PWS_ASTRO_Draft_20261117.docx
DOCX document 130 KB Posted
- Solicitation number
- W9133L27RASTRO
About this file
This is a Performance Work Statement (PWS) for Aviation Standardization, Training, Readiness, and Operations Support Services (ASTRO) for the Army National Guard Air and Space Division (ARNG-ASD), effective November 16, 2026, with a one-year base period and three option years (two 12-month periods and one 4.3-month period).
The contractor must provide comprehensive support across five primary functional areas: TADSS (Training Aids, Devices, Simulations and Simulators) program management, including quarterly analyses of training requirements and device capacity utilization; UAS (Unmanned Aircraft System) Equipment Integration and Training Support, including subject matter expertise on airspace coordination, Certificates of Authorization, operator qualification requirements across Group 1-5 UAS platforms, and standardization procedures; TASMG (Theater Aviation Sustainment Maintenance Group) Support analysis involving daily coordination with TASMG facilities in Connecticut, California, Missouri, and Mississippi regarding maintenance readiness and lifecycle sustainment across all ARNG aircraft platforms; Aviation Data Science and Visualization analysis utilizing Power BI, SQL, and DAX to track readiness metrics across all 54 states and territories; and Aviation Standardization Use of Aircraft Services, including processing MILAIR travel requests, orientation flight requests, and providing subject matter expertise to senior leadership. Performance must occur at Herbert R. Temple Jr. Army National Guard Readiness Center in Arlington, Virginia, during core hours of 0730-1630 Monday through Friday, with telework permitted. The contractor must submit monthly status reports by the 5th business day of the following month, provide a Quality Control Plan within 15 days of award, complete all required security training (AT Level 1, iWATCH, OPSEC, CUI, CIAR, and classified information handling) within 30 days of onboarding, and maintain numerous deliverables including quarterly TADSS assessments, UAS tracking and forecasting data, TASMG documentation, and ETMS2 task processing with routine deliverables due within 2-10 business days and critical deliverables within 4-8 hours. The contractor must designate an on-site lead with full contract authority, ensure all personnel maintain Common Access Cards with Tier 1 background investigations minimum, comply with all installation security and access requirements, and report all contractor labor hours annually via SAM.gov Service Contract Reporting by October 31.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS) FOR
Aviation Standardization, Training, Readiness, and Operations Support Services (ASTRO)
November 16, 2026 1 General:
1.1 Scope: The Contractor must provide analysis to the Army National Guard Air and Space Division (ARNG-ASD) to support the development of strategies and programs that synchronize and support the ARNG Aviation Enterprise. The functions include: Training Aids, Devices, Simulations and Simulators (TADSS) analyst; Unmanned Aircraft System (UAS) Equipment Integration and Training Support services; Aviation Data Science and Visualization analyst, Theater Aviation Sustainment Maintenance Group (TASMG) Support analyst and Aviation Standardization Use of Aircraft Services. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control necessary to meet the Government’s requirement as defined in this PWS.
1.2 Objectives and Background: The Army National Guard Air and Space Division requires comprehensive support to manage the complex synchronization, modernization, and readiness tracking of the ARNG Aviation Enterprise. Operating within a fiscally constrained and evolving strategic environment, ARNG Aviation remains decisively engaged in Overseas Contingency Operations (OCO) and Defense Support of Civil Authorities (DSCA) missions. To ensure the ARNG Aviation force remains trained, ready, and compliant as an operational reserve, ARNG-ASD must continually program and synchronize resourcing, training, equipment integration, and policy enforcement. Under no circumstances will Contractor personnel operate as Government officials, perform Inherently Governmental Functions (IGF), or engage in situations that closely associate with IGF as defined by FAR Subpart 7.5 and Office of Federal Procurement Policy (OFPP) Policy Letter 11-01.
1.3 Period of Performance (PoP): The Period of Performance will be One (1) Base Year is 12 months, Option Years One and Two are 12-month periods. Option Year 3 is 4.3 months.
1.4 General Information: The contractor must remain solely responsible for the supervision, management, and scheduling of all contractor personnel. In the event the Government restricts or revokes access for any contractor employee, such actions do not relieve the contractor of its obligation to meet contract schedules and deliverables.
