W91CRB-24-R-0024 Price List.xlsx
XLSX spreadsheet 57 KB Posted
- Attached to
- Ballistics/Non-Ballistics Testing Solicitation Federal contract opportunity
- Solicitation number
- W91CRB24R0024
About this file
This is a pricing template spreadsheet for ballistic testing services, specifically covering testing of head protection (helmets), soft armor, and hard armor under various conditions. The template includes detailed line items for different types of ballistic testing including V0/RTP testing, V50 testing, and lot acceptance testing using various ammunition types (9mm FMJ, 7.62mm FMJ, FSP, RCC) and backing materials (Roma Plastilina 1, Air Backed).
The pricing template breaks down testing services across multiple environmental conditions including ambient, extreme heat (160°F), extreme cold (-60°F), and saltwater exposure. It includes pricing lines for measurement services using FARO digital measurement and manual bridge measurement methods. The document also details specific testing parameters for Advanced Combat Helmet and Combat Vehicle Crewman helmet testing based on lot sizes ranging from 500 to 3,200 units. Each testing category includes detailed conditioning requirements and test procedures, such as temperature exposure times and measurement protocols.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91CRB-24-R-0024 Price List.pdf | ||
| W91CRB-24-R-0024 QASP.pdf | ||
| W91CRB-24-R-0024 PWS.pdf | ||
| W91CRB-24-R-0024 Solicitation.pdf | ||
| W91CRB-24-R-0024 Performance Assessment Questionnaire.docx | DOCX document | |
| W91CRB-24-R-0024 CDRL Portfolio A001-A003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Services
| Line Item | Category | Test Title/ Service Description | Unit | Price per Unit |
| GS-1 | Facility | Daily Range Support: (All personnel required to operate a range) - Standard rate | per day | |
| GS-2 | Facility | Daily Range Support: (All personnel required to operate a range) - Premium rate | per hour | |
| GS-3 | Facility | Custom Report: (at the request of the government) - Standard rate | per hour | |
| GS-4 | Facility | Custom Report: (at the request of the government) - Premium rate | per hour | |
| GS-5 | Facility | Demilitarization and test item disposal at facility - Standard rate | per hour | |
| GS-6 | Facility | Demilitarization and test item disposal at facility - Premium rate | per hour |
&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
MISCELLANEOUS SERVICES
&"-,Bold"&K000000{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE Terms:
P &P of &N
CLIN 0001 Helmets
| Line | ||
| Item | Backing Material | Test Unit |
| Condition | Test | |
| Threat | Price per |
Unit
| SLIN 1: Roma Plastilina 1 | |||
| 1 | Roma Plastilina 1 | Ambient | 124-gr 9-mm FMJ |
| 2 | Roma Plastilina 1 | Ambient | 7.62x39 M42LC, LC, GM Jacket |
| 3 | Roma Plastilina 1 | Ambient | 7.62x39 M43SS, MS, CCS Jacket |
| 4 | Roma Plastilina 1 | Ambient | 17gr FSP |
| SLIN 2: Air Backed | |||
| 1 | Air Backed | Ambient | 124-gr 9-mm FMJ |
| 2 | Air Backed | Ambient | 2gr RCC |
| 3 | Air Backed | Ambient | 4gr RCC |
| 4 | Air Backed | Ambient | 16gr RCC |
| 5 | Air Backed | Ambient | 17gr FSP |
| 6 | Air Backed | Ambient | 64gr RCC |
| SLIN 3: Head Protection Services | |||
| 1 | Digital Measurement: FARO | ||
| 2 | Manual Measurement: Bridge | ||
| 3 | Armor Conditioning: Extreme Heat | ||
| 4 | Armor Conditioning: Extreme Cold | ||
| 5 | Armor Conditioning: Saltwater | ||
| Conditioning Requirements | |||
| Ambient | 68 ± 10 °F at 50 ± 20 percent relative humidity for a minimum of 24 hours. | ||
| Extreme Heat | 160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Extreme Cold | -60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Saltwater | The saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal. |
{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
HEAD PROTECTION SERVICES
&"-,Bold"COMPETITION SENSITIVE
CLIN 0001 Head ProtectionCOND
| Line | ||
| Item | Backing Material | Test Unit |
| Condition | Test | |
| Threat | Price per |
Unit
| SLIN 1: Ambient | ||||
| A | Roma Plastilina 1 | Ambient | 124-gr 9-mm FMJ | |
| B | Air Backed | Ambient | 124-gr 9-mm FMJ | |
| C | Roma Plastilina 1 | Ambient | 7.62 mm FMJ Lead Core | |
| D | Roma Plastilina 1 | Ambient | 7.62 mm FMJ Steel Core | |
| E | Roma Plastilina 1 | Ambient | 17gr FSP | |
