W91CRB-25-R-5008 0001 2.24.25.pdf
PDF 32 KB Posted
- Solicitation number
- W91CRB-25-R-5008
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
W91CRB
ACC-APG - DIVISION D (W91CRB)
6515 INTEGRITY COURT
APG, MD 21005-3013
ANGELA H. MCFILLIN
EMAIL: ANGELA.H.MCFILLIN.CIV@ARMY.MIL
W91CRB-25-R-5008
2025FEB05
X
X 2025MAR11 02:00pm
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 9
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ANGELA H. MCFILLIN
Buyer Office Symbol/Telephone Number: CCAP-MDD/(410)278-5410
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
FMS REQUIREMENT
*** End of Narrative A0000 ***
The purpose of Amendment #0001 is two-fold:
1) To inform vendors that all proposals shall include related specification sheet(s) for any and all offered products. _____
2) To the address vendors' questions.
Question #1___________
Can offerors propose multiple options or alternates on CLINS if we clearly mark what is the primary offer and what each option costs?
Answer #1_________
Provided that the proposed items meet the requirements cited in the Statement of Work (SOW), offerors can propose alternates/multiple options.
Offerors shall include the offered product's related specification sheet with Offeror's proposal. _____
Question #2___________
Clin 0001: The Vector is a Vectronix manufactured product which is no longer in production. Will you accept a substitute product with similar capability?
Answer #2_________
This is not a brand name requirement. Vectronix is no longer producing the "Vector". Please reference the specifications in the
Statement of Work (SOW), 3.1 Hardware Requirements. _____________________
Offerors shall include the offered product's related specification sheet with Offeror's proposal. _____
Question #3___________
Clin 0002: The requirement states Thermal Monocular Day / Night but the specifications included are typically for an image intensifier night vision device, not a thermal. Please verify requirement.
Answer #3_________
The specifications for the solicitation released on 05Feb2025 CLIN 0002 are incorrect and amended herein. Below are the revised ________ specifications for CLIN 0002:_____________________________
3.1.2. Thermal monocular sights. The contractor shall deliver five (5) each thermal monocular day/night. The thermal sights shall have________________________________ the following specifications:
3.1.2.1. Uncooled Focal Plane Arrays
3.1.2.2. 640x480 or 320x240 pixels
3.1.2.3. 12um or 17 um pixel pitch
3.1.2.4. 7.5 13.5 um Spectral Range
3.1.2.5. 30 Hz or 60 Hz refresh rate
3.1.2.6. 7 degrees x 5 degrees to 24 degrees to 18 degrees
3.1.2.7. 1x native, with digital zoom up to 8x magnification
2 9
W91CRB-25-R-5008
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The revised Statement of Work (SOW) attached and dated 2.20.25 reflects the correct specifications for CLIN 0002, no other changes to
Statement of Work (SOW).
Amendment 0001 herein lists the correct specifications for CLIN 0002. No other changes to solicitation W91CRB-25-R-5008.
Question #4___________
Vector Binoculars:
- Is there a specific brand or model required, or should we focus on technical specifications?
- Is a laser rangefinder necessary? If so, what is the required maximum range?
- What type of internal display is preferred (digital, analog, retinal)?
- What level of environmental resistance is needed (IP67, waterproof, shockproof)?
- Does it need independent night vision or just ambient light enhancement?
- What is the acceptable maximum weight?
- Is wireless connectivity (WiFi/Bluetooth) required?
Answer #4_________
This is not a brand name requirment. Please refer to the technical specifications listed in both Section B (CLIN 0001) and Section C
(3.1) within the solicitation, as well as the attached REVISED Statement of Work (SOW) dated 2.20.25.
Provided that the offered product meets this solicitation's detailed specifications and the offeror's proposal includes the related specification sheet, alternate products are acceptable.
Specification sheet for offered items shall be included in Offeror's proposal. _____
Question #5___________
Thermal Monocular:
- What is the required sensor resolution (e.g., 640x480 or 320x240)?
- What is the necessary detection and recognition range?
- What is the minimum required refresh rate (e.g., 30Hz or 60Hz)?