Place and Performance of Services: The contractor may provide services between the hours of 07:30-1630 local time on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. During Defense Support to Civil Authorities (DSCA)responses, personnel performance hours will be adjusted to that of the Army National Guard’s Battle Rhythm.
1.4.1.1 Performance must be at Herbert R. Temple Jr. Army National Guard Readiness Center (formerly Arlington Hall Station), Aviation and Safety Division, 111 South George Mason Dr. Arlington, Va. 22204. The contractor must at all times maintain a work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. The contractor must keep in mind that the stability and continuity of the work force are essential.
1.4.2 Telework: The Government will permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. The contractor must provide to the COR an initial telework plan for review by the Government within 10 workdays after award of the contract. The Government will review the plan with the contractor. Telework must be at no additional cost to the Government. (Deliverable 1)
1.4.3 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.4 Contractor Responsibilities:
1.4.4.1 On-Site Conduct & Rules: contractor employees must know and obey all installation regulations, including fire, traffic, safety, and security rules.
1.4.4.2 Access Control: Personnel may only enter restricted areas when strictly required for performance and must obtain prior government approval. Proper identification must be carried at all times and presented upon request.
1.4.4.3 Site Security and Performance: The contractor must ensure overall compliance with all installation orders and regulations affecting contract performance.
1.4.4.4 Personnel Integrity and Health: The contractor must bar any employee from accessing Government property or systems who has engaged in misconduct, poses a security threat, or displays symptoms of an infectious illness.
1.4.4.5 Non-Compliance and Replacement: The contractor must comply immediately with access restrictions and remains fully responsible for contract performance and personnel replacement at no additional cost or delay to the Government.
1.4.5 Federal Holidays and Facility Closures:
1.4.5.1 Standard Federal Holidays: The contractor must not perform services on recognized Federal holidays unless explicitly designated herein. Standard recognized Federal holidays and their official observed dates are maintained by the Office of Personnel Management (OPM) at https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/. The contractor is responsible for determining when holidays are observed (such as a Monday or Friday observation for weekend holidays) and adjusting workforce schedules accordingly.
1.4.5.2 Other Declared Holidays and Executive Orders: The contractor is not required to perform services during "other declared" federal holidays or emergency closures (e.g., day before Christmas, day after Thanksgiving) only if such closures are officially mandated by an Executive Order issued by the President of the United States, the Office of Management and Budget (OMB), or the Office of Personnel Management (OPM).
1.4.5.3 Local Facility Closures: During local facility closures, administrative dismissals, or closures that impact performance (and are not covered by Presidential Executive Orders), the Contracting Officer’s Representative (COR) will notify the contractor in writing. The contractor must proactively communicate and coordinate with the COR to verify facility operational status during potential or pending local closures. The Government must not direct, advise, or dictate how the contractor manages its employees during facility closures.
1.4.5.4 The contractor must bear the responsibility for managing its labor costs and schedules during all recognized holidays and Government closures.
1.4.6 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.7 Installation Access and Security Requirements:
1.4.7.1 Contractor and all associated subcontractor employees must provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (RFO FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.4.7.2 Before Common Access Card (CAC) issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 background investigation, or an equivalent or higher investigation in accordance with Army Directive 2014‐05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on‐site or remotely; (2) remote access, via logon, to a DoD network using DoD‐approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non‐DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled Tier 1 at the Office of Personnel Management.
1.4.7.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities and controlled access areas must complete AT Level I Awareness training within 30 calendar days after contract start date or start date of the contractor employee or subcontractor and annually thereafter, whichever is applicable. The contractor must submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer within 15 days of completion of the training. AT level I Awareness training is available at the following website: https://learn.atis.army.mil/ (Deliverable 2)
1.4.7.4 iWATCH Training: The contractor and all associated sub‐contractors must brief all employees on the local iWATCH Army program (training standards provided by the requiring activity). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training must be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award. (Deliverable 3)
1.4.7.5 Communications Security/Information Technology (COMSEC/IT) Security: All communications with DOD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor must ensure wide and frequent dissemination of the above information to all employees dealing with DOD information. The contractor must abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
2. Contractor Requirements for Access to Government IS:
2.1 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy, and their actions affect the most vulnerable portion of the Army Enterprise Infostructure (AEI) or Air Force Infostructure. Contractor employees must have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees must:
1. Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
2. Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://atc.us.army.mil/iastar/docs/Training_BBP.pdf).
3. Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
4. Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
5. Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
2.2 Protection of Personally Identifiable Information (PII): The contractor must protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor must bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.
2.3. OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor must submit certificates of completion for each contractor employee to the COR (if no COR is assigned, delete to the COR and replace with to the KO) within 15 calendar days after completion of training. Level 1 OPSEC training is available at: https://learn.atis.army.mil/learning/course/ (Deliverable 4 )
2.3.1 OPSEC SOP/Plan: The contractor must develop an OPSEC Standard Operating Procedure (SOP)/Plan and provide it to the COR within 90 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan must include a process to identify the Government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. The contractor must implement OPSEC measures as required by the Government. In addition, the contractor must identify an individual who will be an OPSEC Coordinator. The contractor must ensure this individual becomes OPSEC Level II certified within 90 days of appointment as OPSEC coordinator in accordance with AR 530-1. Contractor must provide a copy of the certification to the COR NLT 15 days after completion. (Deliverable 5)
2.4 Access to Controlled Unclassified Information (CUI) and Classified Information (CI): Contractor must complete Classified Information access and handling training in accordance with FAR 52.204-2, Security Requirements. This requires Contractors to comply with The Security Agreement (DD Form 441) and to read and understand the National Industrial Security Program Operating Manual (DoD 5220.22-M) and applicable updates/changes.
2.4.1 The contractor’s employees performing work in support of this contract must have been granted a Secret security clearance from the Defense Industry Security Clearance Office.
2.4.2 Controlled Unclassified Training: In accordance with DODI 5200.48, all personnel with access to CUI are required to complete the CUI training provided by the Combined Defense Services Examination (CDSE) at https://www.cdse.edu/Training. All contractor employees, including subcontractor employees, must complete CUI training within 30 calendar days after contract start date, annually thereafter and within 30 calendar days of new employees commencing performance. The contractor must submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 days after completion of the training. Training can be found at: https://home.army.mil/campbell/about/Garrison/DPTMS/training-division/civilian-employee-one-stop-shop/training/mandatory-online-training. (Deliverable 6)
2.5 Counterintelligence Awareness and Reporting (CIAR): In accordance with DoD Directive (DoDD) 5240.06, CIAR, and AR 381-12, contractor personnel supporting this requirement must complete mandatory CIAR training within thirty (30) days of initial onboarding and annually (every 12 months) thereafter. Training must be conducted by a qualified Counterintelligence (CI) agent, certified trainer, or through Government-approved delivery methods (e.g., Center for Development of Security Excellence / CDSE). The contractor must track and report completed CIAR training, roster of personnel trained, and dates of completion within fifteen (15) calendar days after training completion date. (Deliverable 7)
3. Additional Contractor Responsibilities:
3.1 Physical Security: The contractor must safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials must be secured.
3.2 Post Award Conference/Periodic Progress Meetings:
The Contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the Contractor to review the contactor’s performance. At these meetings, the KO will appraise the Contractor of how the Government views the Contractor’s performance and the Contractor must appraise the Government of problems, if any, being experienced. The Contractor must resolve outstanding issues raised by the Government. Contractor attendance at these meetings must be at no additional cost to the Government.
3.3 On-site Lead: The contactor must designate an on-site lead who must ensure performance under this contract. The name of this person, and an alternate who must act for the contractor when the on-site lead is absent, must be designated in writing to the KO. The on-site lead or alternate must have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The on-site lead must work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The on-site lead must ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The on-site lead must ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor. (Deliverable 8)
3.4 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The Contractor must ensure that all documents or reports produced by Contractor personnel are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. The Contractor’s status as a “Contractor” must be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel must wear identification badges distinguishing themselves as such. The badges must have the company name, employee name and the word “contractor” displayed.