| F | Air Backed | Ambient | 2gr RCC | |
| G | Air Backed | Ambient | 4gr RCC | |
| H | Air Backed | Ambient | 16gr RCC | |
| I | Air Backed | Ambient | 17gr FSP | |
| J | Air Backed | Ambient | 64gr RCC | |
| SLIN 2: Extreme Heat | ||||
| A | Roma Plastilina 1 | Extreme Heat | 124-gr 9-mm FMJ | |
| B | Air Backed | Extreme Heat | 124-gr 9-mm FMJ | |
| C | Roma Plastilina 1 | Extreme Heat | 7.62 mm FMJ Lead Core | |
| D | Roma Plastilina 1 | Extreme Heat | 7.62 mm FMJ Steel Core | |
| E | Roma Plastilina 1 | Extreme Heat | 17gr FSP | |
| F | Air Backed | Extreme Heat | 2gr RCC | |
| G | Air Backed | Extreme Heat | 4gr RCC | |
| H | Air Backed | Extreme Heat | 16gr RCC | |
| I | Air Backed | Extreme Heat | 17gr FSP | |
| J | Air Backed | Extreme Heat | 64gr RCC | |
| SLIN 3: Extreme Cold | ||||
| A | Roma Plastilina 1 | Extreme Cold | 124-gr 9-mm FMJ | |
| B | Air Backed | Extreme Cold | 124-gr 9-mm FMJ | |
| C | Roma Plastilina 1 | Extreme Cold | 7.62 mm FMJ Lead Core | |
| D | Roma Plastilina 1 | Extreme Cold | 7.62 mm FMJ Steel Core | |
| E | Roma Plastilina 1 | Extreme Cold | 17gr FSP | |
| F | Air Backed | Extreme Cold | 2gr RCC | |
| G | Air Backed | Extreme Cold | 4gr RCC | |
| Line | ||||
| Item | Backing Material | Test Unit | ||
| Condition | Test | |||
| Threat | Price per |
Unit
| H | Air Backed | Extreme Cold | 16gr RCC |
| I | Air Backed | Extreme Cold | 17gr FSP |
| J | Air Backed | Extreme Cold | 64gr RCC |
| SLIN 4: Saltwater | |||
| A | Roma Plastilina 1 | Saltwater | 124-gr 9-mm FMJ |
| B | Air Backed | Saltwater | 124-gr 9-mm FMJ |
| C | Roma Plastilina 1 | Saltwater | 7.62 mm FMJ Lead Core |
| D | Roma Plastilina 1 | Saltwater | 7.62 mm FMJ Steel Core |
| E | Roma Plastilina 1 | Saltwater | 17gr FSP |
| F | Air Backed | Saltwater | 2gr RCC |
| G | Air Backed | Saltwater | 4gr RCC |
| H | Air Backed | Saltwater | 16gr RCC |
| I | Air Backed | Saltwater | 17gr FSP |
| J | Air Backed | Saltwater | 64gr RCC |
| SLIN 5: Backing Material Backface Deformation Measurement | |||
| A | Digital Measurement: FARO | ||
| B | Manual Measurement: Bridge | ||
| Conditioning Requirements | |||
| Ambient | 68 ± 10 °F at 50 ± 20 percent RH for a minimum of 24 hours. | ||
| Extreme Heat | 160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Extreme Cold | -60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Saltwater | The saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal. |
{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
HEAD PROTECTION SERVICES
&"-,Bold"COMPETITION SENSITIVE
CLIN 0001 Head Protection (Proj
| Line | ||
| Item | Backing Material | Test Unit |
| Condition | Test | |
| Threat | Price per |
Unit
| SLIN 1: Pistol Threats | ||||
| A | Roma Plastilina 1 | Ambient | 124-gr 9-mm FMJ | |
| B | Roma Plastilina 1 | Extreme Heat | 124-gr 9-mm FMJ | |
| C | Roma Plastilina 1 | Extreme Cold | 124-gr 9-mm FMJ | |
| D | Roma Plastilina 1 | Saltwater | 124-gr 9-mm FMJ | |
| E | Air Backed | Ambient | 124-gr 9-mm FMJ | |
| F | Air Backed | Extreme Heat | 124-gr 9-mm FMJ | |
| G | Air Backed | Extreme Cold | 124-gr 9-mm FMJ | |
| H | Air Backed | Saltwater | 124-gr 9-mm FMJ | |
| SLIN 2: Rifle Threats | ||||
| B | Roma Plastilina 1 | Ambient | 7.62 mm FMJ Lead Core | |
| C | Roma Plastilina 1 | Ambient | 7.62 mm FMJ Steel Core | |
| E | Roma Plastilina 1 | Extreme Heat | 7.62 mm FMJ Lead Core | |
| F | Roma Plastilina 1 | Extreme Heat | 7.62 mm FMJ Steel Core | |
| H | Roma Plastilina 1 | Extreme Cold | 7.62 mm FMJ Lead Core | |
| I | Roma Plastilina 1 | Extreme Cold | 7.62 mm FMJ Steel Core | |
| K | Roma Plastilina 1 | Saltwater | 7.62 mm FMJ Lead Core | |
| L | Roma Plastilina 1 | Saltwater | 7.62 mm FMJ Steel Core | |
| SLIN 3: Fragmentation Threats | ||||
| A | Roma Plastilina 1 | Ambient | 17gr FSP | |
| B | Roma Plastilina 1 | Extreme Heat | 17gr FSP | |
| C | Roma Plastilina 1 | Extreme Cold | 17gr FSP | |
| D | Roma Plastilina 1 | Saltwater | 17gr FSP | |
| E | Air Backed | Ambient | 2gr RCC | |
| F | Air Backed | Ambient | 4gr RCC | |
| G | Air Backed | Ambient | 16gr RCC | |
| H | Air Backed | Ambient | 17gr FSP | |
| I | Air Backed | Ambient | 64gr RCC | |
| J | Air Backed | Extreme Heat | 2gr RCC | |
| K | Air Backed | Extreme Heat | 4gr RCC | |
| Line | ||||
| Item | Backing Material | Test Unit | ||
| Condition | Test | |||
| Threat | Price per |
Unit
