A22_-_W913E5-15-R-0003.pdf

PDF 375 KB Posted

Attached to
Geotechnical and Environmental Drilling Services in Barrow, AK
Solicitation number
W913E5-15-R-0003
Issued by

About this file

RFP

View the file

Other files

File Type Posted
A22_-_RFP_Attachment_3_-_References.pdf PDF
A22_-_RFP_Attachment_2_-_Maps.pdf PDF
A22_-_RFP_Attachment_1_-_WD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W913E5-15-R-0003 15-Jun-2015

b. TELEPHONE NUMBER

217 373-4478

8. OFFER DUE DATE/LOCAL TIME

05:00 PM 25 Jun 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W913E59. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TOM F NOWOCIN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81EWF51288387

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ERDC CONTRACTING OFFICE

HANOVER OFFICE

72 LYME ROAD

HANOVER NH 03755-1290

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

(603) 646-4486FAX:

TEL: (603) 646-4280 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$15M

NAICS:

541360

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W913E5-15-R-0003

Section A - Solicitation/Contract Form

REPRESENTATIVES

CONTRACTOR POC:

TBD

GOVERNMENT COR:

Gary Larsen

(907) 361-3309 Gary.W.Larsen@usace.army.mil

GOVERNMENT CONTRACTING POC:

Tom Nowocin – Contract Specialist

(217) 373-4478 Tom.F.Nowocin@usace.army.mil

Ashley Jenkins – Contracting Officer

(217) 373-7297 Ashley.M.Jenkins@usace.army.mil

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

GEOTECHNICAL AND ENVIRONMENTAL DRILLING

FFP

PLANNING DOCUMENTS, MOBILIZATION AND DEMOBILIZATION,

ENVIRONMENTAL DRILLING (UVOST EXPLORATION), GEOTECHNICAL

EXPLORATION, INSTRUMENTATION CASING INSTALLATION, AND

REPORTING TO BE PERFORMED IN BARROW, ALASKA IN

ACCORDANCE WITH PERFORMANCE WORK STATEMENT (SECTION C).

FOB: Destination

MILSTRIP: W81EWF51288387

PURCHASE REQUEST NUMBER: W81EWF51288387

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

ACCOUNTING FOR CONTRACTOR SERVICES

FFP

SEE "ACCOUNTING FOR CONTRACTOR SERVICES" IN SECTION C

FOB: Destination

NET AMT

PRICING SCHEDULE

Please insert a firm fixed price where prompted below. Detailed specifications of the work to be performed under each task can be found in the Performance Work Statement (Section C).

Task 1:

Planning Documents

Price (If none, insert NSP for “Not Separately Priced”)

Task 2:

Mobilization and Demobilization

Task 3:

Environmental Drilling (UVOST Exploration)

Price (For informational purposes only, it is estimated that the Contractor will complete a minimum of 150 and a maximum of 220 UVOST probings.

Actual number of probings may vary based on field results and productivity.)

$______________________ Each Per UVOST Probing

Task 4:

Geotechnical Exploration

Price (For informational purposes only, it is estimated that geotechnical exploration will occur at a minimum rate of 90 feet per day and include a minimum of 18 and a maximum of 35 boreholes in a four (4) calendar day span. Actual number of boreholes may vary based on field results and productivity. )

$______________________ Per Borehole

Task 5:

Instrumentation Casing Installation

Price (For informational purposes only, it is estimated that the Contractor shall install 10 to 20 monitoring wells and five (5) thermistor casings in boreholes drilled for UVOST or geotechnical explorations.)

$______________________ Per Monitoring Well Installation

$______________________ Per Thermistor String Casing Installation

Task 6:

Reporting

(If none, insert NSP for “Not Separately Priced”)

Additional Days:

Per Diem

Price (Provide a fixed price per day for per diem expenses (lodging, meals & incidentals )

$______________________ Per Day

*See Sections L and M for instructions and evaluation criteria, which delineates how offeror pricing entered above will be used to establish a Total Evaluated Price (TEP) for evaluation purposes.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS) Geotechnical and Environmental Drilling

Services – FY15 NARL Airstrip and Powerhouse Sites, Barrow, Alaska

1 Introduction

1.1 Mission

1.2 Background

1.3 Scope

1.4 Anticipated Site Surface Conditions

1.5 Anticipated Site Subsurface Conditions

1.6 References

2 Performance Requirements

2.1 Tasks

2.2 Additional Drilling

2.3 Accounting for Contractor Services

Attachments:

Exhibit A: Additional Terms and Conditions for Drilling and Sampling

1. NARL Vicinity Map (Section J)

2. NARL Airstrip Location Map (Section J)

3. NARL Powerhouse Location Map (Section J)

4. References (Section J)

Performance Work Statement (PWS) 1 Introduction

The United States Army Corps of Engineers (USACE) Engineering Research and Development Center (ERDC) – Cold Regions Research and Engineering Laboratory

(CRREL) will be performing Hydrological, Ultraviolet Optical Screening Tool (UVOST), Permafrost, Thermal, and Bioremediation studies at former Navy Arctic Research Laboratory (NARL) sites in Barrow, Alaska; more specifically, the Airstrip and Powerhouse sites. A general vicinity map and location maps for the two sites are attached. The services being requested are in support of Naval Facilities Engineering Command Northwest’s (NAVFAC NW’s) Environmental Restoration program. This contract will include geotechnical and environmental drilling services to support ERDC - CRREL studies.

1.1 Mission

The current environmental cleanup program at the NARL Airstrip and

Powerhouse sites is monitored natural attenuation (MNA). The information obtained from USACE ERDC-CRREL studies could provide necessary information to allow for effective remediation and planning at the Airstrip and Powerhouse sites.

1.2 Background

The Airstrip site includes a 5,000-foot runway, a large hangar, an apron area, and other buildings. Several fuel spills occurred on the Airstrip site between 1976 and 1986. The Powerhouse site includes Building 342 (former Powerhouse), Building 442, and a construction equipment lay-down area. Four fuel spills were reported at the Powerhouse site between 1952 and 2002. In response to these spills at both sites, several investigations and remedial actions have been and continue to be performed. In 2002, approximately 2268 and 590 cubic yards of petroleum contaminated soils were removed and treated via hot-air vapor extraction (HAVE) at the Airstrip and Powerhouse sites, respectively. The treated soil was used to backfill the excavation areas. In 2012, the Navy conducted a soil investigation at the Airstrip and Powerhouse sites, including Ultraviolet Optical Screening Tool (UVOST) probing, to determine the location and magnitude of petroleum compounds that were contributing to increasing trends and cleanup level exceedences in the groundwater. The 2012 Soil Investigation Report and associated Sampling and Analysis Plan will be provided as references and are listed in the Reference Section of this Performance Work Statement.

1.3 Scope

This contract will include geotechnical and environmental drilling services to support CRREL studies at the NARL Airstrip and Powerhouse Sites in Barrow, Alaska.

Required services will include geotechnical and environmental drilling activities which in turn involve: UVOST probing, geotechnical probing/sampling, and monitoring well and thermistor casing installation. Services will also require field reporting UVOST data/results to assist CRREL with targeted additional geophysical exploration and final UVOST data/results reporting after field work is complete.

ERDC-CRREL and the Navy will prepare work plans to be reviewed by the Navy and associated government regulators. The work plans include a Sampling and Analysis Plan (SAP), Accident Prevention Plan (APP)/Site Safety and Health Plan (SSHP), and Quality Control Plan (QCP)/Environmental Protection Plan (EPP) in accordance with the Naval Facilities Engineering Command SAP Update on the Uniform Federal Policy Quality Assurance Project Plans (UFP QAPP) – Navy Sampling and Analysis Plans Tiered Approach, dated March 2005, and the Tier II Navy QAPP/SAP, dated February 15, 2011. The Contractor is expected to adhere to these plans and develop their own SSHP for the Work.

1.4 Anticipated Site Surface Conditions

The sites are accessible via motor and foot traffic, however, for the proposed drilling near Imikpuk Lake and the North Salt Lagoon, the Contractor should assume rig mats or other pressure distribution methods will be used in this area (provided by Contractor) to avoid site damage. Several relatively low areas also exist within developed areas which may be soft and wet, which may require pressure distribution methods to avoid site damage.

