16-IRT-057_PWS-Guam_for_Heavy_Equipment.docx

DOCX document 27 KB Posted

Attached to
Heavy Equipment - Guam
Solicitation number
W9133L-16-R-HE57
Issued by

About this file

Description - Heavy equipment rental - Guam

View the file

Other files

File Type Posted
16-IRT-057_PWS-Guam_for_Heavy_Equipment.docx DOCX document
Vendor_Questions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

for

Heavy Equipment (Guam)

1. General

1.1 Scope of Work: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to preform services, as defined in this PWS.

1.2 Background: In accordance with direction given in 7 Apr 2016 Memorandum, Subject National Guard Bureau (NGB) Fiscal Year 2013 Budget Guidance, has been determined the IRT requirements as mission critical for FY16.

1.3 Period of Performance (PoP). The Period of Performance shall start between 6-13 June to 16 September 2016.

1.4 Delivery Date. All rental equipment shall be delivered by the contractor to the location in Guam as early as 6 June and no later than (NLT) 13 June 2016 and shall be returned to the contractor by 16 September 2016.

1.5 Place of Performance. Bilembines Street, Malojlaj, Inarajan, Guam.

1.5.1 Operating Hours. The contractor shall provide the equipment throughout the duration of the PoP. Except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.

1.6 Quality Assurance (QA). The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).

1.7 Post Award Conference / Periodic Progress Meetings. The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.8 Combating Trafficking in Persons. The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.9 Organizational Conflicts of Interest (OCI). The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2. Definitions and Acronyms. This section includes all applicable definitions and acronyms utilized in this PWS.

2.1 Definitions.

CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

WORK WEEK. Monday through Friday, unless specified otherwise.

2.2 Acronyms.

CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
DFARSDefense Federal Acquisition Regulation Supplement
DODDepartment of Defense
FARFederal Acquisition Regulation
GFP/M/E/SGovernment Furnished Property/Material/Equipment/Services
KOContracting Officer

NLT No Later Than

OCIOrganizational Conflict of Interest
ODCOther Direct Costs
PIIPersonally Identifiable Information
POCPoint of Contact

POP Period of Performance

PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
TETechnical Exhibit

3. Requirements.

3.1. The contractor shall deliver all heavy equipment to Bilembines Street, Malojlaj, Inarajan, Guam as early as 6 June, NLT 13 June at 0800 hrs.

3.2 The contractor shall pick up all heavy equipment from Bilembines Street, Malojlaj, Inarajan, Guam at 1000hrs, on 16 Sept 2016.

3.3 The contractor shall provide transportation for delivery and pick up of all heavy equipment to include driver with required trucks and trailers.

3.4 The contractor shall provide all diesel/gas fuel required for the delivery and pickup of heavy equipment at all locations.

3.5 The contractor shall provide all accessories and attachments required for each piece of heavy equipment listed in table below.

3.6 The contractor shall perform any repairs and maintenance required during rental period.

3.7 The contractor shall respond within 24 hours of notification required to repair or replace unserviceable equipment, accessories, or attachments to all the heavy equipment.

EQUIPMENT LIST

NAME

QTY
DURATION

(Dates)

NOTES
Make/Model or equivalent
Bobcat/ Skid Steer Loader, Tracked
1
15 weeks

(6Jun16 to 16Sep16)

Need lights with 3 in 1 bucket.
JD 329 or equivalent
Bobcat/ Skid Steer Loader, Tracked
1
2 weeks

(6Jun16 to 17Jun16)

Need lights with 3 in 1 bucket. *Needed for two weeks only.*
JD 329 or equivalent
Bobcat Fork Attachment, Skid Steer
1
15 weeks

6Jun16 to 16Sep16

Excavator JD 85D w/ hyd. thumb bucket
1
15 weeks

6Jun16 to 16Sep16

John Deere 85D or equivalent

Excavator JD 130G w/ hyd. thumb bucket
1
2 weeks

6Jun16 to 17Jun16

*Needed for only two weeks*
John Deere 130G or equivalent
Ditching Bucket for excavator.
1
15 weeks

24 inch bucket

Backhoe w/ clam attachment
1
15 weeks

6Jun16 to 16Sep16

John Deere 310 or equivalent

8K, 42 ft reach Forklift, All Terrain (telehandler)
1
15 weeks

SkyTrak 8042 or equivalent

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PWS Paragraph
Task
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom

5.1 The contractor shall deliver all heavy equipment to Bilembines Street, Malojlaj, Inarajan, Guam as early as 6 June, NLT 13 June at 0800 hrs.

The contractor shall deliver/pickup all heavy equipment within the 98% of the established locations and timeframe.
2% failure to perform delivery/pickup of heavy equipment from defined locations during the established timeframe.

Program Manager

5.2 The contractor shall pick up all heavy equipment from Bilembines Street, Malojlaj, Inarajan, Guam at 1000hrs, on 16 Sept 2016.

The contractor shall provide 98% of transportation necessary for delivery/pick up of heavy equipment including driver and truck or trailer during established timeframe.
2% failure to provide transportation necessary for delivery/pick up of heavy equipment including driver and truck or trailer during established timeframe.

5.3 The contractor shall provide transportation for delivery and pick up of all heavy equipment to include driver with required trucks and trailers.

The contractor shall provide deliver/pick up all heavy equipment within 98% of established timeframe by their own fueled means.
2% failure to provide delivery/pick up of heavy equipment to defined locations by their own fueled means during established timeframe.

5.4

The contractor shall provide all diesel/gas fuel required for the delivery and pickup of heavy equipment at all locations.

The contractor shall provide all accessories and attachments required for each piece of equipment within 98% of established timeframe by their own fueled means.
2% failure to provide all necessary accessories and attachments required for equipment listed above during established timeframe.
.

5.5 The contractor shall provide all accessories and attachments required for each piece of heavy equipment listed in table below.

The contractor shall provide 98% of all standard commercial warranties to include maintenance of all equipment during established timeframe.
2% failure to provide all equipment with standard commercial warranties to include maintenance required during established timeframe.

5.6 The contractor shall perform any repairs and maintenance required during rental period.

The contractor shall provide 98% of required repair or replacement of all heavy equipment, accessories, and attachments during established timeframe.
2% failure of providing required repair or replacement of all heavy equipment, accessories, and attachments during established timeframe.

5.7 The contractor shall respond within 24 hours of notification required to repair or replace unserviceable equipment, accessories, or attachments to all the heavy equipment.

The contractor shall provide 98% of required repair or replacement of all heavy equipment, accessories, and attachments during established timeframe.
2% failure of providing required repair or replacement of all heavy equipment, accessories, and attachments during established timeframe.

File details come from the government source that posted it. Updated .