| L | Air Backed | Extreme Heat | 16gr RCC |
| M | Air Backed | Extreme Heat | 17gr FSP |
| N | Air Backed | Extreme Heat | 64gr RCC |
| O | Air Backed | Extreme Cold | 2gr RCC |
| P | Air Backed | Extreme Cold | 4gr RCC |
| Q | Air Backed | Extreme Cold | 16gr RCC |
| R | Air Backed | Extreme Cold | 17gr FSP |
| S | Air Backed | Extreme Cold | 64gr RCC |
| T | Air Backed | Saltwater | 2gr RCC |
| U | Air Backed | Saltwater | 4gr RCC |
| V | Air Backed | Saltwater | 16gr RCC |
| W | Air Backed | Saltwater | 17gr FSP |
| X | Air Backed | Saltwater | 64gr RCC |
| SLIN 4: Backing Material Backface Deformation Measurement | |||
| A | Digital Measurement: FARO | ||
| B | Manual Measurement: Bridge | ||
| Conditioning Requirements | |||
| Ambient | 68 ± 10 °F at 50 ± 20 percent RH for a minimum of 24 hours. | ||
| Extreme Heat | 160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Extreme Cold | -60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Saltwater | The saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal. |
{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
HEAD PROTECTION SERVICES
&"-,Bold"COMPETITION SENSITIVE
CLIN 0001 Head Protection
| Line | ||
| Item | Backing Material | Test Unit |
| Condition | Test | |
| Threat | Price per |
Unit
| SLIN 1: V0 / RTP, headform [NIJ, NIJ Multi-Size, Modified Peepsite] | ||||
| A | Roma Plastilina 1 | Ambient | 124-gr 9-mm FMJ | |
| B | Roma Plastilina 1 | Ambient | 7.62 mm FMJ Lead Core | |
| C | Roma Plastilina 1 | Ambient | 7.62 mm FMJ Steel Core | |
| D | Roma Plastilina 1 | Extreme Heat | 124-gr 9-mm FMJ | |
| E | Roma Plastilina 1 | Extreme Heat | 7.62 mm FMJ Lead Core | |
| F | Roma Plastilina 1 | Extreme Heat | 7.62 mm FMJ Steel Core | |
| G | Roma Plastilina 1 | Extreme Cold | 124-gr 9-mm FMJ | |
| H | Roma Plastilina 1 | Extreme Cold | 7.62 mm FMJ Lead Core | |
| I | Roma Plastilina 1 | Extreme Cold | 7.62 mm FMJ Steel Core | |
| J | Roma Plastilina 1 | Saltwater | 124-gr 9-mm FMJ | |
| K | Roma Plastilina 1 | Saltwater | 7.62 mm FMJ Lead Core | |
| L | Roma Plastilina 1 | Saltwater | 7.62 mm FMJ Steel Core | |
| SLIN 2: V0 / RTP, headform [NIJ, NIJ Multi-Size, Modified Peepsite] | ||||
| A | Roma Plastilina 1 | Ambient | 124-gr 9-mm FMJ | |
| B | Roma Plastilina 1 | Extreme Heat | 124-gr 9-mm FMJ | |
| C | Roma Plastilina 1 | Extreme Cold | 124-gr 9-mm FMJ | |
| D | Roma Plastilina 1 | Saltwater | 124-gr 9-mm FMJ | |
| SLIN 3: V0 / RTP - Up to 3 shots per helmet, no headform | ||||
| A | Air Backed | Ambient | 124-gr 9-mm FMJ | |
| B | Air Backed | Extreme Heat | 124-gr 9-mm FMJ | |
| C | Air Backed | Extreme Cold | 124-gr 9-mm FMJ | |
| D | Air Backed | Saltwater | 124-gr 9-mm FMJ | |
| SLIN 4: V0 / RTP Retention Hardware - Up to 2 shots per helmet, headform [NIJ w/witness plate] | ||||
| A | Air Backed | Ambient | 124-gr 9-mm FMJ | |
| B | Air Backed | Extreme Heat | 124-gr 9-mm FMJ | |
| C | Air Backed | Extreme Cold | 124-gr 9-mm FMJ | |
| D | Air Backed | Saltwater | 124-gr 9-mm FMJ | |
| Line | ||||
| Item | Backing Material | Test Unit | ||
| Condition | Test | |||
| Threat | Price per |
Unit
| SLIN 5: V0 / RTP NVD Hardware - 1 shot per helmet, headform [NIJ w/witness plate] | ||||
| A | Air Backed | Ambient | 124-gr 9-mm FMJ | |
| B | Air Backed | Extreme Heat | 124-gr 9-mm FMJ | |
| C | Air Backed | Extreme Cold | 124-gr 9-mm FMJ | |
| D | Air Backed | Saltwater | 124-gr 9-mm FMJ | |
| SLIN 6: NEYER V50 - 1 shot per Modified Peepsite, 20 shots required. | ||||
| A | Roma Plastilina 1 | Ambient | 17gr FSP | |
| B | Roma Plastilina 1 | Extreme Heat | 17gr FSP | |
| C | Roma Plastilina 1 | Extreme Cold | 17gr FSP | |
| D | Roma Plastilina 1 | Saltwater | 17gr FSP | |
| SLIN 7: V50 - Up to 10 shots per helmet shell. | ||||
| A | Air Backed | Ambient | 2gr RCC | |
| B | Air Backed | Ambient | 4gr RCC | |
| C | Air Backed | Ambient | 16gr RCC | |
| D | Air Backed | Ambient | 17gr FSP | |
| E | Air Backed | Ambient | 64gr RCC | |
| F | Air Backed | Extreme Heat | 2gr RCC | |
| G | Air Backed | Extreme Heat | 4gr RCC | |
| H | Air Backed | Extreme Heat | 16gr RCC | |
| I | Air Backed | Extreme Heat | 17gr FSP | |
| J | Air Backed | Extreme Heat | 64gr RCC | |
| K | Air Backed | Extreme Cold | 2gr RCC | |
| L | Air Backed | Extreme Cold | 4gr RCC | |
| M | Air Backed | Extreme Cold | 16gr RCC | |