1.5 Anticipated Site Subsurface Conditions

Barrow, Alaska is located on the northern edge of the Arctic Coastal Plain physiographic province within the Teshekpuk Lake physiographic section. Subsurface conditions could consist of silty, sandy, gravelly man placed fills ranging from a few feet up to 10 feet thick and reportedly placed directly over a natural tundra surface with little clearing or grubbing. This fill is typically underlain by marine beach dune/ridge deposits consisting of interbedded silty sands, sandy silts, gravelly sands, and sandy gravels extending to depths on the order of 5 to 20 feet or more below mean sea level; these deposits could contain interbedded organic, peaty materials along with ground ice features including segregated ice and buried massive ice associated with polygonal ground patterns and ice-wedges, especially within the upper 10 feet below site fill.

Average ice content in the upper 10 feet below site fill typically ranges from 60 to 70 percent by volume, generally decreasing with depth to near-saturation approximately 10 to 20 feet below site fill.

The sites are within an Arctic zone and underlain by continuous permafrost.

Permafrost is defined as that part of the earth’s surface where a temperature below 32 degrees Fahrenheit has existed for two or more consecutive years. The thickness of the ‘active layer’, or the portion of the ground at or near the surface that undergoes an annual freeze-thaw cycle, is largely dependent upon the type of ground surface cover and snow depth. The active layer in the Barrow area is typically on the order of several inches to 6 feet or more but can exceed 7 or 8 feet depending on ground surface cover.

Relatively shallow groundwater is typically perched above permafrost during the thawing season at these sites; reportedly, groundwater flow at each site is generally towards Imikpuk Lake. Active layer soils are prone to caving during excavation or drilling activities, especially below groundwater. Permafrost soils are generally not as susceptible to sloughing conditions; however, saline permafrost conditions could exist.

Given barrow’s proximity to the coast and possible saline conditions, permafrost soils may have reduced ice bonded strengths at near freezing temperatures. Salinity tends to depress the soil freezing point resulting in unbonded soil particles and behavior similar to thawed soil conditions although the ground temperature may be below 32 degrees Fahrenheit (i.e. permafrost).

1.6 References and General Guidance Documents

The Contractor shall use the following references when preparing their Proposal:

• Tier II Uniform federal Policy Sampling and Analysis Plan – 2012 Soil Investigation NARL Airstrip and Powerhouse. July 18, 2012.

• Soil Investigation Report, NARL AIRSTRIP and Powerhouse Sites. October 1, 2013.

• NAVY Standard Operating Procedure (SOP): Field Procedure 5 – Groundwater Monitoring Well Installation.

• Uniform Federal Policy for Quality Assurance Project Plans. Evaluating, Assessing, and Documenting Environmental Data Collection and Use Programs. Part 1: UFP-QAPP Manual. Final Version 1. March 2005.

• Workbook for Uniform Policy for Quality Assurance Project Plans. Evaluating, Assessing, and Documenting Environmental Data Collection and Use Programs. Part2A: UFP-QUAPP Workbook. Final Version 1. March 2005.

2 Performance Requirements The following section specifies the Performance Objectives and Performance

Elements for the contract.

2.1 Tasks

Contractor shall furnish and provide all necessary labor, materials, tools, supplies and equipment, protection, and competent supervision to perform drilling, UVOST probing, sampling, and installation of instrumentation. Contractor shall perform its Work diligently with properly trained and qualified personnel and in conformance with the degree or skill and care ordinarily exercised by other professionals providing the same or similar services under the same or similar circumstances at the time and locality as the Work was provided by Contractor. Additional Terms and Conditions for Explorations, Drilling, and Sampling are attached as Exhibit A and are considered part of the Contract Documents.

Direct push subsurface drilling and sampling technology will be the primary method for geotechnical and environmental drilling activities, including use of polyvinyl chloride (PVC) disposable plastic soil-core liners; secondary methods such as hollow-stem auger adapted for use with direct push equipment or continuous sampling may also be used to supplement the primary method and support achievement of Performance Objectives. Boreholes shall be controlled by the Contractor where necessary so that material does not slough, rise, or heave into the hole. As noted, sloughing conditions could exist in boreholes drilled within the active layer and within permafrost, especially below groundwater. The contractor will be required to maintain stable borehole conditions in order to achieve the desired sampling, testing, and instrumentation installations needed for this project. Mitigating excessive water infiltration and/or caving conditions shall be the responsibility of the Contractor.

