18Q0028_Amendment_2.pdf

PDF 99 KB Posted

Attached to
Generators with 12 months maintenance for La Macarena, Colombia
Solicitation number
W913FT18Q0028
Issued by

About this file

This amendment to this solicitation is to include CMR and DBA CLINs, Change POP and delivery date to 1 June and to extend offers due date to Wednesday, 16 May 2018 at 10:00 AM. All other terms and conditions remain the same. All offerors are asked to read and respond by 16 May 2018 at 10:00. If your previously submitted offers do not change as a result of this amendment please notify the POC.

View the file

Other files

File Type Posted
W913FT-18-Q-0028_Amendment_1.pdf PDF
W913FT-18-Q-0028_Generators.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

To include CMR and DBA CLINs, Change POP and delivery date to 1 June and to extend offers due date to Wednesday, 16 May 2018 at

10:00 AM. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W913FT18Q0028

X 9B. DATED (SEE ITEM 11)

22-Mar-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-May-2018

CODE

REGIONAL CONTRACTING OFFICE (RCO) BOGOTA

CARRERA 45 NO. 24B-27

USMILGP CONTRACTING

BOGOTA

W913FT 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W913FT18Q0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Generators 45KW with installation, as needed connections and wiring. IAW the product description (PD) attached.POC: ADRIAN LUPERCIOMISSION: IIT

To:

Generators 455KW with installation, as needed connections and wiring. IAW the product description (PD) attached.POC: ADRIAN LUPERCIOMISSION: IIT

CLIN 0003 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 Lot

DBA

FFP

DBA The Contractor shall acquire, by means of an insurance policy or a self-insurance program, workers’ compensation coverage required by DBA. The estimated amount will be adjusted throughout the contract period as necessary using projected and actual labor expenditures. The contractor shall be reimbursed for reasonable, allowable, and allocable DBA insurance costs upon submission of proof of payment to the insurance provider. For more information, see FAR clause

52.228-3, Worker's Compensation Insurance."

FOB: Destination

PSC CD: 6115

NET AMT

CLIN 0004 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 Lot

CMR

FFP

CMR Contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract IAW PWS paragraph

5.X. The Offeror shall enter the direct cost for providing CMR data, if any, into the space provided at this CLIN. If no direct cost is associated with providing the data, enter No Cost.

Instructions, including the Contractor and Subcontractor User Guides, are available at the Contractor Manpower Reporting Application (CMRA) website at http://ecmra.army.mil/

PSC CD: 6115

NET AMT

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

01-MAY-2018 2 AIR FORCE BOGOTA-COLOMBIA

ADRIAN LUPERCIO ALCALA

BASE MILITAR LA MACARENA (META)

500 MTS FROM

T

LA MACARENA

57122612437

01-JUN-2018 2 AIR FORCE BOGOTA-COLOMBIA

ADRIAN LUPERCIO ALCALA

BASE MILITAR LA MACARENA (META)

500 MTS FROM

T

LA MACARENA

The following Delivery Schedule item for CLIN 0002 has been changed from:

POP 01-MAY-2018 TO

30-APR-2019

N/A AIR FORCE BOGOTA-COLOMBIA

ADRIAN LUPERCIO ALCALA

BASE MILITAR LA MACARENA (META)

500 MTS FROM

T

LA MACARENA

POP 01-JUN-2018 TO

31-MAY-2019

N/A AIR FORCE BOGOTA-COLOMBIA

ADRIAN LUPERCIO ALCALA

BASE MILITAR LA MACARENA (META)

500 MTS FROM

T

LA MACARENA

The following Delivery Schedule for CLIN 0003 has been added:

N/A AIR FORCE BOGOTA-COLOMBIA

ADRIAN LUPERCIO ALCALA

BASE MILITAR LA MACARENA (META)

500 MTS FROM

T

LA MACARENA

The following Delivery Schedule for CLIN 0004 has been added:

N/A AIR FORCE BOGOTA-COLOMBIA

ADRIAN LUPERCIO ALCALA

BASE MILITAR LA MACARENA (META)

500 MTS FROM

T

LA MACARENA

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0003:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0004:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)

File details come from the government source that posted it.