2 - Bid Sheet - Concrete OMA 10 Sep 20 - Locked.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
Re-Issuance Pending W91QF4-21-B-0002 Installation Concrete Requirements Federal contract opportunity
Solicitation number
W91QF4
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
BASE YEAR - FY20
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT250$ - 0
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT300$ - 0
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD250$ - 0
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD300$ - 0
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD5$ - 0
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD20$ - 0
31Falsework for Elevated SlabSQFT200$ - 0
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD100$ - 0
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD50$ - 0
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose75$ - 0
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose100$ - 0
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD5$ - 0
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD10$ - 0
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
40Flowable Fill ConcreteCUYD30$ - 0
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS10,000$ - 0
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS500$ - 0
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD1,000$ - 0
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT300$ - 0
45Colored Concrete (Material Cost Dye)N/AN/ACUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD500$ - 0
47Saw Cut Concrete or Asphalt 4" ThickN/ALNFT300$ - 0
48Saw Cut Concrete or Asphalt 6" ThickN/ALNFT200$ - 0
49Saw Cut Concrete or Asphalt 8" ThickN/ALNFT200$ - 0
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT50$ - 0
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT100$ - 0
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT50$ - 0
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT200$ - 0
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT50$ - 0
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD100$ - 0
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD100$ - 0
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD175$ - 0
60Common Excavation31 00 00EarthworkCUYD1,500$ - 0
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD1,500$ - 0
63Embankment31 00 00EarthworkCUYD500$ - 0
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD100$ - 0
65Salvage Topsoil31 00 00EarthworkSQYD1,000$ - 0
66Topsoil (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
67Rock Excavation31 00 00EarthworkCUYD1,500$ - 0
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD50$ - 0
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD50$ - 0
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD1,500$ - 0
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD1,000$ - 0
74Core Drill (4”) Pavement SamplingN/AEACH20$ - 0
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH5$ - 0
76Replace Asphalt Incidental to Work32 12 16HMACUFT100$ - 0
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT3,000$ - 0
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT5,000$ - 0
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH30$ - 0
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH6$ - 0
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH5$ - 0
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH30$ - 0
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH2$ - 0
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT1,000$ - 0
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT1,000$ - 0
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH4$ - 0
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH4$ - 0
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH2$ - 0
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT30$ - 0
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH5$ - 0
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD300$ - 0
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD150$ - 0
138Trench Box (8' Tall)31 00 00EarthworkWKLY4$ - 0
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT30$ - 0
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH10$ - 0
152Fence Posts (Metal)(2")32 31 13FencingEACH20$ - 0
153Fence Fabric, Chain-Link32 31 13FencingSQYD1,400$ - 0
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT200$ - 0
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH3$ - 0
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH1$ - 0
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH1$ - 0
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT200$ - 0
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH5$ - 0
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH10$ - 0
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH500$ - 0
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT2,000$ - 0
163Replace CMU04 20 00Unit MasonryEACH100$ - 0
164Repointing Brick Masonry04 20 00Unit MasonryLNFT100$ - 0
165Repointing Stone Masonry04 20 00Unit MasonryLNFT100$ - 0
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT5,000$ - 0
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT500$ - 0
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT50$ - 0
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT50$ - 0
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT50$ - 0
176Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT50$ - 0
177Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT250$ - 0
178Concrete Chimney Crown04 20 00Unit MasonryCUFT10$ - 0
179Man Lift01 35 26Government Safety RequirementsDAY5$ - 0
180Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF100$ - 0
181Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF300$ - 0
182Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF100$ - 0
183Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT100$ - 0
184Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
185Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
186Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
187Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
188Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
189Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT700$ - 0
190New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
191New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT500$ - 0
192New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
193New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT300$ - 0
194Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH4$ - 0
195Conduit, galvanized, 1" diameterLNFT200$ - 0
196Clearing Vegetation31 11 00Clearing and GrubbingACRE30$ - 0
197Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE2$ - 0
198Silt Fence01 57 19Temporary Environmental ControlsLNFT200$ - 0
199Biodegrable Log01 57 19Temporary Environmental ControlsLNFT200$ - 0
200Filter Sock01 57 19Temporary Environmental ControlsLNFT100$ - 0
201Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD200$ - 0
202Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD50$ - 0
203Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD500$ - 0
204Sodding32 92 23SoddingSQYD300$ - 0
205Hazarduous Material HandlingNo Bid

