Amendment #0001 IFB-Harney Gym B-664 Renovations
Solicitation number
W91QF4-23-B-0005
Issued by

About this file

This document is an amendment to a solicitation for the renovation of Harney Gym Building 664 at Fort Leavenworth, Kansas. The project involves renovations to locker rooms, showers, saunas, and other facilities. Key details include specifications for plumbing fixtures, flooring, wall finishes, and mechanical and electrical systems. Bidders must price the project in accordance with the plans, specifications, and Statement of Work included in the amendment. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis is the contracting agency overseeing the project. The amendment provides responses to contractor questions, clarifies scope items, and modifies drawings. Completion is required by December 2023.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 August 2023

W91QF4-23-B-0005

Harney Gym Renovation, Bldg. #664, FORT LEAVENWORTH, KANSAS

Questions, Answers & Modifications

Q1. Question: While the trench for the plumbing clean out is pulled, will there be a separate entrance that can be used to get to the pool?

A1. Answer: The temporary entrance through the NE gymnasium during the entire project (as outlined in SW-2.g and SW-3.a of the SOW) will be the only entrance for the facility users. The users will need to be able to safely traverse the work area, throughout the project period, to get to the pool.

There will be allowed a one-day pre-scheduled shut-down of pool for the work.

Q2. Question: Will electronic submission of Bid Packages with hard copies to follow be allowed?

A2. Answer: In the Solicitation under INSTRUCTIONS TO BIDDERS, L.2. BID SUBMISSION, part f states “Electronic bids via e-mail or fax will not be accepted. Bids shall be mailed through a commercial/Government carrier or hand carried.”

Q3. Question: Can you tell me what the wall type is, in the men’s locker room ADA toilet areas? Is it a CMU Block wall?

A3. Answer: Those are Type “B2” walls with metal stud framing, not CMU.

Q4. Question: In the prints, there are pages that cover a new telecom that will be needed. The project outline makes it sound like a telecom will not be included in the project, which is it?

A4. Answer: Yes, Telecom is to be included.

Q5. Question: Please confirm floor drain count. Item D-06 sht. A2. There were inconsistencies between the drawings and the actuals at the site walk.

A5. Answer: The drawings show the work to be done, but the number should be field verified. I don’t believe any specific count was given.

Sheets A2, A4, P3 and P4 have been updated to show three additional floor drains we found in the Women’s 115 B entry.

B664 Harney Gym Renovation – Questions, Answers & Modifications W91QF4-23-B-0005

Page 2 of 6 1 August 2023

Q6. Question: Please confirm that C-15 sht. A4 "Provide and install new cedar seat benches." only applies to the area outside of the Women's Sauna as stated at the site visit. Drawings note C-15 in the locker areas of both the Men's and Women's.

A6. Answer: There are also new cedar benches inside the new Men’s sauna as well as the one outside the sauna. There are new cedar benches just outside the existing Women’s sauna. There are existing cedar benches inside the Women’s sauna that are to be sanded and oiled. For clarification, in addition to the cedar benches, there are also to be new non-cedar benches in the locker areas of both Mens and Womens Rooms.

Q7. Question: Who is the current fire alarm provider?

A7. Answer: Our fire department states that there is currently only battery-powered “residential style” smoke detectors in the building.

Q8. Question: Concerning the cove base in locker rooms, the actual lockers are called out to receive 6” Tile base (on plan A-8) and the walls are called for 5’0” of tile on walls (on plan A-9), typically we would roll up our Cremona TG cove base below any wall tile but with the lockers receiving tile base it’s unclear and I was unable to locate an elevation for Locker rooms. This would only affect the South locker room walls (assuming Tile on lockers to North, West, and East) please advise.

A8. Answer: All floor base in the locker rooms is to be epoxy quartz. The note on Sheet A8 in the locker areas has been updated to reflect the “6” integral epoxy quartz cove base” (the “tile” note was a leftover from an earlier design scheme). The wall tile is to be on the walls, including the built-out changing benches up 5’-0”, but not the wall base in any location, including below locker areas.

Q9. Question: Sht A14 specs "World Airstyle" Model B series Commercial 80 sec. drying cycle in brushed stainless steel. This item has been discontinued and is no longer available. I have been unable to find a wall push button hair dryer.

However, according to the World Dryer rep I spoke with, the "World SMARTdri" series may be able to work in this application as it sits off the wall by 7.6". Please advise on how to proceed with this item.

A9. Answer: Sheet A14, Division 11, 11400 – Appliances part c. has been changed to ”American Dryer A90-BG Steel Black Graphite Advantage AD Hand & Hair Dryer”

Page 3 of 6 1 August 2023

Q10. Question: What are the integral sink specifications?

A10. Answer: Sheet A7, C1 and D1 Enlarged Lavatory Plans - A note has been added: “Note: integral sinks to be 19" wide ovals with maximum depth and height not obstruct ABA roll-under clearances. Coordinate with counter support and faucets.” Also, the paper towel dispensers’ notes were clarified with added wording: “by Owner.”].

Q11. Question: What are the specifications of the 1/8" "frosted" clear polycarbonate on page A-12 Section B-1?

A11. Answer:

NOTE:

Sheet A12, C3 Desk Elevation, A1 and B1 Sections and A3, B2, D2 Details have been updated to reflect a replacement note “1/8” clear acrylic panel, frosted on both sides”

Q12. Question: Who does the building inspections out there? Is it still a city inspection?

