-1-

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

(Actions NTE $650K for other than Simplified Acquisition Procedures)

1. Agency/Contracting Activity: DPW / MICC Fort Leavenworth, KS

2. Description of Action:

Nature: New Requirement Follow-on Requirement Mod to Existing Purchase Order/Contract Number

Pricing: Firm-Fixed Price Time & Materials Cost

Funds: OMA Other Funds:

Name of Proposed Contractor(s): American Legacy Construction, Inc.

Street Address: 1121 SE Broadway Dr.

City, State, Zip: Lees Summit, Mo 64081-4602 Phone: 816-554-3800

3. Description of Services or Supplies:

The total estimated value of the proposed action is $ 24, 623.00

1. Install new 3/4 inch bypass piping and insulation. Install (2) ¾ inch control valve, one for each loop.

2. Install new (2) differential pressure sensors for bypass system piping. Install DP assembly for fan coils located in rooms 204 and 209. Convert existing 3-way valves to 2-way valves within fan coils in each room.

4. Authority:

Actions other than simplified acquisition procedures (select one):

FAR 6.302-1: Only one responsible source and no other supplies or services will satisfy agency requirements, 10 USC 2304(c)(1)

FAR 6.302-2: Unusual and compelling urgency, 10 USC 2304(c)(2)

FAR 6.302-5: Authorized or Required by Statute, 10 USC 2304(c)(5)

Other: __<insert appropriate authority here

5. Reasons for Authority Cited:

-2-

Going sole source to American Legacy Construction (ALC) is in the best interest of the Government to prevent violating the current warranty on the HVAC system recently installed by ALC and reducing further time delays and issues caused by the system not having the bypass.

Alternatives:

None available due to the warranty on the recently installed HVAC unit installed by ALC. If anyone else performs any work associated with this unit, it will void the warranty on the recently installed HVAC unit.

Justification:

This contractor recently installed the new HVAC unit that needed an additional 2” bypass installed.

This needs to be performed by ALC so it doesn’t void the warranty on the new HVAC system recently installed.

Impact:

The HVAC system will continue to make noises while running and disrupting office personnel and customers. Also could cause issues with the piping and connections during vibrations.

6. Actions to Increase Competition: N/A

7. Market Research: N/A

8. INTERESTED SOURCES: N/A.

9. Procurement History:

Previous Purchase Order(s) or Contract(s): Yes No

10. Additional Information to support the justification. N/A

11. Technical / Requirements Certification:

I certify that the supporting data under my cognizance which is included in this abbreviated J&A is accurate and complete to the best of my knowledge and belief.

Submitted By: Ron Flinner Position Title: Chief, Contract Admin Branch Email address: Ronald.e.flinner.civ@mail.mil Signature: ______________________ Date: 25 Jun 18

-3-

12. Fair and Reasonable Price Determination: As contracting officer, I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable based on price analysis IAW FAR 15.402.

13. Reviews: I have reviewed this justification and have no Small Business concerns.

Local Small Business Specialist (if value exceeds $150K) Typed Name: ______N/A___________ Date: ______________________ Signature: ____________________

I have reviewed this justification and find it legally sufficient.

Legal Counsel (if value exceeds $150K)

Typed Name: ______N/A___________ Date: ______________________

Signature: ____________________

14. Contracting Officer’s Approval: I hereby certify that this justification is accurate and complete to the best of my knowledge and belief. Based on the foregoing, I approve this sole source justification subject to availability of funds, and provided that the services and supplies herein described have otherwise been authorized for acquisition.

Contracting Officer US Army Mission and Installation Contracting Command Fort Leavenworth, Kansas