Task 1: Planning Documents

The Work Plan and associated documents, including the Site Safety and Health Plan (SSHP) and Sampling and Analysis Plan (SAP) will be prepared by ERDC-CRREL and reviewed by the Navy and associated government regulators. The draft planning documents will be submitted to the Contractor after contract award. The Contractor shall review the draft planning documents and shall prepare their own SSHP to work under.

The Contractor shall perform Work in accordance with approved Project Work Plan, SAP, and Contractor’s SSHP.

The Contractor shall prepare a project Field Work Schedule identifying mobilization, field work, and demobilization dates, including additional schedule(s) for one (1) to five

(5) days of additional drilling. The project schedule shall be developed in coordination with ERDC-CRREL. Field Work, excluding mobilization and demobilization, shall be performed from August 17 through August 30, 2015.

The Contractor’s SSHP and Field Work Schedule shall be submitted for Government review no later than 14 days after Contractor receives draft Planning Documents from ERDC-CRREL. The Government intends for these draft documents to be ready to distribute to the Contractor directly following contract award.

Task 2: Mobilization and Demobilization

The Contractor shall mobilize/demobilize all Contractor personnel, equipment, materials, and supplies required to plan, manage, perform, and document all required Work. The Government will not furnish any equipment, materials, or supplies to

Contractor. The Government will provide on-site facilities (at the Airstrip site) for securing and storing equipment, materials, and supplies during Field Work. All Field Work will be accomplished with one mobilization/demobilization effort to/from Barrow.

Task 3: Environmental Drilling (UVOST Exploration)

The Contractor shall perform Ultraviolet Optical Screening Tool (UVOST) exploration. The primary purpose of the UVOST Exploration is to assess vertical and horizontal extents of residual petroleum contamination at the Airstrip and Powerhouse Sites. The Contractor shall accomplish UVOST exploration at a minimum rate of 15 probings per day and include a minimum 150 UVOST probings and a maximum of 220 UVOST probing in a consecutive, ten (10) calendar-day span. Actual number of UVOST probings will vary based on field results and productivity.

The Contractor shall use the following assumptions when preparing their Proposal:

• UVOST exploration and reporting will be accomplished by a certified UVOST operator provided by Contractor.

• Average UVOST Probing depth will be six (6) feet below ground surface (bgs). Actual probing depth for a particular hole could be less than or greater than assumed average depth. UVOST refusal shall be considered when the probe advance decreases to a rate, mutually agreed upon, which is determined to represent the top of the permafrost table, and prevents damage to UVOST equipment. The Contractor shall record depth to the top of permafrost and refusal depth (if different) for each probing; depth shall be provided to ERDC-CRREL upon request.

• Backfill holes with drill cuttings or imported clean sand/pea gravel except for instrumentation boreholes. Backfill for Instrumentation boreholes is addressed in Task 5: Instrumentation Installation.

• No environmental analytical soil samples will be collected.

• Sampling/testing equipment decontamination will be required between each UVOST probing, as specified in Work Plan documents. Contractor disposal of field sampling wastes will be in accordance with the Project Environmental Protection Plan, Waste Management Plan, and Sampling and Analysis Plan.

• The Government anticipates that 10 (10 hour) days will be required to complete the UVOST exploration. This assumption does not include travel to and from sites each day.

• The Contractor will be required to contact a utility locate provider prior to and/or during the Work. ERDC-CRREL will identify approximate locations for UVOST probing as specified in the Work Plans. The Contractor will select the precise location for probing to avoid site damage and avoid contact with buried structures and utilities, if present.

• ERDC-CRREL Representative(s) will be on-site during drilling to log conditions and document work.

All UVOST data shall meet the following quality requirements:

• Average background fluorescence shall be less than 1.75%.

• The background fluorescence signature shall be obviously discernible from low-level petroleum contamination.