| N | Air Backed | Extreme Cold | 17gr FSP | |
| O | Air Backed | Extreme Cold | 64gr RCC | |
| P | Air Backed | Saltwater | 2gr RCC | |
| Q | Air Backed | Saltwater | 4gr RCC | |
| R | Air Backed | Saltwater | 16gr RCC | |
| Line | ||||
| Item | Backing Material | Test Unit | ||
| Condition | Test | |||
| Threat | Price per |
Unit
| S | Air Backed | Saltwater | 17gr FSP |
| T | Air Backed | Saltwater | 64gr RCC |
| SLIN 8: Backing Material Backface Deformation Measurement | |||
| A | Digital Measurement: FARO | ||
| B | Manual Measurement: Bridge | ||
| Conditioning Requirements | |||
| Ambient | 68 ± 10 °F at 50 ± 20 percent RH for a minimum of 24 hours. | ||
| Extreme Heat | 160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Extreme Cold | -60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Saltwater | The saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal. |
&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
HEAD PROTECTION SERVICES
&"-,Bold"COMPETITION SENSITIVE
CLIN 0002 Soft Armor
| Line | ||
| Item | Backing Material | Test Unit |
| Condition | Test | |
| Threat | Price per |
Unit
| SLIN 4: Roma Plastilina 1 | |||
| 1 | Roma Plastilina 1 | Ambient | 2gr RCC |
| 2 | Roma Plastilina 1 | Ambient | 4gr RCC |
| 3 | Roma Plastilina 1 | Ambient | 16gr RCC |
| 4 | Roma Plastilina 1 | Ambient | 17gr FSP |
| 5 | Roma Plastilina 1 | Ambient | 64gr RCC |
| 6 | Roma Plastilina 1 | Ambient | NIJ - 9mm |
| 7 | Roma Plastilina 1 | Ambient | Non-branded - 9mm |
| 8 | Roma Plastilina 1 | Ambient | NIJ - .40 S&W |
| 9 | Roma Plastilina 1 | Ambient | NIJ - .357 Magnum |
| 10 | Roma Plastilina 1 | Ambient | NIJ - .357 SIG |
| 11 | Roma Plastilina 1 | Ambient | NIJ - .44 Magnum |
| 12 | Roma Plastilina 1 | Ambient | NIJ - 7.62 mm FMJ |
| SLIN 5: Air Backed | |||
| 1 | Air Backed | Ambient | 2gr RCC |
| 2 | Air Backed | Ambient | 4gr RCC |
| 3 | Air Backed | Ambient | 16gr RCC |
| 4 | Air Backed | Ambient | 17gr FSP |
| 5 | Air Backed | Ambient | 64gr RCC |
| 6 | Air Backed | Ambient | NIJ - 9mm |
| 7 | Air Backed | Ambient | Non-branded - 9mm |
| 8 | Air Backed | Ambient | NIJ - .40 S&W |
| 9 | Air Backed | Ambient | NIJ - .357 Magnum |
| 10 | Air Backed | Ambient | NIJ - .357 SIG |
| 11 | Air Backed | Ambient | NIJ - .44 Magnum |
| 12 | Air Backed | Ambient | NIJ - 7.62 mm FMJ |
| SLIN 6: Soft Armor Services | |||
| 1 | Digital Measurement: FARO | ||
| 2 | Manual Measurement: Bridge |
| Conditioning Requirements | |
| Ambient/Dry | 68 ± 10 °F at 50 ± 20 percent relative humidity. |
| Extreme Heat | 155 ± 10 °F for a minimum of 24 hours. The length of time for conditioning will be documented in the requirements document. The test item will be removed from conditioning, mounted, and first shot on target within 10 minutes of removal from chamber. All testing must be completed within 60 minutes from the first shot on target. If the test is not completed within 60 minutes, the test item will be reconditioned for 60 (+15, -0) minutes at the temperature specified above. |
| Extreme Cold | -60 ± 10 °F for a minimum of 24 hours.The length of time for conditioning will be documented in the requirements document. The test item will be removed from conditioning, mounted, and first shot on target within 10 minutes from removal of chamber. All testing must be completed within 60 minutes from the first shot on target. If the test is not completed within 60 minutes, the test item will be reconditioned for 60 (+15, -0) minutes at the temperature specified above. |
| Aging | Unless a different method is specified in the test item requirements document, conduct accelerated aging in general accordance with American Society of Testing and Materials (ASTM) International D1149-183, with the following modifications:a. The entire test item will be subjected to treatment. No additional tensile strain during conditioning is required. |
b. Introduce ozone into the chamber at a minimum ozone level of 50 x 10-2 ppm (50 parts per hundred million) and at a temperature of 40 ± 1 °C (104 ± 2 °F) for 72 (+1, -0) hours.
c. After accelerated aging conditioning, the armor sample under test must remain at ambient atmospheric conditions for a minimum of 24 hours prior to ballistic testing, not to exceed 36 hours from completion of conditioning.
d. The length of time for conditioning will be documented in the requirements document.
