MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
BASE YEAR - FY20
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT250$ - 0
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT300$ - 0
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD250$ - 0
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD300$ - 0
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD5$ - 0
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD20$ - 0
31Falsework for Elevated SlabSQFT200$ - 0
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD100$ - 0
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD50$ - 0
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose75$ - 0
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose100$ - 0
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD5$ - 0
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD10$ - 0
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
40Flowable Fill ConcreteCUYD30$ - 0
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS10,000$ - 0
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS500$ - 0
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD1,000$ - 0
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT300$ - 0
45Colored Concrete (Material Cost Dye)N/AN/ACUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD500$ - 0
47Saw Cut Concrete or Asphalt 4" ThickN/ALNFT300$ - 0
48Saw Cut Concrete or Asphalt 6" ThickN/ALNFT200$ - 0
49Saw Cut Concrete or Asphalt 8" ThickN/ALNFT200$ - 0
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT50$ - 0
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT100$ - 0
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT50$ - 0
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT200$ - 0
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT50$ - 0
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD100$ - 0
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD100$ - 0
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD175$ - 0
60Common Excavation31 00 00EarthworkCUYD1,500$ - 0
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD1,500$ - 0
63Embankment31 00 00EarthworkCUYD500$ - 0
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD100$ - 0
65Salvage Topsoil31 00 00EarthworkSQYD1,000$ - 0
66Topsoil (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
67Rock Excavation31 00 00EarthworkCUYD1,500$ - 0
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD50$ - 0
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD50$ - 0
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD1,500$ - 0
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD1,000$ - 0
74Core Drill (4”) Pavement SamplingN/AEACH20$ - 0
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH5$ - 0
76Replace Asphalt Incidental to Work32 12 16HMACUFT100$ - 0
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT3,000$ - 0
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT5,000$ - 0
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH30$ - 0
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH6$ - 0
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH5$ - 0
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH30$ - 0
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH2$ - 0
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT1,000$ - 0
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT1,000$ - 0
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH4$ - 0
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH4$ - 0
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH2$ - 0
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT30$ - 0
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH5$ - 0
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD300$ - 0
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD150$ - 0
138Trench Box (8' Tall)31 00 00EarthworkWKLY4$ - 0
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT30$ - 0
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH10$ - 0
152Fence Posts (Metal)(2")32 31 13FencingEACH20$ - 0
153Fence Fabric, Chain-Link32 31 13FencingSQYD1,400$ - 0
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT200$ - 0
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH3$ - 0
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH1$ - 0
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH1$ - 0
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT200$ - 0
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH5$ - 0
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH10$ - 0
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH500$ - 0
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT2,000$ - 0
163Replace CMU04 20 00Unit MasonryEACH100$ - 0
164Repointing Brick Masonry04 20 00Unit MasonryLNFT100$ - 0
165Repointing Stone Masonry04 20 00Unit MasonryLNFT100$ - 0
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT5,000$ - 0
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT500$ - 0
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT50$ - 0
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT50$ - 0
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT50$ - 0
176Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT50$ - 0
177Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT250$ - 0
178Concrete Chimney Crown04 20 00Unit MasonryCUFT10$ - 0
179Man Lift01 35 26Government Safety RequirementsDAY5$ - 0
180Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF100$ - 0
181Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF300$ - 0
182Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF100$ - 0
183Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT100$ - 0
184Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
185Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
186Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
187Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
188Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
189Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT700$ - 0
190New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
191New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT500$ - 0
192New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
193New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT300$ - 0
194Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH4$ - 0
195Conduit, galvanized, 1" diameterLNFT200$ - 0
196Clearing Vegetation31 11 00Clearing and GrubbingACRE30$ - 0
197Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE2$ - 0
198Silt Fence01 57 19Temporary Environmental ControlsLNFT200$ - 0
199Biodegrable Log01 57 19Temporary Environmental ControlsLNFT200$ - 0
200Filter Sock01 57 19Temporary Environmental ControlsLNFT100$ - 0
201Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD200$ - 0
202Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD50$ - 0
203Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD500$ - 0
204Sodding32 92 23SoddingSQYD300$ - 0
205Hazarduous Material HandlingNo Bid

SUBTOTAL $ - 0

206Payment & Performance Bond - On Task Order at or over $30,000.00%$ - 0$ - 0
207Payment & Performance Bond - On Task Order at or over $150,000.00%$ - 0$ - 0
208Contract Manpower Reporting (www.ecmra.mil)EACH25$ - 0
TOTAL$ - 0

Fort Leavenworth, Kansas

&P of &N

Option Year 1

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
OPTION YEAR 1 - FY20
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT250$ - 0
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT300$ - 0
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD250$ - 0
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD300$ - 0
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD5$ - 0
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD20$ - 0
31Falsework for Elevated SlabSQFT200$ - 0
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD100$ - 0
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD50$ - 0
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose75$ - 0
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose100$ - 0
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD5$ - 0
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD10$ - 0
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
40Flowable Fill ConcreteCUYD30$ - 0
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS10,000$ - 0
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS500$ - 0
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD1,000$ - 0
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT300$ - 0
45Colored Concrete (Material Cost Dye)N/AN/ACUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD500$ - 0
47Saw Cut Concrete or Asphalt 4" ThickN/ALNFT300$ - 0
48Saw Cut Concrete or Asphalt 6" ThickN/ALNFT200$ - 0
49Saw Cut Concrete or Asphalt 8" ThickN/ALNFT200$ - 0
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT50$ - 0
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT100$ - 0
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT50$ - 0
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT200$ - 0
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT50$ - 0
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD100$ - 0
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD100$ - 0
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD175$ - 0
60Common Excavation31 00 00EarthworkCUYD1,500$ - 0
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD1,500$ - 0
63Embankment31 00 00EarthworkCUYD500$ - 0
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD100$ - 0
65Salvage Topsoil31 00 00EarthworkSQYD1,000$ - 0
66Topsoil (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
67Rock Excavation31 00 00EarthworkCUYD1,500$ - 0
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD50$ - 0
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD50$ - 0
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD1,500$ - 0
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD1,000$ - 0
74Core Drill (4”) Pavement SamplingN/AEACH20$ - 0
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH5$ - 0
76Replace Asphalt Incidental to Work32 12 16HMACUFT100$ - 0
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT3,000$ - 0
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT5,000$ - 0
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH30$ - 0
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH6$ - 0
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH5$ - 0
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH30$ - 0
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH2$ - 0
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT1,000$ - 0
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT1,000$ - 0
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH4$ - 0
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH4$ - 0
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH2$ - 0
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT30$ - 0
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH5$ - 0
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD300$ - 0
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD150$ - 0
138Trench Box (8' Tall)31 00 00EarthworkWKLY4$ - 0
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT30$ - 0
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH10$ - 0
152Fence Posts (Metal)(2")32 31 13FencingEACH20$ - 0
153Fence Fabric, Chain-Link32 31 13FencingSQYD1,400$ - 0
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT200$ - 0
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH3$ - 0
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH1$ - 0
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH1$ - 0
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT200$ - 0
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH5$ - 0
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH10$ - 0
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH500$ - 0
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT2,000$ - 0
163Replace CMU04 20 00Unit MasonryEACH100$ - 0
164Repointing Brick Masonry04 20 00Unit MasonryLNFT100$ - 0
165Repointing Stone Masonry04 20 00Unit MasonryLNFT100$ - 0
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT5,000$ - 0
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT500$ - 0
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT50$ - 0
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT50$ - 0
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT50$ - 0
176Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT50$ - 0
177Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT250$ - 0
178Concrete Chimney Crown04 20 00Unit MasonryCUFT10$ - 0
179Man Lift01 35 26Government Safety RequirementsDAY5$ - 0
180Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF100$ - 0
181Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF300$ - 0
182Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF100$ - 0
183Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT100$ - 0
184Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
185Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
186Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
187Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT700$ - 0
188Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT200$ - 0
189Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT700$ - 0
190New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
191New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT500$ - 0
192New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT100$ - 0
193New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT300$ - 0
194Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH4$ - 0
195Conduit, galvanized, 1" diameterLNFT200$ - 0
196Clearing Vegetation31 11 00Clearing and GrubbingACRE30$ - 0
197Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE2$ - 0
198Silt Fence01 57 19Temporary Environmental ControlsLNFT200$ - 0
199Biodegrable Log01 57 19Temporary Environmental ControlsLNFT200$ - 0
200Filter Sock01 57 19Temporary Environmental ControlsLNFT100$ - 0
201Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD200$ - 0
202Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD50$ - 0
203Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD500$ - 0
204Sodding32 92 23SoddingSQYD300$ - 0
205Hazarduous Material HandlingNo Bid

SUBTOTAL $ - 0

205Payment & Performance Bond - On Task Order at or over $30,000.00%$ - 0$ - 0
206Payment & Performance Bond - On Task Order at or over $150,000.00%$ - 0$ - 0
207Contract Manpower Reporting (www.ecmra.mil)EACH25$ - 0
TOTAL$ - 0

Option Year 2

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
OPTION YEAR 2 - FY20
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD20$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD50$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD200$ - 0
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT250$ - 0
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT300$ - 0
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD250$ - 0
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD300$ - 0
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD40$ - 0
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD150$ - 0
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD5$ - 0
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD20$ - 0
31Falsework for Elevated SlabSQFT200$ - 0
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD100$ - 0
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD50$ - 0
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose75$ - 0
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose100$ - 0
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD5$ - 0
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD10$ - 0
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD200$ - 0
40Flowable Fill ConcreteCUYD30$ - 0
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS10,000$ - 0
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS500$ - 0
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD1,000$ - 0
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT300$ - 0
45Colored Concrete (Material Cost Dye)N/AN/ACUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD500$ - 0
47Saw Cut Concrete or Asphalt 4" ThickN/ALNFT300$ - 0
48Saw Cut Concrete or Asphalt 6" ThickN/ALNFT200$ - 0
49Saw Cut Concrete or Asphalt 8" ThickN/ALNFT200$ - 0
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT500$ - 0
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT50$ - 0
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT100$ - 0
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT50$ - 0
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT200$ - 0
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT50$ - 0
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD100$ - 0
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD100$ - 0
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD175$ - 0
60Common Excavation31 00 00EarthworkCUYD1,500$ - 0
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD1,500$ - 0
63Embankment31 00 00EarthworkCUYD500$ - 0
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD100$ - 0
65Salvage Topsoil31 00 00EarthworkSQYD1,000$ - 0
66Topsoil (Government Furnished)31 00 00EarthworkCUYD1,500$ - 0
67Rock Excavation31 00 00EarthworkCUYD1,500$ - 0
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD50$ - 0
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD50$ - 0
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD1,500$ - 0
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS20$ - 0
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD1,000$ - 0
74Core Drill (4”) Pavement SamplingN/AEACH20$ - 0
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH5$ - 0
76Replace Asphalt Incidental to Work32 12 16HMACUFT100$ - 0
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT3,000$ - 0
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT5,000$ - 0
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH30$ - 0
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH6$ - 0
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT10,000$ - 0
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT2,000$ - 0
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH2$ - 0
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH5$ - 0
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT500$ - 0
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT500$ - 0
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT500$ - 0
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH10$ - 0
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH20$ - 0
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH5$ - 0
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH15$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH15$ - 0
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH30$ - 0
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH2$ - 0
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT1,000$ - 0
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT1,000$ - 0
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH4$ - 0
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH4$ - 0
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH2$ - 0
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT30$ - 0
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH5$ - 0
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT50$ - 0
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT50$ - 0
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH4$ - 0
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH2$ - 0
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD300$ - 0
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD150$ - 0
138Trench Box (8' Tall)31 00 00EarthworkWKLY4$ - 0
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT30$ - 0
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH5$ - 0
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH5$ - 0
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH5$ - 0
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT40$ - 0
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR40$ - 0
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH10$ - 0
152Fence Posts (Metal)(2")32 31 13FencingEACH20$ - 0
153Fence Fabric, Chain-Link32 31 13FencingSQYD1,400$ - 0
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT200$ - 0
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH3$ - 0
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH1$ - 0
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH1$ - 0
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT200$ - 0
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH5$ - 0
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH10$ - 0
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH500$ - 0
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT2,000$ - 0
163Replace CMU04 20 00Unit MasonryEACH100$ - 0
164Repointing Brick Masonry04 20 00Unit MasonryLNFT100$ - 0
165Repointing Stone Masonry04 20 00Unit MasonryLNFT100$ - 0
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT5,000$ - 0
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH5,000$ - 0
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT500$ - 0
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT500$ - 0
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT50$ - 0
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT50$ - 0
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT50$ - 0