Answer #5_________
This is not a brand name requirement. Please see amended CLIN 0002 herein for the hardware's requirement. The offered product shall meet the solicitation's listed specifications. Offerors shall submit offered product's specification sheet in Offeror's proposal. _____
*** END OF NARRATIVE A0002 ***
3 9
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0002 THERMAL MONOCULAR DAY/NIGHT 5 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: THERMAL MONOCULAR SIGHTS
CLIN CONTRACT TYPE:
Firm Fixed Price
(Deleted narrative A001)
Thermal monocluar sights._________________________
The thermal sights shall have the following specifications:
Uncooled Focal Plane Arrays
640x480 or 320x240 pixels
12um or 17 um pixel pitch
7.5 13.5 um Spectral Range
30 Hz or 60 Hz refresh rate
7 degrees x 5 degrees to 24 degrees to 18 degrees
1x native, with digital zoom up to 8x magnification
(End of narrative A002)
PRON: J54SAK939C PRON AMD: 01
AMS CD: 431100
FMS COUNTRY/CASE: AL/UBX
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
4 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1.0. Introduction and Scope. ______________________
1.0.1. Introduction. This is a Firm Fixed Price (FFP) contract to provide Night Vision Device to Albania in support of this Foreign
Military Sales (FMS) case.
1.0.2. Scope. This Statement of Work (SOW) defines the effort required to provide Partner Nation (PN) requested support. The word
Government in this document refers to the United States Government. The term PN in this document refers to the FMS customer country.
2.0. Applicable Documents. ____________________
2.1 Military Standards
MIL-STD-130N with Change 1 Identification Marking of U.S. Military Property
MIL-STD-129R Military Marking for Shipment and Storage
MIL-STD-882E System Safety
CECOM Regulation 380-16 Industrial Security Program Requirements
DTM 09-019 Policy Guidance for Foreign Ownership, Control, or Influence (FOCI)
DoD Directive 5230.11 Disclosure of Classified Military Information to Foreign Governments and International Organizations
DoD 8570.01-M Information Assurance Workforce Improvement Program
AR 525-13 Antiterrorism
AR 530-1 Operations Security
2.2 Commercial Standards
ISPM 15 Guidelines for Regulating Wood Packaging Material in International Trade
ASTM D 3951-18 Standard Practice for Commercial Packaging
3.0. Requirements. ____________
3.1 Hardware Requirements. The contractor shall provide equipment described below. Equipment shall be provided in accordance with, and _____________________ shall meet the specifications and performance criteria stated in this SOW.
3.1.1. Vector Binoculars. The contractor shall deliver ten (10) each Binoculars Day/night with long range observation. Binoculars shall _________________ focus image/objects in limited day and night view conditions. Binoculars shall have the following specifications:
3.1.1.1 Field of view: 120 mil / 6.75 degrees daylight; 125 mil / 7 degrees night
3.1.1.2 Distance: during the day not less than 12 km, and during the night not less than 3 km
3.1.1.3 Accuracy: less than 5km
3.1.1.4 Measurement: 205 x 178 x 82mm; 8.1 x 7.0 x 3.2in
3.1.1.5 Weight: less than 2.0 kg (4.4 lbs)
3.1.1.6 laser type: 1,550 nm
3.1.2. Thermal monocular sights. The contractor shall deliver five (5) each thermal monocular day/night. The thermal sights shall have ________________________ the following specifications:
3.1.2.1. Uncooled Focal Plane Arrays
3.1.2.2. 640x480 or 320x240 pixels
3.1.2.3. 12um or 17 um pixel pitch
3.1.2.4. 7.5 13.5 um Spectral Range
3.1.2.5. 30 Hz or 60 Hz refresh rate
3.1.2.6. 7 degrees x 5 degrees to 24 degrees to 18 degrees
3.1.2.7. 1x native, with digital zoom up to 8x magnification
3.1.3. Binocular video recorder. The contractor shall deliver five (5) each Binocular video recorder. The video recorder shall be ________________________ equipped with stabilizers, digital zoom, laser rangefinder, GPS. They shall have a removable memory (SD card, UBS), and a USB port installed. Distance of laser measurements and recording with clear views from 10 m to 10 km. The Binocular video recorder shall have the following specifications:
3.1.3.1 View sensors: Resolution 20.4 MP (6016 x 3384); aspect ratio 16:9; Pixel Gross 2 x 5430K pixels
3.1.3.2 Lenses System: Zoom video: .05 25x: photo; 0.8 12x optical; 25x with digital zoom
3.1.3.3 Recorder: Fixed image format 2D: JPEG; Fixed view resolution 20.4 MP 16:9 (6016 x 3384)15.3 MP 4.3 (4512 x 3384)10.0 MP 16:9
(4224 x 2376)
