W91CRB-24-R-0024 Price List.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
Ballistics/Non-Ballistics Testing Solicitation Federal contract opportunity
Solicitation number
W91CRB24R0024
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This is a pricing template spreadsheet for ballistic testing services, specifically covering testing of head protection (helmets), soft armor, and hard armor under various conditions. The template includes detailed line items for different types of ballistic testing including V0/RTP testing, V50 testing, and lot acceptance testing using various ammunition types (9mm FMJ, 7.62mm FMJ, FSP, RCC) and backing materials (Roma Plastilina 1, Air Backed).

The pricing template breaks down testing services across multiple environmental conditions including ambient, extreme heat (160°F), extreme cold (-60°F), and saltwater exposure. It includes pricing lines for measurement services using FARO digital measurement and manual bridge measurement methods. The document also details specific testing parameters for Advanced Combat Helmet and Combat Vehicle Crewman helmet testing based on lot sizes ranging from 500 to 3,200 units. Each testing category includes detailed conditioning requirements and test procedures, such as temperature exposure times and measurement protocols.

View the file

Other files for this federal contract opportunity

Other files attached to Ballistics/Non-Ballistics Testing Solicitation, newest first.
File Type Posted
W91CRB-24-R-0024 Price List.pdf PDF
W91CRB-24-R-0024 QASP.pdf PDF
W91CRB-24-R-0024 PWS.pdf PDF
W91CRB-24-R-0024 Solicitation.pdf PDF
W91CRB-24-R-0024 Performance Assessment Questionnaire.docx DOCX document
W91CRB-24-R-0024 CDRL Portfolio A001-A003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Services

Line ItemCategoryTest Title/ Service DescriptionUnitPrice per Unit
GS-1FacilityDaily Range Support: (All personnel required to operate a range) - Standard rateper day
GS-2FacilityDaily Range Support: (All personnel required to operate a range) - Premium rateper hour
GS-3FacilityCustom Report: (at the request of the government) - Standard rateper hour
GS-4FacilityCustom Report: (at the request of the government) - Premium rateper hour
GS-5FacilityDemilitarization and test item disposal at facility - Standard rateper hour
GS-6FacilityDemilitarization and test item disposal at facility - Premium rateper hour

&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

MISCELLANEOUS SERVICES

&"-,Bold"&K000000{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE Terms:

P &P of &N

CLIN 0001 Helmets

Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SLIN 1: Roma Plastilina 1
1Roma Plastilina 1Ambient124-gr 9-mm FMJ
2Roma Plastilina 1Ambient7.62x39 M42LC, LC, GM Jacket
3Roma Plastilina 1Ambient7.62x39 M43SS, MS, CCS Jacket
4Roma Plastilina 1Ambient17gr FSP
SLIN 2: Air Backed
1Air BackedAmbient124-gr 9-mm FMJ
2Air BackedAmbient2gr RCC
3Air BackedAmbient4gr RCC
4Air BackedAmbient16gr RCC
5Air BackedAmbient17gr FSP
6Air BackedAmbient64gr RCC
SLIN 3: Head Protection Services
1Digital Measurement: FARO
2Manual Measurement: Bridge
3Armor Conditioning: Extreme Heat
4Armor Conditioning: Extreme Cold
5Armor Conditioning: Saltwater
Conditioning Requirements
Ambient68 ± 10 °F at 50 ± 20 percent relative humidity for a minimum of 24 hours.
Extreme Heat160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
Extreme Cold-60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
SaltwaterThe saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal.

{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

HEAD PROTECTION SERVICES

&"-,Bold"COMPETITION SENSITIVE

CLIN 0001 Head ProtectionCOND

Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SLIN 1: Ambient
ARoma Plastilina 1Ambient124-gr 9-mm FMJ
BAir BackedAmbient124-gr 9-mm FMJ
CRoma Plastilina 1Ambient7.62 mm FMJ Lead Core
DRoma Plastilina 1Ambient7.62 mm FMJ Steel Core
ERoma Plastilina 1Ambient17gr FSP
FAir BackedAmbient2gr RCC
GAir BackedAmbient4gr RCC
HAir BackedAmbient16gr RCC
IAir BackedAmbient17gr FSP
JAir BackedAmbient64gr RCC
SLIN 2: Extreme Heat
ARoma Plastilina 1Extreme Heat124-gr 9-mm FMJ
BAir BackedExtreme Heat124-gr 9-mm FMJ
CRoma Plastilina 1Extreme Heat7.62 mm FMJ Lead Core
DRoma Plastilina 1Extreme Heat7.62 mm FMJ Steel Core
ERoma Plastilina 1Extreme Heat17gr FSP
FAir BackedExtreme Heat2gr RCC
GAir BackedExtreme Heat4gr RCC
HAir BackedExtreme Heat16gr RCC
IAir BackedExtreme Heat17gr FSP
JAir BackedExtreme Heat64gr RCC
SLIN 3: Extreme Cold
ARoma Plastilina 1Extreme Cold124-gr 9-mm FMJ
BAir BackedExtreme Cold124-gr 9-mm FMJ
CRoma Plastilina 1Extreme Cold7.62 mm FMJ Lead Core
DRoma Plastilina 1Extreme Cold7.62 mm FMJ Steel Core
ERoma Plastilina 1Extreme Cold17gr FSP
FAir BackedExtreme Cold2gr RCC
GAir BackedExtreme Cold4gr RCC
Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

