT CEILING
2 X 4 LIGHT FIXTURE
2 x 2 LIGHT FIXTURE
SUSP. FLUORESCENT LIGHT
RETURN AIR GRILLE
SUPPLY AIR GRILLE
EXHAUST AIR GRILLE
RE: TO WALL TYPE WIDTH
METAL STUDS AT 16" O.C.
RE: WALL TYPE
DESCRIPTION
GYPSUM BOARD,
EACH SIDE
SLIP TRACK
STRUCTURAL DECK ABOVE
SEALANT- EACH SIDE, TYPICAL
1.4A GYPSUM WALL
RUNNER TRACK
1.4A - 3-5/8" MTL. STUDS, 5/8" ABUSE-
RESISTANT GYP. BD. BOTH SIDES
RE: TO WALL TYPE WIDTH
METAL STUDS AT 16" O.C.
RE: WALL TYPE DESCRIPTION
RUNNER TRACK
GYPSUM BOARD
STRUCTURAL DECK ABOVE
SEALANT - EACH SIDE, TYPICAL
SLIP TRACK
4.XA TO STRUCTURE
4.1A - 2-1/2" MTL. STUDS, 5/8" GYP. BD. ONE SIDE
4.2A - 3-5/8" MTL. STUDS, 5/8" GYP. BD. ONE SIDE
4.2AT - 3-5/8" MTL. STUDS, 5/8" PAPERLESS, ABUSE-
RESISTANT GYP. BD. ONE SIDE, THERMAL INSULATION
FULL HEIGHT OF STUD CAVITY
9.1A MASONRY WALL
STRUCTURAL DECK ABOVE
7 5/8"
REFER TO STRUCTURAL DWGS.
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
A s in di ca te d
/1
8 /
:5 7 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
JW JW PL
A-000
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
PL
G
EN
ER
AL
N O
TE
S
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A- 0 0
0-
1. ALL WORK SHALL CONFORM WITH APPLICABLE BUILDING
CODES, REGULATIONS, AND ORDINANCES.
CONTRACTOR SHALL OBTAIN ALL REQUIRED BUILDING
AND OCCUPANCY PERMITS.
2 INFORMATION ON THE DRAWINGS REGARDING EXISTING
CONDITIONS IS BASED UPON DRAWINGS FURNISHED BY
THE GOVERNMENT. THE INFORMATION IS BELIEVED TO
BE AN ACCURATE REFLECTION OF THE EXISTING
CONDITIONS, BUT IS IN NO WAY INTENDED TO
GUARANTEE EXACT CONDITIONS.
3 THE CONTRACTOR IS RESPONSIBLE TO PERFORM A
COMPLETE ANALYSIS PRIOR TO COMMENCEMENT OF
WORK. REPORT ALL DISCREPANCIES TO THE ARCHITECT
IMMEDIATELY. FAILURE OF THE CONTRACTOR TO
PERFORM SURVEY, FIELD VERIFY CONDITIONS, AND
COORDINATE WORK DOES NOT RELIEVE CONTRACTOR
OF RESPONSIBLIITY FOR WORK.
4 CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN
AND PROTECT EXISTING SYSTEMS AND FINISHES WHICH
ARE TO REMAIN. ANY DAMAGES TO SUCH SYSTEMS AND
FINISHES SHALL BE REPAIRED IN A MANNER
ACCEPTABLE TO THE ARCHITECT AT THE CONTRACTOR'S
EXPENSE.
5 DRAWINGS CONTAINED IN THIS SET SHALL NOT BE
REPRODUCED FOR SHOP DRAWINGS. COPIES OF THESE
DRAWINGS SUBMITTED AS SHOP DRAWINGS WILL BE
REJECTED AND RETURNED TO THE CONTRACTOR.
6 CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
MEANS, METHODS, AND SEQUENCES OF CONSTRUCTION
AND THE SAFETY OF ALL CONSTRUCTION PERSONNEL
AND VISITORS.
7 DO NOT SCALE DRAWINGS. FOLLOW WRITTEN
DIMENSIONS OR KEYED NOTES ONLY. CONTACT
ARCHITECT FOR CLARIFICATIONS IF REQUIRED.
8 EACH INSTALLER MUST EXAMINE SUBSTRATE AND/OR
CONDITIONS UNDER WHICH THE WORK WILL BE
INSTALLED AND REPORT TO THE CONTRACTOR IN
WRITING ANY CONDITIONS DETRIMENTAL TO THE
PROPER AND TIMELY EXECUTION OF THE INSTALLER'S
WORK. DO NOT PROCEED UNTIL UNSATISFACTORY
CONDITIONS ARE CORRECTED. INSTALLATION SHALL
CONSTITUTE ACCEPTANCE OF THE SUBSTRATE AND/OR
CONDITIONS.
9 "TYPICAL", AS USED IN THESE DOCUMENTS, SHALL MEAN
THAT THE CONDITIONS OR DIMENSION IS THE SAME OR
REPRESENTATIVE FOR SIMILAR CONDITIONS
THROUGHOUT.
10 ALL DISSIMILAR METAL MATERIALS SHALL BE ISOLATED
WITH AN APPROVED NON-METAL ISOLATION MATERIAL.
11 PROVIDE BLOCKING IN GYPSUM BOARD PARTITIONS FOR
ALL WALL-MOUNTED ARCHITECTURAL WOODWORK,
FINISH CARPENTRY, FURNITURE, EQUIPMENT, GRAB
BARS, TOILET ACCESSORIES, WALL-MOUNTED
HANDRAILS, ETC. ALL BLOCKING SHALL BE FIRE
RETARDANT TREATED WOOD. GENERAL CONTRACTOR IS
RESPONSIBLE FOR COORDINATING BLOCKING WITH ALL
WALL-MOUNTED ITEMS INCLUDING, BUT NOT LIMITED TO,
THOSE LISTED ABOVE.
12 NON-BEARING PARTITIONS SHALL BE ISOLATED FROM
THE BUILDING STRUCTURE TO PREVENT TRANSFER OF
BUILDING LOADS FROM THE STRUCTURE TO THE
PARTITIONS.
13 PAINT ALL NEW EXPOSED GYPSUM BOARD AREAS,
COLOR TO BE SELECTED BY ARCHITECT.
14 ALL INTERIOR PARTITION DIMENSIONS ARE FROM
COLUMN GRID LINES TO FACE OF GYPSUM BOARD FINISH
UNLESS OTHERWISE NOTED.
15 REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL
DRAWINGS FOR MORE INFORMATION THAT MAY NOT BE
IN THE ARCHITECTURAL DRAWINGS. CONTRACTOR TO
NOTIFY AND COORDINATE WITH THE ARCHITECT ANY
ISSUES THAT CONFLICT WITH THE NEW DESIGN.
16 PORTABLE FIRE EXTINGUISHERS OF APPROVED TYPE
ARE TO BE PLACED WITHIN THE CONSTRUCTION AREA IN
ACCORDANCE WITH THE LOCAL FIRE DEPARTMENT
INSPECTOR OR MARSHAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
LKJHGFEDCBA M
1107.32 SF
STORAGE
366.08 SF
PLANNING
555.30 SF
COMP. MAIN.
110.97 SF
TELCOM
576.65 SF
STOR/ELECT
556.36 SF
STORAGE
570.00 SF
MECHANICAL
191.17 SF
MECHANICAL
493.07 SF
STORAGE
EXIT 1
TOTAL OCCUPANT LOAD: 43
TWO EXITS REQUIRED
MAX ACCESS TRAVEL DISTANCE 300 FEET
REQUIRED EXIT WIDTH: 43 X 0.3"/PERSON = 12.9"
MINIMUM EXIT WIDTH: 36" (32" AT DOORS)
EXIT ACCESS TRAVEL DISTANCE: 86'-7"
STAIR
WIDTH:
42"
STAIR
WIDTH: 40"
EXIT 2 DIAGONAL = 139'-6"
EXIT SEPARATION = 80'-4"
LKJHGFEDCBA M
988.01 SF
STORAGE
EXIT DISCHARGE
FROM FLOOR
ABOVE
EXIT DISCHARGE
FROM FLOOR
BELOWEXIT 1
EXIT 2
COMMON PATH OF TRAVEL = 94'-11"
TRAVEL DISTANCE = 68'-10"
OFFICE OCC.
6,758 SF
TOTAL OCCUPANT LOAD: 72
TWO EXITS REQUIRED
MAX ACCESS TRAVEL DISTANCE 300 FEET
MAX COMMON PATH OF TRAVEL 100 FEET
EXIT WIDTH REQUIRED AT EXTERIOR DOORS: 72 X 0.2"/PERSON = 14.4"
EXIT WIDTH REQUIRED AT EXTERIOR STAIRS: 72 X 0.3"/PERSON = 21.6"
MINIMUM EXIT WIDTH: 36" (32" AT DOORS)
TRAVEL DISTANCE = 118'-0"
STAIR
WIDTH:
65"
RAMP WIDTH: 46"
STAIR
WIDTH:
46"
DIAGONAL = 138'-6"
EXIT SEPARATION = 70'-9"
LKJHGFEDCBA M
EXIT 2
OFFICE OCC.
6,758 SF
EXIT 1
TRAVEL
DISTANCE =
71'-3"
TRAVEL DISTANCE
= 76'-4
TRAVEL
DISTANCE =
57'-9"
TOTAL OCCUPANT LOAD: 68
TWO EXITS REQUIRED
MAX ACCESS TRAVEL DISTANCE 300 FEET
EXIT WIDTH REQUIRED: 68 X 0.3"/PERSON = 20.4"
MINIMUM WIDTH 36" (32" AT DOORS)
STAIR
WIDTH:
23"
STAIR
WIDTH:
46"
DIAGONAL = 139'-7"
EXIT SEPARATION = 74'-0"
BUILDING SUMMARY
PROJECT INFORMATION
PROJECT NAME: BUILDING 246 RENOVATION
ADDRESS: BUILDING 246, BIDDLE AVENUE, FORT LEAVENWORTH, KS 66027
PROPOSED USE: BUSINESS/OFFICE
OWNER-CONTACT PERSON: KIM BLOOD, USACE
APPLICABLE CODES
- BUILDING CODE: 2012 INTERNATIONAL BUILDING CODE
- MECHANICAL: 2012 INTERNATIONAL MECHANICAL CODE
- PLUMBING: 2012 INTERNATIONAL PLUMBING CODE
- LIFE SAFETY CODE: NFPA 101 - 2012
- ACCESSIBILITY CODE: ADA STANDARDS FOR ACCESSIBLE DESIGN
- ENERGY CODE: 2012 INTERNATIONAL ENERGY CONSERVATION CODE
BUILDING PLANNING
OCCUPANCY: BUSINESS GROUP B
TYPE OF CONSTRUCTION
CONSTRUCTION TYPE: V-B
ALLOWABLE BUILDING HEIGHTS AND AREAS
BASIC MAXIMUM HEIGHT: 40 FEET ACTUAL: APPROX. 40 FEET
MAXIMUM NUMBER OF STORIES: 2 ACTUAL: 2
BASIC ALLOWABLE AREA: 9,000 SF ACTUAL: 7,783 SF
NO INCREASES REQUIRED
FIRE PROTECTION SYSTEMS
- FIRE EXTINGUISHING SYSTEM: PROVIDED, NFPA 13 AUTOMATIC SPRINKLER SYSTEM
- STANDPIPE SYSTEM: NO
- SMOKE CONTROL: NO
FIRE RESISTANT CONSTRUCTION/FIREPROOFING SCHEDULE
ITEM REQ'D RATING / HR
- EXTERIOR WALLS: LOAD BEARING
NON-LOAD BEARING
- FIRE/PARTY WALLS
- SHAFTS
- TENANT SEPARATION
- INTERIOR WALL: LOAD BEARING
NON-LOAD BEARING
- COLUMNS
- BEAMS
- FLOOR/CEILING
- ROOF/CEILING
N/A
1-HR
N/A N/A
STAIRS
MINIMUM WIDTH OF STAIRS SERVING LESS THAN 50 PERSONS = 36"
SYMBOL LEGEND
X X
SIZE OF EXIT (INCHES)
CAPACITY OF EXIT (PERSONS)
X
X DISTRIBUTED NUMBER OF OCCUPANTS AT EACH EXIT
(THEORETICALLY EQUAL DISTRIBUTION BASED ON OCCUPANT LOAD)
X
X
X
ROOM NAME
OCCUPANT LOAD FACTOR
OCCUPANT LOAD
ROOM AREA (SF)
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
A s in di ca te d
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
E G
R
ES
S R
O U
TE
P
LA
N
A-001
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
EG
R
E S S
P L
AN
S
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A I A
-0
3/32" = 1'-0"A-001
D5 BASEMENT FLOOR PLAN
3/32" = 1'-0"A-001
A5 FIRST FLOOR PLAN
3/32" = 1'-0"A-001
A1 SECOND FLOOR PLAN
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
Planning Room
Storage
Telecom
Storage
Electric
Lobby
Storage
Mechanical
Mechanical
Hall
Hall
Storage
Computer Maintenance
Storage
Stair
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
/8
'-0
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
D-100
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
BA
SE
M
EN
T D
E M O
P
LA
N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
D -1
1/8" = 1'-0"D-100
A1 BASEMENT DEMO PLAN
KEYNOTES - PLAN DEMO
Tag Text
1 REMOVE STAIRS AND HAND RAILS.
PATCH/REPAIR EXISTING ADJACENT
CONSTRUCTION TO LIKE-NEW CONDITION IN
ORDER TO RECEIVE NEW WORK.
2 REMOVE EXISTING DOOR, FRAME, AND
HARDWARE.
3 REMOVE EXISTING GYPSUM BOARD PARTITION.
PATCH/REPAIR EXISTING ADJACENT WALLS TO
LIKE-NEW CONDITION IN ORDER TO RECEIVE
NEW WORK.
4 REMOVE EXISTING WINDOW AND FRAME.
5 PARTIALLY DEMO EXISTING PARTITION FOR
NEW DOOR OPENING. REFER TO DOOR
SCHEDULE.
6 REMOVE EXISTING ELEVATED FLOOR.
SALVAGE EXISTING CARPET TILE FOR REUSE.
PREP FLOOR TO RECEIVE NEW FLOOR FINISH
PER FINISH LEGEND AND SCHEDULE.
ELEVATED FLOOR CONSISTS OF CONCRETE
SLAB ON STEEL FLUTED DECK SUPPORTED BY
COLD-FORMED STEEL CHANNEL JOISTS
SUPPORTED BY BRACED STEEL STUD FRAMES
ANCHORED TO FIRST FLOOR SLAB.
7 REMOVE EXISTING ELEVATOR AND ALL
ASSOCIATED COMPONENTS. INFILL CONCRETE
FLOOR SLAB PER STRUCTURAL DRAWINGS.
8 REMOVE EXISTING CARPET FLOORING.
SALVAGE EXISTING CARPET TILE FOR REUSE.
