Amendment 0001 - W91QF4-23-Q-0059 Inspect Test Repair Lightning Protection Systems.pdf

PDF 404 KB Posted

Attached to
Amendment #0001 - Inspect, Test & Repair Lightning Protection Systems on USDB Camera Poles
Solicitation number
W91QF4-23-Q-0059
Issued by

About this file

This is an amendment to a solicitation seeking inspection, testing, and repair services for lightning protection systems on eleven camera poles at the United States Disciplinary Barracks in Fort Leavenworth, Kansas. The services include inspecting and testing the existing lightning protection systems, creating a report of findings and cost estimate for repairs, and executing approved repairs to bring the systems into compliance with regulatory standards. The response due date is extended to August 17, 2023 at 1:00 PM CST. Contractors must ensure personnel complete anti-terrorism and operations security training. The period of performance is 90 days after award with work to be completed on-site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of the amendment is to:

a. Extend the Offer Due Date/Local Time to August 17, 2023 at 1 P.M. CST

b. Update the quantity of poles from fourteen (14) to eleven (11)

c. All other terms and conditions remain unchanged

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W91QF423Q0059

X 9B. DATED (SEE ITEM 11)

24-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Aug-2023

CODE

MICC FORT LEAVENWORTH

535 KEARNY AVE.

BLDG 338

FORT LEAVENWORTH KS 66027

W91QF4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91QF423Q0059

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Aug-2023 02:00 PM to 17-Aug-2023 01:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SOO

Statement of Objectives Inspect, Test & Repair Lightning Protection Systems on USDB Camera Poles

For DPW OMD (USDB)

1. Introduction and Overview. The United States Disciplinary Barracks (USDB) is a Maximum-Security confinement facility located on the Fort Leavenworth, Kansas military installation. Security cameras are located around the perimeter of the USDB on concrete cast utility poles with original lightning protection systems (LPS) installed that are failing or have failed over the course of almost two (2) decades of exposure to the elements that has resulted in damage to eleven (11) LPS on these poles.

2. Overall Scope. This work will require the Contractor to inspect, test, and report findings along with a detailed cost sheet of all necessary repairs, that if acted upon, will result in fully functional LPS and the safe operations of this vital security layer, additional cost savings will be realized in the protection of the cameras and digital data transmission cables attached to these poles by way of secondary grounding cables and wires.

3. Objectives. Contractor shall provide all labor, tools, transportation, equipment, and any sundry supplies and parts to inspect, test, and create a detailed report of these findings. In addition, the Contractor shall create a detailed line-item invoice of component parts, assemblies and devices that would be required to be replaced, repaired or installed to meet or exceed all regulatory minimum standards to achieve fully functional LPS on each of the eleven (11) identified concrete utility poles. Each identified pole has security cameras, electronic devices and data transmission lines that must also be grounded using secondary attachment points to ground, also meeting, or exceeding all regulatory minimum standards.

4. Period and Place of Performance. Proposed start date is within (10) days of award, with all work performed on the Fort Leavenworth, KS military installation, United States Disciplinary Barracks building 1140 perimeter and area of operations located at 1301 Warehouse Rd.

5. Order Type/Award Term. 90 After Delivery of Contract (ADC).

6. Technical Overview.

a. The Contractor shall be required to complete security training and respond with the appropriate certificates or rosters as required to the assigned COR via email.

1. iWatch Training. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within fifteen (15) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT five (5) calendar days after contract award.

2. AT Level 1 Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within fifteen

(15) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within calendar five (5) days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.

3. OPSEC Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete Level I OPSEC Awareness training within fifteen

(15) days from award while new employees must be trained within five (5) calendar days of their reporting for duty and annually thereafter for the life of this contract. https://securityawareness.usalearning.gov/opsec/index.htm

b. Stakeholders

1. Product Owner: Jerry Crane, Supervisor, USDB OMD Maintenance

2. Designated Coordinator: John Ray, Electrician, USDB Maintenance

3. Proposed COR: Raymond Murphy, Construction Control Representative, Energy Div.

c. The on site Project Manager shall be an employee of the Prime Contractor. Overall responsibilities include;

- Ensuring that all personnel scheduled to work on post have made appropriate coordination with the Visitor Control Center to have access to the installation for the proposed time period of work.

- Ensuring proposals from Prime Contractor and Sub-Contractor take into account appropriate labor categories under the Department of Labor Service Contract Act.

- Ensures coordination upon award with the requiring activity Contracting Officer Representative for a Kick Off Meeting and has the ability to provide a schedule of performance within 7-10 business days after the initial kick-off meeting.

- Ensures all Prime Contractor and Sub-Contractor personnel have completed any required Anti- Terrorism and OPSEC training required under this task order as applicable.

- Ensures Prime Contractor has WAWF Point of Contact for submission of invoices upon completion of work.

7. All Contractor employees performing work under this contract shall be required to pass a background investigation to gain access to the Fort Leavenworth military installation and apply for a temporary pass, and may also be required to clear the United States Disciplinary Barracks security office access protocols to work within the perimeter of the prison, see TE-M for additional details. To access the installation and the USDB area, the Designated Coordinator can assist with these processes. See https://home.army.mil/leavenworth/index.php/my-fort/all- services/gate-information for details regarding accessing Fort Leavenworth, KS. A seven (7) day pass may be the most appropriate for this work that can be renewed upon expiration multiple times until the work access requirements are complete.

8. Required Tasks.

Task 1: Inspect and test all LPS installed on the identified utility poles and create a detailed report of the findings of each.

Task 2: Create a detailed line-item invoice from task 1 report showing all necessary repairs to bring each pole to minimum regulatory standards of operations.

Task 3: Upon order of the Contracting Officer (KO), execute all approved repairs to bring each pole to fully-functional and regulatory standards.

Task 4: Create, Publish and provide a copy to the USDB Maintenance Supervisor a UL Letter of Findings Certificate after all other work and repairs and been completed, for each identified pole.

Upon completion of all work, and acceptance by the Designated Coordinator, the Contractor shall submit an accurate and true invoice into the Wide Area Work Flow (WAWF) website. A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows Government vendors to submit and track invoices and receipt or acceptance documents over the web allowing Government personnel to process those invoices in a real-time, paperless environment. The Contractor shall submit all invoices through the Procurement Integrated Enterprise Environment (https://piee.eb.mil/) in the Wide Area Work Flow application. See Section G for details.

9. Delivery/Acceptance.

a. Notice Regarding Late Delivery – The Contractor shall notify the COR, or other authorized representative designated in each Task Order, as soon as it becomes apparent to the Contractor that a scheduled delivery will be late. The Contractor shall include in the notification the rationale for late delivery, the expected date for the delivery, and the project impact of the late delivery. Such notification in no way limits any Government contractual rights or remedies, including, but not limited to, termination.

b. Default Acceptance – Notwithstanding the foregoing, any deliverable requiring acceptance by the Government within 10 business days, the Government considers days of final delivery as “Accepted” if the Contractor has received no written notice of non-conformity within the acceptance period.

10. POC for this action is Mr. Ray Murphy at (913) 306-4036, raymond.p.murphy.civ@army.mil.

(End of Summary of Changes)