HAir BackedExtreme Cold16gr RCC
IAir BackedExtreme Cold17gr FSP
JAir BackedExtreme Cold64gr RCC
SLIN 4: Saltwater
ARoma Plastilina 1Saltwater124-gr 9-mm FMJ
BAir BackedSaltwater124-gr 9-mm FMJ
CRoma Plastilina 1Saltwater7.62 mm FMJ Lead Core
DRoma Plastilina 1Saltwater7.62 mm FMJ Steel Core
ERoma Plastilina 1Saltwater17gr FSP
FAir BackedSaltwater2gr RCC
GAir BackedSaltwater4gr RCC
HAir BackedSaltwater16gr RCC
IAir BackedSaltwater17gr FSP
JAir BackedSaltwater64gr RCC
SLIN 5: Backing Material Backface Deformation Measurement
ADigital Measurement: FARO
BManual Measurement: Bridge
Conditioning Requirements
Ambient68 ± 10 °F at 50 ± 20 percent RH for a minimum of 24 hours.
Extreme Heat160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
Extreme Cold-60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
SaltwaterThe saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal.

{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

HEAD PROTECTION SERVICES

&"-,Bold"COMPETITION SENSITIVE

CLIN 0001 Head Protection (Proj

Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SLIN 1: Pistol Threats
ARoma Plastilina 1Ambient124-gr 9-mm FMJ
BRoma Plastilina 1Extreme Heat124-gr 9-mm FMJ
CRoma Plastilina 1Extreme Cold124-gr 9-mm FMJ
DRoma Plastilina 1Saltwater124-gr 9-mm FMJ
EAir BackedAmbient124-gr 9-mm FMJ
FAir BackedExtreme Heat124-gr 9-mm FMJ
GAir BackedExtreme Cold124-gr 9-mm FMJ
HAir BackedSaltwater124-gr 9-mm FMJ
SLIN 2: Rifle Threats
BRoma Plastilina 1Ambient7.62 mm FMJ Lead Core
CRoma Plastilina 1Ambient7.62 mm FMJ Steel Core
ERoma Plastilina 1Extreme Heat7.62 mm FMJ Lead Core
FRoma Plastilina 1Extreme Heat7.62 mm FMJ Steel Core
HRoma Plastilina 1Extreme Cold7.62 mm FMJ Lead Core
IRoma Plastilina 1Extreme Cold7.62 mm FMJ Steel Core
KRoma Plastilina 1Saltwater7.62 mm FMJ Lead Core
LRoma Plastilina 1Saltwater7.62 mm FMJ Steel Core
SLIN 3: Fragmentation Threats
ARoma Plastilina 1Ambient17gr FSP
BRoma Plastilina 1Extreme Heat17gr FSP
CRoma Plastilina 1Extreme Cold17gr FSP
DRoma Plastilina 1Saltwater17gr FSP
EAir BackedAmbient2gr RCC
FAir BackedAmbient4gr RCC
GAir BackedAmbient16gr RCC
HAir BackedAmbient17gr FSP
IAir BackedAmbient64gr RCC
JAir BackedExtreme Heat2gr RCC
KAir BackedExtreme Heat4gr RCC
Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

LAir BackedExtreme Heat16gr RCC
MAir BackedExtreme Heat17gr FSP
NAir BackedExtreme Heat64gr RCC
OAir BackedExtreme Cold2gr RCC
PAir BackedExtreme Cold4gr RCC
QAir BackedExtreme Cold16gr RCC
RAir BackedExtreme Cold17gr FSP
SAir BackedExtreme Cold64gr RCC
TAir BackedSaltwater2gr RCC
UAir BackedSaltwater4gr RCC
VAir BackedSaltwater16gr RCC
WAir BackedSaltwater17gr FSP
XAir BackedSaltwater64gr RCC
SLIN 4: Backing Material Backface Deformation Measurement
ADigital Measurement: FARO
BManual Measurement: Bridge
Conditioning Requirements
Ambient68 ± 10 °F at 50 ± 20 percent RH for a minimum of 24 hours.
Extreme Heat160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
Extreme Cold-60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
SaltwaterThe saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal.

