The file's text, extracted by GovTribe without its formatting.
AVIATION TRAINING SERVICES AND OPERATIONS SUPPORT (ATSOS)
TASK ORDER 002- Aviation Simulator Instructor Operator
1.0 General
2.0 Definitions and Acronyms
3.0 Government Furnished Property, Material Equipment, and Services (GFP/M/E/S)
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E)
5.0 Requirements
6.0 Applicable Publications
TECHNICAL EXHIBIT 1 – Performance Requirements Summary (PRS) TECHNICAL EXHIBIT 2 – Deliverables Schedule
General: This Task Order details services required under the ATSOS Indefinite Delivery/ Indefinite Quantity (IDIQ) contract specifically relating to services to be performed at the Aviation Simulator Instructor Operator locations. Services are to be performed at the Aviation Simulator Instructor Operator locations as specified in the Sec 1.1 of this document for the purpose of conducting aviation training. Period of Performance (PoP) for this Task Order begins on 27 AUG 17 and ends on 26 AUG 18.
1.1
| 1 |
| AVCATT NCM3 Scheduler |
| ARNG Readiness Center, Arlington, VA |
| 2 |
| AVCATT/NCM3 Quality Assurance |
| Various Locations |
| 12 |
| UH-60A/L SFTS |
| Esler Field, LA |
| 15 |
| TFPS |
| Joint Base Lewis-McChord, WA |
Definitions and Acronyms: Reference PWS Section 2 Government Furnished Property, Material, Equipment, and Services (GFP/M/E/S): Reference PWS Section 3 Contractor Furnished Property Materials, and Equipment (CFP/M/E): Reference PWS Section 4
REQUIREMENTS:
5.1 Table 1.1 provides position name by task, provides reference to the PWS, and identifies the positions that are considered “key personnel”. The positions marked below as “Key Personnel” are considered essential to the work being performed under this contract. Before removing, replacing, or diverting any of the “key personnel”, the Contractor must: (1) Notify the Contracting Officer Representative (COR) reasonably in advance; (2) submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract; and (3) obtain the Contracting Officer's written approval. Notwithstanding the foregoing, if the Contractor deems immediate removal or suspension of any member of its management team is necessary to fulfill its obligation to maintain satisfactory standards of employee competency, conduct, and integrity, the Contractor may remove or suspend such person at once, although the Contractor shall notify Contracting Officer prior to or concurrently with such action. The list of key personnel may, with the consent of the contracting parties, be amended from time to time during the course of the contract to add or delete personnel.
For contract personnel not identified as “key”, the contractor shall determine sufficient personnel to meet the demands presented within the Task Order. The contractor shall notify the COR of predicted vacancies no later than 30 days from the date of expected absence.
Table 1.1 provides historical number of personnel utilized to meet demand under the current contract. Historic number of personnel is being provided for information and estimating purposes only.
TABLE 1.1
| Task Position |
| PWS REF |
| Key Personnel / Number Required |
| Historic Number of Personnel |
| Task Management, Staff Coordination and Organizational Support |
| 5.1.1 |
| Yes / TBD |
| 1 |
| AVCATT/NCM3 Quality Assurance |
| 5.2.7 |
| Yes / 1 |
| 1 |
| Simulation Instructor Operator |
| 5.2 |
| 22 |
| 21 |
| AVCATT/NCM3 Simulator Scheduler |
| 5.2.8 |
| Yes / 1 |
| 1 |
5.2 Aviation Simulator Instructor Operator (I/O): The Contractor shall provide aviation instruction and simulator operation as described in Paragraph 5.2 – 5.2.9.1 of the Base IDIQ PWS. The quantity of service required for this Base Operation is identified in Table 5.2 of this Task Order. The service identified by this paragraph can also be referenced in Table 5.2, “Base Operations/Hours Per Simulator Per Year”, of the IDIQ PWS.
Table 5.2
| Site |
| Type |
| Location |
| Standard + Tier 1/ Hours Per Simulator Per Week |
| 1 |
| AVCATT NCM3 Scheduler |
| ARNG Readiness Center, Arlington, VA |
| PWS 5.2.8 |
| 2 |
| AVCATT/NCM3 Quality Assurance |
| Various Locations |
| PWS 5.2.7 |
| 8 |
| TBOS |
| Grand Ledge, MI |
| 40 |
| 12 |
| UH-60A/L SFTS |
| Esler Field, LA |
| 40 |
| 13 |
| TFPS |
| Camp Ripley, MN |
| 40 |
6 APPLICABLE PUBLICATIONS: Reference PWS Chapter 6
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| IDIQ PWS Paragraph |
| Task |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
1.4.4.1 Place and Performance of
Services (A)
| The contractor shall provide I/O services based on the core facility work schedule but provisioned for a flexible schedule simulator training periods that have been scheduled outside of those core hours |
| Provide aviation instruction and simulator operation tailored to the each facility’s operating hours |
| Simulator I/O service for all scheduled periods |
| Periodic Inspection - COR will review customer survey reports and monthly status reports |
1.4.4.1 (C) Place and Performance of Services
| Maintain an adequate work force for uninterrupted performance of the requirements found in the PWS |
| The contractor shall provide uninterrupted I/O coverage to all sites |
| Uninterrupted coverage with no more than a two week gap for personnel turnover or other unforeseen events. |
| Periodic Inspection - COR will review customer survey reports |
5.2 5.2.1 5.2.9
| Provide aviation instruction and simulator operation |
| Operate the simulator within the limits of that device. |
Conduct Aviation Instruction IAW AR 95-1 and the airframe respective TC 3-04 Aircrew Training Manual -Training data shall be captured through input into the IOS prior to the end of the work day -Document Pilot simulator usage on DA Form 2408-12 Monthly, the Government QAR will submit customer survey reports that reflect aviation training results.
Government QAR will continuously review the accuracy of DA Forms COR will Periodically review Monthly usage reports
| 5.2.5 |
| Documentation of simulator usage |
| Record individual pilot simulator hour usage on DA Form 2408-12, at the completion of each flight, in accordance with DA PAM 738-751, for subsequent transcription by the owning unit in the devices’ logbook daily DA Form 2408-13. |
| All simulator usage will be recorded after each simulator period |
| The local government representative will inspect log books for compliance |
The COR will inspect the monthly report for compliance
| 5.2.5.1 |
| Each I/O shall report device utilization by State |
| Device utilization reports shall include no-shows, availability rate, scenario development time unique to I/O and downtime. |
| -Provide utilization reports on a Weekly basis to the QAR and by electronic mail to designated points of contact for reporting in TS- MATS by the appropriate Training Support Center (TSC) IAW AR 350-38 |
-Provide usage data Monthly to the COR -COR will review monthly status reports
-QAR will review weekly device utilization reports
| 5.2.5.2 |
| RFMSS Fire Desk Operator |
| The contractor shall act in the Fire Desk Operator role in RFMSS |
| The contractor shall use RFMSS to schedule every simulator training period. |
| The contractor AVCATT Simulator Scheduler will provide quality control over the inputs of all contractor Fire Desk Operators. |
The local government representative at each location will monitor RFMSS for compliance.
| 5.2.6 |
| Identify needed corrections or training shortfalls in the I/O training manual. |
| Identify all corrections as needed/ determined. |
| -Provided in monthly status report as appropriate for all applicable instances |
| Periodic Inspection - COR will review the monthly performance reports submitted by the Contractor to the COR |
5.2.7 5.2.7.1 5.2.7.2
| Evaluate the AVCATT and NCM3 simulator utilization and operation. |
| Each site shall be visited at least twice each year. |
Reports shall be submitted within 10 days of each site visit.
| 2 Quality Assurance visits to each site Reports submitted within 10 days of site visit. |
| Periodic Inspection - COR will review the site visit reports submitted by the Contractor to the COR |
| 5.2.7.3 |
| AVCATT/ NCM3 Fielding |
| Travel to AVCATT and NCM3 sites for the fielding of new systems. |
| After every site travel provide recommendations in a trip report to the Government on site selection, device setup, and troubleshooting. |
| The COR will review every trip report |
| 5.2.8 |
| AVCATT/NCM3 Simulator Scheduler |
| Conduct scheduling and usage tracking for all simulators and ARNG AVCATTs and NCM3s utilizing RFMSS |
| The contractor shall identify every simulator device in the ARNG inventory not being reported in RFMSS and provide that information in the monthly report |
| The COR will review the monthly report for compliance |
TECHNICAL EXHIBIT 2
Deliverable Schedule
| PWS Reference / Deliverable Title |
| Frequency |
| Number of Copies |
| Medium/Format |
| Submit To |
| 1.4.1 Quality Control (QC) |
| The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The QCP will be submitted to the COR NLT 45 days after contact award. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.5.6 AT Level 1 Awareness Training (AT) Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.5.10 OPSEC Training Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.5.11 OPSEC SOP/Plan |
| The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan and provide it to the COR or the Contracting Officer within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.10 Contract Manager |
| Prior to the start of the contract |
| 1 |
| Email |
| COR |
1.4.12.2 Identification of Contractor Employees
| Return identification media within 14 days of employee’s departure from contract performance. |
| Original(s) |
| Hard Copy |
| KO |
| 1.4.8.13 |
| I/Os shall have prior experience training or operating with Army Aviation (or Military Equivalent). |
| 1 |
| Upon arrival to the unit, each I/O shall present his or her flight records and qualifications to the Battalion/AASF/ Facility Standardization Instructor Pilot for review. I/O qualifications shall be made available to the COR upon request. |
| QAR, COR |
| 5.2 |
| Monthly Performance Report |
| 1 |
| Monthly/ Electronic Submission |
| COR/ QAR |
| 5.2.2 |
| Flight Records |
| 1 |
| Paper Copy |
| Local Site Government Representative |
| 5.2.5.1 |
| Device Utilization |
| 1 |
| Provide utilization reports on a Weekly basis to the QAR and by electronic mail to designated points of contact for reporting in TS- MATS by the appropriate Training Support Center (TSC) IAW AR 350-38. |
Provide usage data Monthly
COR
5.2.7.1 5.2.7.3
| Travel Report |
| 1 |
| Electronic Submission |
| COR |
| 5.2.8.1 |
| Monthly Report |
| 1 |
| Electronic Submission |
| COR |
5.3 Contractor Manpower Reporting Application (CMRA)
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau via a secure data collection site.
Reporting inputs shall be for the labor executed during the period of performance during each Government Fiscal Year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
| 1 |
| Electronic Submission | |
| web address: http://www.ecmra.mil/ | |
| 5.4 Contractor responsibilities | |
| The Contractor shall submit the draft Task Order Management Plan (TOMP) within 15 days after Task Order award; the final TOMP, within 45 days after Task Order award. | |
| 1 |
| Electronic Submission | |
| COR | |
| 5.5 Requirements | |
| The Contractor shall deliver the draft TaskOrder Management Plan (TOMP) tailored for this Task Order in contractor’s format within 15 days after Task Order award and in final form within 45 days after Task Order award | |
| 1 |
| Electronic Submission | |
| COR | |
| 5.5.1 Requirements | |
| The Contractor shall deliver a Task Order Monthly Report in contractor format that includes a narrative of planned vs. actual performance of tasks, man hours worked, monthly cost of services computation, monthly anticipated billing summary, significant issues and planned activities for the next period. This rollup report will include both an “execution by month” and an “execution to date” section. The report will include the usage by State, by hour, number of personnel trained for each supported simulator. The report shall be submitted electronically to ARNG-AVO COR NLT the 15th of the month of execution. | |
| 1 |
| Electronic | |
Submission to the COR NLT the 15th of the month of execution
COR