Additional Final Questions and Answers for FICS.docx

DOCX document 17 KB Posted

Attached to
Field Information Communications System (FICS)
Solicitation number
W91CRB-23-R-5011
Issued by

About this file

This document contains questions and answers regarding Solicitation Number W91CRB-23-R-5011 for the Field Information Communications System (FICS) being procured by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The questions and answers provide clarification on the requirements for the hardware, program management, support services, fielding, and training to be provided under the contract. Key points addressed include allowing for alternative protocols beyond just Cisco's Skinny Client Control Protocol, confirming an integrated master schedule can be submitted outside of the 60 page technical proposal limit, specifying the two-year warranty starts after developmental testing rather than operational testing, and aggregating the contract line item number mappings to the statement of work requirements.

View the file

Other files

File Type Posted
W91CRB-23-R-5011 AMENDMENT 0003.pdf PDF
W91CRB-23-R-5011.pdf PDF
ATTACHMENT 0001 SOW WITH CHARTS.docx DOCX document
CDRL FICS C001 CONFIGURATION MANAGEMENT PLAN.pdf PDF
CDRL FICS E001 SYSTEM TEST PLAN ACCEPTANCE TEST AND REPORT.pdf PDF
W91CRB-23-R-5011.pdf PDF
CDRL FICS G002 TRAINING COURSES AND MATERIALS.pdf PDF
CDRL FICS E003 DTE PLAN IN -COUNTRY ADN REPORT.pdf PDF
CDRL FICS J003 OPSEC SOP.pdf PDF
CDRL FICS K001 MATERIEL FIELDING PLAN.pdf PDF
CDRL FICS D001 PRODUCTION PLAN AND STATUS REPORT.pdf PDF
CDRL FICS E002 SMALL SCALE DEMONSTRATION PLAN AND REPORT.pdf PDF
CDRL FICS J001 ANTITERRORISM TRAINING.pdf PDF
CDRL FICS J002 IWATCH.pdf PDF
CDRL FICS J004 LEVEL I OPSEC TRAINING.pdf PDF
CDRL FICS A001 INTEGRATED MASTER SCHEDULE.pdf PDF
CDRL FICS B001 INTEGRATED LOGISTIC SUPPORT PLAN.pdf PDF
CDRL L001 SMALL BUSINESS UTILIZATION REPORT.pdf PDF
CDRL FICS H001 TECHNICAL MANUALS.pdf PDF
ATTACHMENT 0002 SMALL BUSINESS PARTCIPATION COMMITMENT DOCUMENT.docx DOCX document
FINAL Questions and Answers W91CRB-23-R-5011.docx DOCX document
CDRL FICS F001 QUALITY ASSURANCE MANAGEMENT.pdf PDF
CDRL FICS A002 POST AWARD CONFERENCE PROGRAM MANAGEMENT REVIEW.pdf PDF
ATTACHMENT 0001 SOW WITH CHARTS.docx DOCX document
CDRL FICS G001 TRAINING PLAN.pdf PDF
CDRL FICS H002 PERFORMANCE SPECIFICATION DOCUMENTS.pdf PDF
CDRL FICS A002 POST AWARD CONFERENCE PROGRAM MANAGEMENT REVIEW.pdf PDF
CDRL FICS E003 DTE PLAN IN -COUNTRY ADN REPORT.pdf PDF
CDRL FICS J001 ANTITERRORISM TRAINING.pdf PDF
CDRL FICS G002 TRAINING COURSES AND MATERIALS.pdf PDF
CDRL FICS B001 INTEGRATED LOGISTIC SUPPORT PLAN.pdf PDF
CDRL FICS D001 PRODUCTION PLAN AND STATUS REPORT.pdf PDF
CDRL FICS A001 INTEGRATED MASTER SCHEDULE.pdf PDF
W91CRB-23-R-5011.pdf PDF
ATTACHMENT 0001 SOW WITH CHARTS.docx DOCX document
CDRL FICS J004 LEVEL I OPSEC TRAINING.pdf PDF
CDRL FICS H002 PERFORMANCE SPECIFICATION DOCUMENTS.pdf PDF
CDRL FICS G001 TRAINING PLAN.pdf PDF
CDRL FICS J003 OPSEC SOP.pdf PDF
CDRL FICS E002 SMALL SCALE DEMONSTRATION PLAN AND REPORT.pdf PDF
CDRL FICS C001 CONFIGURATION MANAGEMENT PLAN.pdf PDF
CDRL FICS F001 QUALITY ASSURANCE MANAGEMENT.pdf PDF
CDRL FICS J002 IWATCH.pdf PDF
CDRL FICS H001 TECHNICAL MANUALS.pdf PDF
CDRL FICS E001 SYSTEM TEST PLAN ACCEPTANCE TEST AND REPORT.pdf PDF
CDRL FICS K001 MATERIEL FIELDING PLAN.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for: W91CRB-23-R-5011 (FICS) DATE 1 August 2023

40. Ref: Q&A dated 10 JUL 2023, Items 38 and 39

Question: Answers to questions 38 and 39 regarding “Skinny Client Control Protocol” dictate a specific vendor (Cisco) protocol that does not allow for advances in the industry or competitive solutions.

We recommend changing the wording in the requirement from “and” to “or” as highlighted below:

The IP-PBX Switch shall support the Session Initiation Protocol (support both TCP/UDP SIP trunk standards), H.323 protocol, Media Control Protocol (MGCP), and or Skinny Client Control Protocol (SCCP) standards for audio-visual sessions on the packet.

This will allow offerors to provide the best solution for the Government.

Response: The Government has revised the Statement of Work (SOW) to read “or”. Revised Attachment 0001 posted to SAM.gov.

41. Ref: Ref: Q&A dated 10 JUL 2023, Items 8 Question: For Question 8, the response given by the USG agreed to the suggestion of including a fully Integrated Master Schedule (IMS) with the proposal, not included in the page count, with a limit of 5 pages for the I MS. However, Section L doesn't mention these additional 5 pages. We recommend revising Section L to reflect a technical volume page limit of 60 pages plus an additional 5 pages for the IMS.

Response: The pages required for IMS will not be counted towards the 5 page limit.

42. Ref: Q&A dated 10 JUL 2023, Item 12 Question: Regarding Question 12, the response given by the USG to the contract warranty requirement post Operational Test & Evaluation (OT&E) suggests the need to amend SOW paragraph 13, subparagraph f, specifying that restoral occurs after Developmental Test & Evaluation (DT&E) rather than OT&E.

Response: The 2-year warranty starts after the DT&E is completed per the answer dated 10 JUL 2023, Item 12. The FICS SOW, Attachment 0001 is revised to reflect the above.

43. Ref: Q&A dated 10 JUL 2023, Item 18 Question: Pertaining to Question 18, the response given by the USG to the FICS Network Management System readiness requirement suggests a revision to Para 2.2.11 of the SOW. As of now, this revision isn't reflected in the document.

Response: The FICS SOW, Attachment 0001 is revised

44. Ref: Q&A dated 10 JUL 2023, Item 12 Question: In response to Question 25, the government outlined the CLIN mapping to SOW requirements. In the interest of clarity and completeness, we suggest aggregating the SOW mapping to include all current and previous SOW mapping clarifications. The final CLIN to SOW mapping should reflect as follows:

• CLIN 0001 - Hardware: As per SOW paragraphs 2 - 2.3.6 and 18.0 and 19.0

• CLIN 0002 - Program Management: As per SOW paragraphs 3 - 7 and 20.0

• CLIN 0003 - Support Services: As per SOW paragraphs 11, 11.1, 11.2, 15 and 12.0

• CLIN 0004 - Fielding: As per SOW paragraphs 10.1, 13 and 9.0

• CLIN 0005- Training: As per SOW paragraphs 8-8.4 and 17.0 Response: Revisions to solicitation CLIN mapping has been made. Please see the revised version of the solicitation posted to SAM.gov.

File details come from the government source that posted it. Updated .