A01_PWS_W91CRB-17-R-0030.doc

DOC document 325 KB Posted

Attached to
Force Development Directorate - Technical, Analytical and Financial Services Federal contract opportunity
Solicitation number
W91CRB-17-R-0030
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

Performance Based Statement of Work For Force Development

View the file

Other files for this federal contract opportunity

Other files attached to Force Development Directorate - Technical, Analytical and Financial Services, newest first.
File Type Posted
A14_Sources_Sought__Questions_W91CRB-17-R-0030.docx DOCX document
A01_PWS_W91CRB-17-R-0030.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) For Technical, Analytical and Financial Services Office of the Deputy Chief of Staff for Programs (G-8) Force Development (FD) Directorates

PART 1 GENERAL INFORMATION

1.0 Description of Services/Introduction: The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to perform technical, analytical and financial services to the Office of the Deputy Chief of Staff G-8 (DCS) as defined in this PWS except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.1 Background: The Force Development (FD) Directorate’s overall responsibility is to provide fully equipped forces, in a fiscally constrained environment, that meet of the Army Force requirements outlined in the Army Campaign Plan (ACP). Essential to this mission is the FD’s role in supporting the DCS G-8 as the principal Army Staff advisory to the Chief of Staff of the Army (CSA) on all material requirements and the prioritization, integration and programming of Army and Joint material capabilities to include translating Army materiel requirements into programs that are synchronized across the domains of Doctrine, Organization, Training, Materiel, Leadership and Education, Personnel, and Facilities (DOTMLPF); coordinating Army efforts with the Joint Requirements Oversight Council (JROC) and Army Requirements Oversight Council (AROC); validating, approving, and prioritizing Army materiel capabilities; and ensuring the integration of materiel capabilities across missions and functional areas. As part of the Planning, Programming, Budgeting, and Execution (PPBE) process, the FD builds the materiel portion of Program Objective Memorandum (POM).

The contractor shall perform a broad range of technical, financial, and operational analysis in support of the Department of the Army. Contract support shall include recommendations relating to the overall force development of the Army. The contractor shall be required to provide subject matter expertise for an Army system, however, at no time will the contractor serve as the lead for an Army system designated as ACAT 1 (to include variations such as ACAT 1A, 1AC, 1AM or 1D) without approval of the Contracting Officer’s Representative (COR). Government maintains control and oversight of all programs. Contractors are not directing Government personnel at any time during the performance of this contract.

1.1.1 The mission of the Director of Materiel (DOM) is to review, analyze, and prioritize requirements and then program resources within the Equipping Program Evaluation Group (PEG) in support of approved force structure equipment requirements and approved Joint Capabilities Integration and Development System (JCIDS) material solution requirements. The DOM leads and synchronizes the material requirements prioritization, validation, and approval through the AROC as well as development of both the Program Objective Memorandum (POM) and the Strategic Planning and Resourcing (SPAR) investment strategies in order to field the Army with optimum equipping capabilities, within resource constraints, across twelve equipping modernization Portfolios in seven divisions: The Mobility and Force Protection Portfolios in Force Development Full Dimension Protection (FDB); the Mission Command Portfolio in Force Development Mission Command (FDC); the Munitions, Maneuver and Soldier Portfolios in Force Development Soldier and Maneuver (FDD); the Air and Missile Defense and Fires (Indirect) Portfolios in Force Development Fires (FDG); the Intelligence Portfolio in Force Development Intelligence (FDI); the Sustainment and Transportation Portfolios in Force Development Focused Logistics (FDL); and, the Aviation Portfolio in Force Development Aviation (FDV). The DOM and DOM Divisions develop portfolio sections in both the Army Equipment Modernization Plan and the Army Equipment Modernization Strategy in support of defending Army modernization objectives and investments to the Office of the Secretary of Defense (OSD), the Joint Staff and the Congress. Additionally, DOM and DOM Divisions support the Director of Force Development, the Army G-8, and other Army Senior Leaders in support of Congressional testimony pertaining to Army equipment modernization and in the development of the Army G-8 position in support of all activities and venues conducted under DODI 5000.2 “Operation of the Defense Acquisition System.” The DOM also allocates Program Manager (PM) identified monthly production and depot delivery quantities in support of unit level distribution and redistribution planning by Army Sustainment Command (ASC) Lead Materiel Integrator (LMI).