SUBTOTAL $ - 0

206Payment & Performance Bond - On Task Order at or over $30,000.00%$ - 0$ - 0
207Payment & Performance Bond - On Task Order at or over $150,000.00%$ - 0$ - 0
208Contract Manpower Reporting (www.ecmra.mil)EACH25$ - 0
TOTAL$ - 0

Fort Leavenworth, Kansas

&P of &N

Option Year 1

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
OPTION YEAR 1 - FY20
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT250$ - 0
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT300$ - 0
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD250$ - 0
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD300$ - 0
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD5$ - 0
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD20$ - 0
31Falsework for Elevated SlabSQFT200$ - 0
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD100$ - 0
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD50$ - 0
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose75$ - 0
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose100$ - 0
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD5$ - 0
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD10$ - 0
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
40Flowable Fill ConcreteCUYD30$ - 0
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS10,000$ - 0
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS500$ - 0
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD1,000$ - 0
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT300$ - 0
45Colored Concrete (Material Cost Dye)N/AN/ACUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD500$ - 0
47Saw Cut Concrete or Asphalt 4" ThickN/ALNFT300$ - 0
48Saw Cut Concrete or Asphalt 6" ThickN/ALNFT200$ - 0
49Saw Cut Concrete or Asphalt 8" ThickN/ALNFT200$ - 0
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT50$ - 0
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT100$ - 0
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT50$ - 0
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT200$ - 0
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT50$ - 0
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD100$ - 0
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD100$ - 0
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD175$ - 0
60Common Excavation31 00 00EarthworkCUYD1,500$ - 0
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD1,500$ - 0
63Embankment31 00 00EarthworkCUYD500$ - 0
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD100$ - 0
65Salvage Topsoil31 00 00EarthworkSQYD1,000$ - 0
66Topsoil (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
67Rock Excavation31 00 00EarthworkCUYD1,500$ - 0
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD50$ - 0
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD50$ - 0
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD1,500$ - 0
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD1,000$ - 0
74Core Drill (4”) Pavement SamplingN/AEACH20$ - 0
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH5$ - 0
76Replace Asphalt Incidental to Work32 12 16HMACUFT100$ - 0
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT3,000$ - 0
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT5,000$ - 0
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH30$ - 0
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH6$ - 0
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH5$ - 0
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH30$ - 0
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH2$ - 0
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT1,000$ - 0
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT1,000$ - 0
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH4$ - 0
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH4$ - 0
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH2$ - 0
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT30$ - 0
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH5$ - 0
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD300$ - 0
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD150$ - 0
138Trench Box (8' Tall)31 00 00EarthworkWKLY4$ - 0
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT30$ - 0
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH10$ - 0
152Fence Posts (Metal)(2")32 31 13FencingEACH20$ - 0
153Fence Fabric, Chain-Link32 31 13FencingSQYD1,400$ - 0
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT200$ - 0
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH3$ - 0
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH1$ - 0
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH1$ - 0
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT200$ - 0
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH5$ - 0
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH10$ - 0
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH500$ - 0
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT2,000$ - 0
163Replace CMU04 20 00Unit MasonryEACH100$ - 0
164Repointing Brick Masonry04 20 00Unit MasonryLNFT100$ - 0
165Repointing Stone Masonry04 20 00Unit MasonryLNFT100$ - 0
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT5,000$ - 0
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT500$ - 0
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT50$ - 0
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT50$ - 0
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT50$ - 0
176Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT50$ - 0
177Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT250$ - 0
178Concrete Chimney Crown04 20 00Unit MasonryCUFT10$ - 0
179Man Lift01 35 26Government Safety RequirementsDAY5$ - 0
180Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF100$ - 0
181Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF300$ - 0
182Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF100$ - 0
183Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT100$ - 0
184Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
185Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
186Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
187Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
188Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
189Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT700$ - 0
190New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
191New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT500$ - 0
192New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
193New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT300$ - 0
194Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH4$ - 0
195Conduit, galvanized, 1" diameterLNFT200$ - 0
196Clearing Vegetation31 11 00Clearing and GrubbingACRE30$ - 0
197Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE2$ - 0
198Silt Fence01 57 19Temporary Environmental ControlsLNFT200$ - 0
199Biodegrable Log01 57 19Temporary Environmental ControlsLNFT200$ - 0
200Filter Sock01 57 19Temporary Environmental ControlsLNFT100$ - 0
201Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD200$ - 0
202Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD50$ - 0
203Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD500$ - 0
204Sodding32 92 23SoddingSQYD300$ - 0
205Hazarduous Material HandlingNo Bid