Task 4: Geotechnical Exploration

The Contractor shall perform Geotechnical Exploration. The primary purpose of the Geotechnical Exploration is to assess subsurface conditions through the active layer and into permafrost, assess groundwater conditions and depth, and assess nature and distribution of permafrost soils. The primary sampling method will be continuous, direct-push soil-coring at a minimum sample diameter of 2.5 inches; however, ERDC-CRREL may vary sampling collection depths depending on actual subsurface conditions encountered; targeted coring depths and collection of samples from drill cuttings are possible. Select portions of soil-core samples will be collected by ERDC-CRREL for geotechnical laboratory analyses. The Contractor shall accomplish Geotechnical Exploration at a minimum rate of 90 feet per day and include a minimum of 18 boreholes and a maximum of 35 boreholes in an anticipated four (4) calendar day span.

Actual number of borings will vary based on field results and productivity.

The Contractor shall use the following assumptions when preparing their Proposal:

• Average borehole depth will be fifteen (15) feet bgs. Actual hole depth for an individual hole could be less than or greater than assumed average depth and is anticipated to range from 10 feet to 20 feet bgs.

• The Government anticipates that 4 (10 hour) calendar days will be required to complete the Geotechnical Exploration. This assumption does not include travel to and from sites each day.

• Backfill holes with drill cuttings or imported clean sand/pea gravel except for instrumentation boreholes. Backfill for Instrumentation boreholes is addressed in Task 5: Instrumentation Installation.

• No environmental analytical soil samples will be collected

• Sampling/testing equipment decontamination will be required between each borehole, as specified in Work Plan documents. Contractor disposal of field decontamination wastes will be in accordance with the Project Environmental Protection Plan, Waste Management Plan, and Sampling and Analysis Plan.

• The Contractor will be required to contact a utility locate provider prior to and during the Work. ERDC-CRREL will identify approximate locations for Geotechnical Exploration. The Contractor will select the precise location for probing to avoid site damage and avoid contact with buried structures and utilities, if present.

• ERDC-CRREL Representative(s) will be on-site during drilling to log conditions and document work.

Task 5: Instrumentation Casing Installation

The Contractor shall install groundwater monitoring wells and thermistor string casings. Monitoring well casing will be installed in either Geotechnical Exploration boreholes or separate boreholes, as determined by field exploration results and required borehole diameter to accommodate instrumentation casing. Contractor shall install a minimum of ten (10) monitoring wells and a maximum of twenty (20) monitoring wells distributed between both sites, concurrent with UVOST and Geotechnical Exploration Tasks. Actual number of monitoring wells will vary based on field results and productivity.

Contractor shall install a maximum of five (5) thermistor casings in boreholes drilled for UVOST Explorations or Geotechnical Explorations; no additional boreholes will be drilled for thermistor casing installation.

Contractor will provide all instrumentation casing installation supplies and materials; ERDC-CRREL will provide thermistor strings and monitoring well development.

The Contractor shall use the following assumptions when preparing their Proposal:

• A maximum of twenty (20) groundwater monitoring wells will be installed in active layer soils above permafrost. The average depth of each well will be six

(6) feet bgs. Actual depth for an individual well could be less than or greater than assumed average depth. Each monitoring well will be installed in separate boreholes according to the Navy Standard Operating Procedure (SOP): Field Procedure 5 – Groundwater Monitoring Well Installation.

Well materials consist of flush-threaded, 2-inch-diameter, Schedule 40 polyvinyl chloride (PVC) riser pipe, 0.10-inch slot threaded flush joint well screen, end caps, and lockable slip-cover or butterfly well caps.

Minimum annular space between casing and borehole wall shall be 1-inch in all directions.

Surface completion includes nominal 3-foot PVC riser stick-up above grade, lockable cap, and reflective marking for visibility. Reflective marking color will be the same for all monitoring wells.

Backfill annular space from bottom of boring to top of screen interval with drill cuttings or imported clean sand or pea gravel. Install hydrated bentonite chip or pellet seal up a minimum of one (1) foot above top of screen interval. Backfill from top of bentonite seal to ground surface with drill cuttings or imported clean sand or pea gravel.

• Five (5) thermistor casings will be installed in active layer soils and into permafrost. Four (4) casings will be installed to approximately three (3) feet bgs; one (1) casing will be installed to approximately fifteen (15) feet bgs.