1.1.2 The mission of the Director of Resources (DOR) Provide oversight and management of the timeline, process, and procedures used in developing the Equipping portion of the Army’s Program. The DOR is also responsible for providing resource policy guidance and prioritization, equipment affordability assessments, and quick-turn analysis that assists FD leaders in making informed programming and budgeting decisions. None of the data that the contractor will have access to shall include any proprietary information from other contractors.

The DOR also executes Headquarters, Department of the Army (HQDA) staff responsibility over several key areas to include the operation and maintenance of the Army Equipping Enterprise System (AE2S) which includes the Army Flow Model (AFM), Equip the Force module and the Force Development Investment Information System (FDIIS) as key components. The DOR is also the HQDA Staff lead for a wide variety of programming and equipment allocation issues that fall under the category of “Transparency” which is a DoD led effort designed to increase the tracking, tracing, and visibility of funding and procurement activities, especially those in support of the Reserve Components.

1.1.3 The mission of the Director’s Initiatives Group (DIG) is to support G-8’s internal and external strategic engagements with senior Army/Service/DoD leadership, Congress, press, industry, think tanks, foreign militaries and other professional engagements. The DIG supports the G-8 in preparing for engagements tasking subject matter experts and distilling a wealth of information into a salient and succinct format to maximize time and decision-making. The DIG executes preparatory sessions for the G-8, coordinates the actual engagements, will capture the event’s relevant insights, due outs and other required follow-up.

1.1.4 The mission of the Directorate of Joint & Integration (DJI) is to perform G-8/FD’s formal, integrating Functions across Office of the Secretary of Defense OSD, the Joint Staff, Army Staff (ARSTAF), Training and Doctrine Command (TRADOC), Assistant Secretary of the Army for Acquisition, Logistics and Technology (ASA(ALT)) and the other Services as it pertains to the AROC and JROC; serves as the Executive Secretary for the AROC chaired by the CSA; serves as the Army lead for implementation of policy and procedures for the Joint Capabilities Integration and Development System process; develops the Army’s Equipment Modernization and Distribution Strategy, Plans, and Policies; provides oversight to the planning and sourcing materiel solutions in support of the Army equipment requirements for all modernized and retrofitted equipment to meet the needs of the Army’s forces. These tasks require an ability to develop, coordinate, and oversee equipping and fielding plans to ensure synchronization and to provide increased war fighting capabilities; support materiel readiness; and provide G-8 management of requirements, procurements and coproduction, including foreign military sales of operational systems, with assistance from the Directorate of Materiel. Further, it ensures that key Army and DoD decisions regarding materiel requirements and materiel acquisition solutions are supported by sound analytical underpinnings that span a continuum of analysis from requirement analysis and framing analysis to specific analysis of alternatives (AoAs); assists the DOM hardware divisions in the identification of critical operational issues (COIs) and the determination of criteria associated with a capability development; shapes Army science and technology objectives and demonstrations to ensure they reflect the Army priorities ; and seeks to improve the methods, tools and processes for transforming concepts to capabilities.

1.2 Objectives: The objective of this procurement is to provide the Director, Force Development with dedicated analytic subject matter expertise and programmatic support in force development processes, analysis, integration, information and tactical data systems, force modernization, and the equipment fielding process needed to support the Army's mission. Analytic subject matter expertise will be primarily, but not exclusively, in the areas of: 1) Army capabilities integration and prioritization, experimentation, T&E, and S&T; 2) support validation, approval, sourcing, resourcing, and prioritization of current and future warfighting capabilities; 3) support analysis, reviews, recommendations, and assess analytical products such as Analysis of Alternatives (AoA); 4) gathers information from a diverse community of stakeholders to draw conclusions based on warfighter requirements; 5) provides configuration management research, findings and recommendations; quality assurance documentation of information and documents associated with Army capability requirements, capability strategies, and programs; and 6) provides administrative support for meetings and the coordination and staffing of products.

1.3 Scope: The contractor shall provide on-site strategic, operational and subject matter expertise with a focus on research, analytic, requirements development, programmatic, communications, financial, and liaison services to ensure successful execution of the G8-FD mission. This also includes expertise on matters associated with Army warfighting capability development and include expertise on matters associated with reviewing and assessing analysis supporting Army capability development decisions.

