Attachments 26QA057_Revised.pdf
PDF 10 MB Posted
- Solicitation number
- W912WJ26QA057
About this file
This is a Performance Work Statement (PWS) for the U.S. Army Corps of Engineers Union Village Dam in Thetford, Vermont, specifically addressing dam intake debris removal. The document consists of informational photographs and a map rather than a detailed statement of work objectives. The photographs show the site conditions, including the access road with a 45-degree turn featuring guardrails and a road gate, the crane setup area at the intake, and multiple examples of debris accumulation within the dam intake structure including branches, logs, and other organic materials trapped against intake screens and grates. The informational map indicates the project location relative to the Union Village Dam property boundary, designates the crane access route, identifies the road to the disposal area, and marks the Project Office location.
The PWS is presented as a revised version with visuals intended to provide potential contractors with site-specific information regarding the debris removal work at Union Village Dam. The photographs document the challenging access conditions, the equipment setup requirements, and the extent of debris that requires removal from the intake structures. However, this document appears to be the informational visual section of a larger PWS package and does not contain specific performance requirements, deliverables, timelines, budget information, response deadlines, or other contractual terms necessary for full solicitation details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA057-0001.pdf | ||
| Attachments 26QA057.pdf | ||
| Solicitation W912WJ26QA057.pdf | ||
| Solicitation Survey 26QA057.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAM INTAKE DEBRIS REMOVAL
U.S. ARMY CORPS OF ENGINEERS
UNION VILLAGE DAM
THETFORD, VT
PERFORMANCE WORK STATEMENT
Informational Photos (REVISED)
Informational Photo 1: Access Road 45-degree turn showing guardrail, ledge, and road gate.
Informational Photo 2: Set up area for crane at intake
Informational Photo 3: Example of debris in the intake at Union Village Dam.
Not a current photo - for informational purposes only.
Informational Photo 4: Additional photo of example of debris in the intake at Union Village Dam. Not a current photo - for informational purposes only.
Informational Photo 5: Additional photo of example of debris in the intake at Union Village Dam. Not a current photo - for informational purposes only.
Informational Map
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .