Amendment 0002 to Solicitation W912WJ26QA141

This is an amendment to a U.S. Army Corps of Engineers supply solicitation for cobblestone curbing and molded plastic lumber at Buffumville Lake Dam in Charlton, Massachusetts. The amendment extends the response due date from August 7, 2026 to August 10, 2026, with closing at 2:00 PM Eastern time. The requisition number is W912WJ26QA1410002, issued by the W92D ENDIST New England KO Contracting Division. The amendment modifies the molded plastic lumber dimension specification to accept 7.4" x 7.4" x 8' in addition to the primary specification of 8" x 8" x 8', clarifying that 7.5" x 7.5" dimensions are also acceptable.

The supply requirement calls for delivery and unloading of 440 sections of 4" x 8" x 48" cobblestone curbing (new and unused, earthy tones, weathered appearance, surface-cut with irregular shapes, free of defects) and 65 sections of 8" x 8" x 8' molded plastic lumber (brown color, 100% recycled high-density polyethylene with fiberglass reinforcement and UV stabilizer, structural grade, new and unused, free of defects). All materials must be delivered and unloaded to Buffumville Lake Park parking lot at 229 Oxford Road, Charlton, MA 01507 within 120 days of contract award during weekday hours (Monday-Friday, 7:00 AM–3:30 PM), with coordination through the Technical Point of Contact. The contractor is responsible for obtaining necessary permits and complying with EM 385-1-1 safety requirements and applicable OSHA and federal regulations. Payment is made for actual materials delivered at applicable contract unit prices via invoice. Vendors must complete the mandatory solicitation survey and review the addendum to evaluation criteria; failure to comply may result in non-responsive quotes.

View the file

Other files

File Type Posted
Amendment W912WJ26QA141-0001.pdf PDF
Attachments.pdf PDF
Solicitation Survey 26QA141.pdf PDF
Solicitation W912WJ26QA141.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date

07 Aug 2026 10 Aug 2026

Continuation of Description

Miscellaneous text in this section has been modified to:

INTERESTED VENDORS SHALL REVIEW THE "ADDENDUM TO 52.212-1" AND "ADDENDUM

TO EVALUATION" FOR INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE

RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS.

FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND

REMOVED FROM CONSIDERATION.

THE MANDATORY SOLICITATION SURVEY ISSUED FOR THE SOLICITATION SHALL BE

COMPLETED IN ITS ENTIRETY AND RETURNED WITH QUOTES. FAILURE TO DO SO MAY

RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM

CONSIDERATION. USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT

SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND

REMOVED FROM CONSIDERATION.

COBBLESTONE CURBING & MOLDED PLASTIC LUMBER

U.S. ARMY CORPS OF ENGINEERS

BUFFUMVILLE LAKE DAM

CHARLTON, MA

SUPPLY REQUIREMENT

I. General:

W912WJ26QA1410002

1. Scope- Supply, ship/deliver, and unload cobblestone curbing and molded plastic lumber to Buffumville Lake Park. The Government will not provide any assistance with unloading. Supplies are to be provided in accordance with the following requirements and schedule.

2. Location -All supplies shall be delivered to and unloaded at the Buffumville Lake Park parking lot at 229 Oxford Road in Charlton, MA 01507.

3. Project Coordination - Contact the Technical Point of Contact (TPOC), Aidan Buck, at (978)-318- 8692 or Aidan.J.Buck@usace.army.mil to coordinate the specific delivery schedule (date and time).

4. Schedule - All equipment and materials identified in these requirements shall be delivered and unloaded no later than 120 days from Contract Award. The project area will be open to the Contractor Monday through Friday 7:00 AM to 3:30 PM and all deliveries must be completed during those hours unless alternate hours are approved by the TPOC.

5. Safety Requirements - All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable OSHA, federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link: https://www.publications.usace.army.mil/Portals/76/EM% 20385-1-1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

6. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

7. Payment - The Contractor shall furnish the TPOC with one invoice, stating the Contract Number, the materials delivered, the date of delivery, the date of acceptance, and the amount to be paid.

The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made for actual materials delivered at the applicable contract unit price.

All invoices may be mailed to:

U.S. Army Corps of Engineers

Buffumville Lake Dam

48 Old Oxford Road

Charlton, MA 01507

Or emailed to: Aidan.J.Buck@usace.army.mil

II. Product Requirements:

Cobblestone curbing and molded plastic lumber: The Contractor shall supply, ship/deliver, and unload four hundred and forty (440) sections of 4" x 8" x 48" cobblestone curbing (new & unused) and sixty-five (65) sections of 8" x 8" x 8' molded plastic lumber that satisfy the following requirements:

Note: This Contract does NOT require installation of the cobblestone curbing or the molded plastic lumber.

1. Four hundred and forty (440) sections of 4" x 8" x 48" cobblestone curbing:

a. The cobblestone curbing shall be 4" x 8" x 48".

b. Curbing shall be newly sourced and not refurbished.

c. Curbing color shall be of earthy tones and weathered appearance.

d. Curbing shall be cut on the surface to allow for irregular shapes.

e. Curbing shall be free of scratches, chips, splits, or cracks.

f. Example Photo(s):

Please see Example Photos 1 and 2 for a basic representation of cobblestone curbing that would satisfy design but not color requirements.

2. Sixty-five (65) sections of 8" x 8" x 8' molded plastic lumber:

a. The molded plastic lumber shall be 8" x 8" x 8'. x 8' will be accepted.7.5" x 7.5" 7.4" x 7.4"

b. The lumber's color shall be brown.

c. The lumber shall be made of 100% recycled high-density polyethylene plastic and fiberglass reinforced.

d. An ultraviolet stabilizer shall be added at the time of manufacture to help protect against ultraviolet degradation of the plastic surface.

e. Lumber shall be free of scratches, splinters, splits, or cracks.

f. Lumber shall be rated as structural grade.

g. Lumber shall be new and unused.

h. Example Photo(s):

Please see Example Photo 3 for a basic representation of molded plastic lumber that would satisfy design but not color requirements.

ATTACHMENTS: Please refer to the attachments included with this solicitation for additional information.

IDCode: J
Page: 1
Pages: 5
AmendNo: 0002
EffDate: 06 AUG 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA141
SolDate: 27 JUL 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to revise the size of the molded plastic lumber to an acceptable size of 7.4" x 7.4" x 8'.

Closing is extended until August 10, 2026 at 2:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 06 AUG 2026