Each casing will be installed in separate boreholes.

Thermistor casing materials will consist of 1-inch-diameter Schedule 40 PVC sealed from water or soil intrusion and PVC caps. Minimum annular space between casing and borehole wall shall be 1.5-inch in all directions.

Surface completion includes nominal 3-foot PVC riser stick-up above grade, removable PVC cap, and reflective marking for visibility.

Reflective marking color will be the same for all thermistor string casing; the color shall be different from monitoring well markings.

Backfill annular space with drill cuttings or imported clean sand/pea gravel.

Task 6: Reporting

The Contractor shall submit daily results from UVOST probing during field work.

As a minimum, the Contractor shall prepare and distribute either hard copy or electronic UVOST Field Logs illustrating interval-waveform and select point-waveform results. The field logs shall identify location, number, date, and relative depth for each UVOST probing. ERDC-CRREL representatives will use the Contractor’s daily results to target probing further exploration locations and plan additional geophysical exploration;

ERDC-CRREL will perform geophysical exploration.

Before demobilization from Barrow, the Contractor shall submit all UVOST data files and field notes to ERDC-CRREL representatives. The Contractor shall prepare and submit a draft UVOST exploration report to ERDC-CRREL describing field work, methods and equipment, presenting data results displayed on UVOST logs and site plan maps. The draft report shall also contain Contractor’s interpretation of the results and quality control methods used. ERDC-CRREL, the Navy and associated government regulators will review the draft report and provide comments. Contractor shall incorporate review comments, prepare a final report, and submit to ERDC-CRREL.

Reporting requirements and submittals are as listed below:

ITEM DUE FORMAT

Contractor SSHP and Field Work Schedule

14 days after Contractor receives Planning Documents from ERDC-CRREL

Electronic

Daily UVOST Logs Daily Hard copy or Electronic

UVOST Data Files Before Contractor demobilization from project site

Electronic

Draft UVOST Exploration Report Four Weeks After Field Work is Completed Electronic

Final UVOST Report Two weeks after Contractor receives comments from ERDC-CRREL

Electronic

The Contractor shall be responsible for the hard copy and/or electronic delivery of submittals. The Contractor shall send a letter of transmittal listing the material being submitted with each submission. The letter shall reference the project title and location.

Submittals shall be made to:

Contact e-mail Phone

Kevin Bjella Kevin.Bjella@usace.army.mil 907-361-5171

Quentin Gehring Quentin.P.Gehring@usace.army.mil 907-361-3319

Anna Wagner Anna.M.Wagner@usace.army.mil 907-361-5459

Kendra Leibman kendra.leibman@navy.mil 360-396-0022

2.2 Additional Drilling

Based on field conditions, results, and/or Government delays, additional field days, not to exceed five (5) additional 10-hour workdays in Barrow, Alaska, for UVOST and/or Geotechnical Exploration may be required. The additional exploration consists of the same field work and reporting requirements (as applicable) as detailed inTasks 3, 4, and 5. Additional exploration will not exceed the maximum quantities identified in the tasks above.

2.3 Accounting for Contractor Services: The Office of the Assistant Secretary of the Army (Manpower & Reserved Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil/. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-contractors); (7) Total payments (including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language: and (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of https://contractor/ performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.

NDAA DATA

UIC W2R2AA - Military Appropriations

FSC B518

Contract Number Contract Fiscal Year 2015 Form of Contract Action Definitive Contract Contract Type Firm Fixed Price PBSA Yes Non-DoD Purchasing Agency (leave blank) Competed Action Full and Open Competition If Competed, number of offerors 2 Small Business Yes or No Small Disadvantaged Business Yes or No Women-owned Small Business Yes or No DoD Administering Component USA- USACE CRREL, Hanover Contracting Organization USA- USACE CRREL, Hanover

Exhibit A

Additional Terms and Conditions for Drilling and Sampling

General Requirements. Contractor shall provide all equipment, supplies, material, and personnel necessary to perform drilling, sampling, and installation of instrumentation in the approximate amount(s) and at the approximate location(s) indicated in this Contract. Depth(s) and number(s) of boring(s) and test pit(s) shall be as indicated in this Contract.

