Answers to Requests for Information (RFI’s) for OHARNG Asphalt 10AUG18:
1) Are we stock pilling or are we delivering to a paving machine?
The asphalt will be poured into a paving machine.
2) How far inside the main gate is the delivery point, approximately, in miles?
Approximately 3.5 miles