Wet Unless a different method is specified in the test item requirements document, seawater will be prepared IAW ASTM International D1141-984. Completely submerge the test item in a seawater bath such that the fluid is in contact with all exterior surfaces to allow maximum fluid penetration. If using a pan, place a 4.54 kg (10 lb) weight on a 38- x 38-cm (15- x 15-in.) plate on top of the test item in order to completely submerge the test item. If using a sink tank, clamp the test item to the rack and lower vertically into the water to completely submerge the test item. Conditioning is completed at ambient temperature. The length of time for conditioning will be documented in the requirements document. The seawater temperature will be taken and recorded on the data sheet just before the test item is removed for testing.
b. After completion of seawater conditioning, excessive seawater will be drained from the test item by hanging it vertically for 15 minutes to allow it to drip dry. The test item will be ballistically impacted within 5 minutes after completion of the drip drying time.
c. If testing is not completed within 60 minutes after the first shot on target, a new, untested test item will be conditioned as specified above, and the testing will continue with the second test item. The second test item is also subject to test completion within 60 minutes after the first shot on target.
POL/F-24 a. Unless a different method is specified in the test item requirements document, the test item will be dipped in a pan with 3.0 to 7.0 mm (0.1 to 0.3 in.) of POL as specified by the requirements document, so that the test item is fully immersed. The test item will remain immersed at ambient temperature for the length of time specified in the requirements document. The POL temperature will be recorded on the data sheet just before the test item is removed for testing.
Note: When performing the legacy standard, a 4.54 kg (10 lb) weight can be placed on a 38- x 38-cm (15- x 15-in.) plate to distribute load to allow for maximum fluid penetration.
b. After completion of POL conditioning, the test item will be hung vertically to drip dry for length of time specified in the requirement document. If specified in the requirement document, excess POL will be wiped from the surface. The test item may be inserted into a resealable, plastic anti-static bag to facilitate handling of the test item from the conditioning room to the test fixture. The test item may remain in the anti-static bag throughout testing to limit fume and POL exposure.
c. First valid shot on target must be taken within 30 minutes from removal, with testing completed within 60 minutes after the first shot. If testing is not completed within 60 minutes, another test item will be conditioned as specified above and the testing will continue with the second item.
{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
SOFT ARMOR SERVICES
&"-,Bold"COMPETITION SENSITIVE
CLIN 0003 Hard Armor
| Line | ||
| Item | Backing Material | Test Unit |
| Condition | Test | |
| Threat | Price per |
Unit
| SLIN 7: Roma Plastilina 1 | |||
| 1 | Roma Plastilina 1 | Ambient | 7.62x63 Armor Piercing Steel |
| 2 | Roma Plastilina 1 | Ambient | 7.62x54r LPS Ball Steel + Lead Slug, GM or CCS Jacket |
| 3 | Roma Plastilina 1 | Ambient | 5.56x45 Ball Hardened Steel + Lead Slug, GM or CCS Jacket |
| 4 | Roma Plastilina 1 | Ambient | 7.62x51 Ball, LC, GM or CCS Jacket |
| 5 | Roma Plastilina 1 | Ambient | 7.62x51 Armor Piercing |
| 6 | Roma Plastilina 1 | Ambient | 5.56x45 Armor Piercing |
| SLIN 8: Hard Armor Services | |||
| 1 | Digital Measurement: FARO | ||
| 2 | Manual Measurement: Bridge | ||
| 3 | Armor Conditioning: Extreme Heat | ||
| 4 | Armor Conditioning: Extreme Cold | ||
| 5 | Armor Conditioning: Saltwater | ||
| 6 | Armor Conditioning: Oil | ||
| 7 | Armor Conditioning: F-24 | ||
| 8 | Armor Conditioning: DEET | ||
| 9 | Armor Conditioning: Temperature Cycling | ||
| 10 | Armor Conditioning: Weathered | ||
| 11 | Armor Conditioning: Altitude | ||
| 12 | Armor Conditioning: Vibration | ||
| Conditioning Requirements | |||
| Ambient | 68 ± 10 °F at 50 ± 20 percent relative humidity. | ||
| Extreme Heat | 160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Extreme Cold | -60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||
| Saltwater | The saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal. | ||