Site Damage. Contractor shall be responsible for exercising reasonable care in drilling holes, excavating test pits, and operating other equipment in the vicinity of utilities or structures, whether overhead, at ground level, or buried. Contractor and its subcontractors shall take reasonable precautions to help minimize damage to the project site. Contractor shall be responsible for all damage to property and injury to persons caused by the negligent or wrongful acts, errors, omissions, or breach of contract of Contractor or as a result of settlement of backfill in the drill holes. Contractor shall repair wheel ruts and marks, and restore the ground surface to its former condition. All surplus material shall be removed and the site left in a neat condition. To the extent of Contractor’s and its subconsultant’s negligent or wrongful acts, errors, omissions, or breach of contract, Contractor shall, only to the fullest extent permitted by law, indemnify, defend and hold Government harmless from any claim or liability arising from any the project site damage caused by Government’s and its Contractor’s operations.

Buried Structures. If there are any buried structures and/or utilities on the project site where subsurface explorations are to take place, the Government shall provide Contractor with a plan showing their existing locations. The Government shall contact a utility locator service to request that they identify any public utilities. Contractor shall use reasonable care and diligence to avoid contact with buried structures and/or utilities as shown. Contractor shall not be liable for any loss or damage to buried structures and/or utilities resulting from inaccuracy of the plans, or lack of plans, or errors by the locator service relating to the location of buried structures and/or utilities. To the extent of Contractor’s and its subconsultant’s negligent or wrongful acts, errors, omissions, or breach of contract, Contractor shall, only to the fullest extent permitted by law, indemnify, defend, and hold Government harmless from any claim or liability arising from damage to buried structures and/or utilities caused by Contractor’s and its subcontractor’s operations.

Aquifer Cross-Contamination. Contractor shall take reasonable precautions to avoid contamination of soil or groundwater during subsurface exploration when drilling or sampling tools are advanced through a contaminated area, linking it to an aquifer, underground stream, or other hydrous body not previously contaminated and capable of spreading contaminants off the project site. To the extent of Contractor’s and its subconsultant’s negligent or wrongful acts, errors, omissions, or breach of contract, Contractor shall, only to the fullest extent permitted by law, indemnify, defend, and hold Government harmless from any claim or liability arising from cross-contamination caused by Contractor’s and its subcontractor’s operations.

Pollution Control. Contractor shall be responsible for compliance with all applicable federal, state, and local laws and regulations pertaining to hazardous or toxic substances used in, generated by, or released as a result of Contractor’s work. To the extent of Government’s and its subconsultant’s negligent or wrongful acts, errors, omissions, or breach of contract, Contractor shall, only to the fullest extent permitted by law, indemnify, defend, and hold Government harmless from any claim or liability arising from any hazardous or toxic substances used in, generated by, or released as a result of Contractor’s and its subcontractor’s operations.

Barricades and Traffic Control. Contractor shall be responsible for supplying barricades, traffic control, and flaggers as needed for Contractor operations on streets and roads. The type of barricade and procedures for placement and use shall conform to the requirements set forth by the applicable governmental entity.

Compliance with Law, Contract Documents, and Safety – Contractor shall be solely responsible for all matters dealing with safety in performing Contractor’s work. This includes the safety of all persons and property affected by Contractor’s work, including Contractor’s own employees and all employees of subcontractors that may perform on Contractor’s behalf.

Government shall not be responsible for Contractor’s means, methods, techniques, sequences, or procedures of construction selected by Contractor, or safety precautions and programs incident to Contractor’s work (other than those solely and exclusively for Government’s own employees), nor be required to ensure that Contractor complies with any laws and regulations applicable to Contractor’s work, all of which are the sole responsibility of Contractor. This requirement will apply continuously, regardless of time or place, and will in no way be altered because a representative of Government is present at the project site performing his/her duties. Notwithstanding anything to the contrary, Government shall never be deemed to have assumed responsibility for site safety for Contractor’s work by either contract or conduct. No act or direction by Government shall be deemed to be the exercise of supervision or control of Contractor’s employees or the direction of Contractor’s performance hereunder. Any direction provided by Government shall be deemed only to ensure Contractor’s general overall compliance with Government’s design concept and this Agreement. No act or direction by Government shall be construed as the acceptance of any services, labor, work, goods, materials, or procedures that do not strictly comply with this Agreement.

