W91QF0-19-Q-1008_Site_Visit_Notes_&_Q&A.docx

DOCX document 14 KB Posted

Attached to
Fire Detection & Suppression System Maint 19-24 Federal contract opportunity
Solicitation number
W91QF0-19-Q-1008
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Carlisle Barracks

About this file

This document provides both notes from the site visit and the answers to questions posed as a part of the Q&A

View the file

Other files for this federal contract opportunity

Other files attached to Fire Detection & Suppression System Maint 19-24, newest first.
File Type Posted
2018_Fire_Alarm_Reports.pdf PDF
2018_FPS_Insp_Rep.zip ZIP file
W91QF0-19-Q-1008_Fire_Detect_&_Supp_Syst_Maint_19-24_FINAL_.pdf PDF
Synopsis_Fire_D&S_Syst_Maint.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91QF0-19-Q-1008 SITE VISIT NOTES

A site visit was conducted at US Army Garrison Carlisle Barracks on 9 Aug 2019. In attendance were 5 representatives from 3 companies. Below is information that resulted from this visit.

· All pumps are electric.

· If a lift is needed to perform inspections/maintenance/repairs and one is not already on-site, the vendor is responsible for providing the equipment.

· Vendor will be provided with a radio when on-site for communication.

· Some buildings have sprinklers, but not all.

· Vendor is responsible for the disposal of all batteries. They must be removed from the post.

· LVCC/Bldg 313 is in the middle of installing a new system, vendors shall quote for the new system.

W91QF0-19-Q-1008 QUESTIONS

Two questions were posed as a part of the Q&A period.

1. Would it be possible to be provided with the most recent inspection report for the fire alarm systems? We are trying to get a snapshot of the device counts in each building.

· These have been added as a separate attachment to the solicitation.

2. We noticed during the walkthrough that the sprinkler system backflow preventers did not have inspection tags on them. Are the annual inspections of the sprinkler system backflow preventers not included as part of this solicitation?

· The backflow preventers are not part of this solicitation, but the valves that isolate them are. Also, we have not required them to be tested, but if one has a catastrophic failure, we would most likely use this contract for replacement or repair.