3.1.3.4 Video Format: 2D HD; AVCHF format ver2.0 compatible; 1080/60p/60 iMPEG4-AVC/H.264 3D HD; AVCHD format ver2.0 compatible
5 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1080/60i) MPEG4 MVC/H.264
3.1.3.5: Video resolution: 2D: 1920 x 1080 (60p/50p PS); 1920 x 1080 (60i / 50i FX, FH): 1440 x 1080 (60i, 50i HQ, LP); 3D HD: (2x) 1920 x 1080 (60i/50i)
3.1.3.6: Video Bit rate: 2D HD PS: 28 Mbps, 2D HD FX: 24 Mbps, 2D HD FH: 17 Mbps, 2D HD HQ: 9 Mbps, 2D HD LP: 4 Mbps, 3D HD: 28 Mbps
3.1.3.7: Audio format: Digital 2-channel radio stereo
3.1.3.8: Media type: Memory stick PRO Duo; SD/SDHC/SDXC media
3.1.3.9: Battery life/autonomy: not less than 8 hours, chargers must be included
3.2 Services. Not Applicable ________
3.3 Item Unique Identification (IUID). _________________________________
The Contractor shall mark all contract deliverables in accordance with DFARS clause 252.211-7003 and the following requirements:
3.3.1 IUID Marking.
a. New items: The Contractor shall provide IUID, or DoD recognized equivalent, for all items delivered with an acquisition cost of
$5,000.00 or more and Government serial numbered items. For long term contracts, the Contractor shall implement IUID markings IAW MIL-
STD-130N w/Ch1, dated 16 Nov 12 for any item that will exceed the $5,000.00 unit price for any range quantity or contract year. This requirement is effective throughout the life of this contract.
b. Repair items: The Contractor shall mark those items as identified by the Government. Items received for repair shall be inspected for
IUID markings. Those items where the marking is damaged or missing the Contractor shall mark the equipment. When marking requirements are not clearly specified then the Contractor shall advise the PCO. For previously acquired items where the IUID markings were not required the Contractor shall follow the procedures as if the item was a new item.
c. Commercial Markings. All other items shall have acceptable commercial markings that meet the guidelines in Department of Defense
(DoD) Guide to Uniquely Identifying Items http://www.acq.osd.mil/dpap/pdi/uid/index.html .
d. Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-STD-130N w/Ch1, dated 16 Nov 12.
e. Deleterious Effect. Marking of items shall be accomplished in a manner that shall not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.
f. Mandatory Information Reporting for all items requiring IUID marking. The Contractor shall include the National Stock Number (NSN), if the item has a NSN, the Serial Number marked on the item, if a Serial Number is marked on the item, the original part number, the current part number (only if not the same as the original part number), the current part number effective date (only if the current part number is used) and the USARMY as the SERVICE /AGENCY/COMMAND data element in the information reported to the Aberdeen Proving
Ground Army Acquisition Command (APG ACC), in addition to the information required to be reported to the APG ACC by DFARS clause 252.211-
7003.
g. Wide Area Workflow (WAWF) users shall report this mandatory information to the APG ACC by Direct submission via an X12 Ship
Notice/Shipment and Billing Notice (856/857) transaction, an IUID XML transaction, an IUID flat file transaction or a WAWF IUID Material
Inspection and Receiving Report/Combo UDF through the Global Exchange (GEX) Service, or manually, via the IUID Web Entry Site at http://www.bpn.gov/iuid . For WAWF users, these methods do not replace the current WAWF interaction, but are performed in addition to it after the shipment has been accepted to provide IUID data that cannot be provided via WAWF.
3.3.2 IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N w/Ch1, dated 16 Nov 12. ___________
a. Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD-130N w/Ch1, dated 16 Nov
12. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.
b. If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.
c. If items are not described by Government Product Technical Data (i.e. Commercial Items), the Contractor shall maintain diagrams showing placement and description of the IUID marking and applicable installation and processing instructions for government review.
6 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
d. The Contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other
Government representative at any time during the life of this contract. The Contractor shall provide this list to the government at the end of the contract.