Right-of-Entry and Access. Government will determine the approximate location of each drill hole and/or test pit on the site and obtain the necessary rights-of-entry to the site. Where conditions are imposed as a prerequisite of entry, Government will inform Contractor of those conditions, and Contractor shall be solely responsible for complying with them. Contractor shall select the precise locations for drilling or excavating in the general area indicated by Government. Government shall furnish uninterrupted access to and from the site for all equipment, supplies, material, and personnel associated with the work. Where temporary access roads are required to be built, Contractor shall determine the route to the drill hole(s) or test pit(s).

Permits. Government will secure all governmental permits required for operation of drilling and excavating equipment on streets, roadways, or sidewalks. Contractor shall obtain all necessary business and professional licenses, certifications, and registrations necessary to perform its work, including, but not limited to, a contractor’s and well driller’s/operator’s license, if required.

Compliance with Law. Contractor shall comply with all applicable federal, and state, local laws, regulations, standards, and codes pertaining to the construction, sampling, instrumentation, and decommissioning of wells, soil borings, and test pits.

Inspection by Government. Drilling and sampling of test pits shall be accomplished only in the presence of a representative of Government.

Drilling and Sampling Procedure. After Contractor has selected the precise location for the drill hole, the hole shall be advanced by any method satisfactory to Government, and shall not disturb the material to be sampled at the bottom of the hole.

The hole shall be controlled by Contractor where necessary by use of water, drilling mud, and casing so that material does not cave, rise, or heave into the hole. The methods used must prevent groundwater contamination. At depths as indicated in this Contract, and as otherwise requested by a representative of Government, samples of the material below the bottom of the hole, or at other locations, shall be obtained by Contractor using methods approved by Government.

At all times, Contractor shall proceed in such a manner as to prevent contamination of the ground or groundwater, which may result from the spillage of drilling lubricants or fuels and similar substances. In addition, Contractor shall take necessary steps to prevent any cross-contamination between aquifers during drilling. Contractor shall backfill all drill holes in accordance with applicable rules and regulations.

When appropriate, Government may specify backfill procedures and materials different from the suggested minimum standards;

nevertheless, Contractor shall take the necessary steps to meet or exceed the applicable standards. After each drill hole is completed, Contractor shall backfill in such a manner that the edges of the hole will not cave in and the backfill will not settle.

Should the hole backfill settle, Contractor shall immediately refill the hole to the ground surface.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

Section F - Deliveries or Performance

FIELD WORK

As denoted in the Performance Work Statement, Field Work (excluding mobilization and demobilization) shall be performed from 17 August 2015 through 30 August 2015. One (1) to five (5) days of additional field work may be requested for Tasks 3, 4, and/or 5 based on field conditions, results, and/or Government delays.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 01-JUL-2015 TO

30-SEP-2015

N/A PR W2R2 COLD RGNS RSCH ENG LAB

FORCE PROJECTION & SUSTAINMENT

BR

SUPPLY SECTION

72 LYME ROAD

HANOVER NH 03755-1290

603-646-4301

W14GQK

0002 POP 01-JUL-2015 TO

30-SEP-2015

N/A N/A

CLAUSES INCORPORATED BY REFERENCE

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

INVOICING INSTRUCTIONS

The Contractor shall only be permitted to invoice for the work that is performed, and in accordance with the fixed prices delineated in the Section B Pricing Schedule.

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

TO BE PROVIDED IN AWARD DOCUMENT

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

TO BE PROVIDED IN AWARD DOCUMENT

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC TO BE PROVIDED IN AWARD DOCUMENT Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

TO BE PROVIDED IN AWARD DOCUMENT

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

TO BE PROVIDED IN AWARD DOCUMENT

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

Section I - Contract Clauses

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

APR 1984

52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7012 Safeguarding of Unclassified Controlled Technical

Information

NOV 2013

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Nov 2014)

NOV 2014

252.225-7002 Qualifying Country Sources As Subcontractors DEC 2012 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7048 Export-Controlled Items JUN 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2015)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014)

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (July 2013) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L.

111-117, section 743 of Div. C).

_X__ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug, 2013) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).

____ (10)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .