About this file

Question and Answers No. 3

View the file

Other files

File Type Posted
IH_States_facilities_NY_Sep_14_2016.pdf PDF
IH_States_facilities_NJ_Sep_14_2016.pdf PDF
Q A_2.pdf PDF
Instruction_to_Offerors.pdf PDF
Q A_1.pdf PDF
FBO_SOW_ALL_FACILITIES_WITH_LEAD_SAMPLING_GUIDE_SEP_2016-final.pdf PDF
NY-Wage_Determination.pdf PDF
NJ-Wage_Determination.pdf PDF
Pricing_example.pdf PDF
NGB_IH_Map_Encl7.pdf PDF
IH_States_facilities-NY.pdf PDF
IH_States_facilities-NJ.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Guard Bureau Industrial Hygiene Region Northeast All Areas

Questions and Answers

NO. 3

1. A concern arises that the number of maintenance employees at each facility was not provided so we are unable to ensure that 50% of maintenance employees can be monitored for noise dosimetry in the allotted sampling day as stated in section 2.1.4.2 that states “Perform dosimetry on a minimum of 50% of all maintenance employees.

Provide an explanation in the report if this cannot be accomplished.”

a. Is there any location that list how many workers are located at each facility or are we to bid on facility type/sq footage alone?

Answer: The facility information sheets has been re‐uploaded to the PR tracker with the number of personnel in each facility (broken out by maintenance and admin personnel).

2. I wanted to ensure our price quotes were correct in the assumption that we are providing a price for one full day of analysis at each facility as stated in section 1.3.2 which states "Price will include all cost factors to complete the surveys inclusive of travel cost to spend one full day at each facility. Price will not include costs for media and laboratory analyses." for a two person sampling team as stated in the sampling plan attached as attachment 9.

Answer: The cost of media, lab analysis, shipping and equipment will be paid by the regional office and are not part of the budget submissions for these survey contracts.

The winning bidder will request equipment and media from the NGB Regional IH Office, who will send the requested supplies to the contractor. FedEx labels will be included to return the equipment and send the media to the lab.

3. As for the 50% requirement for noise dosimetry, this is based on the personnel present the day of the survey. The contractor cannot control who is present for work on any given day. This can be explained in the report. Historically, we've seen good results with effective pre‐coordination to ensure the shop personnel know what is going on and are present for the survey.

Answers: Please provide in your quote whatever personnel costs you would require to enact your sampling plan.