Statement of Work for Load Carriage Modernization 20NOV2026.pdf
PDF 264 KB Posted
- Solicitation number
- W91CRB-27-S-LCMI
About this file
This is a Statement of Work (SOW) for the Commercial Load Carriage Modernization Initiative under Other Transaction Authority (10 U.S.C. § 4022) administered by Army Contracting Command – Aberdeen Proving Ground via Call for Solutions W91CRB-27-S-LCMI.
The requirement encompasses the manufacture and delivery of commercial and commercial-derivative tactical load carriage equipment for Close Combat Forces operational testing and Soldier evaluation by Product Manager Soldier Clothing and Individual Equipment (PdM SCIE). The contractor must deliver four line items: (1) 620 Tactical Belt Systems (two-layer construction with ANSUR II sizing assortment) by 28 December 2026; (2) 60 Grenadier Equipment Suites (M320 Holster/Rig, Sight Shield, QLS Interface, 18x 40mm Munitions Pouches); (3) 60 Automatic Rifleman Suites (4x Ammo Carriers for M250 drums, Load-Bearing Harness, Belt Rig); and (4) 462 Rapid-Stow Dump Pouches (capacity for 3x 6.8mm magazines, folding geometry with drainage). All items must meet durability standards for five years of operational wear, incorporate Operational Camouflage Pattern (OCP) or MultiCam textiles, and comply with ISO 9001:2015 quality standards. Deliverables include a delivery/shipping schedule (within 5 calendar days of award), Certificate of Conformance certifying Berry Amendment and Buy American compliance, inspection and packing slips, commercial user guides, and a final delivery report. Initial delivery location is JBLM, WA (Building 9640, Bay E Door 23, Prescott Ave, JBLM, WA 98433); follow-on deliveries proceed to Lansing, MI (Peckham Vocational Industries, Inc., 7100 Millet Highway, Lansing, MI 48917). The period of performance extends from OTA award through 17 December 2027, encompassing delivery, a 60-day Soldier evaluation period, and post-trial feedback collection. The contractor must designate a single primary Point of Contact, provide weekly status updates, participate in a post-award kickoff within five business days, and engage in monthly check-ins during the evaluation phase. Upon successful completion, the Government may negotiate a sole-source follow-on production contract without further competition, with estimated capacity requirements of 3,197 Tactical Belt Systems monthly (38,357 annually), 305 Grenadier Suites monthly (3,360 annually), 305 Automatic Rifleman Suites monthly (3,360 annually), and 2,813 Rapid-Stow Dump Pouches monthly (33,754 annually).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final LCMI CFS 20NOV2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work – Commercial Load Carriage Modernization Initiative (Close Combat Forces)
1. Background. This effort encompasses the acquisition and delivery of commercial and commercial-derivative load carriage equipment to support immediate operational test sample fielding and Soldier evaluation for Product Manager Soldier Clothing and Individual Equipment (PdM SCIE). To maintain Warfighter lethality, mobility, ergonomic load distribution, and modular weapon integration across Close Combat Forces (CCF), PdM SCIE requires field-proven tactical load carriage solutions. This initiative aligns with Department of War (DOW) executive directives and Secretary of War (SECWAR) priorities to modernize acquisition processes, strengthen the Defense Industrial Base, reduce barriers to entry for commercial industry partners, and build supply chain resilience. This acquisition secures prototypes consisting of a two-layer tactical belt, an equipment suite for the Grenadier role, an equipment suite for the Automatic Rifleman role, and a rapid-stow dump pouch. The Government's determination to competitively solicit and award prototype agreements is executed under the authority of 10 U.S.C. § 4022 (Other Transaction Authority for Test samples) via Call for Solutions (CFS) W91CRB-27-S-LCMI, administered by Army Contracting Command – Aberdeen Proving Ground (ACC-APG).
2. Scope of Requirement. The Contractor shall furnish all necessary personnel, facilities, manufacturing capabilities, quality control, packaging, and commercial materials required to manufacture, inspect, and deliver the specified items to the Government in accordance with this Statement of Work.
2.1 Item Identification and Quantities (Test Samples)
CLIN Part Number / Model
Item Description Quantity Unit of Issue
Required Delivery Date
0001 Commercial /
TBD
Tactical Belt System (Two- Layer: Inner Trouser Belt & Outer MOLLE Belt; ANSUR II Sizing Assortment)
620 EA No later than 28 December 2026
0002 Commercial /
TBD
Grenadier Equipment Suite (M320 Holster/Rig, Sight Shield, QLS
60 SE No later than 28 December 2026
Interface, 18x 40mm Munitions Pouches)
0003 Commercial /
TBD
Automatic Rifleman Suite (4x Ammo Carriers for M250 100-rd/50-rd Drums, Load- Bearing Harness, Belt Rig)
60 SE No later than 28 December 2026
0004 Commercial /
TBD
Rapid-Stow Dump Pouch (Capacity: 3x 6.8mm Magazines for NGSW M8 Rifle;
Folding Geometry w/ Drainage)
462 EA No later than 28 December 2026
2.2 Technical & Performance Objectives
• Durability Standard: All delivered tactical gear items shall possess sufficient structural integrity, abrasion resistance, and material quality to withstand approximately five (5) years of operational service under normal tactical wear-and-tear conditions.
• Tactical Belt System (Two-Layer):
• The belt shall be an integrated two-layer system: an inner trouser belt whose exterior face incorporates the "loop" portion of a hook-and-loop fastener, and an outer tactical belt whose interior face incorporates the mating "hook" portion to prevent slippage and rotation under dynamic movement.
• The outer belt shall measure 1.75-2.0 inches in width and incorporate two rows of standard webbing/PALS compatible with current and future Army Modular Lightweight Load Carrying Equipment (MOLLE) attachments.
• The outer belt shall offer sufficient stiffness to comfortably support a Soldier's tactical sidearm and mission gear load without sagging, twisting, or rolling.
• The outer belt closure mechanism shall be a secure Cobra-style quick-release buckle.
• The belt system shall be sized to accommodate waist measurements spanning the 2nd percentile to 98th percentile of Army Soldiers in accordance with the ANSUR II database.
• Textile materials shall be finished in Operational Camouflage Pattern (OCP) (or MultiCam where authorized by the Agreements Officer).
• Grenadier Equipment Suite:
• The grenadier equipment suite shall provide a stable, secure carriage method for the M320 Grenade Launcher during tactical operations, sprinting, crawling, and dynamic maneuvers.
• The set shall provide secure carriage for eighteen (18) standard 40mm grenades, offering modular flexibility to accommodate operational variations of High- Explosive (HE), smoke, and signal flare munitions.
• The design may incorporate a protective shroud or cover to shield the grenadier optical sighting system from environmental fouling and impact.
• The suite may offer direct mounting compatibility with the Quick-Locking System (QLS) currently fielded on holsters for the M17 Modular Handgun System.
• All textile components shall be finished in OCP or MultiCam.
• Automatic Rifleman Suite:
• The set shall consist of four (4) ammunition carriers, each providing sufficient volume to secure either one (1) 100-round drum or two (2) 50-round drums for the M250 Automatic Rifle.
• The system shall include an ergonomic harness and belt configuration engineered to balance and comfortably manage the basic combat load of the M250 (three 100-round drums and two 50-round drums; 400 rounds total).
• Rapid-Stow Dump Pouch:
• The dump pouch shall provide sufficient internal capacity to hold at least three (3) 6.8mm magazines for the M8 rifle.
• The pouch shall feature positive bottom drainage (grommets or mesh openings) to allow rapid evacuation of water and debris.
• The pouch shall fold or compress flat when empty so as to minimize profile and not encumber the Soldier or create snag hazards during tactical operations.
• Workmanship & Commercial Standard: All delivered items shall conform to the Contractor's commercial quality assurance standards and ISO 9001:2015 (or equivalent) processes, free from manufacturing defects, structural seam stitching flaws, fabric tears, hardware burrs, or buckle malfunctions.
3. Deliverables The Contractor shall provide the following deliverables to the Agreements Officer’s Representative (AOR) / Contracting Officer’s Representative (COR):
Deliverable Description Due Date Format
Delivery / Shipping Schedule
Projected manufacturing schedule, shipment release dates, and tracking details ensuring arrival by 28 December 2026.
Within 5 calendar days after OTA award
Electronic submission (PDF / Email to
AOR/COR)
Certificate of Conformance (CoC) & Domestic Compliance
Commercial certificate verifying that all test samples conform to specifications, certifying Berry Amendment compliance (10 U.S.C. § 2533a) for all textiles and Buy American compliance for all non-textile hardware.
Accompanying shipment lot (on or before 28 December 2026)
Hardcopy with shipment & electronic copy to
AOR/COR
Inspection & Packing Slips
Detailed bill of lading / packing lists detailing part numbers, sizing breakdown
(ANSUR II
distribution), quantities, lot codes, and Government agreement number.
At time of shipment delivery
Physical copy attached to pallet/box exterior
Commercial User Guides & Sizing Instructions
Commercial product literature detailing sizing adjustment, modular
Accompanying shipment & electronic copy
1 Printed copy per sample set & electronic PDF to
AOR/COR
attachment instructions, cleaning, and maintenance.
Final Delivery Report
Summary documentation confirming receipt and final acceptance of all test sample units across CLINs 0001 through 0004.
Within 5 business days after final delivery acceptance.
Electronic submission (PDF / Email to
AOR/COR)
Commercial Warranty
Standard commercial warranty providing rapid repair or replacement upon notification of manufacturing, material, or stitching defects.
Active throughout the 60-day Soldier evaluation period (December– February); 14-day turnaround for replacement samples.
Contractor Return Material Authorization (RMA) process
4. Packaging, Handling, and Delivery
• Initial Delivery Date: Final delivery of all test samples across CLIN 0001, CLIN 0002, CLIN 0003, and CLIN 0004 shall occur no later than 28 December 2026 to support initial issue to an operational battalion (~420 personnel, 54 grenadiers) in December.
• Initial Delivery Destination & Consignee:
• Facility: PM SSV, RFI (WALFIP)
• Address: Bldg 9640, Bay E Door# 23, Prescott Ave
JBLM, WA 98433
• JBLM Delivery Points of Contact (POC):
• Logistics Management Specialist POC: Cliff Diffendaffer, clifford.a.diffendaffer.civ@army.mil, 586-571-5104
• PdM SCIE POC: Blaise P. Liess, email: blaise.p.liess.civ@army.mil mailto:clifford.a.diffendaffer.civ@army.mil mailto:blaise.p.liess.civ@army.mil
• Note: The Contractor or commercial carrier shall contact the Delivery POC at least 48 to 72 hours prior to arrival to schedule dock delivery and ensure personnel are available for offloading and initial receipt verification.
• Follow On Delivery: Any follow-on equipment requested will be sent to Lansing.
• Lansing Delivery Address:
• Facility: Peckham Vocational Industries, Inc.
• Address: 7100 Millet Highway
Lansing, MI 48917
ATTN: PdM SCIE-TSM
DODAAC: W912H7
• Lansing Delivery POC:
• Josh Salgado, joshua.c.salgado.civ@army.mil, 703-223-1728
• Preservation & Packaging: All belt systems, equipment suites, and pouches shall be packaged in durable commercial polybags labeled by item nomenclature, size, and part number, and consolidated into heavy-duty corrugated cartons packed on standard 40" x 48" pallets. Packaging shall prevent moisture intrusion, soiling, or mechanical damage during transit.
• Marking: Exterior cartons shall be clearly marked with the Contractor Name, Part Number, Item Nomenclature, Size/Quantity Assortment, Agreement Number (W91CRB-27-S-LCMI), and Receiving Activity details as specified by the AOR/COR.
5. Government-Furnished Property (GFP) / Equipment (GFE) None. There is no Government-Furnished Property, Material, or Equipment associated with the fabrication and delivery of these commercial test samples.
6. Period of Performance The period of performance shall commence upon OTA award and conclude on 17 DEC 2027, allowing for:
1. Delivery of all test samples no later than 28 December 2026;
2. Government receipt, inventory, and initial issue to the test battalion in December;
3. Execution of the sixty (60) day operational Soldier evaluation; and
4. Post-trial Soldier feedback gathering regarding form, fit, function, and final Soldier preference.
7. Program Management & Contract Administration The Contractor shall designate a single individual to serve as the primary Point of Contact (POC) between the Government and the Contractor. This individual shall:
• Be responsible for overall coordination and execution of all Contractor activities related to this agreement.
mailto:joshua.c.salgado.civ@army.mil
• Possess the authority to commit the Contractor to specific courses of action and accept binding direction from the Agreements Officer or the designated AOR/COR.
