Attachment_3_SOW_ANA_Medical_Pharmaceutical_Supplies.pdf

PDF 67 KB Posted

Attached to
Medical Pharmaceutical Supplies in support of Afghanistan National Army (ANA)
Solicitation number
W91B4N-16-R-2013
Issued by

About this file

SOLICITATION W91B4N-16-R-2013 Medical Pharmaceutical Supplies in support of Afghanistan National Army (ANA) Attachment 3 Statement of Work

View the file

Other files

File Type Posted
Attachment_2_Version_2_W91B4N-16-R-2013.xlsx XLSX spreadsheet
Solicitation_W91B4N-16-R-2013.pdf PDF
Attachment_2_W91B4N-16-R-2013.xlsx XLSX spreadsheet
Attachment_1_W91B4N-16-R-2013.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

W91B4N-16-R-2013

STATEMENT OF WORK

AFGHANISTAN NATIONAL ARMY (ANA)

MEDICAL PHARMACEUTICAL SUPPLIES

4 September 2016

INTRODUCTION: The objective of this vendor instructions is to define requirements for delivery of pharmaceuticals for partial fulfillment of the annual medical materiel requirement for the Afghan Ministry of Defense (MOD).

1. GENERAL REQUIREMENTS: Requirements for the supplies reflected in this vendor instructions are specified throughout the document. The contractor must be knowledgeable of and comply with applicable Afghan procurement and customs laws or regulations relevant to the execution of this vendor instructions. Except as noted in paragraph 3.1, items with expiration dates must have a minimum of 12 months of shelf-life at the time of delivery. The pharmaceuticals must be manufactured pursuant to Good Manufacturing Practices (GMP) Certificate issued by competent authority as set forth in UNHCR’s Essential Medicines and Medical Supplies Policy and Guidance 2013. A copy of this guideline can be obtained from the following address or website:

UNHCR

Division of Programme Support and Management Public Health Section

CP 2500

1202 Geneva, Switzerland Email:

HQPHN@unhcr.org http://www.unhcr.org/protection/health/527baab09/unhcrs-essential-medicines-medical-supplies.html?query=policy and guidance

1.1. REQUIREMENT LIST: See “Attachment 1 and Attachment 2 – Requirement List, MOD Pharmaceuticals”.

1.2. CONTRACTOR QUALIFICATIONS: Not Used.

1.3. DELIVERY INSTRUCTIONS: See Contract Delivery Information.

1.4. METHOD OF DELIVERY: Contractor will utilize materials, equipment and work methods sufficient to successfully execute the terms and conditions of this vendor instructions. Contractor will obtain stock levels of the pharmaceuticals in quantities sufficient to ensure it can deliver the required amounts within the specified timeframe. Contractor will ensure delivery vehicles are equipped with the tools necessary (i.e. bolt cutters, wire cutters, etc.) to remove shipping container seals upon delivery. All pharmaceuticals must be new, undamaged, in the manufacturer’s original packaging, and meet required shelf-life requirements.

1.5. DELIVERY POC: The DELIVERY POC for this contract is:

ANA Logistics Command Compound Class VIII National Supply Depot Qasaba Road (a.k.a. Wings Road) North of Hamad Karzai International Airport (HKIA) Kabul, Afghanistan

1.6. ALTERNATE U.S. GOVERNMENT (USG) REPRESENTATIVES: With approval of the Contracting Officer (KO), the delivery POC may designate a USG representatives from the HQ RS Medical Institutional Advisory Team (MED IAT) to assist with coordinating and executing the contract terms and conditions.

1.7. DELIVERY LOCATION / POINTS OF CONTACT (POCs): Contractor will deliver the supplies to:

ANA Logistics Command Compound Russian Road Class VIII National Supply Depot Qasaba Road (a.k.a. Wings Road) North of Hamad Karzai International Airport (HKIA) Kabul, Afghanistan

1.8. DELIVERY SCHEDULE / COORDINATION: Contractor will deliver Attachment 1 Requirements List items no later than 90 days after acceptance of award (on or about 30 December 2016). Contractor will deliver Attachment 2 Requirements List items no later than 180 days after acceptance of award (on or about 30 March 2016). Contractor will coordinate directly with the delivery POC or designated USG representative to schedule the actual delivery date and time in order to ensure that the delivery vehicle is allowed passage through the security check points.