SUBTOTAL $ - 0

205Payment & Performance Bond - On Task Order at or over $30,000.00%$ - 0$ - 0
206Payment & Performance Bond - On Task Order at or over $150,000.00%$ - 0$ - 0
207Contract Manpower Reporting (www.ecmra.mil)EACH25$ - 0
TOTAL$ - 0

Option Year 2

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
OPTION YEAR 2 - FY20
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT250$ - 0
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT300$ - 0
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD250$ - 0
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD300$ - 0
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD5$ - 0
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD20$ - 0
31Falsework for Elevated SlabSQFT200$ - 0
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD100$ - 0
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD50$ - 0
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose75$ - 0
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose100$ - 0
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD5$ - 0
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD10$ - 0
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
40Flowable Fill ConcreteCUYD30$ - 0
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS10,000$ - 0
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS500$ - 0
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD1,000$ - 0
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT300$ - 0
45Colored Concrete (Material Cost Dye)N/AN/ACUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD500$ - 0
47Saw Cut Concrete or Asphalt 4" ThickN/ALNFT300$ - 0
48Saw Cut Concrete or Asphalt 6" ThickN/ALNFT200$ - 0
49Saw Cut Concrete or Asphalt 8" ThickN/ALNFT200$ - 0
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT50$ - 0
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT100$ - 0
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT50$ - 0
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT200$ - 0
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT50$ - 0
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD100$ - 0
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD100$ - 0
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD175$ - 0
60Common Excavation31 00 00EarthworkCUYD1,500$ - 0
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD1,500$ - 0
63Embankment31 00 00EarthworkCUYD500$ - 0
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD100$ - 0
65Salvage Topsoil31 00 00EarthworkSQYD1,000$ - 0
66Topsoil (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
67Rock Excavation31 00 00EarthworkCUYD1,500$ - 0
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD50$ - 0
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD50$ - 0
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD1,500$ - 0
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD1,000$ - 0
74Core Drill (4”) Pavement SamplingN/AEACH20$ - 0
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH5$ - 0
76Replace Asphalt Incidental to Work32 12 16HMACUFT100$ - 0
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT3,000$ - 0
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT5,000$ - 0
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH30$ - 0
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH6$ - 0
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH5$ - 0
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH30$ - 0
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH2$ - 0
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT1,000$ - 0
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT1,000$ - 0
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH4$ - 0
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH4$ - 0
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH2$ - 0
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT30$ - 0
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH5$ - 0
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD300$ - 0
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD150$ - 0
138Trench Box (8' Tall)31 00 00EarthworkWKLY4$ - 0
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT30$ - 0
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH10$ - 0
152Fence Posts (Metal)(2")32 31 13FencingEACH20$ - 0
153Fence Fabric, Chain-Link32 31 13FencingSQYD1,400$ - 0
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT200$ - 0
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH3$ - 0
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH1$ - 0
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH1$ - 0
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT200$ - 0
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH5$ - 0
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH10$ - 0
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH500$ - 0
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT2,000$ - 0
163Replace CMU04 20 00Unit MasonryEACH100$ - 0
164Repointing Brick Masonry04 20 00Unit MasonryLNFT100$ - 0
165Repointing Stone Masonry04 20 00Unit MasonryLNFT100$ - 0
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT5,000$ - 0
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT500$ - 0
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT50$ - 0
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT50$ - 0
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT50$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .