Attachment_11_-_CoMSupCen_-_PWS_-_v18.pdf
PDF 2 MB Posted
- Attached to
- Consequence Management Support Center (CoMSupCen) Federal contract opportunity
- Solicitation number
- W9133L-18-R-0008
- Issued by
- Department of the Army National Guard
About this file
Attachment 11 - CoMSupCen - PWS - v18
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
CONSEQUENCE MANAGEMENT SUPPORT CENTER
CoMSupCen - Contract 2017
2/6/2017
Version 17.0
Table of Contents
1.0 Background
2.0 Definitions and Acronyms
2.1 Definitions
2.1.1 Contractor
2.1.2 Defective Service
2.1.3 Deliverable
2.1.4 Key Personnel
2.1.5 Physical Security
2.1.6 Quality Assurance
2.1.7 Quality Control
2.1.8 Subcontractor
2.2 Acronyms
3.0 Consequence Management Support Center Mission
3.1 National Guard Operational Mission
3.2 Contractor Mission
4.0 Contract Scope
4.1 Period of Performance (PoP):
4.2 Concept of Contractor Support
4.2.1 Major Tasks
4.2.2 Place and Performance of Services
4.2.3 Key Personnel:
4.2.4 Types of Services Included:
4.2.5 Additional required functions:
4.2.6 Telework
4.3 Security Requirements
4.3.1 COMSEC/IT
4.3.2 Use of Government Information Systems (IS)
4.3.3 Protection of Personally Identifiable Information (PII)
4.3.4 CAC Requirements
4.3.5 Background Investigation Requirements
4.3.6 Trusted Associate Sponsorship System (TASS)
4.3.7 Level 1 Antiterrorism Awareness Training (AT)
4.3.8 Information Assurance (IA)/Information Technology (IT) Training
4.3.9 Information Awareness
4.3.10 iWATCH Training
4.3.11 Operations Security (OPSEC) Training
4.3.12 Combating Trafficking in Persons
4.3.13 Non-Disclosure of Information
4.3.14 Organizational Conflict of Interest (OCI)
4.3.15 Personnel Security Incidents and Violations:
4.3.16 Vehicles on Post & Unscheduled Gate Closures
4.3.17 Contractor's employees
4.3.18 Emergency Notification Procedures
5.0 General Work Requirements
5.1 Transition Planning
5.1.1 Phase-In Responsibilities:
5.1.2 Phase-Out Responsibilities
5.2 Project Management & Supervision
5.2.1 Designation of a Site Director
5.2.2 Designation of Managers and Supervisors
5.3 Contractor and Contractor Personnel
5.3.1 Terminology
5.3.2 Identification of Contractor Employees
5.4 Contractor Planning Documents
5.4.1 Contingency and Surge Plan
5.4.2 Property Control System Plan
5.4.3 Security Plan
5.4.4 Quality Control Program (QCP)
5.4.5 Quality Assurance (QA)
5.4.7 Environmental Protection and Hazardous Material Plan
5.4.8 Safety and Emergency Response Plan
5.4.9 Purchasing System Plan
5.4.10 Other Standard Operating Guidelines (SOGs)
5.4.11 Phase Out Plan
5.5 Training for Contractor Employees
5.5.1 Contractor Training Program
5.5.2 Special Qualifications
5.6 Non-Exclusive Contract
5.7 Data and Information
5.7.1 Format
5.7.2 Data Rights
5.7.3 Release Controlled
5.8 Regulations, Manuals and Technical Documents
5.9 Workload
5.10 Recognized Holidays
5.11 Media Information
5.12 Contractor Performance Assessment Reports System (CPARS)
5.13 Non-Personal Services
5.14 Inherently Governmental Functions Not Authorized
5.15 Designated Government Officials
5.15.1 Contracting Officer (KO)
5.15.2 Contracting Officer’s Representative (COR)
5.15.3 NGB J4 Representative
5.15.4 Limitations on Authority
5.16 Briefings and Meetings
5.16.1 Recurring Meetings and Briefings
5.16.2 Weekly Meeting
5.16.3 Monthly Financial In-Process Review (FIPR) Briefing
5.16.4 Quarterly Operational In-Process Review (OIPR) Briefing
5.16.5 Quarterly KO Review of Contractors Purchase Actions
5.16.6 Non-Recurring Meetings and Briefings
5.16.7 Post Award Conference/Periodic Progress Meetings
5.17 Reports
5.17.1 Weekly Quad Chart Statuses
5.17.2 Monthly Task Order Funds/Costs Status Report
5.17.3 Quarterly Operational Contract Status Report
5.17.4 Contractor Manpower Reporting Application (CMRA
5.18 Service Contract Act Wage Determination Incorporated
5.19 Insurance Requirements
6.0 Functional Work Requirements
6.1 Logistical Operations
6.1.1 Integrated Logistical Support
6.1.2 Life-Cycle Sustainment Management (LCSM)
6.1.3 Inventory Management
6.1.3.1 Asset Visibility
6.1.3.2 Shelf Life and Warranty Management
6.1.4 Subject Matter Expert (SME)
6.1.4.1 SME General Duties
6.1.4.2 SME General Knowledge/Experience
6.1.4.3 SME Specialized Training
6.1.5 Configuration Management Systems (CMS)
6.1.6 Direct Support Operations Team (DSO
6.1.7 Warehouse Operations
6.1.8 Government Property Control
6.1.9 Stock Inventory
6.1.9.1 Joint Contractor Transition Stock Inventories
6.1.9.2 Monthly Cyclic Stock Inventory
6.1.9.3 Annual Stock Inventory
6.1.10 Unscheduled Special (COR-Discretion) Inventory of Stock and/or GFE
6.1.11 Responsibility for Negligent Loss of Equipment and Inventory
6.1.12 Shipping & Receiving
6.1.13 Shipping of Original Equipment Manufacturer (OEM) Repairable Items
6.1.14 Prepackaging for Immediate Delivery Using Ground or Air Transportation
6.1.15 Contractor Travel and Training
6.1.16 Forward Area Support Team (FAST) Packages
6.1.17 Deployments
6.1.18 Medical Logistics SME
6.2 Maintenance
6.2.1 Technical Maintenance
6.2.2 Technical Data Repository
6.2.3 Certification Management
6.2.4 Tracking Vehicle Modifications
6.2.5 Minor Design and Fabrication
6.2.6 Systems Engineering
6.2.7 OEM-Certified Specialized Maintenance and Repair
6.2.8 Kit Assembly
6.3 Purchasing
6.3.1 Scope of Purchasing Duties
6.3.2 Warranty Management for Purchases
6.3.3 Purchasing Procedures
6.4 Information Technology (IT)
6.4.1 Information Technology Support and Maintenance
6.4.2 Database Support
6.4.3 Web Site Support
6.4.4 Network Management
6.5 Facility Operations
6.5.1 Facilities Coordinator
6.5.2 Restrictions on Facility Operation
6.5.3 Physical Security
6.5.3.1 External Security
6.5.4 Visitor Control
6.5.5 Safety
6.5.6 Hazardous Waste Management (HAZMAT)
6.5.7 Janitorial Services/Grounds Maintenance Coordination
6.5.8 Government-Provided Utilities
6.5.9 Mail and Package Delivery
7. Performance Requirements Summary (PRS)
7.1 Objective: Enhancing Accountability and Inventory Accuracy for GFE
7.2 Objective: Enhancing Accountability and Inventory Accuracy for Hand-Receipt Items 61
7.3 Objective: Increasing Accuracy of Cyclic Inventories of Stock
7.4 Objective: Increasing Timeliness of Preparing FAST Package for Shipment
7.5 Objective: Increasing Timeliness of Preparing FAST Support Personnel for Travel
7.6 Objective: Increasing Timeliness of Submitting Supply Discrepancy Report (SDR) for
Non-Conforming Shipments
7.7 Objective: Increasing Timeliness of Resolving Supply Discrepancy Report (SDR) for
Non-Conforming Shipments
7.8 Objective: Increasing Timeliness of Shipping OEM-Repairable Critical Items
7.9 Objective: Increasing Timeliness of Shipping OEM-Repairable Non-Critical Items
7.10 Objective: Reducing Duration of Website Downtime
7.11 Objective: Ensuring Contract & Regulatory Compliance in Purchase Actions
8.0 Applicable Publications
Performance Work Statement (PWS)
CoMSupCen - Contract 2017
1.0 Background
The potential for a terrorist-related activity or other exposure to chemical, biological, radiological, nuclear, and high-yield explosives (CBRN) threats within the United States has become increasingly probable. In response to those threats, Congress provided funding to the
Department of Defense (DoD) to train, organize, and equip the National Guard Bureau (NGB) to develop a national capability to meet the pressing demands of this emerging homeland defense threat.
The Defense Against Weapons of Mass Destruction Act of 1996 mandated the enhancement of domestic preparedness and response capability for terrorist attacks involving nuclear, radiological, biological, and chemical weapons. The Act provided funding to improve the capability of the Federal, State and local emergency response agencies to prevent and, if necessary, respond to domestic terrorist incidents involving Weapons of Mass Destruction
(WMD).
In addition, the NGB was tasked with disaster preparedness and disaster response missions arising from natural disasters and other non-terrorist emergencies.