1.9. DELIVERY INSPECTION / INVENTORY: The delivery POC or designated USG representative must be present to accept delivery in conjunction with MOD personnel. The pharmaceuticals will be inventoried, inspected for contract compliance and, if compliant, signed for by the POC or designated USG representative. Contractor will submit the invoice to the delivery POC once the delivery is accepted. After acceptance, the USG POC will submit the vendor’s invoice together with a signed DD250 to the Afghanistan Wide Area Workflow (WAWF) POC or KO for payment.

1.10. CONTRACTOR COMMUNICATION / POINTS OF CONTACT (POCs): Due to the security situation in the Kabul area and the potential for schedule changes or delays, it is essential all parties coordinate thoroughly and communicate effectively during the delivery period in order to reduce or mitigate potential problems. To this end, contractor will provide a list of contact names with corresponding email addresses and phone numbers for both in order to ensure seamless delivery of requested supplies.

Contractor will ensure the crew of every delivery vehicle has the capability to communicate by cell phone and will provide the delivery POC or designated USG representative with the crew contact information.

2. STORAGE / HANDLING / SHIPPING REQUIREMENTS: All storage, handling, and shipping costs will be included in the price quoted. Contractor will ensure pharmaceuticals are stored and shipped in accordance with the manufacturer’s specifications.

In particular, any parameters for temperature and/or humidity limits during storage and/or shipment of a given item must be strictly observed.

2.1. DEGREE OF PROTECTION: Contractor will use the amount and type of packaging and packing material to the degree necessary to preserve, protect or otherwise preclude damage to shipping containers and the contents thereof under normal shipping and handling conditions. The degree of protection will conform to standard commercial practices, applicable carrier regulations, and manufacturer’s specifications for shipment of the item or materiel from the provider to the receiving location(s) cited in the contract.

2.2. COLD-CHAIN MANAGED ITEMS: Contractor will package and mark refrigerated items in accordance with industry standards. Items requiring refrigeration will be packed with sufficient ice (chemical gel packs or dry ice, as applicable) to maintain preservation for up to 96 hours from time of packing. Such packages will be annotated with the date/time of packing and the date/time by which the materiel must reenter refrigeration. Contractor will ensure cold-chain items are transported in refrigerated containers or delivery vehicles.

2.3. . BIOHAZARDOUS ITEMS: Contractor will package and mark flammable, biohazardous and chemical materiel in accordance with industry standards and as required by applicable law. Such items will be shipped in separate containers that are appropriate to properly and safely store the material throughout shipment.

2.4. LABELING: Material will be labeled or marked in accordance with industry standards, applicable law and regulation, or as otherwise specified herein. Commercial markings on packaging or containers that interfere with the clarity or positioning of required markings must be removed or covered.

3. ADDITIONAL REQUIREMENTS / CONDITIONS / SPECIFICATIONS.

3.1. SHELF-LIFE / PRODUCT EXPIRATION: For products with a shelf-life of 12 months or greater, the contractor must ensure the item has at least 12 months of shelf-life remaining at delivery. For products with an initial, as-manufactured shelf-life of less than 12 months, the contractor will ensure the item has at least 75% remaining on its projected shelf-life at delivery.

3.2. VARIATIONS / SUBSTITUTIONS: Only the Contracting Officer (KO) can authorize any variations or substitutions to the requirements, terms and conditions set forth in this contract. Contractor will not provide a substitute brand-named or generic product for the specified requirement without first obtaining permission from the KO.

3.3. PRODUCT RECALL NOTIFICATION: Contractor will provide information regarding product recall notification to the delivery POC within two (2) business days of notification from the manufacturer or its supplier. The delivery POC will then contact the KO in order to determine whether to cancel or identify a substitute for the item in question.

3.4. U.S. GOVERNMENT-FURNISHED ITEMS / MATERIAL: None.

3.5. Not Used

3.6. CONTRACTOR LIABILITY: Contractor will be held liable for any damage to the pharmaceuticals caused by the contractor’s failure to follow manufacturer specified shipping and handling procedures and/or by any negligent or careless acts on the part of the contractor.

File details come from the government source that posted it. Updated .