3.3.3 Correction of Noncompliant Equipment and Technical Data. ________________________________________________________
a. If this contract contains configuration control requirements, the Contractor shall initiate the appropriate configuration control document to correct all affected drawings/specifications which conflict with or omit the marking requirements stipulated above.
b. If configuration control requirements do not apply and the equipment on order is defined by technical data which conflicts with or omits the marking requirements stated above, the Contractor shall advise the PCO. Such advice shall list the number of each deficient drawing/specification and a brief description of the deficiency.
c. If the item on order is defined by existing Government technical documentation and such documentation is in conflict with the requirements of this SOW, production of equipment with revised markings shall not proceed until Government approval is received.
3.3.4 Government Purchase of Product/Technical Data.
a. Specifications. If the Government is procuring any equipment specification(s) on this contract, such specification(s) shall include a requirement to mark the appropriate items with IUID.
b. Drawings. If the Government is procuring engineering drawings or drawing revisions on this contract, the Contractor shall include
IUID marking requirements on each applicable drawing. Location shall be depicted on the pictorial and other details presented in the notes.
c. Pricing of IUID Requirements. All efforts required by this PWS and modification, including, but not limited to, the preparation of
ECPs or notification of marking deficiencies, serial number data reporting at end of contract and the actual marking of hardware, shall be included in the modification price.
3.4. Operations Security ___________________
3.4.1. Antiterrorism / iWATCH
a. AT Level 1 Training. This standard language is for contractor employees with an area of performance within a controlled installation, facility or area: All contractor employees, to include subcontractor employees, requiring access to installations, facilities and controlled access areas shall complete AT Level 1 Awareness Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Security Assistance Management Directorate (SAMD)
Person of Contact (POC) or to the contracting officer, if a Security Assistance Management Directorate (SAMD) Person of Contact (POC) is not assigned, within 60 calendar days after completion of training by all employees and subcontractor personnel. AT level 1 Awareness
Training is available at the following website: https://jkodirect.jten.mil/ for CAC holders (Course number -US007). Non-CAC-holders may go to: http://jkodirect.jten.mil/Atlas2/page/login/Login.jsf .
b. AT Awareness Training - Not Applicable
c. iWATCH Training: This standard language is for contractor employees with an area of performance within a facility or area.
The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Security Assistance Management Directorate (SAMD) Person of Contact (POC). This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Security Assistance Management Directorate (SAMD) Person of Contact (POC) NLT 60 calendar days after contract award. https://www.dhs.gov/see-something-say-something .
3.4.2 Operations Security (OPSEC)
a. For contracts that require a formal OPSEC program. The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The Contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.
b. For contracts that require OPSEC Training: Per AR 530-1 Operations Security, the CECOM OPSEC Plan, and AR 350-1 Army
Training and Leader Development contractor employees must complete Level I OPSEC Awareness training within 30 calendar days of reporting for duty and annually thereafter. Training will be provided to the contractor by their contract company (may coincide with the
7 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
government employee training). (CDRL A004)
3.4.3 Personnel Security (PERSEC).
a. Security training for contractors: Several training requirements exist for contractor personnel per DoD and Army regulation/directives. On-site contractors may receive training briefs from the government appointed Security Manager; however, contracting companies will be required to provide training to off-site contractor employees. Training is tailored to the organizations requirements as well as local policy. Some examples of Security training provided to integrated/embedded contractors may include, but is not limited to, the following:
Initial Security Orientation: Online training available on the Army Learning Management
System (ALMS) site, reference ALARACT 207-2103 - Initial training
Annual Security Orientation: Online training available on the Army Learning Management
System (ALMS) site, reference ALARACT 207-2103 - Annual training requirement
Derivative Classification training, reference DoD 5200.01-V3-biennial training requirement
Foreign travel training, AR 525-13, required when traveling abroad
DA, AMC, and/or commander directed security stand-downs, e.g., ad-hoc refresher training
b. For Contract Requiring Performance or Delivery in a Foreign Country.
DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractors compliance with combatant commander and subordinate task force commander policies and directives.
3.5 Procurement New Production. The contractor shall provide email verification to the Security Assistance Management Directorate
(SAMD) Person of Contact (POC) that all delivered hardware is supplied from new production and is of the latest configuration at time of production. The email shall include model/configuration number, date of production, and serial number of major end items delivered.