3.5 Retrieve Identification: The contractor must retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor must return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure. (Deliverable 9)
3.6 Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and Contractor employees must not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor must notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The Contractor must take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
3.7 The Contractor Travel:
3.7.1 Travel to off-site locations may be requested by the Government during the performance of the requirements. The cost of shipping training aids shall be borne by the Government. The contractor will be reimbursed for the costs of shipping training aids in accordance with the JTR and limitation of funds in this contract. A separate Not To Exceed (NTE) Contract Line Item Number (CLIN) will be added to the contract for travel expenses.
3.7.2 Travel Requests: The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and authorization by the KO 15 days prior to travel arrangements made by the contractor. (Deliverable 10)
3.8 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
3.9 Transition Period: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the contractor must have all staff on board after award during the first 15 days phase-in period. The government will consider any exception due to time for security clearances. During the phase- in period, the contractor must become familiar with performance requirements in order to commence full performance of services.
3.10 Transition Period Responsibility: The Contractor must support the contractor’s employees that are starting, retiring, transitioning to another job or removed from the position with “in and out-processing procedures” from the designated work facility. This includes the contractor creating an In- and Out-Processing Plan approved by the government and ensuring a certified list of all employees is provided to the Government NLT 30 days after award and maintained until the contract end of performance date for Government review monthly. Deliverables include completing the online Out-processing form on the Guard Enterprise Installation Platform (GEIP). The COR will review and approve out-processing completion. (Deliverable 11)
3.11 Security and Common Access Card (CAC):
3.12 For contractors requiring Common Access Card (CAC): The CAC is the DOD Federal Personal Identity Verification (PIV) credential. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 or an equivalent or higher investigation in accordance with Army Directive (AD) 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) both physical access to a DOD facility and access, via logon, to DOD networks on-site or remotely; (2) remote access, via logon, to a DOD network using DOD-approved remote access procedures; or (3) physical access to multiple DOD facilities or multiple non-DOD federally controlled facilities on behalf of the DOD on a recurring basis for a period of six-months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the Federal Bureau of Investigation (FBI) fingerprint check and a successfully scheduled Tier 1 investigation at the Office of Personnel Management (OPM).
3.13 Sponsorship and enrollment information about each applicant must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either the Real-Time Automated Personnel ID System (RAPIDS) using the DD Form 1172-2 or the Mission Partner Identity, Credential and Access Management (MP ICAM).
3.14 Homeland Security Presidential Directive (HSPD)-12 Background Investigation Requirements: The contractor must ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them, and must process all CAC card applications. The contractor must ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form, at the earliest possible date and that this form is forwarded to the COR immediately. The COR will review the form for completeness and accuracy and forward it to the NGB Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e-mail messages; the first will confirm that the investigative service provider has received the request, and the second will provide instructions for the completion of the appropriate form via the Electronic Questionnaires for Investigations Processing (e-QIP) system. Upon completion of the e-QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the background investigation will be initiated. The contractor must ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from two to six weeks and must factor this lead-time into its hiring/placement process. The contractor must make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and must be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause (Deliverable 12).
3.15 Mission Partner Identity, Credential and Access Management (MP ICAM) The contractor must process CAC applications through the MP ICAM, the procedures for which are described below. Although there is no requirement for the contractor to designate a “Corporate Facility Security Officer" (FSO) to serve as its single point of contact for the Background Investigation, the MP ICAM application process and other CAC and security-related matters, such designation facilitates these processes. If a Corporate FSO is not established, all contractor employees requiring a CAC will be required to process their own applications. The submission process for CAC applications is as follows:
3.16 The contractor's FSO or contractor employee must submit requests for a CAC via email to the designated Mission Partner Affiliation Sponsor (MPAS) (formerly known as the Trusted Agent (TA). The MPAS for this requirement is David Dluzyn, ARNG-G3 Requirements and Sourcing Branch.
3.17 The Government will establish an MP ICAM application account for each CAC Request and will provide each contractor employee a user ID and password, via email, to the contractor’s FSO or contractor employee. The FSO or contractor employee must access the MP ICAM account and complete the CAC application (entering/editing contractor information as applicable) at: https://www.cisa.gov/safecom/icam. The contractor’s FSO or contractor employee must follow up to ensure that the TA is processing the request.