PREP FLOOR TO RECEIVE NEW FINISH PER
LEGEND AND SCHEDULE.
9 REMOVE ALL EXISTING ELEVATOR EQUIPMENT
IN ROOM.
10 PARTIALLY REMOVE SLAB FOR NEW ELEVATOR
SHAFT. EXCAVATE FOR NEW ELEVATOR PIT
AND FOOTINGS. REFER TO STRUCTURAL
DWGS.
11 REMOVE EXISTING FLOOR FINISH. PREP
FLOOR TO RECEIVE NEW FINISH PER FINISH
LEGEND AND SCHEDULE.
12 REMOVE EXISTING ACCESS TRENCH COVER.
13 REMOVE EXISTING SUSPENDED PANEL CEILING
SYSTEM IN ELEVATOR LOBBY. RETAIN GYPSUM
BOARD SOFFIT OVER FOOT OF STAIRS AT
BASEMENT LEVEL.
14 REMOVE EXISTING GYP. BD. CEILING.
15 REFER TO MECH/PLUMBING/FP DRAWINGS FOR
WORK IN THESE AREAS.
17 REMOVE EXISTING OVERHEAD BULKHEAD.
18 SALVAGE EXISTING CARPET TILE FOR REUSE.
19 REMOVE STEEL PLATE AND ANGLE FROM IN
FRONT OF WINDOW.
20 REMOVE STEEL PLATE GRAVEL RETAINER.
21 REMOVE EXISTING ASPHALT FOR EXCAVATION
OF NEW PERFORATED DRAIN. SEE A-100.
22 EXCAVATE FOR INSTALLATION OF NEW
PERFORATED DRAIN. SEE A-100.
23 NOTE: TESTING PERFORMED ON THIS BUILDING
HAS INDICATED THE PRESENCE OF
NON-FRIABLE ASBESTOS-CONTAINING
MATERIAL (TILE MASTIC) IN ROOMS 112 AND
113. DO NOT DISTURB FLOOR MATERIALS
WITHIN THESE SPACES. THE REPORT,
PREPARED BY BURNS & MCDONNELL
ENGINEERING COMPANY, DATED JANUARY,
2013, IS AVAILABLE FROM THE GOVERNMENT.
04 8 16268
SCALE: 1/8"=1'-0"
N
GENERAL NOTE
TESTING PERFORMED ON THIS BUILDING HAS INDICATED
THE PRESENCE OF LEAD-BASED PAINT IN
CONCENTRATIONS EQUAL TO OR EXCEEDING 1 mg/cm^2.
THE REPORT, WHICH IS AVAILABLE FROM THE
GOVERNMENT, INDICATES THAT SUCH
CONCENTRATIONS OCCUR PRIMARILY AT SOME
EXTERIOR WINDOWS AND AT PAINTED STRUCTURAL
STEEL ANGLES SUPPORTING OVERHEAD CLAY TILE IN
ROOMS 005 AND 006. THE REPORT ALSO INDICATES THE
PRESENCE OF LEAD-BASED PAINT IN CONCENTRATIONS
LESS THAN 1 mg/cm^2, BUT NOTES THAT THIS MATERIAL
COULD BE TURNED INTO LEAD DUST IF THE PAINT IS
TURNED INTO DUST BY ABRASION, SCRAPING OR
SANDING. WHERE SURFACES CONTAINING LEAD-BASED
ARE DISTURBED, FOLLOW ALL PROCEDURES FOR
HANDLING AND CONTAINMENT OF SPECIFICATION
SECTION 02 83 13. 00 20 "LEAD IN CONSTRUCTION." THE
REPORT WAS PREPARED BY BURNS & MCDONNELL AND
IS DATED JANUARY, 2013.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
Office
Hall
Office
Office
Office
Hall
Office
Conference
Men
Women
Jan
Telecom
Elect.
Mechanical
Lobby
Open Office
Room
Room
Office
Office
Vestibule
Vestibule
Storage
19 20
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
/8
'-0
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
D-101
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
FI
R
ST
F
LO
O
R D
EM
O
P
LA
N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
D -1
1/8" = 1'-0"D-101
A1 FIRST FLOOR DEMO PLAN
KEYNOTES - PLAN DEMO
Tag Text
1 REMOVE STAIRS AND HAND RAILS.
PATCH/REPAIR EXISTING ADJACENT
CONSTRUCTION TO LIKE-NEW CONDITION IN
ORDER TO RECEIVE NEW WORK.
2 REMOVE EXISTING DOOR, FRAME, AND
HARDWARE.
3 REMOVE EXISTING GYPSUM BOARD PARTITION.
PATCH/REPAIR EXISTING ADJACENT WALLS TO
LIKE-NEW CONDITION IN ORDER TO RECEIVE
NEW WORK.
4 REMOVE EXISTING WINDOW AND FRAME.
5 PARTIALLY DEMO EXISTING PARTITION FOR
NEW DOOR OPENING. REFER TO DOOR
SCHEDULE.
6 REMOVE EXISTING ELEVATED FLOOR.
SALVAGE EXISTING CARPET TILE FOR REUSE.
PREP FLOOR TO RECEIVE NEW FLOOR FINISH
PER FINISH LEGEND AND SCHEDULE.
ELEVATED FLOOR CONSISTS OF CONCRETE
SLAB ON STEEL FLUTED DECK SUPPORTED BY
COLD-FORMED STEEL CHANNEL JOISTS
SUPPORTED BY BRACED STEEL STUD FRAMES
ANCHORED TO FIRST FLOOR SLAB.
7 REMOVE EXISTING ELEVATOR AND ALL
ASSOCIATED COMPONENTS. INFILL CONCRETE
FLOOR SLAB PER STRUCTURAL DRAWINGS.
8 REMOVE EXISTING CARPET FLOORING.
SALVAGE EXISTING CARPET TILE FOR REUSE.
PREP FLOOR TO RECEIVE NEW FINISH PER
LEGEND AND SCHEDULE.
9 REMOVE ALL EXISTING ELEVATOR EQUIPMENT
IN ROOM.
10 PARTIALLY REMOVE SLAB FOR NEW ELEVATOR
SHAFT. EXCAVATE FOR NEW ELEVATOR PIT
AND FOOTINGS. REFER TO STRUCTURAL
DWGS.
11 REMOVE EXISTING FLOOR FINISH. PREP
FLOOR TO RECEIVE NEW FINISH PER FINISH
LEGEND AND SCHEDULE.
12 REMOVE EXISTING ACCESS TRENCH COVER.
13 REMOVE EXISTING SUSPENDED PANEL CEILING
SYSTEM IN ELEVATOR LOBBY. RETAIN GYPSUM
BOARD SOFFIT OVER FOOT OF STAIRS AT
BASEMENT LEVEL.
14 REMOVE EXISTING GYP. BD. CEILING.
15 REFER TO MECH/PLUMBING/FP DRAWINGS FOR
WORK IN THESE AREAS.
17 REMOVE EXISTING OVERHEAD BULKHEAD.
18 SALVAGE EXISTING CARPET TILE FOR REUSE.
19 REMOVE STEEL PLATE AND ANGLE FROM IN
FRONT OF WINDOW.
20 REMOVE STEEL PLATE GRAVEL RETAINER.
21 REMOVE EXISTING ASPHALT FOR EXCAVATION
OF NEW PERFORATED DRAIN. SEE A-100.
22 EXCAVATE FOR INSTALLATION OF NEW
PERFORATED DRAIN. SEE A-100.