2.0 Definitions and Acronyms
2.1 Definitions
2.1.1 Contractor
For the purpose of this contract, the term "contractor applies to all operations under this contract, whether those operations are performed by the prime contractor or by a subcontractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime. The terms "contractor personnel" or "contractor employees” apply to all contractor and subcontractor personnel performing work on this contract. The contractor shall provide fully trained and experienced technical and lead personnel required for performance. The contractor shall maintain the current work force in such a manner as to ensure that personnel remain fully qualified.
2.1.2 Defective Service
A service output that does not meet the standard of performance associated with the Performance
Work Statement (PWS).
2.1.3 Deliverable
Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel
Contractor personnel that are evaluated in a source selection process and will be required to be used in the performance of a contract. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security
Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance
Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Control
All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.8 Subcontractor
One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms
ACO Administrative Contracting Officer
AEI U.S. Army Enterprise Infrastructure
AF Air Force
AFARS Army Federal Acquisition Regulation Supplement
AKO Army Knowledge Online
ALS Analytical Lab Suites
AOR Area of Responsibility
AR Army Regulation
ASL Authorized Stockage List
AT Antiterrorism Awareness Training
ATCTS Army Training Certification Tracking System
AUP Acceptable Use Policy
BGS Bluegrass Station
BI Background Investigation
CAC Common Access Card
CAD Computer Aided Designs
CALS Common Analytical Lab Suites
CCP Configuration Change Proposals
CDL Commercial Driver’s License
CBRN Chemical, Biological, Radiological, Nuclear, and high-yield Explosives
CDR Contract Deficiency Report
CERFP Chemical, Biological, Radiological, Nuclear, Enhanced Response Force
Package
CFR Code of Federal Regulations
CLIN Contract Line Item Number
CMRA Contractor Manpower Reporting Application
CMS Configuration Management Systems
COMSEC Communications Security
CoMSupCen Consequence Management Support Center
CONUS Continental United States (excludes Alaska and Hawaii)
COOP Continuity of Operations Planning
COR Contracting Officer’s Representative
COTS Commercial-Off-the-Shelf
CPARS Contractor Performance Assessment Reports System
CST Civil Support Team
DA Department of the Army
DCAA Defense Contract Audit Agency
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DEERS Defense Enrollment Eligibility Reporting System
DFARS Defense Federal Acquisition Regulation Supplement
DISA Defense Information Systems Agency
DOD Department of Defense
DODD Department of Defense Directive
DoDM Department of Defense Manual
DMLSS Defense Medical Logistics Standard Support
DPAS Defense Priorities and Allocation System
DSO Direct Support Operations
DTM Directive Type Memorandum
ECP Engineering Change Proposals
EEO Equal Employment Opportunity
FAD Force / Activity Designator
FAR Federal Acquisition Regulation
FAST Forward Area Support Team package
FEMA Federal Emergency Management Agency
FIPR Financial In-Process Review
FLIPL Financial Liability Investigation for Property Loss (Form DD 200)
FOUO For Official Use Only
FPCON Force Protection Condition
FSO Corporate Facility Security Officer
FSRT Fatality Search & Recovery Team
FSS Federal Supply Schedule
FY Fiscal Year
GFP/M/E/S Government Furnished Property/Material/Equipment/Services
GSA General Services Administration
HAZMAT Hazardous Material
HRF Homeland Response Force
HTML Hypertext Markup Language
IA Information Assurance
IAR Inventory Adjustment Report
ICS Incident Command System
ID Identification (Refers to a Federal or State issued identification with picture)
IPR In-Process Review
IRAPT Invoicing, Receipt, Acceptance and Property Transfer (formerly Wide Area
Work Flow)
IS Information System(s)
ISO International Organization for Standardization
IT Information Technology
JTR Joint Travel Regulation
KO Contracting Officer
LAN Local Area Network
LCSM Life-Cycle Sustainment Management
MCSE Microsoft Certified Solutions Expert
MIS Management Information System
MTBF Mean Time Between Failure
NACI National Agency Check with Inquiries
NDI Non-Developmental Items
NGB National Guard Bureau
NGB-ZC-AQ NGB operational Contracting Division
NLT Not Later Than
OCI Organizational Conflict of Interest
OCONUS Outside the Continental United States
ODC Other Direct Costs
OEM Original Equipment Manufacturer
ODBC Open Database Connectivity
OFPP Office of Federal Procurement Policy
OIPR Operational In-Process Review
OPM Office of Personnel Management
OPSEC Operational Security
OSHA Occupational Safety & Health Administration
PCO Procuring Contracting Officer
PCS Property Control System
PII Personally Identifiable Information
PIPO Phase In/Phase Out
PIV Personal Identity Verification
POC Point of Contact
PoP Period of Performance
PPE Personal Protection Equipment
PRS Performance Requirements Summary
PSIP Personnel Security Investigation Portal
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
RAPIDS Real-Time Automated Personnel Identification System
ROD Report of Discrepancy
SAM System for Award Management (www.sam.gov)
SCA Service Contract Act
SD Site Director
SDR Supply Discrepancy Report
SME Subject Matter Expert
SOG Standard Operating Guidelines
SQL Structured Query Language
TASS Trusted Associate Sponsorship System
TASS TA TASS Trusted Agent
TCO Termination Contracting Officer
TE Technical Exhibit
TF Task Force
TO Task Order
VIN Vehicle Identification Number
WAN Wide Area Network
WMD Weapons of Mass Destruction http://www.sam.gov/
3.0 Consequence Management Support Center Mission
3.1 National Guard Operational Mission
In responding to the CBRN threat, the NGB organized and equipped various types of teams of personnel throughout the DoD Area of Responsibility (AOR) to respond to natural disaster, man-made threats or other incidents. These teams include:
1. Weapons of Mass Destruction Civil Support Teams (CST) to assess events, advise civilian agency responders, and facilitate requests for assistance, prevent human suffering and mitigate major property damage. The 57 CST teams (each consisting of about 22 military personnel) perform command, operations, administrative/logistics, medical, and survey functions. NGB anticipates that there will be 2-5 additional teams added requiring logistical support during this contract period.
