PRS_Fire_Detection_and_Suppression_System_Maintenance.docx

DOCX document 25 KB Posted

Attached to
Fire Detection & Suppression System Maintenance Federal contract opportunity
Solicitation number
W91QF0-19-Q-1008
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Carlisle Barracks

About this file

Draft PRS

View the file

Other files for this federal contract opportunity

Other files attached to Fire Detection & Suppression System Maintenance, newest first.
File Type Posted
PWS_Fire_Detection_and_Suppression_System_Maintenance.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Carl-19-001 DES Fire Detection and Suppression System Maintenance PRS

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Required Services (Tasks)

Performance Standard
Acceptable Quality Level (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance

Incentive (Positive and/or Negative) (Impact on Contractor Payments)

# 1.

The contractor shall Perform quarterly, monthly, and semi-annual system testing The contractor will perform system performance checks, examination, calibration, and cleaning of all systems and component parts of the system. All systems will be adjusted and maintained at the highest attainable sensitivity and/or tolerance that will provide optimum performance and reliability without false or nuisance alarms. Optimum performance will be determined from the manufacturer’s stated specifications during testing the of equipment.

100%
Periodic Physical verification and review of system logs.

Review of contractor provided record of the test submitted to the contracting officer of their representative and will reflect the date of the test, name(s) of persons completing the test, results of the test, and any action taken in the event of malfunctions.

Stop work order issued.

# 2 The contractor will perform preventative maintenance The contractor will perform system performance checks, examination, calibration, and cleaning of all systems and component parts of the system. All systems will be adjusted and maintained at the highest attainable sensitivity and/or tolerance that will provide optimum performance and reliability without false or nuisance alarms. Optimum performance will be determined from the manufacturer’s stated specifications during testing the of equipment.

100%
Periodic Physical verification and review of system logs.

Review of contractor provided record of the test submitted to the contracting officer of their representative and will reflect the date of the test, name(s) of persons completing the test, results of the test, and any action taken in the event of malfunctions..

Stop work order issued.

# 3 Contractor shall respond to corrective maintenance service calls

Corrective maintenance includes all parts and materials needed to repair equipment to individual manufactures equipment specifications.

100%
Periodic Physical verification and review of system logs.

Review of contractor provided record of the test submitted to the contracting officer of their representative and will reflect the date of the test, name(s) of persons completing the test, results of the test, and any action taken in the event of malfunctions.

Stop work order issued.

#4 Contractor Manpower reporting. Para 5.3

Contractor reports estimated direct labor hours and direct labor dollars paid for reporting periods. Contractor reports total payments for the reporting period.
100%
100% inspection. Each order shall have CMRA input by the contractor.
100% of delivery order payment will be with held until input is entered by the contractor.

The following listing provides various types of Surveillance as examples to select from and should not be included on the final document:

Random Sampling: Appropriate for frequently recurring tasks. Evaluate randomly selected samples of the lot to determine the acceptability of the entire lot.

Random Inspection Guide, Method of surveillance, Lot size, Sample size, Performance requirement, Sampling procedure, Inspection procedure 100 Percent Inspection: Appropriate for tasks that occur infrequently. Inspect and evaluate performance each time task is performed Periodic Surveillance: Evaluation of samples selected on other than 100% or statistically random basis. (i.e., monthly, quarterly, semi-annually etc.)

Validated Customer Complaint: Complaints must be validated.