1.4 Quality Control (QC): The contractor shall develop and maintain an effective quality control plan (CDRL A0001) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control plan is the means by which he assures himself that his work complies with the requirement of the contract. As a minimum, the contractor shall develop quality control procedures that address the areas identified in the Quality Assurance Surveillance Plan (QASP). The quality control plan shall be delivered to the Contracting Officer within 30 days of award. The Contracting Officer shall request any changes within 5 days of receipt of the plan and the contractor shall make the requested changes within 5 days. The final plan shall be approved within 15 days of submission. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to the quality control plan.

1.5 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this contract in accordance with the QASP. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6 Recognized Holidays: The contractor is not required to perform services on the following days:

New Year’s Day Labor Day

Martin Luther King Jr’s Birthday Columbus Day President’s Day Veterans Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.7 Government Site Hours of Operation: The Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS unless the government facility is closed. The number of productive hours per year for contractor support personnel is 1880 hours, roughly equivalent to a 40 hour work week and an eight hour work day. The eight hours of services shall be provided between the hours of 0700 through 1800 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closures. Weekend performance may also occur but only by mutual agreement when the COR requests and the contractor agrees (the contractor shall retain the discretion to decide whether or not to perform on Saturdays and/or Sundays). Additionally, it is acknowledged that individual personnel supplied to meet the terms and conditions of this PWS may be given additional time off in the event of family emergency or need for other event (vacation, leave, sick time, etc.) arises and scheduled IAW the contractor’s policy for time off. However, during any “other” time off (other than time listed above as a recognized holiday), the government shall not go without services. During contractor personnel “other” time off, the contractor shall continue to meet the intent of this PWS, providing qualified substitute personnel capable of filling in for personnel not available during scheduled work hours (if needed).

The Contractor shall obtain prior approval from the COR when conducting support services outside of the hours stated above. The contractor shall notify the COR of any support requirement that exceeds the 40 hour work week and is outside the services support range of 0700 through 1800, Monday through Friday.

This notification shall include task description, PWS tasks being supported and copy of weekly/bi-weekly time card. The contractor shall obtain approval from the COR for performance outside the expected support range.

Unless approved in accordance with the above, the Contractor shall not be reimbursed when the government facility is closed for the above reasons. Also, the contractor shall make provisions for the contract work force on those days that the government is closed as the workforce will not be permitted inside of government offices. Productive hours are defined as hours actually providing support to meet PWS requirements.

1.8 Place of Performance: The work to be performed under this contract will be performed at Government facilities within the National Capital Region (NCR), Germany, Hawaii, North Carolina, and South Carolina. In the event of continuity of operations (COOP) during emergency or a pandemic situation, contractors identified as “Key Personnel” may be required to work at the G-8 alternate assigned Government work sites within the NCR. Contract personnel may be allowed to telework in the event of COOP operations, but only if approved in advance by the Contracting Officer and only if there is no additional expense to the government. Otherwise, telework for contract personnel is not allowed. The Program/Contract Manager shall reside at contractor provided space. However, the Program/Contract Manager shall physically visit the Government place of performance a minimum of three (3) times per week (Monday-Friday) to ensure that all employees are performing to the terms and conditions of the contract. The Program/Contract Manager shall communicate daily with the Contracting Officer’s Representative (COR) on days he or she does not physically visit the Government place of performance.

1.9 Signature Blocks: Contractor personnel will not include their company’s name on emails connected to the performance of their work on this task order, but instead will use the following standard signature block template on those emails:

Name

Position Title- Support Contractor

HQDA ODCS G-8 FD (DAPR-XXX)

Unclass email

SIPR email

(v) Phone number

1.10 Security Requirements: The contractor shall comply with all appropriate Government security directives and regulation when performing work in support of this contract. The highest security classification of work to be performed under this execution plan is Top Secret/Sensitive Compartmented Information (TS/SCI). The Contractor shall provide services up to the classification level of Top Secret/SCI as required. Army Contracting Command Aberdeen Proving Ground (ACC-APG) will not provide sponsorship for Facilities Clearances (FCLs) to contractors. Contractor personnel working in support of this contract may require a favorably completed Access National Agency Check and Inquiries (ANACI) or National Agency Check with Local Agency and Credit Check (NACLC). Interim Secret or Secret accesses must be posted in Joint Personnel Adjudication System (JPAS) by the Facility Security Officer (FSO) before the start of the contract for those individuals requiring appropriate clearances.