3.6 Requirements for Packaging. Packaging/packing shall be in accordance with ASTM D 3951-18, Standard Practice for Commercial
Packaging, Level of Protection (LOP): Commercial, Level of Pack (LPK): Commercial, Quantity Unit Pack (QUP): 001. Marking shall be in accordance with MIL-STD-129R.
3.6.1. Wood Packaging Material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
3.6.2. All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, Regulations in Wood
Packaging Material in International Trade (2009). DoD shipments inside and outside of the United States shall meet the requirements of
ISPM 15 whenever WPM is used to ship DoD cargo.
3.6.3. All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW)
American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see ALSC WPM).
3.6.4. All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
3.6.5. Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry.
The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.
3.6.6 Handling, Storage, Preservation, Packaging and Shipping. The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.
3.7 Requirements for Quality, Final Inspection and Test. The contractor shall comply with the following requirements: ____________________________________________________
3.7.1. Sites for Inspection, Testing and Acceptance. Inspection, testing and acceptance of all equipment shall be at Origin.
Inspection and testing shall be performed by the contractor. Acceptance shall be by the cognizant DCMA office/POC identified in the
Wide Area Workflow (WAWF) clause 252.232-7006.
3.7.2 Quality System. The contractor shall establish/maintain a system for the final inspection and test of all purchased items to comply with contract requirements. The Government has the right to review the contractors quality system and require correction whenever
8 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
it, or any portion thereof, fails to meet the requirements set forth in the contract.
3.7.3 Inspection and Testing. The contractor shall ensure that all necessary inspections and tests are performed on completed products, and this shall include all inspections and tests which are normally performed for the equipment on order. The contractor shall at a minimum perform any inspections and tests (including visual/mechanical inspections and functional tests) required to satisfy the form, fit, and function requirements of the contract. The form, fit, and function requirements are defined by the contractors drawings and literature (specification documents, data sheets, acceptance test procedures, host component assembly checklist, remote antenna assembly checklist, and laptop configuration checklist.) Acceptance tests shall be performed according to the models, descriptions, and quantities listed in paragraph 3.1, above.
3.7.4 Responsibility. The requirements of this PWS do not relieve the contractor of the responsibility to perform any additional tests or inspections required to assure product quality and compliance with drawings and specification requirements.
3.7.5 Records. The contractor shall maintain adequate records of inspections and tests to demonstrate that the final product satisfies contract requirements. The Government has the right to review these records at any time.
3.8 Requirements for Warranty. _________________________
3.8.1 The contractor shall provide a no-cost warranty covering workmanship and materials for all items furnished IAW this contract or any contractor-directed modification thereof. If the warranty is a commercial warranty and states that the warranty is not in effect outside the continental United States, then the wording of the warranty shall be amended so that the warranty is extended to the customer country. The warranty shall be for a minimum of one (1) year in duration, starting from the date of hardware acceptance by the
U.S. Government.
3.8.2. Warranty Procedures. The FMS customer will notify The US Army Security Assistance Command (USASAC) New Cumberland (NC) of an equipment failure using a Supply Deficiency Report (SDR). USASAC NC will forward the SDR to the CECOM SAMD SDR action officer, and the contractor will be notified of an equipment failure. Exercising of the warranty shall commence upon contractor receipt of failure notification, at which point the warranty clock shall be stopped relative to the unit in question. Upon receipt of the failed item, the contractor shall determine if the item and failure are covered by the warranty. Upon confirmation that the contractor has repaired/replaced the item under warranty, the warranty clock shall be restarted. The FMS Customer shall be responsible for the established contractual price for items tested and found to be a "False Pull" or "No Evidence of Failure (NEOF)". The contractor shall meet or exceed a 60-day turn-around time for repairs. This time shall be from the date of receipt of the failed item by the contractor at the Contractors facility, to shipment from the contractor's facility. The contractor shall be responsible for the transportation cost of repaired items under warranty from the contractors facilities to the PN base in Albania. Transportation costs of repair items determined to be not under warranty shall be borne by the customer country.
4.0 Procurement Contracting Officer. The ACC-APG Procurement Contracting Officer (PCO) is the single point of contact within the _______________________________ government for funds, program direction or approval of progress payments. Only the PCO can approve or direct changes or additions to the contract.
*** END OF NARRATIVE C0001 ***