{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

HEAD PROTECTION SERVICES

&"-,Bold"COMPETITION SENSITIVE

CLIN 0001 Head Protection

Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SLIN 1: V0 / RTP, headform [NIJ, NIJ Multi-Size, Modified Peepsite]
ARoma Plastilina 1Ambient124-gr 9-mm FMJ
BRoma Plastilina 1Ambient7.62 mm FMJ Lead Core
CRoma Plastilina 1Ambient7.62 mm FMJ Steel Core
DRoma Plastilina 1Extreme Heat124-gr 9-mm FMJ
ERoma Plastilina 1Extreme Heat7.62 mm FMJ Lead Core
FRoma Plastilina 1Extreme Heat7.62 mm FMJ Steel Core
GRoma Plastilina 1Extreme Cold124-gr 9-mm FMJ
HRoma Plastilina 1Extreme Cold7.62 mm FMJ Lead Core
IRoma Plastilina 1Extreme Cold7.62 mm FMJ Steel Core
JRoma Plastilina 1Saltwater124-gr 9-mm FMJ
KRoma Plastilina 1Saltwater7.62 mm FMJ Lead Core
LRoma Plastilina 1Saltwater7.62 mm FMJ Steel Core
SLIN 2: V0 / RTP, headform [NIJ, NIJ Multi-Size, Modified Peepsite]
ARoma Plastilina 1Ambient124-gr 9-mm FMJ
BRoma Plastilina 1Extreme Heat124-gr 9-mm FMJ
CRoma Plastilina 1Extreme Cold124-gr 9-mm FMJ
DRoma Plastilina 1Saltwater124-gr 9-mm FMJ
SLIN 3: V0 / RTP - Up to 3 shots per helmet, no headform
AAir BackedAmbient124-gr 9-mm FMJ
BAir BackedExtreme Heat124-gr 9-mm FMJ
CAir BackedExtreme Cold124-gr 9-mm FMJ
DAir BackedSaltwater124-gr 9-mm FMJ
SLIN 4: V0 / RTP Retention Hardware - Up to 2 shots per helmet, headform [NIJ w/witness plate]
AAir BackedAmbient124-gr 9-mm FMJ
BAir BackedExtreme Heat124-gr 9-mm FMJ
CAir BackedExtreme Cold124-gr 9-mm FMJ
DAir BackedSaltwater124-gr 9-mm FMJ
Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SLIN 5: V0 / RTP NVD Hardware - 1 shot per helmet, headform [NIJ w/witness plate]
AAir BackedAmbient124-gr 9-mm FMJ
BAir BackedExtreme Heat124-gr 9-mm FMJ
CAir BackedExtreme Cold124-gr 9-mm FMJ
DAir BackedSaltwater124-gr 9-mm FMJ
SLIN 6: NEYER V50 - 1 shot per Modified Peepsite, 20 shots required.
ARoma Plastilina 1Ambient17gr FSP
BRoma Plastilina 1Extreme Heat17gr FSP
CRoma Plastilina 1Extreme Cold17gr FSP
DRoma Plastilina 1Saltwater17gr FSP
SLIN 7: V50 - Up to 10 shots per helmet shell.
AAir BackedAmbient2gr RCC
BAir BackedAmbient4gr RCC
CAir BackedAmbient16gr RCC
DAir BackedAmbient17gr FSP
EAir BackedAmbient64gr RCC
FAir BackedExtreme Heat2gr RCC
GAir BackedExtreme Heat4gr RCC
HAir BackedExtreme Heat16gr RCC
IAir BackedExtreme Heat17gr FSP
JAir BackedExtreme Heat64gr RCC
KAir BackedExtreme Cold2gr RCC
LAir BackedExtreme Cold4gr RCC
MAir BackedExtreme Cold16gr RCC
NAir BackedExtreme Cold17gr FSP
OAir BackedExtreme Cold64gr RCC
PAir BackedSaltwater2gr RCC
QAir BackedSaltwater4gr RCC
RAir BackedSaltwater16gr RCC
Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SAir BackedSaltwater17gr FSP
TAir BackedSaltwater64gr RCC
SLIN 8: Backing Material Backface Deformation Measurement
ADigital Measurement: FARO
BManual Measurement: Bridge
Conditioning Requirements
Ambient68 ± 10 °F at 50 ± 20 percent RH for a minimum of 24 hours.
Extreme Heat160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
Extreme Cold-60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
SaltwaterThe saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal.