Contractor personnel for this contract may be subject to additional security clearance requirements for access and non-classified security requirements such as: search of person, their hand carried items and/or their vehicle; use of a metal detector; the requirement to provide personal information in completing a visitor access or vehicle parking pass form, etc. This requirement applies to any personnel performing on the contract, including the contractor’s own employees and any subcontractor personnel.

Contractor personnel performing work under this contract must have a Secret (S) or Top Secret (TS) clearance or be able to obtain and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254. Contractor personnel performing tasks in support of the following programs/systems must have the Top Secret clearances as specified below all other require Secret clearance: Contract personnel must have TS/ Sensitive Compartmented Information (SCI) clearance access to support the following tasks: 1. Biometrics Tactical Collection Devices; and 2. Communications Security (COMSEC) Modernization 3. CYBER. Operations, and 4. SATCOM Database Operations Contract personnel must have TS security clearances to support the following tasks: 1. Joint Theater Air and Missile Defense (JTAMD); 2. Ballistic Missile Defense System (BMDS); and 3. Air Missile Defense (AMD) requirements generation.

1.10.1 Physical Security: The contractor support personnel shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, equipment, and materials which the contractor is responsible for shall be secured.

1.10.2 Key Control: The Contractor shall establish and implement methods of making sure all building passes, Common Access Cards (CAC), and keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards, CAC, and building passes. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the COR.

1.10.2.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the COR, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.10.2.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.

1.10.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. These procedures shall be included in the Contractor’s Quality Control Plan.

1.11 Antiterrorism/Operations Security:

1.11.1 Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://atlevel1.dtic.mil/at

1.11.2 AT Awareness Training for Contractor Personnel Traveling Overseas. Specific Area of Responsibility (AOR) training content is directed by the combatant commander with the unit Antiterrorism Officer (ATO) being the local point of contact.

1.11.3 Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes

1.11.4 iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR no later than 30 calendar days after contract award.

1.11.5 Contractor Employees Who Require Access to Government Information Systems. All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

1.11.6 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training.

1.11.7 All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working Information Assurance (IA)/Information Technology (IT) functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

1.11.8 Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

1.11.9 Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished.

1.12 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

1.13 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.14 Identification of Contractor Employees: In accordance with the United States Army Acquisition Corps, Army Contracting Agency Guide, Contractors in the Workplace, March 2008, all contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel will be responsible for obtaining and wearing badges appropriate for the facilities where they work. Contractors are also responsible for obtaining CAC necessary to gain access to Government provided computer equipment.

1.15 Proprietary Information: The Contractor and all contractor support personnel must sign a nondisclosure statement regarding the use and promulgation of information obtained in the accomplishment of all tasks. The Contractor shall ensure compliance with its obligations under FAR 9.505-4 relating to accessing the proprietary data of other contractors.

1.16 Fiscal Accountability: The Government will use sources of funds appropriate for the project/program to which services are provided. Contractor shall be responsible for tracking costs by the appropriation, to include a breakout of all subcontractor costs. Contractor will allocate, track, invoice, and account for labor hours, travel, and other expenses, by program, project and source of funds.

1.17 Organizational Conflict of Interest (OCI): Refer to Section H for information relating to OCI.

1.18 Government Furnished Property, Equipment and Services:

1.18.1 General: The government shall provide, the facilities, equipment, materials, and/or services listed below.

1.18.2 Equipment: The Government will provide the contractor with access to information, systems and databases concerning force structure, doctrine, concepts, training, program, budget, equipment requirements, authorizations and on-hand data, including data on various weapon systems, programs, processes, and schedules, to facilitate the contractor’s review and analysis. The government will provide the contractor information required to perform the tasks in this PWS and facilitate the interface of contractor personnel with other Army Staff offices as required completing this effort.

1.18.3 Services: Utilities. All utilities in the Government’s facility will be available for the contractor’s use in performance of duties outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.