2. Chemical, Biological, Radiological, Nuclear, Enhanced Response Force Package
(CERFP): 17 teams (each with about 203 military personnel per team) to respond to a CBRN incident by assisting other agencies in personnel decontamination, emergency Medical Services, Fatality Search & Recovery Teams (FSRT), casualty search and extraction and limited security. The Medical & FSRT Teams are supported separately from the CERFP Task Force (TF) for accountability.
3. Homeland Response Force (HRF) contains a CERFP with additional brigade and battalion level command and control with additional security, search/extraction, decontamination, and medical triage capabilities. There are 10 HRFs with approximately 589 military personnel per team. The Medical & FSRT Teams are supported separately from the HRF TF for accountability.
3.2 Contractor Mission
NGB established the Consequence Management Support Center (CoMSupCen) in Lexington, Kentucky, to support the four types of geographically-dispersed teams. The CoMSupCen contractor provides a full range of contractor logistics support for the supply support, maintenance support, purchasing, training, and help desk support to the teams discussed above.
Items maintained in the CoMSupCen warehouse or shipped directly from suppliers to the teams are primarily Commercial Off-the-Shelf (COTS) equipment and other specialized items.
(CoMSupCen does not issue, store, or handle ammunition, military weapons, or explosives.)
The contractor charged with operating CoMSupCen is responsible for developing and executing a logistics support system customized to meet the operational requirements of the NGBs specific homeland defense mission in the areas described above, with the capability to support contingency operations (i.e., major exercises and national security events) 24 hours a day, 7 days a week when ordered. The contractor is to operate a logistics support center compliant with all governing DoD, Army, and NGB regulations.
The contractor logistics support services provided to the nation by the CoMSupCen are vital to protect public health and safety, restore essential Government services, and provide emergency relief to communities and individuals impacted by unforeseen national threats or disasters.
Examples of some CoMSupCen events have included:
Chemical Spills
Natural Disasters (e.g., Hurricane & Mud Slide Relief Efforts)
Major National Political Events (e.g., Political Party Conventions)
Olympics
The Global War on Terror (respond as required)
4.0 Contract Scope
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform
CoMSupCen Services, as defined in this PWS.
4.1 Period of Performance (PoP):
The Period of Performance shall be one Base Year of 12 months and four (4) 12-month option years.
4.2 Concept of Contractor Support
4.2.1 Major Tasks
The CoMSupCen overall concept of operations is based on carrying out these major support areas to NGB’s CBRN Enterprise:
1. Logistical Operations
2. Maintenance
3. Purchasing
4. Information Technology (IT)
5. Facility Operations
In addition, the contractor provides supply support, equipment maintenance support (above the operator-level maintenance level), training, and help desk support toward a mission goal greater than 90% operational readiness rate for COTS equipment as defined in Attachment 3 – Mission
Essential COTS items.
The logistics support contractor is tasked with ensuring all systems perform at levels meeting or exceeding the original system requirement as defined in the Original Equipment Manufacturer
(OEM) manuals and performance requirements.
The contractor provides the trained, qualified, and (where required) OEM-certified personnel to provide supply, maintenance, training and Subject Matter Expert (SME) support.
4.2.2 Place and Performance of Services
The CoMSupCen facility is located on Bluegrass Station (BGS) at 5751 Briar Hill Road, Bldg.
415, Lexington, KY 40516. It is a Government-leased building that includes a warehouse
(approximately 150,000 square feet) and office space (approximately 50,000 square feet) available without charge to the contractor.
The contractor shall provide services between the duty hours of 0700-1730 EST Monday through
Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
It is the contractor’s responsibility to maintain an adequate work schedule / personnel for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. The contractor must arrange the work schedules of its employees to cover the hours of the normal daily period of operation. The working hours cover responsibilities to teams inside and outside of the continental US (e.g., Alaska, Hawaii, and Guam). Telecommuting for personnel shall be approved in advance by the Contracting Officer Representative (COR).
When required, the contractor shall operate the CoMSupCen on an expanded schedule up to and including 24 hours per day, 7 days per week, which will be billed against a surge Contract Line
Item Number (CLIN). The contractor shall be available to respond to critical mission requirements which occur outside of the duty days/hours. In addition to business hours, the contractor shall provide emergency support to critical items and provide support during pre-planned special events and/or training exercises.
The contractor shall provide to the COR, by contract start date, emergency telephone numbers for contacting key personnel. The contractor shall respond to emergency situations and report to work within two hours of notification if required.
4.2.3 Key Personnel:
The following personnel are considered key personnel: Site Director, Contracts Manager and IT
Manager. The key personnel will work on-site at the CoMSupCen facility. Resumes will be submitted to the COR prior to contract performance for approval. The Government will review the resumes for these key personnel and their replacements, if any. Any changes of key personnel require Government approval. All personnel require SECRET clearances. Minimum qualifications for key personnel are listed below:
Site Director (SD):
Serves as the primary interface with the Government and has overall responsibility for overseeing and coordinating all aspects of the contract effort, including cost, schedule, and technical performance of programs/projects. Leads customer program reviews and coordinates personnel, technical, and financial resources as required to meet contract requirements.
15 years of proven successful senior management and supervisory experience
Master’s Degree or equivalent experience
Contracts Manager:
Assists SD in management of all financial resources. May also be assigned the support and advisory functions for logistics and/or personnel accounting to the senior management official.
Will ensure the maintenance of applicable tracking documents and records in support of large programs and projects. Shall track all resources from program/project start through its finish.
Arbitrates claims or complaints occurring in performance of contracts.
10 years of experience in a related field, including supervisory or management experience.
Bachelor’s degree in associated discipline or equivalent years in experience.
IT Manager:
Responsible for all IT related processes and equipment. Responsible for keeping the website and local area network operational at all times except for scheduled server maintenance. Also responsible for overall operation and integration of hardware and software furnished by the
Government under the contract. Acts as the senior database administrator.
10 years’ experience in IT systems architecture with technical responsibility for websites, databases, and networks.
Network Operating System: Microsoft Certified Solutions Expert (MCSE) certification plus experience with Microsoft Server 2008 and 2012 R2 and Active Directory.
Database: Experience with Microsoft Structured Query Language (SQL) required, certification preferred.
Website: Current website uses asp.net C # coding. Web creation skills using raw Hypertext
Markup Language (HTML) coding required. The enhanced Website is being built on .Net MVC using C# and SQL server Entity Framework.
Architecture: Local Area Network (LAN) / Wide Area Network (WAN) skills using Cisco switches and routers required as well as experience with DHCP, DNS, and Domain Controllers required.
Bachelor’s Degree with 4 years of experience or minimum 10 years of experience as a Network
Administrator.
4.2.4 Types of Services Included:
In providing contractor logistics support at the CoMSupCen facility, the contractor provides support services such as the following general types - each explained more fully in this PWS:
Program Management
Life Cycle Management
Supply Support Activity
Preparing Forward Area Support Team (FAST) packages
Warranty Management
Management of Modifications to Government Vehicles
Industrial Operations
Training
Help Desk
Integrated Logistics
Fielding of New Equipment/Systems/Kits
Purchasing
Subject Matter Experts
Vehicle and Trailer Modifications
Repair & Return
Transportation
Website and Database Development
Support Operations
4.2.5 Additional required functions:
In carrying out the preceding broad functions, the contractor is responsible for the following types of functions, as discussed in more detail in this PWS: [Note: This list is provided to help define the contract requirements with some examples of in-scope work. Other examples of contractor work within the scope of contemplated task orders are shown in Exhibit D.]
Receive, inspect, establish accountability, store, and issue supplies and equipment in the support of teams
Support all COTS and Non-Developmental Items (NDI) equipment and provide consumable materials. Mission-essential COTS items are shown in Attachment 3.
Receive, store, and issue warehouse float stock estimated at 15% of the total fielded equipment.
When directed by the COR or KO, operate a 24-hour Response Center.
Provide sustainment support for the NGB-unique items of fielded equipment.
Operate a help desk (technical) to include after-hours. Provide on-call technical support to the teams. Coordinate maintenance of fielded equipment and sustain a maintenance management system compliant with DoD, Army, and NGB regulations.
Manage a Direct Support section focusing on logistical and supply support operations.
Maintain web-based Open Database Connectivity (ODBC)-compliant databases. Upgrade the system as new technologies are developed to provide quality, real-time logistics support to the supported teams. Monitor systems functionality to ensure system reliability.
Purchase and maintain operational stocks. Replenish the Authorized Stockage List (ASL) items (Attachment 4), training sets, and FAST packages.
Establish, operate, manage, and coordinate a facility providing shipments in support of maintenance and calibration of equipment.
Establish and deploy pre-prepared FAST packages (with personnel) to incident sites.
Perform warranty management.
Maintain accountability for standard and non-standard commercial equipment, vehicles, and other ground mobility systems. Provide repair support for communications, electronic devices and other equipment.
Ensure that vehicles requiring a Commercial Driver’s License are only driven by CDL certified personnel
Manage, maintain and perform training on General Service Administration (GSA) vehicles that are rotated in and out of the fleet kept at the CoMSupCen
Manage, maintain, license if required, and perform training on the trailers, etc. that are rotated in and out of the fleet kept at the CoMSupCen
Review, revise and update established Standard Operating Guidelines (SOGs) for all users.
4.2.6 Telework
The Government may permit telework by contractor employees when determined to be in the best interest of the Government in meeting work requirements. The contractor shall have an established telework program subject to review by the Government. All telework agreements shall be authorized and approved by the COR and include the date, time, and description of the tasks to be performed. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure the Government's mission-critical operations stay operational during times of National Emergency or incidents of National Significance. The COR(s) must identify to the Contracting Officer any tasks that are required to ensure continuity of critical supplies and services and at what level those supplies and services must be delivered. Telework shall be at no additional cost to the Government.
4.3 Security Requirements
Favorable background checks shall be obtained for all personnel prior to contract performance start date. Requests for security clearances will be validated by the COR. All contractor personnel shall obtain and maintain a favorable security investigation to support a SECRET clearance in order to work under this contract. Only US Citizens are authorized to work on this effort. Contractor personnel shall be familiar with Government security regulations and experienced in handling/working with secure systems/secure environment.
The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from BGS Security. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DOD, Department of the Army
(DA), and/or local policy. Should the Force Protection Condition (FPCON) change, the
Government may require changes in contractor security matters or processes.
4.3.1 COMSEC/IT
All communications with DOD organizations are subject to communications security
(COMSEC) review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, the contractor is advised that any time contractor place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DOD information.
The contractor shall abide by all Government regulations concerning the authorized use of the
Government's computer network, including the restriction against using the network to recruit
Government personnel or advertise job openings.
4.3.2 Use of Government Information Systems (IS)
Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the U.S. Army Enterprise Infrastructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system.
Contractor employees shall:
a. Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
b. Complete initial and/or annual Information Assurance (IA) training at the Cyber Security
Training Center of Excellence at Fort Gordon, GA.
(https://ia.signal.army.mil/DoDIAA/default.asp)
c. Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
d. Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
e. Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
4.3.3 Protection of Personally Identifiable Information (PII).
The contractor will ensure all Personally Identifiable Information (PII) encountered in the performance of services in accordance with DFARS 224.103 and DoDD 5400.11, Department of
Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractors violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.
4.3.4 CAC Requirements
The Common Access Card (CAC) is the Department of Defense (DOD) Federal Personal
Identity Verification (PIV) credential. In accordance with Directive Type Memorandum (DTM)
08-003, December 1, 2008, incorporating Change 5, October 8, 2013, Initial issuance of a CAC requires at a minimum, the completion of FBI fingerprint check with favorable results reflecting
"No Record" and submission of a National Agency Check with Inquiries (NACI) to the Office of
Personnel Management (OPM), or a DoD-determined equivalent investigation. The issuance of a
CAC will be based on four criteria; (a) eligibility for a CAC; (b) verification of DoD affiliation from an authoritative data source; (c) completion of background vetting requirements according to the Federal Information Processing Standards Publication 201-1, Personal Identity
Verification (PIV) of Federal Employees and Contractors, March 2006, and DOD Regulation
5200.2-R, Department of Defense Personnel Security Program, January 1987, and (d) verification of a claimed identity. CAC eligible personnel must be registered in the Defense
Enrollment Eligibility Reporting System (DEERS) through either an authoritative personnel data feed from the appropriate Service or Agency or Trusted Associate Sponsorship System (TASS).
https://web-okcd01.mail.mil/owa/redir.aspx?SURL=WLqRHGHf5V_4XZ6_cG1SiucdeNYGJEfHdzA0ithr5jrtJ2z5gDzTCGgAdAB0AHAAcwA6AC8ALwBpAGEALgBzAGkAZwBuAGEAbAAuAGEAcgBtAHkALgBtAGkAbAAvAEQAbwBEAEkAQQBBAC8AZABlAGYAYQB1AGwAdAAuAGEAcwBwAA..&URL=https%3a%2f%2fia.signal.army.mil%2fDoDIAA%2fdefault.asp
4.3.5 Background Investigation Requirements
The contractor ensures Common Access Cards (CACs) are obtained by all contract or subcontract personnel assigned to work on the Government site and by personnel requiring access to a DoD network (and other eligible populations as specified in DTM-08-003
Attachment 3, paragraph 3a.) are required to, at a minimum, have received a favorable FBI fingerprint check and must have submitted a National Agency Check with Inquiries (NACI) or equivalent/higher investigation. It is the responsibility of the contractor to ensure that all employees complete a Personnel Security Investigation Portal (PSIP) form. The contractor shall ensure all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system are complied with immediately. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from 2-6 weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.
4.3.6 Trusted Associate Sponsorship System (TASS)
The contractor is responsible for processing applications for Common Access Cards (CAC) for every contractor employee who deploys with the military force OR who has need to access any government computer network in accordance with FAR 52.204-9, "Personal Identity Verification of Contractor Personnel."
The contractor is responsible for managing requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract.
If needed, the contractor will obtain an Army Knowledge Online (AKO) address for each applicant, including subcontractors, who may be deployed or require logical access to a government computer network. This can be done by going to: http://www.us.army.mil and register as an "Army Guest," with the sponsor being the COR or a COR designated individual if the COR is ineligible to Serve as an AKO Sponsor. Note: If an employee of a contractor loses the Privilege to access AKO, they lose the ability to renew their CAC. Therefore it is critical that contractor employees maintain their AKO accounts.
A "Corporate Facility Security Officer" (FSO) shall be designated to serve as your firm's single point of contact for Background Investigation (BI), the TASS application process and other CAC and security related matters.
All contractor CAC applications must be processed through the TASS. The contractor's FSO will submit requests for a CAC via email to the designated TASS Trusted Agent (TA) before accessing the TASS website.
The Government will establish a TASS application account for each CAC Request and will provide each contractor employee a USER ID and Password. The contractor employee will access the TASS account and complete the CAC application (entering/editing contractor information as applicable) at: https://www.dmdc.osd.mil/tass/.
A CAC cannot be issued without evidence that the FSO has initiated a National Agency Check with Written Inquires (NACI).
The government will inform the contractor's applicant of one of the following:
a. Approved.* Upon approval, the information is transferred to the Defense Enrollment
Eligibility Reporting System (DEERS) database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a Real-Time
Automated Personnel Identification System (RAPIDS) station (RAPIDS Site Locator:
http://www.dmdc.osd.mil/rsl/).
b. Rejected.* The Government, in separate correspondence, will provide reason(s) for rejection.
c. Returned. Additional information or correction to the application required by the contractor employee.
*The contractor shall maintain records of all approved and rejected applications.
At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor by SSN and two forms of identification. Identity source Documents must come from the list of acceptable documents included in Form I-9, OMB No. 115-0136, "Employment Eligibility Verification."
Consistent with applicable law, at least one document from the Form I-9 list shall be a valid
(unexpired) State or Federal Government-issued picture identification (ID). The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS and will then issue a CAC.
Issued CACs shall be for a period of performance not longer than three (3) years or the individual's contract end date (inclusive of any options), whichever is earlier.
The contractor shall return issued CAC's to the COR upon departure or dismissal of each contractor employee.
4.3.7 Level 1 Antiterrorism Awareness Training (AT)
All contractor employees requiring access to Army Installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. Training must be recertified on an annual basis. The contractor shall submit certificates of completion for each contractor and subcontractor employee, to the COR, within 15 calendar days after completion of training Level
1 AT is available at https://atlevel1.dtic.mil/at/.
4.3.8 Information Assurance (IA)/Information Technology (IT) Training
All contractor employees shall complete the DoD Cyber Awareness Challenge training before issuance of network access and annually thereafter. All contractor employees performing services involving IA/IT functions shall comply with DoD and Army training requirements in
DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of the start of contract performance. In accordance with DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, contractor employees performing services supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M shall be completed upon contract award.
4.3.9 Information Awareness
All contractor employees with access to a government information system shall be registered in the Army Training Certification Tracking System (ATCTS) (https://atc.us.army.mil/iastar/) prior to commencement of services and shall successfully complete the DoD Cyber Awareness
Challenge training prior to access to the IS and then annually thereafter.
(https://ia.signal.army.mil/DoDIAA/).
4.3.10 iWATCH Training
The contractor with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the COR, or to the KO if a COR is not assigned, within 15 calendar days after completion of training. iWatch Training is available at http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx
4.3.11 Operations Security (OPSEC) Training
In accordance with AR 530-1, Operations Security, new contractor employees shall complete
Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee, to the COR, within 15 calendar days after completion of training. Level 1 OPSEC training is available at http://cdsetrain.dtic.mil/opsec/.
4.3.12 Combating Trafficking in Persons
The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in any form of trafficking in https://ia.signal.army.mil/DoDIAA/ http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The
Contractor shall notify its employees of the United States Governments zero tolerance policy, the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR
22.17. Combating Trafficking in Persons Training is available at http://jko.jten.mil/.
4.3.13 Non-Disclosure of Information
All information or data developed under this contact belongs to and is the property of the
Government and shall be classified For Official Use Only (FOUO) unless otherwise classified.
The contractor shall not release any information or data without the express written approval of the COR. Non-Use and Non-Disclosure Agreements are required of all contractor personnel performing under this contract. The contractor shall abide by all DoD and Army rules, procedures and standards of conduct. The contractor employees will be required to obtain a
Common Access Card (CAC).
4.3.14 Organizational Conflict of Interest (OCI)
The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information
(e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractors mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
4.3.15 Personnel Security Incidents and Violations:
The contractor will immediately notify the COR of any actual or suspected security violation, loss of security clearance, security incident, or potential unauthorized disclosure or compromise of FOUO information. The contractor shall monitor and report to the COR any unauthorized attempts to access contractor-supported technical systems.
4.3.16 Vehicles on Post & Unscheduled Gate Closures
Vehicles operated by contractor personnel must be registered with BGS Security - who will issue an on-post sticker. All vehicles are subject to search pursuant to applicable regulations.
Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Any moving http://jko.jten.mil/ violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
4.3.17 Contractor's employees
The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation.
Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times.
The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.
4.3.18 Emergency Notification Procedures
Contractor personnel witnessing a fire, accident, criminal act, hazardous material release, or threatening act or condition shall notify the local first responder agency by dialing 9-911. The
COR will be notified immediately after the 9-911 call or at the first opportunity when it is safe to make that notification.
5.0 General Work Requirements
5.1 Transition Planning
The contractor shall attend phase-in and phase-out hand-receipt-holder meetings with the
Contracting Officers Representative (COR) which will be scheduled by the Government approximately three weeks prior to contract full performance start and three weeks prior to contract expiration or termination dates.
This should be a ramp up process for the new contractor and a ramp down process for the existing contractor. For this reason, all personnel salaries will be by-name billed by each
Contractor as they leave the old contractor and transition to the new one upon an agreed upon schedule by both contractors. If there are any issues/concerns, these can be resolved by either the COR or KO as required.
The contractors shall conduct a phase-in/phase-out 100% joint inventory in accordance with AR
710-2, Supply Policy; DA Pam 710-2-1, Using Unit Supply System; and AR 735-5, Policies and
Procedures for Property Accountability. This inventory shall include: Government Furnished
Equipment (GFE, Attachment 5), keys, warehouse stock inventory, repair parts, equipment, and materiel items of work in progress such as equipment on active maintenance work orders.
5.1.1 Phase-In Responsibilities:
During phase-in, the contractor shall prepare to assume full responsibility for areas of operation in accordance with the terms and conditions of this contract. The contractor shall take actions necessary for a smooth transition of the contracted operations, including coordinating phase-in efforts with the incumbent contractor to ensure there is no disruption to mission accomplishment during the phase-in period. During the phase-in period, the Government and the incumbent contractor will gradually make facilities, data, and equipment available to the contractor for observation and for execution of the incoming contractor’s phase-in plan. Phase-in must include at a minimum establishing the contractor’s project management, recruiting and hiring necessary personnel, obtaining all required certifications and security clearances, participating in joint inventories and signing for GFE, developing and submitting required contract deliverables, and accomplishing necessary training to support the functions listed in the PWS. The contractor agrees to attend any post award conferences convened by the Government office in accordance with FAR Subpart 42.5.
5.1.2 Phase-Out Responsibilities.
No less than 60 days prior to contract expiration or termination the contractor shall develop a
Phase-Out plan to effect a smooth and orderly transfer of contract responsibility to a successor.
The contractor shall provide an update to the COR NLT 30 days prior to expiration or termination of the contract. The content of this plan is described in PWS Section 5.4.11.
The contractor shall plan and execute a joint comprehensive inventory of all in-place equipment and supplies, including all GFE, with the successor contractor. The contractor’s phase-out actions at a minimum will include reconciliation of all property accounts, clean-up of contractor work areas, provision for training of the successors personnel on automated systems used in performance of this contract, and any required security debriefings.
During the phase-out period, the contractor shall allow the successor to observe the contractors performance for a period of at least ten working days prior to the full performance start date of the successor and coordinate a proposed phase-out plan and schedule milestones with the COR to ensure a complete and seamless transition.
The contractor shall provide sufficient information on work remaining that will transfer to the successor to allow for an efficient, uninterrupted flow of work products.