&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

HEAD PROTECTION SERVICES

&"-,Bold"COMPETITION SENSITIVE

CLIN 0002 Soft Armor

Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SLIN 4: Roma Plastilina 1
1Roma Plastilina 1Ambient2gr RCC
2Roma Plastilina 1Ambient4gr RCC
3Roma Plastilina 1Ambient16gr RCC
4Roma Plastilina 1Ambient17gr FSP
5Roma Plastilina 1Ambient64gr RCC
6Roma Plastilina 1AmbientNIJ - 9mm
7Roma Plastilina 1AmbientNon-branded - 9mm
8Roma Plastilina 1AmbientNIJ - .40 S&W
9Roma Plastilina 1AmbientNIJ - .357 Magnum
10Roma Plastilina 1AmbientNIJ - .357 SIG
11Roma Plastilina 1AmbientNIJ - .44 Magnum
12Roma Plastilina 1AmbientNIJ - 7.62 mm FMJ
SLIN 5: Air Backed
1Air BackedAmbient2gr RCC
2Air BackedAmbient4gr RCC
3Air BackedAmbient16gr RCC
4Air BackedAmbient17gr FSP
5Air BackedAmbient64gr RCC
6Air BackedAmbientNIJ - 9mm
7Air BackedAmbientNon-branded - 9mm
8Air BackedAmbientNIJ - .40 S&W
9Air BackedAmbientNIJ - .357 Magnum
10Air BackedAmbientNIJ - .357 SIG
11Air BackedAmbientNIJ - .44 Magnum
12Air BackedAmbientNIJ - 7.62 mm FMJ
SLIN 6: Soft Armor Services
1Digital Measurement: FARO
2Manual Measurement: Bridge
Conditioning Requirements
Ambient/Dry68 ± 10 °F at 50 ± 20 percent relative humidity.
Extreme Heat155 ± 10 °F for a minimum of 24 hours. The length of time for conditioning will be documented in the requirements document. The test item will be removed from conditioning, mounted, and first shot on target within 10 minutes of removal from chamber. All testing must be completed within 60 minutes from the first shot on target. If the test is not completed within 60 minutes, the test item will be reconditioned for 60 (+15, -0) minutes at the temperature specified above.
Extreme Cold-60 ± 10 °F for a minimum of 24 hours.The length of time for conditioning will be documented in the requirements document. The test item will be removed from conditioning, mounted, and first shot on target within 10 minutes from removal of chamber. All testing must be completed within 60 minutes from the first shot on target. If the test is not completed within 60 minutes, the test item will be reconditioned for 60 (+15, -0) minutes at the temperature specified above.
AgingUnless a different method is specified in the test item requirements document, conduct accelerated aging in general accordance with American Society of Testing and Materials (ASTM) International D1149-183, with the following modifications:a. The entire test item will be subjected to treatment. No additional tensile strain during conditioning is required.

b. Introduce ozone into the chamber at a minimum ozone level of 50 x 10-2 ppm (50 parts per hundred million) and at a temperature of 40 ± 1 °C (104 ± 2 °F) for 72 (+1, -0) hours.

c. After accelerated aging conditioning, the armor sample under test must remain at ambient atmospheric conditions for a minimum of 24 hours prior to ballistic testing, not to exceed 36 hours from completion of conditioning.

d. The length of time for conditioning will be documented in the requirements document.

Wet Unless a different method is specified in the test item requirements document, seawater will be prepared IAW ASTM International D1141-984. Completely submerge the test item in a seawater bath such that the fluid is in contact with all exterior surfaces to allow maximum fluid penetration. If using a pan, place a 4.54 kg (10 lb) weight on a 38- x 38-cm (15- x 15-in.) plate on top of the test item in order to completely submerge the test item. If using a sink tank, clamp the test item to the rack and lower vertically into the water to completely submerge the test item. Conditioning is completed at ambient temperature. The length of time for conditioning will be documented in the requirements document. The seawater temperature will be taken and recorded on the data sheet just before the test item is removed for testing.

b. After completion of seawater conditioning, excessive seawater will be drained from the test item by hanging it vertically for 15 minutes to allow it to drip dry. The test item will be ballistically impacted within 5 minutes after completion of the drip drying time.

c. If testing is not completed within 60 minutes after the first shot on target, a new, untested test item will be conditioned as specified above, and the testing will continue with the second test item. The second test item is also subject to test completion within 60 minutes after the first shot on target.

POL/F-24 a. Unless a different method is specified in the test item requirements document, the test item will be dipped in a pan with 3.0 to 7.0 mm (0.1 to 0.3 in.) of POL as specified by the requirements document, so that the test item is fully immersed. The test item will remain immersed at ambient temperature for the length of time specified in the requirements document. The POL temperature will be recorded on the data sheet just before the test item is removed for testing.

Note: When performing the legacy standard, a 4.54 kg (10 lb) weight can be placed on a 38- x 38-cm (15- x 15-in.) plate to distribute load to allow for maximum fluid penetration.

b. After completion of POL conditioning, the test item will be hung vertically to drip dry for length of time specified in the requirement document. If specified in the requirement document, excess POL will be wiped from the surface. The test item may be inserted into a resealable, plastic anti-static bag to facilitate handling of the test item from the conditioning room to the test fixture. The test item may remain in the anti-static bag throughout testing to limit fume and POL exposure.

c. First valid shot on target must be taken within 30 minutes from removal, with testing completed within 60 minutes after the first shot. If testing is not completed within 60 minutes, another test item will be conditioned as specified above and the testing will continue with the second item.