23 NOTE: TESTING PERFORMED ON THIS BUILDING
HAS INDICATED THE PRESENCE OF
NON-FRIABLE ASBESTOS-CONTAINING
MATERIAL (TILE MASTIC) IN ROOMS 112 AND
113. DO NOT DISTURB FLOOR MATERIALS
WITHIN THESE SPACES. THE REPORT,
PREPARED BY BURNS & MCDONNELL
ENGINEERING COMPANY, DATED JANUARY,
2013, IS AVAILABLE FROM THE GOVERNMENT.
04 8 16268
SCALE: 1/8"=1'-0"
N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
GENERAL NOTE
TESTING PERFORMED ON THIS BUILDING HAS INDICATED
THE PRESENCE OF LEAD-BASED PAINT IN
CONCENTRATIONS EQUAL TO OR EXCEEDING 1 mg/cm^2.
THE REPORT, WHICH IS AVAILABLE FROM THE
GOVERNMENT, INDICATES THAT SUCH
CONCENTRATIONS OCCUR PRIMARILY AT SOME
EXTERIOR WINDOWS AND AT PAINTED STRUCTURAL
STEEL ANGLES SUPPORTING OVERHEAD CLAY TILE IN
ROOMS 005 AND 006. THE REPORT ALSO INDICATES THE
PRESENCE OF LEAD-BASED PAINT IN CONCENTRATIONS
LESS THAN 1 mg/cm^2, BUT NOTES THAT THIS MATERIAL
COULD BE TURNED INTO LEAD DUST IF THE PAINT IS
TURNED INTO DUST BY ABRASION, SCRAPING OR
SANDING. WHERE SURFACES CONTAINING LEAD-BASED
ARE DISTURBED, FOLLOW ALL PROCEDURES FOR
HANDLING AND CONTAINMENT OF SPECIFICATION
SECTION 02 83 13. 00 20 "LEAD IN CONSTRUCTION." THE
REPORT WAS PREPARED BY BURNS & MCDONNELL AND
IS DATED JANUARY, 2013.
Meeting Room
Open Office
Room
202Room
Toilet
Women
Men
Office
Office
Office
Hall
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
/8
'-0
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
D-102
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
SE
C
O N
D F
LO
O
R D
EM
O
P L A
N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
D -1
1/8" = 1'-0"D-102
A1 SECOND FLOOR DEMO PLAN
KEYNOTES - PLAN DEMO
Tag Text
1 REMOVE STAIRS AND HAND RAILS.
PATCH/REPAIR EXISTING ADJACENT
CONSTRUCTION TO LIKE-NEW CONDITION IN
ORDER TO RECEIVE NEW WORK.
2 REMOVE EXISTING DOOR, FRAME, AND
HARDWARE.
3 REMOVE EXISTING GYPSUM BOARD PARTITION.
PATCH/REPAIR EXISTING ADJACENT WALLS TO
LIKE-NEW CONDITION IN ORDER TO RECEIVE
NEW WORK.
4 REMOVE EXISTING WINDOW AND FRAME.
5 PARTIALLY DEMO EXISTING PARTITION FOR
NEW DOOR OPENING. REFER TO DOOR
SCHEDULE.
6 REMOVE EXISTING ELEVATED FLOOR.
SALVAGE EXISTING CARPET TILE FOR REUSE.
PREP FLOOR TO RECEIVE NEW FLOOR FINISH
PER FINISH LEGEND AND SCHEDULE.
ELEVATED FLOOR CONSISTS OF CONCRETE
SLAB ON STEEL FLUTED DECK SUPPORTED BY
COLD-FORMED STEEL CHANNEL JOISTS
SUPPORTED BY BRACED STEEL STUD FRAMES
ANCHORED TO FIRST FLOOR SLAB.
7 REMOVE EXISTING ELEVATOR AND ALL
ASSOCIATED COMPONENTS. INFILL CONCRETE
FLOOR SLAB PER STRUCTURAL DRAWINGS.
8 REMOVE EXISTING CARPET FLOORING.
SALVAGE EXISTING CARPET TILE FOR REUSE.
PREP FLOOR TO RECEIVE NEW FINISH PER
LEGEND AND SCHEDULE.
9 REMOVE ALL EXISTING ELEVATOR EQUIPMENT
IN ROOM.
10 PARTIALLY REMOVE SLAB FOR NEW ELEVATOR
SHAFT. EXCAVATE FOR NEW ELEVATOR PIT
AND FOOTINGS. REFER TO STRUCTURAL
DWGS.
11 REMOVE EXISTING FLOOR FINISH. PREP
FLOOR TO RECEIVE NEW FINISH PER FINISH
LEGEND AND SCHEDULE.
12 REMOVE EXISTING ACCESS TRENCH COVER.
13 REMOVE EXISTING SUSPENDED PANEL CEILING
SYSTEM IN ELEVATOR LOBBY. RETAIN GYPSUM
BOARD SOFFIT OVER FOOT OF STAIRS AT
BASEMENT LEVEL.
14 REMOVE EXISTING GYP. BD. CEILING.
15 REFER TO MECH/PLUMBING/FP DRAWINGS FOR
WORK IN THESE AREAS.
17 REMOVE EXISTING OVERHEAD BULKHEAD.
18 SALVAGE EXISTING CARPET TILE FOR REUSE.
19 REMOVE STEEL PLATE AND ANGLE FROM IN
FRONT OF WINDOW.
20 REMOVE STEEL PLATE GRAVEL RETAINER.
21 REMOVE EXISTING ASPHALT FOR EXCAVATION
OF NEW PERFORATED DRAIN. SEE A-100.
22 EXCAVATE FOR INSTALLATION OF NEW
PERFORATED DRAIN. SEE A-100.
23 NOTE: TESTING PERFORMED ON THIS BUILDING
HAS INDICATED THE PRESENCE OF
NON-FRIABLE ASBESTOS-CONTAINING
MATERIAL (TILE MASTIC) IN ROOMS 112 AND
113. DO NOT DISTURB FLOOR MATERIALS
WITHIN THESE SPACES. THE REPORT,
PREPARED BY BURNS & MCDONNELL
ENGINEERING COMPANY, DATED JANUARY,
2013, IS AVAILABLE FROM THE GOVERNMENT.
04 8 16268
SCALE: 1/8"=1'-0"
N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
GENERAL NOTE
TESTING PERFORMED ON THIS BUILDING HAS INDICATED
THE PRESENCE OF LEAD-BASED PAINT IN
CONCENTRATIONS EQUAL TO OR EXCEEDING 1 mg/cm^2.
THE REPORT, WHICH IS AVAILABLE FROM THE
GOVERNMENT, INDICATES THAT SUCH
CONCENTRATIONS OCCUR PRIMARILY AT SOME
EXTERIOR WINDOWS AND AT PAINTED STRUCTURAL
STEEL ANGLES SUPPORTING OVERHEAD CLAY TILE IN
ROOMS 005 AND 006. THE REPORT ALSO INDICATES THE
PRESENCE OF LEAD-BASED PAINT IN CONCENTRATIONS
LESS THAN 1 mg/cm^2, BUT NOTES THAT THIS MATERIAL
COULD BE TURNED INTO LEAD DUST IF THE PAINT IS
TURNED INTO DUST BY ABRASION, SCRAPING OR
SANDING. WHERE SURFACES CONTAINING LEAD-BASED
ARE DISTURBED, FOLLOW ALL PROCEDURES FOR
HANDLING AND CONTAINMENT OF SPECIFICATION
SECTION 02 83 13. 00 20 "LEAD IN CONSTRUCTION." THE
REPORT WAS PREPARED BY BURNS & MCDONNELL AND
IS DATED JANUARY, 2013.
LKJHGF
E
DCBA M
Planning Room
Storage
Telecom
Storage
Electric
Lobby
Storage
Mechanical
Mechanical
Hall
Hall
Storage
Computer Maintenance
Storage
Stair1
1.4A 1.4A 1.4A 1.4A
ELEVATOR
A-100 C5
A-100 A5
A-400 A4
4.2AT TYP.
UNO
4.2A
4.1A
4.1A
2 A-100 D5
4.2A 4.2A
4.2A4.2A
APPROXIMATE
LOCATION OF
DRAIN PIPE
DISCHARGE
APPROXIMATE
LOCATION OF
DRAIN PIPE
DISCHARGE
1/ 8"
P
ER
F O
O T
M
IN
1/8" PER FOOT MIN.
TYP.
15 15 15 15
16 16
EQ
EQ
TYP.
1/ 8"
P
ER
F O
O T
M
IN
A-100A3
TYP.
F
CAULK PERIMETER
OF NEW GYP. BD. INFILL,
BOTH SIDES
3-5/8" MTL. STUDS
@ 16" OC MAX
5/8" GYP. BD.,
BOTH SIDES,
PAINTED (P-1)
CENTER NEW
PARTITION IN
OPENING
A
4.2A 1.4A 4.2A1.4A
CAULK JOINT
4.2AT
EXISTING
TUNNEL
NEW CONCRETE INFILL
RE: STRUCT. DWGS.
NEW CMU INFILL,
PAINT TO MATCH WALL
RE: STRUCT. DWGS.
EXISTING EXTERIOR
STONE WALL
CJ CJ
EXISTING WINDOW. PAINT FRAMING P-1.
ALIGN NEW
FURRING WITH
EXISTING FRAME
UNDERSIDE OF SLAB
NEW GYP. BD.
FURRING,
PAINT (P-1)
NEW RESILIENT BASE
(RB-1)
NEW 3/4" THICK BIRCH SILL
TO CAP FURRED WALL AT WINDOW,
EASED EDGE, OVERHANG 1/2"
PAINT (P-1)
CAULK GYP. BD.
JOINT AROUND
ENTIRE WINDOW
EXISTING SILL. PAINT P-1.
A-100 A2
WOOD SILL BELOW
SCRIBE GYPSUM BOARD
AROUND PROFILE OF EXISTING
WINDOW SILL
CAULK
CAULK WINDOW FRAME TO
STONE BEFORE INSTALLATION
OF GYPSUM BOARD
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
A s in di ca te d
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
A-100
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
BA
SE
M
EN
T
FL
O O
R P
LA
N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A- 1 0
0-
1/8" = 1'-0"A-100
A1 BASEMENT FLOOR PLAN
04 8 16268
SCALE: 1/8"=1'-0"
N
KEYNOTES - PLAN NEW CONSTRUCTION
Tag Text
1 INSTALL NEW CARPET TILE FLOORING (CPT-1)
AND RESILIENT WALL BASE (RB-1)
THROUGHOUT ROOM.
2 INSTALL NEW VINYL COMPOSITION TILE
(VCT-1) THROUGHOUT ROOM.
3 INFILL OPENING WITH 3-5/8" MTL. STUDS AND
5/8" GYP. BD. BOTH SIDES. INFILL SHALL
MATCH SURROUNDING CONSTRUCTION WITH
FLUSH SURFACES. PAINT WALL.
4 PATCH AREAS WITHOUT FLOOR COVERING
WITH SALVAGED CARPET TILE FROM
DEMOLITION.
5 EXISTING BRICK ARCHED OPENING TO
REMAIN. ADD NEW WALL PER PLAN TO INFILL
OPENING. CAULK AROUND OPENING WHERE
BRICK/GYP. BD. MEET.
6 INFILL EXISTING PIT NORTH OF NEW
ELEVATOR SHAFT WALLS. REFER TO
STRUCTURAL DWGS.
7 INFILL EXISTING OPENING WITH 8" CMU.
REFER TO STRUCTURAL DRAWINGS.
8 SEAL WALL OPENING AROUND DUCT WORK
WITH METAL FLASHING.
9 GROUT SOLID EXISTING OPENINGS IN
MASONRY.
10 INSTALL SALVAGED CARPET TILE FROM
DEMOLITION THROUGHOUT ENTIRE ROOM.
11 NOT USED.
12 SEAL HOLES IN STONE FOUNDATION WALL
(GROUT SOLID)
13 NEW PERFORATED DRAIN PIPE EMBEDDED IN
GRAVEL DRAINAGE COURSE, SLOPED 1/8"
PER FOOT MIN. TO POINT OF DISCHARGE
BASED ON FIELD-VERIFIED DISCHARGE
ELEVATIONS
14 6" EXTERIOR AREA DRAIN TIED INTO DRAIN
PIPE DESCRIBED IN NO. 13.
15 TIE DOWNSPOUT DISCHARGE INTO DRAIN
PIPE DESCRIBED IN NO. 13.
16 CAULK PERIMETER OF WINDOW FRAME TO
STONE FOUNDATION WALLS, INTERIOR AND
EXTERIOR SIDES OF FRAME. EXISTING
PLYWOOD COVERINGS TO REMAIN IN PLACE
AT COMPLETION OF WORK WHERE THEY
EXIST AT EAST WALL OF PLANNING ROOM
003.
17 PROVIDE 18"X18" ACCESS PANEL IN WALL TO
PROVIDE ACCESS TO GAS PIPE FITTING.
GENERAL NOTES
1. UNLESS NOTED OTHERWISE, CLEAN ALL BASEMENT
CONCRETE FLOORING AND SEAL WITH URETHANE
FLOOR ENAMEL (P-10). REFER TO FINISH LEGEND,
SCHEDULE AND SPECIFICATIONS.
2. UNLESS NOTED OTHERWISE, PATCH, SEAL, AND
PAINT ALL BASEMENT WALLS (P-1). REFER TO FINISH
LEGEND, SCHEDULE AND SPECIFICATIONS.
3. ULESS NOTED OTHERWISE, CLEAN AND PAINT ALL
OVERHEAD STRUCTURAL SURFACES AND PIPING (P-1).
RE: CEILING PLANS.
4. NEW DOORS INDICATED WITH NO DIMENSIONS ARE
TYPICALLY LOCATED 6" FROM ADJACENT
PERPENDICULAR WALL TO THE HINGE.
5. CLEAN AND REPAIR ALL GUTTERS AND
DOWNSPOUTS INCLUDING SCUPPERS AND CONDUCTOR
HEADS.
1/2" = 1'-0"A-100
C5 STOR. OPENING INFILL
1/2" = 1'-0"A-100
A5 PLANNING ROOM DOOR INFILL
3/4" = 1'-0"A-100
D5 CMU INFILL
1/2" = 1'-0"A-100
A3 WINDOW DTL.
1 1/2" = 1'-0"A-100
A2 JAMB DTL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
Office
Hall
Office
Office
Office
Hall
Office
Conference
Men
Women
Jan
Telecom
Elect.
Mechanical
Lobby
Open Office
Room
Room
Office
Office
Stair
Stair
Storage
ELEVATOR
A-400 B4
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
/8
'-0
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r fil en am e
A-101
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
FI
R
ST
F
LO
O
R P
L A N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A A -
1-
X
XX
1/8" = 1'-0"A-101
A1 FIRST FLOOR PLAN
KEYNOTES - PLAN NEW CONSTRUCTION
Tag Text
1 INSTALL NEW CARPET TILE FLOORING (CPT-1)
AND RESILIENT WALL BASE (RB-1)
THROUGHOUT ROOM.