1.18.4 Facilities: The Government will furnish the necessary workspace for a maximum of 85,638 work hours which is approximately 49.5 man years within the NCR consisting of the Pentagon, Crystal City and Fort Belvoir, Germany, Hawaii, North Carolina and South Carolina to provide the support outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment. The Program/Contract Manager shall not reside within government workspace. However, the Program/Contract Manager shall visit the Government work space a minimum of three (3) times per week and communicate with the Contracting Officer’s Representative regarding contract performance. On days that the Program/Contract Manager does not physically visit the Government work space, the Program/Contract Manager shall be available via phone or email.

1.19 Contractor Furnished Items and Services

1.19.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed as Government Furnished Property (GFP) in this PWS.

1.19.2 Top Secret Facility Clearance: The prime contractor and all subcontractors providing personnel with a Top Secret clearance or higher shall possess and maintain a Top Secret facility clearance from the Defense Security Service at proposal submission. The Contractor’s employees, performing work in support of this contract shall have been granted a SECRET security clearance, except as those requiring TS/SCI from the Defense Industrial Security Clearance Office. The DD 254 is provided as Attachment 1. The contractor shall furnish the necessary workspace for the Program/Contract Manager.

1.20 Contractor Travel: Contractors may be required to travel locally, within the Continental United States (CONUS), and Outside Continental United States (OCONUS) in the performance of designated tasks and duties. The contractor shall invoice travel costs based on actual costs incurred, not to exceed the maximum lodging and per diem rates stipulated in the Department of Defense Joint Federal Travel Regulations (JTR), FAR 31.205.46, and the limitation of funds clause specified in the contract. The contractor is responsible for making their own travel arrangements. The contractor shall also adhere to Joint Travel Regulations relating to the reimbursement of travel costs. Local travel costs (commuting costs) between the contractor/subcontractor employee’s home and their regular worksite (even if the regular worksite is a Government site), will not be reimbursed by the Government. The Contractor will provide the COR supporting documentation with invoices. Invoices including travel shall display the travel costs separately from the labor price, and show a breakdown of the number of personnel in travel status, the number of days/nights for each person, the points of departure and arrival (lodging site), and the transportation costs involved. All travel requires Government approval/authorization and notification to the COR.

The table below is a list of locations that the contractor may be required to travel to in order to support this requirement. This list is representative of locations that have been supported through this contract vehicle in the past, or may require future support within the period of performance of this requirement. This list is not inclusive and locations may be added or deleted throughout the performance period.

Fort Bliss, TX
Detroit, MI
Fort Eustis, VA
Huntsville, AL
Warren, MI
Fort Bragg, NC
Tucson, AZ
Washington, DC
Joint Base Lewis
Colorado Springs, CO
Orlando, FL
Rock Island Arsenal, IL
Fort Benning, GA
Fort Wainwright, AK
White Sands Missile Range, NM
Fort Leavenworth, KS
Fort Huachuca, AZ
McCord (JBLM), WA
Natick, MA
Fort Sill, OK
Aberdeen Proving Grounds (APG)
Fort Greely, AK
Fort Polk, LA
Picatinny Arsenal, NJ
Fort Rucker, AL
Fort Leonard Wood, MO
Fort Gordon, GA

1.21 1 Travel Authorizations and Documentation (CDRL A0002) - The contractor shall provide advance notification for travel to facilities outside the Washington DC metropolitan area, as well as travel to locations requiring additional Government coordination. All travel requires Government approved representative authorization and notification to the COR. Authorization requests shall be submitted no later than 5 working days prior to the proposed travel start date, and all travel shall be conducted in accordance with the Joint Travel Regulation. Travel authorization requests shall include the following:

· Title, purpose/objective, expected outcome

· Date, time (window), and location

· Proposed itinerary

· Proposed meeting/activities agenda

· Number of contractor participants

· Desired Government participants

· Requested Government support The contractor shall prepare a trip report to the relevant directorate no later than 5 days following the conclusion of the trip, providing actual costs, attendees, and a description of activities conducted on the trip.

1.22 Compliance with Regulation: Contractor shall ensure performance complies with all applicable Army and DOD regulations relating to the services provided unless otherwise stated in this PWS or deviation is approved in writing by the COR.

1.23 Transition Period: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have Key Personnel on board during the thirty (30) day Transition Period. The contractor shall manage an overlap of operations with the replacement provider in accomplishment of tasks beginning at the end of the contract.