{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

SOFT ARMOR SERVICES

&"-,Bold"COMPETITION SENSITIVE

CLIN 0003 Hard Armor

Line
ItemBacking MaterialTest Unit
ConditionTest
ThreatPrice per

Unit

SLIN 7: Roma Plastilina 1
1Roma Plastilina 1Ambient7.62x63 Armor Piercing Steel
2Roma Plastilina 1Ambient7.62x54r LPS Ball Steel + Lead Slug, GM or CCS Jacket
3Roma Plastilina 1Ambient5.56x45 Ball Hardened Steel + Lead Slug, GM or CCS Jacket
4Roma Plastilina 1Ambient7.62x51 Ball, LC, GM or CCS Jacket
5Roma Plastilina 1Ambient7.62x51 Armor Piercing
6Roma Plastilina 1Ambient5.56x45 Armor Piercing
SLIN 8: Hard Armor Services
1Digital Measurement: FARO
2Manual Measurement: Bridge
3Armor Conditioning: Extreme Heat
4Armor Conditioning: Extreme Cold
5Armor Conditioning: Saltwater
6Armor Conditioning: Oil
7Armor Conditioning: F-24
8Armor Conditioning: DEET
9Armor Conditioning: Temperature Cycling
10Armor Conditioning: Weathered
11Armor Conditioning: Altitude
12Armor Conditioning: Vibration
Conditioning Requirements
Ambient68 ± 10 °F at 50 ± 20 percent relative humidity.
Extreme Heat160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
Extreme Cold-60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
SaltwaterThe saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal.
OilTest samples will be subjected to fluid conditioning at ambient temperatures between 15.6 and 26.7 °C (60 and 80 °F). There is no humidity requirement. Fluid conditioning equipment will consist of a fluid bath of sufficient size to allow at least one test sample of the largest size to rest horizontally, without touching the sides of the equipment. The test samples will be placed in containers of fluid: 30-weight lubricating oil of commercial grade SE or better, commercial grade JP-8, F24, or 4.6 percent saltwater. Lubricating oil, JP-8, or F24 test samples will be placed face down in a pan filled with 12.7 mm (0.50 in.) of fluid for 2 hours (+ 15 minutes) with a 9.1-kg (20-lb) weighted object placed on top of the test sample. For saltwater testing, the test sample will be completely immersed in a container of saltwater having a concentration of 4.6 percent sodium chloride (NaCl) for a minimum of 2 hours (+ 15 minutes). An alternative to saltwater is simulated sea water, prepared in accordance with (IAW) American Society for Testing and Materials (ASTM) D11414. Test samples will be held or stood vertically to drip-dry for 5 minutes upon completion of the required submersion time, after which the test sample will undergo post conditioning X-ray analysis. Shot patterns may be adjusted in response to any noted degradation of the test sample.
F-24
DEET
Temperature CyclingUnless directed otherwise by project documentation, temperature cycling tests will be performed in accordance with Method 503.7 of MIL-STD-810H, Procedure I-A. The extreme temperatures will be 48.9 and -31.7 °C (120 and -25 °F). The test samples will be stabilized at the appropriate temperature for a minimum of 2 hours before cycling to the other temperatures. Test samples are subjected to ballistic testing after removal from the temperature chamber and post-conditioning X-ray analysis. Shot patterns may be adjusted in response to any noted degradation of the test sample.
WeatheredThe test plates will be conditioned for weather resistance in accordance with AATCC Test Method No. 169, with modifications.
AltitudeUnless a different method is specified in the test item’s requirements document, Procedure 1, Method 500.6 of MIL-STD-810H, tailored as follows will be used for this test. The test samples will be placed in an ambient air pressure chamber to simulate a 12,200-meter (40,000-ft) altitude for 1 hour. The air pressure will then be changed to simulate a 4,600-meter (15,000-ft) altitude for 1 hour. Upon completion of conditioning, a complete visual inspection will be performed. The change rate of the ambient air pressure is 460 to 610 m/min (1,500 to 2,000 ft/min). Test samples are subjected to ballistic testing after removal from the pressure chamber and post-conditioning X-ray analysis. Shot patterns may be adjusted in response to any noted degradation of the test sample.
VibrationThe vibration test will simulate a loose cargo handling environment in accordance with MIL-STD-810H, Method 514.8, Procedure II. The hard armor will be inserted strike face down into a wooden box 25.4 mm larger than the hard armor insert in all directions. Only one hard armor insert may be tested in a wooden box, per trial. The wooden box will be secured on a vibration table such that the top and bottom of the insert is parallel to the x-axis of the vibration table with the vibration caused from motion in the y- and z-axis. Figure 4 illustrates the hard armor orientation on the vibration table. The simulation of the loose cargo environment imparts a 25.4 mm peak-to-peak, circular synchronous motion to the vibration table at a frequency of 5 Hz for 1 hour. After post-conditioning X-ray analysis, the hard armor insert will be subjected to ballistic testing at the conclusion of the vibration cycle. Shot patterns may be adjusted in response to any noted degradation of the test sample.