3.18 The Government will inform the contractor's applicant, via email, of one of the following:
1. Approval.* Upon approval, the information is transferred to the DEERS database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a RAPIDS station (RAPIDS Site Locator: https://idco.dmdc.osd.mil/idco/).
2. Rejection.* The Government, in separate correspondence, will provide reason(s) for rejection.
3. Return. Additional information or correction to the application required by the contractor employee.
*The contractor must maintain records of all approved and rejected applications.
3.19 The Contractor must manage requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The Contractor must provide at least 10 calendar days advance notice to the MPAS, unless there are extenuating circumstances approved by the COR or KO.
3.20 The contractor must return issued CACs to the COR or MPAS within seven (7) working days upon departure or dismissal of each contractor employee, and must obtain a receipt for each card and provide it to the COR or MPAS. (Deliverable 13)
4.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services below solely for the purpose of performance under this contract:
4.1 Property: The Government will furnish the necessary onsite workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers, and other items necessary to maintain an office environment. The contractor is only responsible for maintenance and repair costs or replacement costs to any incidental property and the conditions by which the contractor could be liable for loss. Otherwise, the Government maintains routine upgrades, maintenance and COR coordinates inventory tracking with the contractor. An inventory document to be completed the contractor will be provided in the solicitation attachments.
4.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor must instruct employees in utilities conservation practices. The contractor must operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.3 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.3.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 4.0 above, the contractor must furnish everything required to perform these services.
5.0 Requirements: The contractor must provide services for the following:
5.1 Monthly Status Report (MSR). The Contractor must deliver an MSR in the Contractor’s choice of format that includes a narrative of planned vs. actual performance of tasks, the status of work assigned, significant issues, planned activities for the next period, and a travel summary including travel executed and travel projected during the next billing cycle. The report is required to be signed and submitted via email to the COR. MSRs will be submitted NLT 5th business day of the next month. (Deliverable 14)
5.1.1 The Contractor’s MSRs must include ALL of the following:
1. Narrative of planned vs. actual performance of tasks;
2. Status of work assigned; and
3. Summary of tasks accomplished:
a. Summary of tasks accomplished: Critical actions/issues taken
b. Issues/Problems encountered
c. Program recommendations
d. Tracking of all Deliverables required date and date completed
5.1.2 Quality Control Plan: The contractor must submit a comprehensive written Quality Control Plan (QCP) with the MSR to the Contracting Officer, with a copy to the Contracting Officer’s Representative, within 15 calendar days after award and no later than 15 calendar days before the start of performance. The QCP must, at a minimum, describe:
A. The personnel responsible for quality control and their responsibilities;
B. Inspection, monitoring, and documentation procedures tied to the PWS performance requirements and performance standards;
C. Procedures for identifying, documenting, correcting, and preventing recurrence of deficiencies;
E. Quality-control records and reporting procedures; and F. Procedures for notifying the Government of significant or recurring performance deficiencies.
5.1.3 The Government will review the QCP for adequacy. Government review, comments, or acceptance of the QCP does not relieve the contractor of responsibility for meeting all contract requirements.
5.1.4 The contractor must submit proposed material changes to an accepted QCP to the Contracting Officer for written acceptance before implementing the changes.
5.2 Training Aids, Devices, Simulation and Simulator (TADSS) Program Manager: The Contractor must provide support and manage following areas:
5.2.1 The Contractor must provide to the ARNG-ASD government representative quarterly analysis of TADSS requirements for each Army Aviation Training Site (AATS) based upon current and forecasted POIs (Program of Instruction). (Deliverable 15)
5.2.2 The Contractor must provide to the ARNG-ASD government representative a quarterly assessment of POI-based and regional training loads versus total TADSS device capacity, including program related constraints and restraints. (Deliverable 15A)
5.2.3 The Contractor must provide, to the ARNG-ASD government official, a quarterly analysis of on-hand maintainer training devices (MTD) and non-flight operator training devices (OTD) capacity versus current and forecasted POI-based and regional training loads. (Deliverable 16)
5.2.4 The Contractor must provide, to the ARNG-ASD government official, a monthly utilization report of simulation devices usage. This includes all simulation devices of the current inventory and any additional devices added to the ARNG-ASD portfolio. (Deliverable 17)
5.2.5 The Contractor must coordinate with Army Training Support Center (ATSC) and other external agencies, as applicable, within the TADSS community to ensure that all utilization of ARNG managed aviation devices are incorporated into Training Support Material Army-wide Tracking System (TS-MATS), or any army directed program of record, quarterly reports.
5.2.6 The Contractor must coordinate with each ARNG site, assigned an aviation simulation device, and ensure that the respective device is loaded into TS-MATS (or any army directed program of record) and is correctly assigned to the appropriate Training Support Center (TSC).
5.2.7 The Contractor must ensure that all training scheduled and completed is loaded within TS-MATS (or any army directed program of record) for their respective aviation simulation device at each ARNG site.
5.2.8 The Contractor must provide support, make recommendations to ARNG-ASD government officials, and analyze impacts to the ARNG aviation community: simulator training regions, simulator moves, and device reductions/fielding’s.
5.2.9 The Contractor must analyze aviation TADSS requirements for all Army National Guard aviation units and personnel. Develop and recommend to ARNG-ASD government official, solutions to ensuring annual training requirements can be met based on aviation simulator distribution and training load.
5.2.10 The Contractor must analyze and assess current simulator training regions. Develop and make recommendations, to ARNG-ASD military official, of training region design, training usage load per device and unit assignment to the device. Assessment will be provided bi-annually or as needed, to the government official, to meet emerging need. (Deliverable 18)
5.2.11 The Contractor must participate in aviation TADSS meeting(s) that develop training regions, simulator usage by device and coordination meeting for new simulation devices and their fielding. The Contractor must analyze impacts to the Army National Guard Aviation community and develop recommendations to the senior military lead. Recommendations must include: Impacts to training, impacts to programmed resources and recommendations to satisfy the ARNG-ASD’s desired end-state and Soldier Readiness Model (SRM).
5.2.12 The Contractor must manage synthetic flight training system (SFTS) LUH-72A program and ensure staffing, maintenance and travel needs are met.
5.2.13 The Contractor must meet with Department of Army Military Operations – Aviation (DAMO-AV) and ensure ARNG sims fall in line with national sim strategy.
5.2.14 The Contractor must manage staffing for all UH60/AH64/CH47 sims and ensure availability for all ARNG aviators to maintain readiness.
5.2.15 The Contractor must meet with UH/CH and Apache PM project offices for delivery and removal for all sims. And ensure New Equipment training (NET) are conducted correctly.
5.2.16 The Contractor must work with ARNG G3 on funding for annual maintenance requirements and issues.
5.2.17 The Contractor must advise and assist states that host sims and those that will be fielding new sims.
5.2.18 The Contractor must plan for future TADSS requirements and divestments with Active and Reserve components.
5.2.19 The Contractor must manage sim cyber compliance with G6 and Army Cyber Command.
5.2.20 The Contractor must manage all Manage all ABHFS (UH60A/L), LSMP (Legacy UH60) /Blackhawk Aeronautical Trainer M/L (BAT), Longbow Crew trainer (LCT)/SFTS/ CH47 SIM (TFPS) in guard inventory.
5.2.21 The Contractor must meet periodically with Army Aviation Training Sites (AATS) to ensure simulator needs are met.
5.2.22 The Contractor must work with Security Assistance Training Field Activity (SAFTA) to field Foreign Military Service (FMS) sim requirements.
5.2.23 The Contractor must ensure SFTS are available for deployments and mobilizations.
5.2.24 The Contractor must analyze budget for TADDS operations and maintenance. Submit forecast for future budget requirements.
5.2.25 The Contractor must maintain a previous cadre and diverse set of professional contacts across the ARNG, the Army, and OSD. Key contacts include State Army Aviation Officers (SAAO), US Army Aviation Center of Excellence (USAACE), US Army Reserve (USAR), Headquarters Department of the Army (HQDA) G3/G8/G4, TRADOC, AMERDEC, PEO-STRI, DAMO-AV, FORCES Command staff, NGB Joint Staff, Army Aviation System Program Managers, and the ARNG Aviation Training Sites. Therefore, the contractor must update and continuously develop the cadre of professional contacts as it pertains to the mission requirements in this PWS.