1.23.1 Start-up - The Contractor shall be responsible for conducting all tasks necessary to be capable of fully performing within 30 days after contract award without disruption or degradation of the FD mission. The contractor is responsible for coordination of all information needed to obtain appropriate access to facilities and badges required by government sites. Contractor Phase-In tasks include ensuring that sufficient resources that are fully trained and qualified to perform the requirements set forth in the PWS are on hand and available to begin work on the first day after the 30 day Start-up period.

1.23.2 Phase-Out: The Contractor shall be responsible for providing a phase-out plan with the proposal, which enables a smooth transition to replacement services for one-month when the contract ends (including technical data rights considerations). The plan shall provide phase-in support for up to 30 days to the selected contractor if the incumbent contractor is not selected for subsequent contract. The contractor is responsible for returning all badges and access obtained as a result of performance under the contract. Contractor Phase-out tasks include ensuring that sufficient resources are available to perform the requirements set forth in the PWS during the 30 day Phase-out period.

PART 2 PERSONNEL REQUIREMENTS

2.1 Special Qualifications: All contractor personnel shall be proficient in using all Microsoft Office applications to include Excel, Word and Power Point.

2.2 Key Personnel: The Program/Contract Manager (paragraph 2.2.1) and the following 15 Senior Analysts are considered key personnel: Force Development Full Dimension Protection (FDB) Synchronization Staff Officer (SSO) (paragraph 3.5.1), COMSEC Modernization SSO (paragraph 3.5.2), Soldier Weapons SSO (paragraph 3.5.3.1), Joint Theater Air and Missile Defense (JTAMD) SSO (paragraph 3.5.4.1), Ballistic Missile Defense System (BMDS) and Space SSO (paragraph 3.5.4), Air Missile Defense SSO (paragraph 3.5.2), Intelligence Systems SSOs (paragraph 3.5.5), Army Aviation SSOs (paragraph 3.5.7), Force Development Warfighting Analysis (FDA) senior analyst (paragraph 3.6.1), Affordability Analyst (paragraph 3.6.2.3.2) and Integration Analyst (paragraph 3.10.1.1). Prior to any Key Personnel reassignment, removal, or resignation, the Contractor shall provide written notification at least fifteen (15) working days in advance to the COR and shall submit justification (including proposed substitutions and its resume) in sufficient detail to permit evaluation of the impact of the proposed change on the program and its schedule. No replacement of Key Personnel shall be made by the Contractor without COR review of the replacement resume to ensure all PWS requirements are met. All replacement personnel must meet the minimum requirements of the PWS.

2.2.1 Program/Contract Manager – The contractor shall provide a Program Manager (PM) who shall be responsible for the performance of the work. The name of this person and an Alternate Program Manager (APM) who shall act for the contractor when the PM is absent shall be designated in writing to the Contracting Officer. The PM or APM shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The PM or APM shall be available between 0800 to 1630 Monday through Friday, except Federal holidays, or when the government facility is closed for administrative reasons.

The PM will not be provided government work space. It is expected that the PM will operate from corporate work space in the Washington D.C. area. The PM will not be given any additional duties found in the PWS. Conversely, employees assigned to PWS tasks will not perform PM functions, duties or responsibilities. The sole exception to this is for the APM.

The APM will be designated in writing and may be an employee working a PWS task in the government work area. The APM will only perform PM related tasks when the PM is physically unavailable for duty. This would include annual vacations, occasional travel and emergencies. The APM would not be expected to perform PM duties more than 20 work days in any given fiscal year.

2.3 Requirements

2.3.1 Program/Contract Manager (Key Personnel) Required – A Bachelor’s Degree, specialized knowledge and expertise in contract management, and a minimum of five (5) years of demonstrated program management experience with project planning, execution, and performance. Specialized knowledge and expertise areas include requirements definition, contract management, work planning, control of budget, schedule, and task execution, and personnel management and supervision of analyst and consultants. The PM will not be provided government work space. It is expected that he/she will operate from corporate work space in the Washington D.C. area.

2.3.2 Senior Analyst Required - must have a Bachelor’s Degree. Position requires a minimum of eight (8) years of experience in performing force development related military duties, three (3) of which must be direct Headquarters, Dept of Army Staff experience or equivalent OR the experience listed in 2.4.6.

2.3.3 Senior Operations Research Systems Analyst- Required -This analytical expert will have a post-graduate degree in operations research, systems/industrial engineering, math, statistics or computer science. The person will have demonstrated the knowledge of and experience in identifying and solving real-world problems in areas such as capital investment, decision analysis supporting a business unit, system design and engineering, linear and non-linear programming and trend/predictive analysis. The demonstrated ability to collect and organize information from a variety of sources, such as computer databases, sales histories, and customer feedback. The demonstrated ability to conduct and interpret survey data from workers involved in all aspects of a problem or from others who have specialized knowledge, so that they can help solve the problem. The demonstrated ability to figure out what is relevant to a problem and what methods might be used to analyze it and brief the pertinent to senior leaders (O6-GO/SES). The demonstrated ability to use statistical analysis, simulations, predictive modeling, or other methods to analyze information and develop practical solutions to business problems. The demonstrated ability to advise Army senior leaders, managers and other decision makers on the impacts of various courses of action to take in order to address a problem. The ability to write memos, reports, and other documents explaining their findings and recommendations for Army senior leader’s managers, executives, and other officials.

2.3.4 Analyst. Required - must have a Bachelor’s Degree. Position requires a minimum of four (4) years of experience in force development related military duties or providing professional force development related management/engineering services OR the experience listed in 2.4.6. A bachelor's degree in a technical, scientific, business, or other field relevant to the support in which the individual is performing is also required.

2.3.5 Operations Research Systems Analyst- Contractor support personnel supporting the FDA Division shall be required to perform as Operations Research Systems Analyst and shall have a Bachelor's degree(s) in one or more of the following disciplines: operations research, applied mathematics, statistics, engineering (Systems or Industrial), or computer science and demonstrated experience in conducting analytical studies using a variety of mathematical, statistical, and other operations research techniques to identify and define problems, develop and investigate alternative courses of action, and present findings and recommendations. ORSA contractor support personnel shall be able to build, evaluate and model modernization, resourcing, equipment distribution and readiness using optimization software e.g., GAMS/CPLEX or SAS.

2.3.6 Graphics Specialist Required - must have a Bachelor’s Degree in a graphic arts related study; two (2) or more years of experience in graphic art, design or commercial art; proficient in several graphics programs including but not limited to Adobe Photoshop, Adobe Acrobat Pro, Adobe InDesign, Adobe Illustrator; practical experience with digital photo/video equipment; and knowledge of Macintosh and PC platforms and the ability to work in and convert files on both platforms.

2.3.7 Web Designer Required - must have a Bachelor’s Degree with a course of study in computer science or information science and three (3) years of experience in Web-based maintenance, development, design, and programming. The Position also requires a minimum of two (2) years of experience with Hypertext Mark-up Language (HTML) 3.2/4.0 at the tag level, Dynamic Hyper Text Mark-up Language (DHTML), Web and client-side Java Script programming, Microsoft server-side VBScript and ASP development, Conversion of existing images using Adobe ImageReady and PhotoShop, concept, design and implementation of SharePoint sites, and Adobe CS6 (and previous versions) Suite of tools and Final Cut Pro software.

2.4 For the purpose of personnel qualification, force development experience is defined as experience in translating Army materiel requirements into programs synchronized across the Doctrine, Organization, Training, Materiel, Leadership and Education, Personnel, and Facilities (DOTML-PF) domains in a fiscally constrained environment.

2.4.1 For the purpose of personnel qualification, supervisory experience is defined as providing oversight and assuming management responsibility for the productivity and progress of employees.

2.4.2 The contractor shall coordinate the proposed name and resumes of replacement personnel for all support personnel performing on the contract for key and non-key requirements with the Government.

2.4.3 Force development experience is defined as experience in translating Army materiel requirements into programs synchronized across the DOTML-PF domains in a fiscally constrained environment.

2.4.4 Supervisory experience is defined as experience in the act of overseeing the productivity and progress of employees.

PART 3 SPECIFIC TASKS

3.0 The following are applicable to all Department of the Army, G-8 Force Development organizations, but do not apply to contract personnel who are administrative assistants, graphic artists, or web page masters or designers:

3.1 REQUIREMENTS DEVELOPMENT SUPPORT. The contractor shall have a thorough understanding of the processes and procedures found in Army Regulation 71-9 “Army Warfighting Capabilities, “Chairman, Joint Chiefs of Staff Instruction (CJCSI) 3170.01 “Operation of The Joint Capabilities Integration and Development System” (JCIDS). The Contractor shall also possess the staff skills needed to conduct the necessary reviews and analyses of JCIDS documents related to the functioning of the Joint Requirements Oversight Council (JROC), Joint Capabilities Board (JCB), Functional Capabilities Board (FCB), Army Requirements Oversight Council (AROC), AROC Capabilities Board (ACB), AROC Review Board (ARB), AROC Functional Council (AFC), Army Marine Corps Board (AMCB), and Army Requirements and Resourcing Board (AR2B). The contractor shall prepare Division, Directorate, FD, and G8 leadership in advance of these venues. Contractor shall provide all relevant analysis to include the recommended G8 position on the proposed requirement.

3.2 MATERIEL DEVELOPMENT SUPPORT Contractor shall have a thorough understanding of the processes and procedures found in DoD Instruction 5000.02 “Operation of the Defense Acquisition System”, and the Defense Acquisition Guidebook. The Contractor shall also possess the staff skills needed to conduct the necessary reviews and analyses of acquisition documents related to the functioning of Cost Review Boards (CRB), Cost Benefit Analysis (CBAs), Overarching Integrated Product Teams (OIPT), Capabilities Based Assessments (CBA), Analysis of Alternatives (AoA) Study Questions and Sufficiency and support AoA, Study Advisory Groups (SAG) and Joint/OSD SAGs, TRADOC SAGs (TSAG), Army Systems Acquisition Review Council (ASARC), and Defense Acquisition Boards (DAB).

3.3 DATABASE AND COLLABORATIVE PROGRAM SUPPORT. Contractor shall extract and analyze data from various databases and collaborative programs used within G-8: Army Equipping Enterprise System (AE2S) and its key modules to include the Force Development Investment Information System (FDIIS), Army Flow Model (AFM), Equip the Force (EQ4), Continuous Early Validation (CEaVa), Transparency Workbooks, and the Future Years Defense Program (FYDP) Collaboration Tool, and CAMS. The contractor should also be familiar with and able to extract relevant information from the following web sites: Acquisition Information Management (AIM), Planning, Programming, and Budgeting Business Operating System (PPB BOS), SSN-LIN Automated Management and Integrating System (SLAMIS), Logistics Information Warehouse (LIW), Equipment Common Operating Picture (ECOP) and the Force Management Web Site (FMSWeb).

3.4 Directorate of Materiel (DOM): The contractor shall have the knowledge and skills identified above in addition to the following and Section 3.5 for successful performance of the following specific tasks:

3.4.1 Specific Tasks - All contractor support personnel assigned to DOM as Acquisition Officers (AOAOs)are responsible for accomplishing the following tasks:

3.4.1.1 Provide analysis, reviews, and recommendations in support of validation, prioritization, and approval of future war fighter requirements to include validation of Army JCIDS documents (ICD, CDD, CPD) in support of the AROC or JROC process.

3.4.1.2 Provide analysis, reviews, and recommendations in support of validation, prioritization, and approval of Operational Needs Statements (ONS) in support of current operations and the Army requirements.

3.4.1.3 Support the development of investment and resourcing strategies for Army and Joint programs.

3.4.1.4 Plan, program, and budget for programs to include providing recommendations for funding of approved requirements, monitoring contracts and programs during execution years and the allocation of PM identified monthly production and depot delivery quantities in support of unit level distribution and redistribution planning by Army Sustainment Command (ASC) Lead Materiel Integrator (LMI). Develop a comprehensive annual funding strategy for assigned systems using established program requirements and approved facts and assumptions with regards to funding levels, and present the strategy to leadership for approval. The funding strategy will include an investment strategy that prioritizes Research, Development, Test, and Evaluation (RDT&E) and procurement funding levels in support of approved force requirements. The contractor shall subsequently assist in the development of a Division level funding and investment strategies for the assigned portfolios.

3.4.1.5 Monitor requirement and capability developments by attending and providing leader approved inputs at meetings and decision briefings. Develops and recommends for approval the G-8 position on Mission Needs Statements, Initial Capabilities Document (ICD), Capabilities…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .