About this file

This is Amendment 0001 to Solicitation W912WJ26QA132, issued by the U.S. Army Corps of Engineers (W2SD ENDIST NEW ENGLAND, Concord, Massachusetts) on July 24, 2026. The amendment extends the solicitation closing date to July 28, 2026 at 5:00 PM Eastern and is not extended beyond that time. Offerors must acknowledge receipt of this amendment prior to the closing deadline through one of three methods: completing items 8 and 15 and returning copies of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt by the specified deadline may result in rejection of the offer.

The amendment adds two substantive sections to the solicitation. Section A includes a Site Visit Attendee List identifying eight attendees from organizations including U.S. Army Corps of Engineers, Cassidy Bros. Forge Inc., Neri Construction, Great Oak Services, Demers Landscaping and Excavating, All Steel Fab/Veren Industries, Brodeur-Campbell Fence, and Hastie Fence. A Request for Information section addresses three contractor questions regarding gate removal and disposal procedures: concrete footings must be removed completely with new gates installed in the same location; old gates and concrete must be moved to a storage area at Tully Lake spillway field per coordination with the Technical Point of Contact; and contractors may cut gate arms free from hinge posts during removal operations. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
Attachments 26QA132.pdf PDF
Solicitation W912WJ26QA132.pdf PDF
Solicitation Survey 26QA132.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been added to:

SITE VISIT ATTENDEE LIST:

NAME ORGANIZATION

Jason Robinson U.S. Army Corps of Engineers

Vincent Cassidy Cassidy Bros. Forge Inc.

John Neri Neri Construction

Bob Glidden Great Oak Services

Justin Demers Demers Landscaping and Excavating

James Magill All Steel Fab / Veren Industries

W912WJ26QA1320001

John Cowles Brodeur-Campbell Fence

Mike Girard Hastie Fence

REQUEST FOR INFORMATION:

QUESTION 1: Can the Contractor cut the gate off and not dig up concrete footings?

RESPONSE 1: No, the concrete footings must be removed completely and the new gate installed in the same location as the old gate.

QUESTION 2: Where should the Contractor dispose of old the gates and concrete?

RESPONSE 2: Please refer to Part 3 Execution, 1 a. i. "Ten (10) existing road gates will be removed from their current locations and moved to a storage area at the Tully Lake spillway field.

(See Figure 20). The exact location will be coordinated with the Technical Point of Contact."

QUESTION 3: The gates being removed are of a design where the gate arm is a separate piece from the hinge post. During removal of the gate, is it permissible to cut the gate arms free from the post then remove the post and concrete separately from the gate arm with out the gate arm in the way?

RESPONSE 3: Yes, it is permissible to cut the gate arm free from the hinge post during removal of the old gates.

W912WJ26QA1320001

IDCode: J
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 24 JUL 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA132
SolDate: 14 JUL 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry and provide a site visit attendee list.

Solicitation closing remains July 28, 2026 at 5:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 24 JUL 2026