&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

HARD ARMOR SERVICES

&"-,Bold"COMPETITION SENSITIVE

CLIN 0001 Helmets (Alt)

Lot SizingV0V50Test NotesMinimum PriceMaximum Price
Advanced Combat Helmet Testing - Lot Acceptance
Ammunition: 124-gr 9-mm FMJ, 17gr FSP
50081BFD measurement required for V0. V50 is air-backed with witness plate
501-1200131
1201-3200131
Advanced Combat Vehicle Crewman Helmet Testing
500819mm V0/17gr FSP V50
501-12001319mm V0/17gr FSP V50
1201-32001319mm V0/17gr FSP V50
4Air BackedAmbient16gr RCC
5Air BackedAmbient17gr FSP
6Air BackedAmbient64gr RCC
SLIN 3: Head Protection Services
1Digital Measurement: FARO
2Manual Measurement: Bridge
3Armor Conditioning: Extreme Heat
4Armor Conditioning: Extreme Cold
5Armor Conditioning: Saltwater
Conditioning Requirements
Ambient68 ± 10 °F at 50 ± 20 percent relative humidity for a minimum of 24 hours.
Extreme Heat160 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
Extreme Cold-60 ± 10 °F for a minimum of 24 hours. After exposure, test personnel will remove the helmet from the chamber, mount it, and ballistically test it within 10 min with tests completed within 30 min after the first shot on target. If the ballistic test cannot be completed within 30 min and the helmet has been out of conditioning for 1 hr or less, the helmet will be reconditioned for 1 (+24, -0) hr. If the helmet has been out of conditioning for more than 1 hr, the helmet will be reconditioned 24 (+24, -0) hr.
SaltwaterThe saltwater formulation and testing will be performed in accordance with MIL-STD-810H, Test Method 504.3 (Contamination by Fluids) using 5-percent sodium chloride (NaCI). Submerged to a depth of 3-ft. for 3-4 hours and tested within 2-hours of removal.

{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

HEAD PROTECTION SERVICES

&"-,Bold"COMPETITION SENSITIVE

Soft Armor - V50

V50 (BL)
Line
ItemSubtestBacking MaterialTest Unit
ConditionBacking Material MeasurementTest
ThreatTest
UnitPrice per

Unit

SABL-1V50 (BL)Air BackedAmbientNone2gr RCCPanel
SABL-2V50 (BL)Air BackedAmbientNone4gr RCCPanel
SABL-3V50 (BL)Air BackedAmbientNone16gr RCCPanel
SABL-4V50 (BL)Air BackedAmbientNone17gr FSPPanel
SABL-5V50 (BL)Air BackedAmbientNone64gr RCCPanel
SABL-6V50 (BL)Air BackedAmbientNoneNIJ - 9mmPanel
SABL-7V50 (BL)Air BackedAmbientNoneNon-branded - 9mmPanel
SABL-8V50 (BL)Air BackedAmbientNoneNIJ - .40 S&WPanel
SABL-9V50 (BL)Air BackedAmbientNoneNIJ - .357 MagnumPanel
SABL-10V50 (BL)Air BackedAmbientNoneNIJ - .357 SIGPanel
SABL-11V50 (BL)Air BackedAmbientNoneNIJ - .44 MagnumPanel
SABL-12V50 (BL)Air BackedAmbientNoneNIJ - 7.62 mm FMJPanel
SABL-13V50 (BL)Air BackedAmbientNoneSA Threat -Panel
SABL-14V50 (BL)Air BackedAmbientNoneSA Threat -Panel
SABL-15V50 (BL)Air BackedAmbientNoneSA Threat -Panel
SABL-16V50 (BL)Air BackedAmbientNoneSA Threat -Panel
SABL-17V50 (BL)Air BackedAmbientNoneSA Threat -Panel
SABL-18V50 (BL)Air BackedAmbientNoneSA Threat -Panel
SABL-19V50 (BL)Air BackedAmbientNoneSA Threat -Panel
SABL-20V50 (BL)Air BackedAmbientNoneSA Threat -Panel
National Institute of Justice (NIJ) 0101.06 [Soft Armor]
NIJ -1----Level IIACertification
NIJ -2----Level IICertification
NIJ -3----Level IIIACertification

{City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

SOFT ARMOR SERVICES

&"-,Bold"COMPETITION SENSITIVE

CLIN xxxx Head Protection (C)