2 INSTALL NEW VINYL COMPOSITION TILE
(VCT-1) THROUGHOUT ROOM.
3 INFILL OPENING WITH 3-5/8" MTL. STUDS AND
5/8" GYP. BD. BOTH SIDES. INFILL SHALL
MATCH SURROUNDING CONSTRUCTION WITH
FLUSH SURFACES. PAINT WALL.
4 PATCH AREAS WITHOUT FLOOR COVERING
WITH SALVAGED CARPET TILE FROM
DEMOLITION.
5 EXISTING BRICK ARCHED OPENING TO
REMAIN. ADD NEW WALL PER PLAN TO INFILL
OPENING. CAULK AROUND OPENING WHERE
BRICK/GYP. BD. MEET.
6 INFILL EXISTING PIT NORTH OF NEW
ELEVATOR SHAFT WALLS. REFER TO
STRUCTURAL DWGS.
7 INFILL EXISTING OPENING WITH 8" CMU.
REFER TO STRUCTURAL DRAWINGS.
8 SEAL WALL OPENING AROUND DUCT WORK
WITH METAL FLASHING.
9 GROUT SOLID EXISTING OPENINGS IN
MASONRY.
10 INSTALL SALVAGED CARPET TILE FROM
DEMOLITION THROUGHOUT ENTIRE ROOM.
11 NOT USED.
12 SEAL HOLES IN STONE FOUNDATION WALL
(GROUT SOLID)
13 NEW PERFORATED DRAIN PIPE EMBEDDED IN
GRAVEL DRAINAGE COURSE, SLOPED 1/8"
PER FOOT MIN. TO POINT OF DISCHARGE
BASED ON FIELD-VERIFIED DISCHARGE
ELEVATIONS
14 6" EXTERIOR AREA DRAIN TIED INTO DRAIN
PIPE DESCRIBED IN NO. 13.
15 TIE DOWNSPOUT DISCHARGE INTO DRAIN
PIPE DESCRIBED IN NO. 13.
16 CAULK PERIMETER OF WINDOW FRAME TO
STONE FOUNDATION WALLS, INTERIOR AND
EXTERIOR SIDES OF FRAME. EXISTING
PLYWOOD COVERINGS TO REMAIN IN PLACE
AT COMPLETION OF WORK WHERE THEY
EXIST AT EAST WALL OF PLANNING ROOM
003.
17 PROVIDE 18"X18" ACCESS PANEL IN WALL TO
PROVIDE ACCESS TO GAS PIPE FITTING.
04 8 16268
SCALE: 1/8"=1'-0"
N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
Meeting Room
Open Office
Open Office
202Telecom
Toilet
Women
Men
Office
Office
Office
Stair
ELEVATOR
A-400 C4
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
/8
'-0
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
A-102
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
SE
C
O N
D F
LO
O
R P
LA
N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A A -
2-
1/8" = 1'-0"A-102
A1 SECOND FLOOR PLAN
04 8 16268
SCALE: 1/8"=1'-0"
N
KEYNOTES - PLAN NEW CONSTRUCTION
Tag Text
1 INSTALL NEW CARPET TILE FLOORING (CPT-1)
AND RESILIENT WALL BASE (RB-1)
THROUGHOUT ROOM.
2 INSTALL NEW VINYL COMPOSITION TILE
(VCT-1) THROUGHOUT ROOM.
3 INFILL OPENING WITH 3-5/8" MTL. STUDS AND
5/8" GYP. BD. BOTH SIDES. INFILL SHALL
MATCH SURROUNDING CONSTRUCTION WITH
FLUSH SURFACES. PAINT WALL.
4 PATCH AREAS WITHOUT FLOOR COVERING
WITH SALVAGED CARPET TILE FROM
DEMOLITION.
5 EXISTING BRICK ARCHED OPENING TO
REMAIN. ADD NEW WALL PER PLAN TO INFILL
OPENING. CAULK AROUND OPENING WHERE
BRICK/GYP. BD. MEET.
6 INFILL EXISTING PIT NORTH OF NEW
ELEVATOR SHAFT WALLS. REFER TO
STRUCTURAL DWGS.
7 INFILL EXISTING OPENING WITH 8" CMU.
REFER TO STRUCTURAL DRAWINGS.
8 SEAL WALL OPENING AROUND DUCT WORK
WITH METAL FLASHING.
9 GROUT SOLID EXISTING OPENINGS IN
MASONRY.
10 INSTALL SALVAGED CARPET TILE FROM
DEMOLITION THROUGHOUT ENTIRE ROOM.
11 NOT USED.
12 SEAL HOLES IN STONE FOUNDATION WALL
(GROUT SOLID)
13 NEW PERFORATED DRAIN PIPE EMBEDDED IN
GRAVEL DRAINAGE COURSE, SLOPED 1/8"
PER FOOT MIN. TO POINT OF DISCHARGE
BASED ON FIELD-VERIFIED DISCHARGE
ELEVATIONS
14 6" EXTERIOR AREA DRAIN TIED INTO DRAIN
PIPE DESCRIBED IN NO. 13.
15 TIE DOWNSPOUT DISCHARGE INTO DRAIN
PIPE DESCRIBED IN NO. 13.
16 CAULK PERIMETER OF WINDOW FRAME TO
STONE FOUNDATION WALLS, INTERIOR AND
EXTERIOR SIDES OF FRAME. EXISTING
PLYWOOD COVERINGS TO REMAIN IN PLACE
AT COMPLETION OF WORK WHERE THEY
EXIST AT EAST WALL OF PLANNING ROOM
003.
17 PROVIDE 18"X18" ACCESS PANEL IN WALL TO
PROVIDE ACCESS TO GAS PIPE FITTING.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
115'-0"
100'-0"
CONCRETE FOUNDATION
AND FOOTINGS
RE: STRUCT. DWGS.
SUMP PIT
RE: STRUCT. DWGS.
90'-8"
BASEMENT
1ST FLOOR
2ND FLOOR
ROOF
ELEV. UNKNOWN
2"
HOIST BEAM
RE: STRUCT.
DWGS.
NOTE: ELEVATOR
MANUFACTURER WILL
PROVIDE RAIL BRACKET
INSERTS FOR
INSTALLATION BY MASON.
A-400 A5
TYP.
A-400 B5
KJ
115'-0"
100'-0"
CONCRETE FOUNDATION
AND FOOTINGS
RE: STRUCT. DWGS.
90'-8"
BASEMENT
1ST FLOOR
2ND FLOOR
ROOF
ELEV. UNKNOWN
HOIST BEAM
RE: STRUCT.
DWGS.
NOTE: ELEVATOR
MANUFACTURER WILL
PROVIDE RAIL BRACKET
INSERTS FOR
INSTALLATION BY MASON.
PIT LADDER,
LOCATE PER ELEV. MFR.
RECOMMENDATIONS
DOOR
OPENING
DOOR
OPENING
DOOR
OPENING
KJ
8'-6" 9" F.V. WIDTH OF BEAM
4.1A 4.1A
9.1A
9.1A
9.1A
9.1A
4.1A
A3 A-400
A1 A-400
7 5/8"
1' -6
3'-7" 1'-6"
SUMP PIT,
RE: STRUCT.
DWGS.
