Vendor QandA for W913E524Q0016.docx
DOCX document 14 KB Posted
- Solicitation number
- W913E524Q0016
About this file
This document is a Question and Answer (Q&A) file related to a Request for Quotation (RFQ) for Trenching and Burial of Fiber Optic Cable at Moose Creek Dam, AK, Solicitation Number W913E524Q0016. The RFQ requires a contractor to perform trenching and placing of fiber optic cable at the Moose Creek Dam in North Pole, AK from September 9-13, 2024. The contractor must have previous experience with trenching, fiber optic cable installation, and HDPE fusion and testing. The vendor must provide references for at least 3 similar services performed in the past 5 years. Award will be based on the best value to the government, considering the vendor's ability to meet the technical and performance requirements, experience requirements, period of performance, and price. The Q&A file addresses questions related to the scope of work, including clarification that a separate contractor will be responsible for fiber optic cable splicing and connection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08.02 Wage Determination 2015-5683.pdf | ||
| B08.02 RFQ W913E524Q0016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor Q&A for W913E524Q0016 Trenching and Burial of Fiber Optic Cable at Moose Creek Dam, AK
Question 1: In the 2. scope, paragraph 2, it states another contractor will perform fiber optic cable splicing and connection. I would like to complete this work as well, but I did not see a posting on SAM.GOV for splicing scope.
Answer 1: The splicing portion to be completed by a second contractor is part of a larger requirement for supplies that is a sole source requirement. The notice of intent to sole source was posted to SAM.gov from May 9, 2024 through May 16, 2024 under Notice ID W913E524Q0017.
Question 2: How long of a timeframe from installation of the cable till splicing and testing will occur?
Answer 2: Once the cable has been installed, the splicing will be completed the same day. If for any reason the trenching is completed after working hours, splicing will be completed the following day.