A12. Answer: The Fort Leavenworth Department of Public Works COR and Project Manager will be reviewing the work. A representative of the MICC and the User Management may also review the on-going work..

Q13. Question: You can see circuits going to panels LPN1 and LP6 on sheets E5& E6 but can’t see where the panels are located. Where are these panels located?

A13. Answer: Sheet E1, 2 Electrical Panel Location Plan - Floor 1: “LP-6” has been noted. Electrical Panel Location Plan – Floor 2 has been added, along with designated locations of “LPN-1” and “LPN-2”.

Q14. Question: Cut #2 on sheet E7 and the specifications call for cable tray and Cat6 cable to be pulled. However, there is no demarcation point. Where is this located?

A14. Answer: “Telecom Room 126” is 20 feet straight north of the expanded Office. Figure 45 feet of cable tray from the Office to the Telecom Room, which would cover from the south wall of the Office to the north wall of the Telecom Room.

Page 4 of 6 1 August 2023

Q15. Question: Regarding the Mechoshades at the office windows. I see the elevation in section A3 of sht A6 for (1) new window, is this typical of all (6)?

Would it be possible to have elevation with dimensions of these (6) windows?

A15. Answer: Three of the new glazing elements are noted on the Sheet A4 Floor Plan and Sheet A6, A3 Window Elevations as one at “DD” and two at “AA”. The other new glazing to receive a shade is the sidelight to the new Office Door 103B with Frame “5” in A4 Door and Frame Elevations, Sheet 6.

The two existing are vertically stacked sidelights to the existing Door 103A to remain. The exposed glass on these are Upper: 37 3/4” high x 22 ¾” wide and LOWER: 33 ¾” high x 22 ¾” wide. All must be field verified by the contractor.

The following B664 Harney Gym Drawing Sheets have been updated to include some of the answers stated above. Also included in the drawings are additional DPW-driven changes that needed to be made, as well as one modification to the Statement of Work (SOW) to clarify the work:

SOW CHANGE:

SW-2 Principal Features. The following was added “ h) Men’s Sauna Access: At least one Men’s Sauna (existing or new) must be operational and usable by the public at all times during the project. For clarity, this means the existing Men’s Sauna in the north locker room shall not be demolished or taken out of use until the new Men’s Sauna is completed and the new Men’s Locker Room and Sauna are open and available for public use.”

MODIFIED SHEETS:

A2, A4 Three (3) floor drains were found and added inside the

Women’s Room entry.

A5 A hatch was added to clarify the new ceilings in the six (6) showers.

A6 The ceiling type C-2A was added to reflect the new ceilings and grid in the six (6) shower stalls and the Roof Finish Schedule was updated with same.

A6 Finish Schedule & Legend – Family Restroom - Epoxy Quartz all three walls of shower.

A7 Epoxy Quartz shower water dam. Door moved 2” to provide 4” of tile between shower and door frame.

A7 C1, D1 Enlarged Lavatory Plans - Integral Lavatory shapes and dimensions were clarified.

A8 Wall Base notes in the Locker Rooms were corrected.

Page 5 of 6 1 August 2023

A12 Elevation, Sections and Details were updated, modifying the former polycarbonate notes to “clear Acrylic, frosted on both sides.”

A14 The hand/hair dryer Basis of Design designations were updated to “American Dryer A90-BG Steel Black - Graphite Advantage AD Hand & Hair Dryer.”

P2 PLUMBING FIXTURES Basis of Design Designations:

DRINKING FOUNTAINS:

BASIS OF DESIGN: ELKAY – EMABFTL8WSLK - EZH2O –

Bottle Fill, with cane-detectable apron “skirt” on high fountain

URINAL

BASIS OF DESIGN: American Standard “Decorum 0.125 GPF High Efficiency Urinal (vitreous china) 6042.001 EC Top Spud – Color: White

LAVATORY (Family Restroom) BASIS OF DESIGN: American Standard 17” deep White Wall- Mount Recatangular Traditional Bathroom Sink, verify faucet

FAUCET - LAVATORY

BASIS OF DESIGN:

Delta 2529LF-LGHDF Commercial Centerset Faucet with Blade

- Chrome

TOILET ABA & STANDARD – WALL-MOUNT (Locker Rooms):

BASIS OF DESIGN: American Standard “Afwall Millenium” 1.1

– 1.6 gpf – Top Spud – Color: White

TOILET ABA – FLOOR MOUNT (Family Restroom):

BASIS OF DESIGN: American Standard “Madera” FloWise 16- 1/2” (plus seat height = 17” ADA) plus Bemis 1955SSCT Commercial Heavy-Duty Plastic Toilet Seet - Color White

INDIVIDUAL SHOWERS (WOMEN’S, MEN’S, FAMILY):

BASIS OF DESIGN: Delta Shower Faucet Trim - Model No.

T17264, Shower Head RP64859, Valve Body: R10000-UNBX

NATATORIUM PRE-SHOWER:

BASIS OF DESIGN: Speakman Commander, 2 GPM fixed Showerhead

Page 6 of 6 1 August 2023

P3, P4 Three (3) floor drains were found and added inside the Women’s Room entry.

P5 A new insulated hot water line to the pre-shower in the Natatorium entry was added where the new shower controls and head are designated.

E1 Electrical Panel Location – Floor 1 – “LP6” is designated in the

East Gymnasium. Electrical Panel Location – Floor 2 was added, along with the “LPN-1” and “LPN-2

END