5.2.26 The Contractor must collect and maintain historical documents for reference related to ARNG-ASD-O simulations.
5.2.27 The Contractor must maintain ARNG-ASD-O TADSS SharePoint site, content added or deleted will be at the direction of the military lead. Maintenance by the contractor NLT the last business day of each month for government review. (Deliverable 19)
5.3 Unmanned Aircraft System (UAS) Equipment Integration and Training Support Services: The Contractor must provide support in the following areas:
5.3.1 The Contractor must provide subject matter expertise to State Aviation, Air Traffic & Airspace (AT&A), and ground component command S‑3 Air officers on all UAS‑related issues, including mission planning tools, digital airspace coordination systems, and interoperability with manned aviation assets.
5.3.2 The Contractor must provide subject matter expertise for UAS areas of operation to include UAS operational facilities, Launch & Recovery Sites (LRS), Tactical UAS command nodes, Ground Control Stations (GCS), and emerging Modular Open Systems Architecture (MOSA)‑enabled UAS infrastructure.
5.3.3 The Contractor must provide development guidance for Certificates of Authorization (COA), including documentation required for both legacy and newly fielded UAS platforms, Beyond Visual Line of Sight (BVLOS) operations, and COA updates related to FAA Part 89 Remote ID compliance. The contractor must provide to the government representative: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours; Strategic NLT: as prescribed by ARNG-ASD (Deliverable 20)
5.3.4 The Contractor must provide guidance and support for flight operations within all types of airspace inside the National Airspace System (NAS), including Class A through Class G operations, temporary flight restrictions (TFRs), UAS facility maps, and requirements for automated airspace authorization systems (LAANC/ALO).
5.3.5 The Contractor must assist in training and development of Airspace Coordination procedures, Safety and Standardization of UAS operations, and development of a UAS Aviation Resource Management (ARMS) Checklist. This includes updates to ARNG operator tracking, UAS currency requirements, mishap reporting procedures, and system‑specific maintenance/sustainment training integration. (Deliverable 21)
5.3.6 The Contractor must update existing and new regulations, policies, and training materials affecting ARNG UAS operations, including changes to training circulars for SUAS, and updates driven by emerging UAS modernization programs and lethal payload advancements.
5.3.7 The Contractor must track and store information identifying ARNG UAS unit readiness, including updates required for ARNG UAS system fielding, software version baselines, operator qualification tracking, and readiness reporting for Group 1–5 UAS systems. Provide forecasting options to ARNG‑ASD for flying hours (Air OPTEMPO), training seat allocations, AFTP usage, and manning. The tasks the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD (Deliverable 22)
5.3.8 The Contractor must analyze current UAS training-support strategies that establish the Army’s Master Trainer (MT) qualification‑course requirements. This includes integration of emerging ARNG SUAS training pathways, updated simulator capability, and remote training modalities. Present courses of action to assist ARNG‑ASD in developing regional MT Courses at flight centers or RTIs. The tasks performed by the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD. (Deliverable 23)
5.3.9 The Contractor must coordinate ongoing and emerging capabilities development efforts by utilizing the Doctrine, Organization, Training, Material, Leadership & Education, Personnel, Facilities and Policy (DOTMLPF-P) domains for the establishment of the ARNG-ASD MT qualification course and continued UAS force structure to the ARNG enterprise. The tasks performed by the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD. (Deliverable 24)
5.3.10 The Contractor must present techniques and procedures enabling ARNG‑ASD to develop a centralized approach to UAS operator qualification requirements across Group 1–5 UAS platforms. This includes standardized qualification pathways, cross‑platform training consolidation opportunities, and best practices for maintaining operator currency. The tasks performed by the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD. (Deliverable 25)
5.3.11 The Contractor must provide unit sourcing options, based on unit analysis and readiness levels, including updated criteria for SUAS‑equipped units, Gray Eagle detachments, and units receiving new equipment fielding (NEF). Provide recommendations supporting ARNG‑ASD leadership in identifying units for sourcing. The tasks performed by the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD. (Deliverable 26)
5.3.12 The Contractor must analyze UAS Data and Dashboard metrics with current UAS manning requirements and authorizations, including UAS‑specific MOS/ASI utilization, personnel distribution across flight companies, and readiness trends related to upcoming UAS fielding schedules. Provide consolidated analysis to senior military or DA civilian leaders. (Deliverable 27)
5.3.13 The Contractor must coordinate with internal and external entities supporting ARNG‑ASD UAS efforts, including PEO Aviation UAS PM offices, State Joint Force Headquarters (JFHQ), RTIs, FAA regional representatives, and emerging enterprise‑level UAS integration initiatives across the Army.
5.3.14 The Contractor must review existing standardization programs and make recommendations to improve upon existing techniques and procedures, including updates for distributed training, simulator integration, MOSA‑compliant UAS systems, and multi‑domain training integration. Proactively review, coordinate, and make recommendations on enhancements to the ARNG‑ASD UAS standardization program. (Deliverable 28)
5.4 Theater Aviation Sustainment Maintenance Group (TASMG) Support: The Contractor must provide support in the following areas:
5.4.1 The Contractor must support the ARNG-ASD, by providing subject matter expertise and analysis on issues, initiatives, and programs involving: maintenance, systems, programs, general services, and aviation life cycle sustainment support services for all ARNG Aviation airframes/platforms/aircraft MDS (Mission Design Series). Analysis generated will be provided to the government representative in order to facilitate ARNG leadership in developing increase maintenance readiness for all aircraft and component repair completed at the TASM-G locations located at Connecticut (CT), California (CA), Missouri (MO) and Mississippi (MS).
5.4.2 The Contractor must, on a daily basis, assist the ARNG in synthesizing efforts and communications with the TASM-G units within CT, CA, MO and MS, PEO Aviation, AMC, AMCOM, and other aviation and logistical agencies. Provide analysis to ARNG- AVN on aviation support services derived from TASMG on-site and offsite coordination and integration. The tasks the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD. (Deliverable 29)
5.4.3 The Contractor must analyze TASMG maintenance and lifecycle programs and potential impacts to ARNG aviation community. Provide supporting documentation and make recommendations for improvement to ARNG-ASD program managers/senior government official. The tasks the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD. (Deliverable 30)
5.4.4 The Contractor must assist in analyzing TASMG maintenance, system sustainment, and logistics requirements for all ARNG aviation fleets. The contractor must present techniques and procedures that enables ARNG-ASD Branch chiefs/program managers to develop initiatives that ensure proper integration into PEO and PM driven initiatives for Army National Guard Aviation. The tasks the contractor must be delivered as follows: Routine NLT: 2-10 Business days; Critical NLT 4-8 hours Strategic NLT: as prescribed by ARNG-ASD (Deliverable 31)
5.4.5 The Contractor must have access to, utilize, and extract data from various sources of information/website portals to include the Logistics Data Analysis Center (LDAC); AMCOM Aviation Field Maintenance Directorate (AFMD) Webdesk; Force Management System (FMS); Joint Technical Data Integration (JTDI); AMCOM Safety and Maintenance Messages (ASM).
5.4.6 The Contractor must through regular communication, provide administrative, facilitating, and coordinating support for ARNG personnel on official business at Army Aviation Support Facilities (AASF) and TASMGs based in the 54 states and territories.
5.4.7 The Contractor must collect and maintain historical documents for reference related to ARNG-ASD systems, maintenance, life-cycle management, and other related initiatives. Maintenance and collection of data will be done IAW the directorate’s internal procedures and stored electronically on GKO or ARNG-ASD internal share-point site. The contractor must provide Daily, Weekly, and Monthly collection of documentation for the government’s representatives’ review and use. (Deliverable 32)
5.4.8 The Contractor will participate in scheduled meetings with ARNG-ASD and TASMGs to communicate and follow up on ARNG requests for information (RFIs). The contractor must analyze impacts to the ARNG Aviation Community and communicate those potential impacts to ARNG-ASD leadership.
5.4.9 The Contractor must refer all decision related questions to the tasks that are inherently government official in nature to the overseeing Branch Chief or COR. The Government expects that contractor personnel will communicate with the liaison approximately 5 times per week.
5.4.10 The Contractor must present techniques and procedures, to the senior military lead, that enables ARNG-ASD leadership to assess ongoing strategies, efforts, and programs that involve TASMG equities.