• Immediately notify the Agreements Officer and the AOR/COR in writing of any unforeseen supply chain disruptions, component shortages, or manufacturing delays that could adversely impact the 28 December 2026 delivery milestone.
8. Communications and Meetings
• Post-Award Orientation / Kickoff: An initial teleconference shall be coordinated by the Contractor and held within five (5) business days after OTA award via Microsoft Teams.
• Status Updates: The Contractor shall provide weekly electronic status updates to the Agreements Officer and AOR/COR detailing raw material procurement, cutting/sewing progress, inventory staging, and logistics tracking toward the 28 December 2026 delivery suspense.
• 60-Day Soldier Evaluation Check-ins: The Contractor shall participate in monthly virtual check-in conferences with PdM SCIE during the 60-day operational Soldier evaluation to review emerging user feedback, durability questions, and potential iterative prototyping adjustments.
• Meeting Minutes: The Contractor shall record and distribute brief action items and meeting minutes following any formal technical teleconference within three (3) business days of the event.
9. Statutory Compliance, Berry Amendment & Follow-On Production Notes
• Award Authority: This transaction is awarded under 10 U.S.C. § 4022 for test sample projects. In accordance with 10 U.S.C. § 4022(h), this agreement is treated as a Federal Agency procurement for the purposes of 41 U.S.C. Chapter 21 (Procurement Integrity Act). This CFS and resulting OTA are not subject to the Federal Acquisition Regulation (FAR) or its supplements.
• Berry Amendment & Domestic Sourcing:
• All textile components, webbings, threads, fabrics, and hook-and-loop fasteners delivered under this agreement (and any follow-on production contracts) shall be 100% compliant with the Berry Amendment (10 U.S.C. § 2533a).
• Non-textile items (buckles, hardware, stiffeners, clips) shall be compliant with the Buy American statute (41 U.S.C. §§ 8301–8305).
• Quality Management System: The Contractor shall maintain a Quality Assurance Plan compliant with ISO 9001:2015 or an equivalent commercial quality standard.
• Controlled Unclassified Information (CUI): Any Government technical data packages, weapon dimensions, or CUI documentation provided during performance shall be transmitted and stored strictly in compliance with DoW SAFE and applicable CUI regulations.
• Iterative Prototyping (Section 6 of CFS): The Government and Contractor may, by mutual agreement, iteratively adapt and modify the load carriage designs during or immediately following the 60-day Soldier evaluation to incorporate Soldier feedback or integrate new mission attachments.
• Follow-On Production Pathway (10 U.S.C. § 4022(f)): Upon successful completion of this test sample project, determined by the Agreements Officer and Program Manager based on technical performance and Soldier evaluation acceptance, the Government may negotiate and award a sole-source follow-on production contract or transaction to the Contractor without further competition. Follow-on production planning shall be based on the following maximum capacity requirements:
Item Nomenclature Monthly Production Requirement
Annual Production Requirement
Tactical Belt System 3,197 EA 38,357 EA
Grenadier Equipment Suite
305 SE 3,360 SE
Automatic Rifleman Suite
305 SE 3,360 SE
Rapid-Stow Dump Pouch
2,813 EA 33,754 EA
| Statement of Work – Commercial Load Carriage Modernization Initiative (Close Combat Forces) |
| 1. Background. This effort encompasses the acquisition and delivery of commercial and commercial-derivative load carriage equipment to support immediate operational test sample fielding and Soldier evaluation for Product Manager Soldier Clothing and ... |
| 2. Scope of Requirement. The Contractor shall furnish all necessary personnel, facilities, manufacturing capabilities, quality control, packaging, and commercial materials required to manufacture, inspect, and deliver the specified items to the Gover... |
| 2.1 Item Identification and Quantities (Test Samples) |
| 2.2 Technical & Performance Objectives |
| 3. Deliverables |
| 4. Packaging, Handling, and Delivery |
| 5. Government-Furnished Property (GFP) / Equipment (GFE) |
| 6. Period of Performance |
| 7. Program Management & Contract Administration |
| 8. Communications and Meetings |
| 9. Statutory Compliance, Berry Amendment & Follow-On Production Notes |
File details come from the government source that posted it. Updated .