6' -1
1" 4'
-6
20"W X 36"H
ACCESS PANEL,
6" ABOVE FLOOR
TO BOTTOM OF
PANEL
PAINT CMU
SURFACE
(P-1)
KJ
A3 A-400
A1 A-400
9.1A
9.1A
9.1A 9.1A
4.1A
4.1A4.1A
4.1A 4.1A
24"W X 36"H
ACCESS PANEL,
6" ABOVE FLOOR
TO BOTTOM OF
PANEL
KJ
A3 A-400
A1 A-400
9.1A
9.1A
9.1A 9.1A
4.1A 4.1A
4.1A
4.1A 4.1A
24"W X 36"H
ACCESS PANEL,
6" ABOVE FLOOR
TO BOTTOM OF
PANEL
PAINT CMU
SURFACE
(P-1)
3/4" MAX.
SEALANT & BACKER ROD, TYP.
CONCRETE FLOOR SLAB
CMU ELEVATOR SHAFT WALL
STEEL RETAINER ANGLES,
BOTH SIDES, RE: STRUCT.
DWGS.
CONCRETE ROOF SLAB
CMU ELEVATOR
SHAFT WALL
COMPRESSABLE
SEALANT
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
A s in di ca te d
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
A-400
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
EL
E V
AT
O
R D
ET
A I
LS
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A A -
0-
3/8" = 1'-0"A-400
A1 ELEVATOR SECTION E/W
3/8" = 1'-0"A-400
A3 ELEVATOR SECTION N/S
1/4" = 1'-0"A-400
A4 ENLARGED ELEVATOR - BASEMENT
1/4" = 1'-0"A-400
B4 ENLARGED ELEVATOR - 1ST FLOOR
1/4" = 1'-0"A-400
C4 ENLARGED ELEVATOR - 2ND FLOOR
GENERAL NOTES
1. ELEVATOR CAB FLOOR FINISH SHALL BE VCT-1. REFER
TO FINISH LEGEND, SCHEDULE, AND SPECIFICATIONS.
2. ELEVATOR WALL PANEL LAMINATE SHALL BE
SCHINDLER TORONTO GREY.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
1 1/2" = 1'-0"A-400
A5 SHAFT WALL DTL
1 1/2" = 1'-0"A-400
B5 HEAD OF SHAFT WALL DTL.
LKJHGFE
DCBA
M
A.F.F.7'-0"
EQ 16 PANELS EQ
A.F.F.7'-8"
A.F.F.6'-8"
2' -0
" EQ
EQ
F.
V.
Planning Room
Storage
Telecom
Storage
Electric
Lobby
Storage
Mechanical
Mechanical
Hall
Hall
Storage
Computer Maintenance
Storage
Stair
ELEVATOR
1'-0" EQ 8 PANELS EQ
1' -0
EQ
PA
N
EL
S
EQ
A.F.F.7'-8"
A2 A-500
4"
UNDERSIDE OF CONCRETE DECK
ABOVE, PAINT P-1
GYPSUM BOARD OVER METAL STUD
FURRING, RE: WALL TYPES
FINISH FACE OF PILASTER
WRAP BEYOND
CLG. HEIGHT
7'-8" A.F.F.
GYPSUM BOARD OVER
METAL STUD SOFFIT
FRAMING
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
A s in di ca te d
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
A-500
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
BA
SE
M
EN
T R
E F
LE
C
TE
D C
EI
LI
N G
P L
AN
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A A -
0-
1/8" = 1'-0"A-500
A1 BASEMENT RCP
04 8 16268
SCALE: 1/8"=1'-0"
N
KEYNOTES - RCP
Tag Text
1 THE CEILING HEIGHT INDICATED IS AN
APPROXIMATION BASED ON EXISTING
CONSTRAINTS. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS AND SET CEILING
HEIGHT AS HIGH AS POSSIBLE TO CONCEAL DUCT
WORK AND STRUCTURAL BEAMS.
2 VERTICAL FACE OF SUSPENDED CEILING. ALIGN
GRID WITH VERTICAL FACE.
3 TURN GRID UP VERTICALLY TO THE UNDERSIDE
OF STRUCTURAL SLAB. LOCATE VERTICAL FACE
AS CLOSE TO DUCT WORK AS POSSIBLE.
4 EXISTING 2'X4' SUSPENDED CEILING TO REMAIN.
5 EXTEND EXISTING 2'X4' SUSPENDED CEILING.
NEW GRID AND PANELS SHALL MATCH EXISTING
CEILING SYSTEM.
6 PAINT EXPOSED STRUCTURE (P-1)
7 INFORMATION: NOT A WINDOW. EXISTING DUCTS
PASS THRU FORMER WINDOW OPENING INTO
BUILDING ANNEX ON OTHER SIDE OF WALL.
GENERAL NOTES
1. UNLESS NOTED OTHERWISE, CLEAN AND PAINT ALL
OVERHEAD STRUCTURAL SURFACES AND PIPING (P-1).
1 1/2" = 1'-0"A-500
A2 WINDOW HEAD/CEILING DTL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
Office
Hall
Office
Office
Office
Hall
Office
Conference
Men
Women
Jan
Telecom
Elect.
Mechanical
114 Lobby
Open Office
Room
Room
Office
Office
Stair
Stair
Storage
ELEVATOR
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
/8
'-0
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
JW JW PL
A-501
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
PL
FI
R
ST
F
LO
O
R R
EF
LE
C
TE
D C
EI
L I
N G
P
LA
N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A A -
1-
1/8" = 1'-0"A-501
A1 FIRST FLOOR RCP
04 8 16268
SCALE: 1/8"=1'-0"
N
KEYNOTES - RCP
Tag Text
1 THE CEILING HEIGHT INDICATED IS AN
APPROXIMATION BASED ON EXISTING
CONSTRAINTS. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS AND SET CEILING
HEIGHT AS HIGH AS POSSIBLE TO CONCEAL DUCT
WORK AND STRUCTURAL BEAMS.
2 VERTICAL FACE OF SUSPENDED CEILING. ALIGN
GRID WITH VERTICAL FACE.
3 TURN GRID UP VERTICALLY TO THE UNDERSIDE
OF STRUCTURAL SLAB. LOCATE VERTICAL FACE
AS CLOSE TO DUCT WORK AS POSSIBLE.
4 EXISTING 2'X4' SUSPENDED CEILING TO REMAIN.
5 EXTEND EXISTING 2'X4' SUSPENDED CEILING.
NEW GRID AND PANELS SHALL MATCH EXISTING
CEILING SYSTEM.
6 PAINT EXPOSED STRUCTURE (P-1)
7 INFORMATION: NOT A WINDOW. EXISTING DUCTS
PASS THRU FORMER WINDOW OPENING INTO
BUILDING ANNEX ON OTHER SIDE OF WALL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
CEILING
ETR
Meeting Room
Open Office
Open Office
Telecom
Toilet
Women
Men
Office
Office
Office
Stair
ELEVATOR
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
/8
'-0
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
A-502
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
SE
C
O N
D F
LO
O
R R
EF
L E
C T E
D C
EI
L I
N G
P
LA
N
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A A -
2-
1/8" = 1'-0"A-502
A1 SECOND FLOOR RCP
04 8 16268
SCALE: 1/8"=1'-0"
N
KEYNOTES - RCP
Tag Text
1 THE CEILING HEIGHT INDICATED IS AN
APPROXIMATION BASED ON EXISTING
CONSTRAINTS. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS AND SET CEILING
HEIGHT AS HIGH AS POSSIBLE TO CONCEAL DUCT
WORK AND STRUCTURAL BEAMS.
2 VERTICAL FACE OF SUSPENDED CEILING. ALIGN
GRID WITH VERTICAL FACE.
3 TURN GRID UP VERTICALLY TO THE UNDERSIDE
OF STRUCTURAL SLAB. LOCATE VERTICAL FACE
AS CLOSE TO DUCT WORK AS POSSIBLE.