Line
ItemBacking MaterialTest Unit
ConditionBacking Material MeasurementTest
ThreatPrice per

Unit

V0 / RTP, 1 shot per helmet, headform [NIJ, NIJ Multi-Size, Modified Peepsite]
HLI-1RP1AmbientNone124-gr 9-mm FMJ
HLI-2RP1AmbientFARO (1 shot)124-gr 9-mm FMJ
HLI-3RP1AmbientNone7.62 mm FMJ Lead Core
HLI-4RP1AmbientFARO (1 shot)7.62 mm FMJ Lead Core
HLI-5RP1AmbientNone7.62 mm FMJ Steel Core
HLI-6RP1AmbientFARO (1 shot)7.62 mm FMJ Steel Core
HLI-7RP1Extreme HeatNone124-gr 9-mm FMJ
HLI-8RP1Extreme HeatFARO (1 shot)124-gr 9-mm FMJ
HLI-9RP1Extreme HeatNone7.62 mm FMJ Lead Core
HLI-10RP1Extreme HeatFARO (1 shot)7.62 mm FMJ Lead Core
HLI-11RP1Extreme HeatNone7.62 mm FMJ Steel Core
HLI-12RP1Extreme HeatFARO (1 shot)7.62 mm FMJ Steel Core
HLI-13RP1Extreme ColdNone124-gr 9-mm FMJ
HLI-14RP1Extreme ColdFARO (1 shot)124-gr 9-mm FMJ
HLI-15RP1Extreme ColdNone7.62 mm FMJ Lead Core
HLI-16RP1Extreme ColdFARO (1 shot)7.62 mm FMJ Lead Core
HLI-17RP1Extreme ColdNone7.62 mm FMJ Steel Core
HLI-18RP1Extreme ColdFARO (1 shot)7.62 mm FMJ Steel Core
HLI-19RP1SeawaterNone124-gr 9-mm FMJ
HLI-20RP1SeawaterFARO (1 shot)124-gr 9-mm FMJ
HLI-21RP1SeawaterNone7.62 mm FMJ Lead Core
HLI-22RP1SeawaterFARO (1 shot)7.62 mm FMJ Lead Core
HLI-23RP1SeawaterNone7.62 mm FMJ Steel Core
HLI-24RP1SeawaterFARO (1 shot)7.62 mm FMJ Steel Core
HLI-25RP1SaltwaterNone124-gr 9-mm FMJ
HLI-26RP1SaltwaterFARO (1 shot)124-gr 9-mm FMJ
HLI-27RP1SaltwaterNone7.62 mm FMJ Lead Core
HLI-28RP1SaltwaterFARO (1 shot)7.62 mm FMJ Lead Core
HLI-29RP1SaltwaterNone7.62 mm FMJ Steel Core
HLI-30RP1SaltwaterFARO (1 shot)7.62 mm FMJ Steel Core
V0 / RTP, 2 shots per helmet, headform [NIJ, NIJ Multi-Size, Modified Peepsite]
HLI-31RP1AmbientNone124-gr 9-mm FMJ
HLI-32RP1AmbientFARO (1 shot)124-gr 9-mm FMJ
HLI-33RP1AmbientFARO (2 shot)124-gr 9-mm FMJ
HLI-34RP1AmbientNone7.62 mm FMJ Lead Core
HLI-35RP1AmbientFARO (1 shot)7.62 mm FMJ Lead Core
HLI-36RP1AmbientFARO (2 shot)7.62 mm FMJ Lead Core
HLI-37RP1AmbientNone7.62 mm FMJ Steel Core
HLI-38RP1AmbientFARO (1 shot)7.62 mm FMJ Steel Core
HLI-39RP1AmbientFARO (2 shot)7.62 mm FMJ Steel Core
HLI-40RP1Extreme HeatNone124-gr 9-mm FMJ
HLI-41RP1Extreme HeatFARO (1 shot)124-gr 9-mm FMJ
HLI-42RP1Extreme HeatFARO (2 shot)124-gr 9-mm FMJ
HLI-43RP1Extreme HeatNone7.62 mm FMJ Lead Core
HLI-44RP1Extreme HeatFARO (1 shot)7.62 mm FMJ Lead Core
HLI-45RP1Extreme HeatFARO (2 shot)7.62 mm FMJ Lead Core
HLI-46RP1Extreme HeatNone7.62 mm FMJ Steel Core
HLI-47RP1Extreme HeatFARO (1 shot)7.62 mm FMJ Steel Core
HLI-48RP1Extreme HeatFARO (2 shot)7.62 mm FMJ Steel Core
HLI-49RP1Extreme ColdNone124-gr 9-mm FMJ
HLI-50RP1Extreme ColdFARO (1 shot)124-gr 9-mm FMJ
HLI-51RP1Extreme ColdFARO (2 shot)124-gr 9-mm FMJ
HLI-52RP1Extreme ColdNone7.62 mm FMJ Lead Core
HLI-53RP1Extreme ColdFARO (1 shot)7.62 mm FMJ Lead Core
HLI-54RP1Extreme ColdFARO (2 shot)7.62 mm FMJ Lead Core
HLI-55RP1Extreme ColdNone7.62 mm FMJ Steel Core
HLI-56RP1Extreme ColdFARO (1 shot)7.62 mm FMJ Steel Core
HLI-57RP1Extreme ColdFARO (2 shot)7.62 mm FMJ Steel Core
HLI-58RP1SeawaterNone124-gr 9-mm FMJ
HLI-59RP1SeawaterFARO (1 shot)124-gr 9-mm FMJ
HLI-60RP1SeawaterFARO (2 shot)124-gr 9-mm FMJ
HLI-61RP1SeawaterNone7.62 mm FMJ Lead Core
HLI-62RP1SeawaterFARO (1 shot)7.62 mm FMJ Lead Core
HLI-63RP1SeawaterFARO (2 shot)7.62 mm FMJ Lead Core
HLI-64RP1SeawaterNone7.62 mm FMJ Steel Core
HLI-65RP1SeawaterFARO (1 shot)7.62 mm FMJ Steel Core
HLI-66RP1SeawaterFARO (2 shot)7.62 mm FMJ Steel Core
HLI-67RP1SaltwaterNone124-gr 9-mm FMJ
HLI-68RP1SaltwaterFARO (1 shot)124-gr 9-mm FMJ
HLI-69RP1SaltwaterFARO (2 shot)124-gr 9-mm FMJ
HLI-70RP1SaltwaterNone7.62 mm FMJ Lead Core
HLI-71RP1SaltwaterFARO (1 shot)7.62 mm FMJ Lead Core
HLI-72RP1SaltwaterFARO (2 shot)7.62 mm FMJ Lead Core
HLI-73RP1SaltwaterNone7.62 mm FMJ Steel Core
HLI-74RP1SaltwaterFARO (1 shot)7.62 mm FMJ Steel Core
HLI-75RP1SaltwaterFARO (2 shot)7.62 mm FMJ Steel Core
V0 / RTP - Up to 3 shots per CVC shell
HLI-76Air BackedAmbientNone124-gr 9-mm FMJ
HLI-77Air BackedExtreme HeatNone124-gr 9-mm FMJ
HLI-78Air BackedExtreme ColdNone124-gr 9-mm FMJ
HLI-79Air BackedSeawaterNone124-gr 9-mm FMJ
HLI-80Air BackedSaltwaterNone124-gr 9-mm FMJ
NEYER V50 - 1 shot per Modified Peepsite, 20 shots required.
HLI-80RP1AmbientNone17gr FSP
HLI-81RP1Extreme HeatNone17gr FSP
HLI-82RP1Extreme ColdNone17gr FSP
HLI-83RP1SeawaterNone17gr FSP
HLI-84RP1SaltwaterNone17gr FSP
V50 - Up to 10 shots per helmet shell.
HLI-85Air BackedAmbientNone2gr RCC
HLI-86Air BackedAmbientNone4gr RCC
HLI-87Air BackedAmbientNone16gr RCC
HLI-88Air BackedAmbientNone17gr FSP
HLI-89Air BackedAmbientNone64gr RCC
HLI-90Air BackedExtreme HeatNone2gr RCC
HLI-91Air BackedExtreme HeatNone4gr RCC
HLI-92Air BackedExtreme HeatNone16gr RCC
HLI-93Air BackedExtreme HeatNone17gr FSP
HLI-94Air BackedExtreme HeatNone64gr RCC
HLI-95Air BackedExtreme ColdNone2gr RCC
HLI-96Air BackedExtreme ColdNone4gr RCC
HLI-97Air BackedExtreme ColdNone16gr RCC
HLI-98Air BackedExtreme ColdNone17gr FSP
HLI-99Air BackedExtreme ColdNone64gr RCC
HLI-100Air BackedSeawaterNone2gr RCC
HLI-101Air BackedSeawaterNone4gr RCC
HLI-102Air BackedSeawaterNone16gr RCC
HLI-103Air BackedSeawaterNone17gr FSP
HLI-104Air BackedSeawaterNone64gr RCC
HLI-105Air BackedSaltwaterNone2gr RCC
HLI-106Air BackedSaltwaterNone4gr RCC
HLI-107Air BackedSaltwaterNone16gr RCC
HLI-108Air BackedSaltwaterNone17gr FSP
HLI-109Air BackedSaltwaterNone64gr RCC

&"-,Bold"{Test Lab Name} {Street Address} {City, State Zip code} &"-,Bold"COMPETITION SENSITIVE

HEAD PROTECTION SERVICES

&"-,Bold"COMPETITION SENSITIVE

File details come from the government source that posted it. Updated .