| Oil | Test samples will be subjected to fluid conditioning at ambient temperatures between 15.6 and 26.7 °C (60 and 80 °F). There is no humidity requirement. Fluid conditioning equipment will consist of a fluid bath of sufficient size to allow at least one test sample of the largest size to rest horizontally, without touching the sides of the equipment. The test samples will be placed in containers of fluid: 30-weight lubricating oil of commercial grade SE or better, commercial grade JP-8, F24, or 4.6 percent saltwater. Lubricating oil, JP-8, or F24 test samples will be placed face down in a pan filled with 12.7 mm (0.50 in.) of fluid for 2 hours (+ 15 minutes) with a 9.1-kg (20-lb) weighted object placed on top of the test sample. For saltwater testing, the test sample will be completely immersed in a container of saltwater having a concentration of 4.6 percent sodium chloride (NaCl) for a minimum of 2 hours (+ 15 minutes). An alternative to saltwater is simulated sea water, prepared in accordance with (IAW) American Society for Testing and Materials (ASTM) D11414. Test samples will be held or stood vertically to drip-dry for 5 minutes upon completion of the required submersion time, after which the test sample will undergo post conditioning X-ray analysis. Shot patterns may be adjusted in response to any noted degradation of the test sample. | ||
| F-24 | |||
| DEET | |||
| Temperature Cycling | Unless directed otherwise by project documentation, temperature cycling tests will be performed in accordance with Method 503.7 of MIL-STD-810H, Procedure I-A. The extreme temperatures will be 48.9 and -31.7 °C (120 and -25 °F). The test samples will be stabilized at the appropriate temperature for a minimum of 2 hours before cycling to the other temperatures. Test samples are subjected to ballistic testing after removal from the temperature chamber and post-conditioning X-ray analysis. Shot patterns may be adjusted in response to any noted degradation of the test sample. | ||
| Weathered | The test plates will be conditioned for weather resistance in accordance with AATCC Test Method No. 169, with modifications. | ||
| Altitude | Unless a different method is specified in the test item’s requirements document, Procedure 1, Method 500.6 of MIL-STD-810H, tailored as follows will be used for this test. The test samples will be placed in an ambient air pressure chamber to simulate a 12,200-meter (40,000-ft) altitude for 1 hour. The air pressure will then be changed to simulate a 4,600-meter (15,000-ft) altitude for 1 hour. Upon completion of conditioning, a complete visual inspection will be performed. The change rate of the ambient air pressure is 460 to 610 m/min (1,500 to 2,000 ft/min). Test samples are subjected to ballistic testing after removal from the pressure chamber and post-conditioning X-ray analysis. Shot patterns may be adjusted in response to any noted degradation of the test sample. | ||
| Vibration | The vibration test will simulate a loose cargo handling environment in accordance with MIL-STD-810H, Method 514.8, Procedure II. The hard armor will be inserted strike face down into a wooden box 25.4 mm larger than the hard armor insert in all directions. Only one hard armor insert may be tested in a wooden box, per trial. The wooden box will be secured on a vibration table such that the top and bottom of the insert is parallel to the x-axis of the vibration table with the vibration caused from motion in the y- and z-axis. Figure 4 illustrates the hard armor orientation on the vibration table. The simulation of the loose cargo environment imparts a 25.4 mm peak-to-peak, circular synchronous motion to the vibration table at a frequency of 5 Hz for 1 hour. After post-conditioning X-ray analysis, the hard armor insert will be subjected to ballistic testing at the conclusion of the vibration cycle. Shot patterns may be adjusted in response to any noted degradation of the test sample. |
&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
HARD ARMOR SERVICES
&"-,Bold"COMPETITION SENSITIVE
CLIN 0001 Helmets (Alt)
| Lot Sizing | V0 | V50 | Test Notes | Minimum Price | Maximum Price |
| Advanced Combat Helmet Testing - Lot Acceptance | |||||
| Ammunition: 124-gr 9-mm FMJ, 17gr FSP | |||||
| 500 | 8 | 1 | BFD measurement required for V0. V50 is air-backed with witness plate | ||
| 501-1200 | 13 | 1 | |||
| 1201-3200 | 13 | 1 | |||
| Advanced Combat Vehicle Crewman Helmet Testing | |||||
| 500 | 8 | 1 | 9mm V0/17gr FSP V50 | ||
| 501-1200 | 13 | 1 | 9mm V0/17gr FSP V50 | ||
| 1201-3200 | 13 | 1 | 9mm V0/17gr FSP V50 | ||
| 4 | Air Backed | Ambient | 16gr RCC | ||
| 5 | Air Backed | Ambient | 17gr FSP | ||
| 6 | Air Backed | Ambient | 64gr RCC | ||
| SLIN 3: Head Protection Services | |||||
| 1 | Digital Measurement: FARO | ||||
| 2 | Manual Measurement: Bridge | ||||
| 3 | Armor Conditioning: Extreme Heat | ||||
| 4 | Armor Conditioning: Extreme Cold | ||||
| 5 | Armor Conditioning: Saltwater | ||||
| Conditioning Requirements | |||||
| Ambient | 68 ± 10 °F at 50 ± 20 percent relative humidity for a minimum of 24 hours. | ||||
| Extreme Heat | 160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||||
| Extreme Cold | -60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr. | ||||
| Saltwater | The saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal. |
{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
HEAD PROTECTION SERVICES
&"-,Bold"COMPETITION SENSITIVE
Soft Armor - V50
| V50 (BL) | |||
| Line | |||
| Item | Subtest | Backing Material | Test Unit |
| Condition | Backing Material Measurement | Test | |
| Threat | Test | ||
| Unit | Price per |
Unit
| SABL-1 | V50 (BL) | Air Backed | Ambient | None | 2gr RCC | Panel |
| SABL-2 | V50 (BL) | Air Backed | Ambient | None | 4gr RCC | Panel |
| SABL-3 | V50 (BL) | Air Backed | Ambient | None | 16gr RCC | Panel |
| SABL-4 | V50 (BL) | Air Backed | Ambient | None | 17gr FSP | Panel |
| SABL-5 | V50 (BL) | Air Backed | Ambient | None | 64gr RCC | Panel |
| SABL-6 | V50 (BL) | Air Backed | Ambient | None | NIJ - 9mm | Panel |
| SABL-7 | V50 (BL) | Air Backed | Ambient | None | Non-branded - 9mm | Panel |
| SABL-8 | V50 (BL) | Air Backed | Ambient | None | NIJ - .40 S&W | Panel |
| SABL-9 | V50 (BL) | Air Backed | Ambient | None | NIJ - .357 Magnum | Panel |
| SABL-10 | V50 (BL) | Air Backed | Ambient | None | NIJ - .357 SIG | Panel |
| SABL-11 | V50 (BL) | Air Backed | Ambient | None | NIJ - .44 Magnum | Panel |
| SABL-12 | V50 (BL) | Air Backed | Ambient | None | NIJ - 7.62 mm FMJ | Panel |
| SABL-13 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| SABL-14 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| SABL-15 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| SABL-16 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| SABL-17 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| SABL-18 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| SABL-19 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| SABL-20 | V50 (BL) | Air Backed | Ambient | None | SA Threat - | Panel |
| National Institute of Justice (NIJ) 0101.06 [Soft Armor] | ||||||
| NIJ -1 | - | - | - | - | Level IIA | Certification |
| NIJ -2 | - | - | - | - | Level II | Certification |
| NIJ -3 | - | - | - | - | Level IIIA | Certification |
{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
SOFT ARMOR SERVICES
&"-,Bold"COMPETITION SENSITIVE
CLIN xxxx Head Protection (C)
| Line | ||
| Item | Backing Material | Test Unit |
| Condition | Backing Material Measurement | Test |
| Threat | Price per |
Unit
| V0 / RTP, 1 shot per helmet, headform [NIJ, NIJ Multi-Size, Modified Peepsite] | ||||
| HLI-1 | RP1 | Ambient | None | 124-gr 9-mm FMJ |
| HLI-2 | RP1 | Ambient | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-3 | RP1 | Ambient | None | 7.62 mm FMJ Lead Core |
| HLI-4 | RP1 | Ambient | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-5 | RP1 | Ambient | None | 7.62 mm FMJ Steel Core |
| HLI-6 | RP1 | Ambient | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-7 | RP1 | Extreme Heat | None | 124-gr 9-mm FMJ |
| HLI-8 | RP1 | Extreme Heat | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-9 | RP1 | Extreme Heat | None | 7.62 mm FMJ Lead Core |
| HLI-10 | RP1 | Extreme Heat | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-11 | RP1 | Extreme Heat | None | 7.62 mm FMJ Steel Core |
| HLI-12 | RP1 | Extreme Heat | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-13 | RP1 | Extreme Cold | None | 124-gr 9-mm FMJ |
| HLI-14 | RP1 | Extreme Cold | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-15 | RP1 | Extreme Cold | None | 7.62 mm FMJ Lead Core |
| HLI-16 | RP1 | Extreme Cold | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-17 | RP1 | Extreme Cold | None | 7.62 mm FMJ Steel Core |
| HLI-18 | RP1 | Extreme Cold | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-19 | RP1 | Seawater | None | 124-gr 9-mm FMJ |
| HLI-20 | RP1 | Seawater | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-21 | RP1 | Seawater | None | 7.62 mm FMJ Lead Core |
| HLI-22 | RP1 | Seawater | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-23 | RP1 | Seawater | None | 7.62 mm FMJ Steel Core |
| HLI-24 | RP1 | Seawater | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-25 | RP1 | Saltwater | None | 124-gr 9-mm FMJ |
| HLI-26 | RP1 | Saltwater | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-27 | RP1 | Saltwater | None | 7.62 mm FMJ Lead Core |
| HLI-28 | RP1 | Saltwater | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-29 | RP1 | Saltwater | None | 7.62 mm FMJ Steel Core |
| HLI-30 | RP1 | Saltwater | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| V0 / RTP, 2 shots per helmet, headform [NIJ, NIJ Multi-Size, Modified Peepsite] | ||||
| HLI-31 | RP1 | Ambient | None | 124-gr 9-mm FMJ |
| HLI-32 | RP1 | Ambient | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-33 | RP1 | Ambient | FARO (2 shot) | 124-gr 9-mm FMJ |
| HLI-34 | RP1 | Ambient | None | 7.62 mm FMJ Lead Core |
| HLI-35 | RP1 | Ambient | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-36 | RP1 | Ambient | FARO (2 shot) | 7.62 mm FMJ Lead Core |
| HLI-37 | RP1 | Ambient | None | 7.62 mm FMJ Steel Core |
| HLI-38 | RP1 | Ambient | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-39 | RP1 | Ambient | FARO (2 shot) | 7.62 mm FMJ Steel Core |
| HLI-40 | RP1 | Extreme Heat | None | 124-gr 9-mm FMJ |
| HLI-41 | RP1 | Extreme Heat | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-42 | RP1 | Extreme Heat | FARO (2 shot) | 124-gr 9-mm FMJ |
| HLI-43 | RP1 | Extreme Heat | None | 7.62 mm FMJ Lead Core |
| HLI-44 | RP1 | Extreme Heat | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-45 | RP1 | Extreme Heat | FARO (2 shot) | 7.62 mm FMJ Lead Core |
| HLI-46 | RP1 | Extreme Heat | None | 7.62 mm FMJ Steel Core |
| HLI-47 | RP1 | Extreme Heat | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-48 | RP1 | Extreme Heat | FARO (2 shot) | 7.62 mm FMJ Steel Core |
| HLI-49 | RP1 | Extreme Cold | None | 124-gr 9-mm FMJ |
| HLI-50 | RP1 | Extreme Cold | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-51 | RP1 | Extreme Cold | FARO (2 shot) | 124-gr 9-mm FMJ |
| HLI-52 | RP1 | Extreme Cold | None | 7.62 mm FMJ Lead Core |
| HLI-53 | RP1 | Extreme Cold | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-54 | RP1 | Extreme Cold | FARO (2 shot) | 7.62 mm FMJ Lead Core |
| HLI-55 | RP1 | Extreme Cold | None | 7.62 mm FMJ Steel Core |
| HLI-56 | RP1 | Extreme Cold | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-57 | RP1 | Extreme Cold | FARO (2 shot) | 7.62 mm FMJ Steel Core |
| HLI-58 | RP1 | Seawater | None | 124-gr 9-mm FMJ |
| HLI-59 | RP1 | Seawater | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-60 | RP1 | Seawater | FARO (2 shot) | 124-gr 9-mm FMJ |
| HLI-61 | RP1 | Seawater | None | 7.62 mm FMJ Lead Core |
| HLI-62 | RP1 | Seawater | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-63 | RP1 | Seawater | FARO (2 shot) | 7.62 mm FMJ Lead Core |
| HLI-64 | RP1 | Seawater | None | 7.62 mm FMJ Steel Core |
| HLI-65 | RP1 | Seawater | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-66 | RP1 | Seawater | FARO (2 shot) | 7.62 mm FMJ Steel Core |
| HLI-67 | RP1 | Saltwater | None | 124-gr 9-mm FMJ |
| HLI-68 | RP1 | Saltwater | FARO (1 shot) | 124-gr 9-mm FMJ |
| HLI-69 | RP1 | Saltwater | FARO (2 shot) | 124-gr 9-mm FMJ |
| HLI-70 | RP1 | Saltwater | None | 7.62 mm FMJ Lead Core |
| HLI-71 | RP1 | Saltwater | FARO (1 shot) | 7.62 mm FMJ Lead Core |
| HLI-72 | RP1 | Saltwater | FARO (2 shot) | 7.62 mm FMJ Lead Core |
| HLI-73 | RP1 | Saltwater | None | 7.62 mm FMJ Steel Core |
| HLI-74 | RP1 | Saltwater | FARO (1 shot) | 7.62 mm FMJ Steel Core |
| HLI-75 | RP1 | Saltwater | FARO (2 shot) | 7.62 mm FMJ Steel Core |
| V0 / RTP - Up to 3 shots per CVC shell | ||||
| HLI-76 | Air Backed | Ambient | None | 124-gr 9-mm FMJ |
| HLI-77 | Air Backed | Extreme Heat | None | 124-gr 9-mm FMJ |
| HLI-78 | Air Backed | Extreme Cold | None | 124-gr 9-mm FMJ |
| HLI-79 | Air Backed | Seawater | None | 124-gr 9-mm FMJ |
| HLI-80 | Air Backed | Saltwater | None | 124-gr 9-mm FMJ |
| NEYER V50 - 1 shot per Modified Peepsite, 20 shots required. | ||||
| HLI-80 | RP1 | Ambient | None | 17gr FSP |
| HLI-81 | RP1 | Extreme Heat | None | 17gr FSP |
| HLI-82 | RP1 | Extreme Cold | None | 17gr FSP |
| HLI-83 | RP1 | Seawater | None | 17gr FSP |
| HLI-84 | RP1 | Saltwater | None | 17gr FSP |
| V50 - Up to 10 shots per helmet shell. | ||||
| HLI-85 | Air Backed | Ambient | None | 2gr RCC |
| HLI-86 | Air Backed | Ambient | None | 4gr RCC |
| HLI-87 | Air Backed | Ambient | None | 16gr RCC |
| HLI-88 | Air Backed | Ambient | None | 17gr FSP |
| HLI-89 | Air Backed | Ambient | None | 64gr RCC |
| HLI-90 | Air Backed | Extreme Heat | None | 2gr RCC |
| HLI-91 | Air Backed | Extreme Heat | None | 4gr RCC |
| HLI-92 | Air Backed | Extreme Heat | None | 16gr RCC |
| HLI-93 | Air Backed | Extreme Heat | None | 17gr FSP |
| HLI-94 | Air Backed | Extreme Heat | None | 64gr RCC |
| HLI-95 | Air Backed | Extreme Cold | None | 2gr RCC |
| HLI-96 | Air Backed | Extreme Cold | None | 4gr RCC |
| HLI-97 | Air Backed | Extreme Cold | None | 16gr RCC |
| HLI-98 | Air Backed | Extreme Cold | None | 17gr FSP |
| HLI-99 | Air Backed | Extreme Cold | None | 64gr RCC |
| HLI-100 | Air Backed | Seawater | None | 2gr RCC |
| HLI-101 | Air Backed | Seawater | None | 4gr RCC |
| HLI-102 | Air Backed | Seawater | None | 16gr RCC |
| HLI-103 | Air Backed | Seawater | None | 17gr FSP |
| HLI-104 | Air Backed | Seawater | None | 64gr RCC |
| HLI-105 | Air Backed | Saltwater | None | 2gr RCC |
| HLI-106 | Air Backed | Saltwater | None | 4gr RCC |
| HLI-107 | Air Backed | Saltwater | None | 16gr RCC |
| HLI-108 | Air Backed | Saltwater | None | 17gr FSP |
| HLI-109 | Air Backed | Saltwater | None | 64gr RCC |
&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE
HEAD PROTECTION SERVICES
&"-,Bold"COMPETITION SENSITIVE
File details come from the government source that posted it. Updated .