4 EXISTING 2'X4' SUSPENDED CEILING TO REMAIN.
5 EXTEND EXISTING 2'X4' SUSPENDED CEILING.
NEW GRID AND PANELS SHALL MATCH EXISTING
CEILING SYSTEM.
6 PAINT EXPOSED STRUCTURE (P-1)
7 INFORMATION: NOT A WINDOW. EXISTING DUCTS
PASS THRU FORMER WINDOW OPENING INTO
BUILDING ANNEX ON OTHER SIDE OF WALL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AWS - WOOD DOOR, SINGLE AMD - METAL DOOR, DOUBLE
PE
R
S C
H
ED
U
LE
PER SCHEDULE
PE
R
S C
H
ED
U
LE
PER SCHEDULE
A - HOLLOW MTL. FRAME
2" 2"
2"
WALL TYPE PER PLAN
5/8" GYPSUM
BOARD PER
WALL TYPE
HOLLOW METAL
DOOR FRAME
DOOR PER
SCHEDULE
PARTITION THK. + 1"
2"
WALL TYPE PER PLAN
5/8" GYPSUM BOARD
PER WALL TYPE
HOLLOW METAL
DOOR FRAME
DOOR PER
SCHEDULE
PA
R
TI
TI
O N
T H
K.
2"
HARDWARE SET NO. 1
3 HINGES
1 BORED LOCKSET (OFFICE FUNCTION)
1 WALL STOP
1 KICKPLATE
3 SILENCERS
HARDWARE SET NO. 2
3 HINGES
1 BORED LOCKSET (OFFICE FUNCTION)
1 FLOOR-MOUNT STOP
3 SILENCERS
HARDWARE SET NO. 3
6 HINGES
1 BORED LOCKSET (STOREROOM FUNCTION) (ACTIVE LEAF)
1 FLUSH BOLT SET (INACTIVE LEAF)
2 KICKPLATES
1 ASTRAGAL
6 SILENCERS
HARDWARE SET NO. 4
3 HINGES
1 BORED LOCKSET (OFFICE FUNCTION)
1 WALL STOP
3 SILENCERS
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T
SC
A
LE
P
LO
T D
AT
E:
SHEET OF
0% S
U
BM
IT
TA
L
.1 9.
IN
TE
R
IM
S
U
BM
IT
TA
L
.0 6.
A s in di ca te d
/1
8 /
:5 8 :
A
M
B id d l e
A ve nu e
Fo rt
L e av en w or th
, K S
6 6
/1
9/
W
2D Q
-1 4-
R -4
W
2D Q
-1 4-
C -4
Kansas City District
D es ig ne r
A ut ho r
A pp ro ve r
A-600
KA
N
SA
S
C
IT
Y D
IS
TR
IC
T
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
C he ck er
D O
O R
T
YP
E S
S C
H E D
U L E
S
BU
IL
D
IN
G
R
E N O
V A
TI
O N
A A -
0-
USACE DOOR SCHEDULE
Room No. Door No. Door Type
DOOR
Fire Rating
FRAME
Hardware
SIZE
Material Finish Under Cut Type Material Finish
DETAILS
Width Height Thickness Head Jamb
002 1 AWS 3'-0" 6'-8" 1 3/4" WOOD ST-1 N/A A HM P-1 A1/A-600 B1/A-600 1
002 2 AWS 4'-0" 6'-8" 1 3/4" WOOD ST-1 N/A A HM P-1 A1/A-600 B1/A-600 1
003 1 AWS 3'-0" 6'-8" 1 3/4" WOOD ST-1 N/A A HM P-1 A1/A-600 B1/A-600 2
009 1 AMD 3'-0" 7'-0" 1 3/4" METAL P-20 N/A A HM P-1 A1/A-600 B1/A-600 3
119 1 AWS 3'-0" 7'-0" 1 3/4" WOOD ST-1 N/A A HM P-1 A1/A-600 B1/A-600 4
USACE INTERIOR FINISH LEGEND
CODE MANUFACTURER ITEM NUMBER PRODUCT DESCRIPTION COLOR
1 FLOORING
CPT-1 Shaw Contract Sculpt Tile 5T007 24" x 24" carpet tile - Quick Ship product Carbon 83585 VCT-1 Armstrong Standard Excelon Imperial Texture 12" x 12" vinyl composition tile Selected by user
2 BASE
RB-1 Johnsonite Traditional Rubber Wall base 4" resilient base with standard toe Match existing base color RB-2 Johnsonite Traditional Rubber Wall base 4" resilient base with standard toe 20 Charcoal
3 PAINT
P-1 Sherwin Williams interior paint per specification per specifications SW6077 Everyday White P-2 Sherwin Williams interior paint per specification per specifications Match existing wall color P-10 Sherwin Williams Armorseal floor coating per specifications per specifications Haze Gray
4 CEILINGS
APC-1 Armstrong Dune 1774 panels with 15/16" Prelude suspension system 24" x 24" suspended panel ceiling and grid White
1/4" = 1'-0"A-600
D1 DOOR TYPES
1/4" = 1'-0"A-600
C1 FRAME TYPES
3" = 1'-0"A-600
A1 MTL. STUD- DOOR HEAD DETAIL
3" = 1'-0"A-600
B1 MTL. STUD- DOOR JAMB DETAIL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
As in di ca te d
B id dl e
A ve nu e
Fo rt
L ea ve nw or th
, K S
W
2D
Q -1
4- R
-4
W
2D Q
-1 4-
C -4
Ap pr ov er
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
BU
IL
D
IN
G
R
EN
O
VA
TI
O N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
P.
R
AD
LE
Y
S.
L
LO
YD
C . C
LI
N
E
NOT F
OR
CONSTR
UCTIO
N
0 %
SUBMITT
AL
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SB
M
T
BY
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
FI
LE
N U
M
BE
R
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
/1
0/
:0 5:
A
M
/1
9/
AP
PR
S-001
G
EN
ER
AL
N O
TE
S di ca te d
B id dl e
A ve nu e
Fo rt
L ea ve nw or th
, K S
W
2D
Q -1
4- R
-4
W
2D Q
-1 4-
C -4
Ap pr ov er
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
BU
IL
D
IN
G
R
EN
O
VA
TI
O N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
P.
R
AD
LE
Y
S.
L
LO
YD
C . C
LI
N
E
NOT F
OR
CONSTR
UCTIO
N
0 %
SUBMITT
AL
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SB
M
T
BY
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
FI
LE
N U
M
BE
R
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
/1
0/
:0 5:
A
M
/1
9/
AP
PR
S-002
TY
PI
C
AL
D
ET
AI
LS
di ca te d
B id dl e
A ve nu e
Fo rt
L ea ve nw or th
, K S
W
2D
Q -1
4- R
-4
W
2D Q
-1 4-
C -4
Ap pr ov er
Va zq ue z
C om m er ci al
C on tra ct in g, L
LC
V in e St re et
, S ui te E
Ka ns as C ity , M
O
BU
IL
D
IN
G
R
EN
O
VA
TI
O N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
P.
R
AD
LE
Y
S.
L
LO
YD
C . C
LI
N
E
NOT F
OR
CONSTR
UCTIO
N
0 %
SUBMITT
AL
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SB
M
T
BY
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
FI
LE
N U
M
BE
R
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
/1
0/
:0 5:
A
M
/1
9/
AP
PR
SB100
BA
SE
M
EN
T
FO
U N
D
AT
IO
N
P
LA
N di ca te d
B id dl e
A ve nu e
Fo rt
L ea ve nw or th
, K S
W
2D
Q -1
4- R
-4
W
2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .