Specifications.pdf

PDF 5 MB Posted

Attached to
Navigation Obstruction Removal, Portland Harbor, Portland, ME
Solicitation number
W912WJ26BA014
Issued by

About this file

This is a Specifications document for a federal construction solicitation (W912WJ26BA014) issued by the Department of the Army Corps of Engineers Engineering District New England for the removal of a navigation obstruction from Portland Harbor, Portland, Maine. The project involves mobilization and demobilization of marine equipment, complete removal of a wood and metal piling with fendering from the Federal Channel, and disposal of the obstruction at a land location secured and certified by the Contractor. The pile is embedded at an angle with approximately 32 feet exposed above the mudline at elevation -30.8 feet MLLW in a -35 foot MLLW deep channel; if full removal proves impossible after documented attempts, the pile may be cut below -35.5 feet MLLW with the lower portion remaining in place. The Contractor must provide photographic evidence of complete removal at the channel bottom and comply with all federal, state, and local regulations regarding creosote-treated material handling, transportation, and disposal.

The contract involves a single job payment item for "Removal and Disposal of Navigation Obstruction" with payment dependent on Government acceptance via post-removal survey. Key requirements include: submission of an Initial Project Schedule within 15 days of Notice to Proceed; 24/7 operational authorization for the entire performance period; a Safe Harbor Plan detailing emergency procedures for floating plant and equipment; coordination with the U.S. Coast Guard regarding Notice to Mariners within 15 days of NTP and aids to navigation; a Partnering Meeting within 10 days of NTP involving Government, Coast Guard, Harbormaster, Pilots, and other stakeholders; weekly progress meetings; monthly schedule updates; a Project Superintendent with minimum 10 years construction experience and 5 years as superintendent on similar projects; and a Site Safety and Health Officer meeting Level One or Two SSHO qualifications per EM 385-1-1. Additional submittals required include an Accident Prevention Plan, Dive Operations Plan (for underwater work), Activity Hazard Analysis, Environmental Protection Plan, Construction Waste Management Plan (minimum 60 percent diversion from landfill), and confirmation of obstruction removal with bill of lading. The specifications emphasize strict environmental compliance, minimal channel traffic disruption, coordination with Portland Pilots for daily traffic reports, and adherence to all safety protocols including confined space entry requirements and dive safety standards.

View the file

Other files

File Type Posted
Bid Abstract W912WJ26BA014.pdf PDF
Amendment 0001.pdf PDF
Drawings.pdf PDF
Solicitation - W912WJ26BA014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number:

W912WJ26BA014

Remove Navigation Obstruction Portland Harbor, Portland, Maine

Construction Solicitation and Specifications

May 2026

Remove Navigation Obstruction, Portland Harbor, Portland, ME

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 54 50 MARINE PLANT AND EQUIPMENT

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 71 23 FIELD ENGINEERING

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DIVISION 02 - EXISTING CONDITIONS

02 41 00 NAVIGATION OBSTRUCTION REMOVAL AND DISPOSAL

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 25 00 UNDERWATER DIVING WORK

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT LOCATION AND DESCRIPTION

1.2 PERIOD OF PERFORMANCE

1.3 SITE PHOTOGRAPHS AND SURVEY INFORMATION

1.4 REFERENCES

1.5 SUBMITTALS

1.6 SAFE HARBOR PLAN

1.7 PROJECT SITE CONDITIONS

1.7.1 Physical Data

1.8 SUPERINTENDENCE BY THE CONTRACTOR

1.9 WORK SEQUENCING AND SCHEDULING

1.9.1 Hours of Operations

1.9.2 Work Restrictions

1.9.3 Notification of Sturgeon Strikes

1.9.4 Work Sequence

1.9.4.1 General

1.9.4.2 Initial Project Schedule

1.9.4.3 Periodic Schedule Updates

1.9.4.4 Weekly Progress Meetings

1.9.4.5 Scheduling

1.9.5 Rate of Progress

1.10 CONTRACTOR'S USE OF UPLAND FACILITIES AND HAULING ROUTES

1.11 CONTRACTOR USE OF PREMISES

1.11.1 General

1.11.2 Access to the Site and Storage/Staging Areas

1.11.3 Temporary Facilities and Utilities, and Storage Areas

1.11.4 Work Limits

1.11.5 Government Access to Work Site

1.11.6 Protection and Security

1.11.7 Work By Other Contractors

1.11.8 Emergency Contacts

1.11.9 Damaged Property

1.11.10 Contractor's Receipt of Supplies

1.11.11 Daily Clean Up

1.11.12 Littering

1.11.13 Government Sanitary Facilities

1.12 QUALITY ASSURANCE

1.13 COORDINATION

1.13.1 Notice to Mariners

1.13.2 Aids to Navigation

1.13.3 Points of Contact

1.14 GENERAL SAFETY REQUIREMENTS

1.14.1 General

1.14.2 Contractor's Project Superintendent

1.15 ENVIRONMENTAL PROTECTION

1.16 PRECONSTRUCTION CONFERENCE

1.17 PRECONSTRUCTION SURVEY PROCESS MEETING

PART 2 PRODUCTS

SECTION 01 11 00 Page 1

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 2

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT LOCATION AND DESCRIPTION

The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under the project drawings and specifications.

The work of this project involves removal of a navigation obstruction from the Federal Channel in Portland, Maine. Works includes mobilization and demobilization of marine plant and equipment as necessary, removal of the navigation obstruction from the channel and from the water, and disposal of the obstruction at a land location secured by the Contractor and certified to accept disposal.

The obstruction designated for removal appears to be a wood and metal piling with fendering in place. The pile is embedded at an angle in the channel bottom, with the high end reaching elevation -30.8 feet MLLW in the -35 foot MLLW deep channel. Approximately 32 feet of the pile is exposed above the mudline of the channel bottom. The full length of the pile is unknown. The intact fendering is at the mudline. The wood of the pile is anticipated to have been creosote-treated. The objective of the pile removal is to remove the full length of the pile, from above the mudline and below, from the water and handle, transport and dispose of the pile and associated items at a land location in accordance with Federal, state, and local laws, rules, and regulations pertaining to handling, transportation and disposal of creosote-treated materials.

The Contractor must confirm the removal of the piling with photographic evidence at the channel bottom in the location of the pile removal.

If, in the opinion of the Contracting Officer, the Contractor has shown that removal of the full pile is not possible after attempts at full removal have failed, the pile may be cut below elevation -35.5 feet MLLW with the portion below -35.5 feet MLLW remaining in place. The pile above -35.5 feet MLLW shall be removed and disposed of as stated above.

The Contractor shall perform the work in strict accordance with the contract drawings and specifications and provide all supervision, plant, labor, materials, equipment, safety, and quality control necessary to perform all operations as necessary to accomplish the work, complete. The Contractor is responsible for providing and utilizing appropriate plant and equipment to remove and dispose of the navigation obstruction.

1.2 PERIOD OF PERFORMANCE

The period of performance is defined in the SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The period of performance includes all work defined by this project.

1.3 SITE PHOTOGRAPHS AND SURVEY INFORMATION

Attached at the end of the specification document are photographs and

SECTION 01 11 00 Page 1 other survey information of the navigation obstruction taken at the project site during recent site investigations. The photographs and survey information are intended to show the approximate conditions existing at the obstruction location. Items shown are not generally shown in their entirety. The Government does not guarantee that the conditions shown in the photographs and data will exist at the time of the performance of the work, and the Contractor is advised to investigate existing conditions.

1.4 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety and Occupational Health (SOH) Requirements

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Initial Project Schedule ; G, RO

In accordance with the contract clauses, the Contractor shall, within 15 days after receipt of Notice to Proceed (NTP) or as otherwise determined by the Contracting Officer, submit for approval a practicable project schedule. When changes are authorized that result in contract time extensions, the Contractor shall submit a revised project schedule for approval by the Contracting Officer.

Notice to Mariners

Submit a copy of Notice to Mariners to the Contracting Officer.

Aids to Navigation

Submit proof of coordination with the USCG for any necessary relocation or movement of aids to navigation.

Safe Harbor Plan ; G, RO

SD-07 Certificates

Periodic Schedule Updates ; G, RO

1.6 SAFE HARBOR PLAN

The Contractor shall submit a Safe Harbor Plan to the Contracting Officer for approval prior to the start of on-site work. The Safe Harbor Plan

SECTION 01 11 00 Page 2 shall include a written description of the Contractor's plan to provide for the safety and security of floating plant, equipment, and personnel in the event of a storm or other site emergency. The location for the docking of floating plant and the off-loading of equipment and crews shall be clearly indicated.

1.7 PROJECT SITE CONDITIONS

1.7.1 Physical Data

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

a. Site Conditions: The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys. The conditions represented prevailed at the time the investigations and surveys were made. Before commencing work at the site, the Contractor shall verify the existing conditions indicated on the drawings and in the specifications. See CONTRACT CLAUSE entitled "SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK".

b. Weather Conditions: Weather conditions for the site may be obtained by the Contractor from the National Oceanic and Atmospheric Administration's National Weather Service; www.NOAA.gov.

c. Tide Conditions: The mean tidal range in the project area is 9.12 feet mean higher high water (MHHW) to mean lower low water (MLLW). The Federal Channel is marginally sheltered from the effects of coastal storms. Predicted times and heights of tides for each day of the year can be obtained from the National Oceanic and Atmospheric Administration, National Ocean Service, "Tidal Current Tables, Atlantic Coast of North America."

d. Transportation facilities: The Contractor shall make its own investigations on the use of town, State and Federal highways, roads, streets, and bridges.

e. Channel Traffic: The channel is used by large deep draft commercial ships including container ships, oil tankers, and bulk cargo ships, as well as commercial fishing vessels, ferries, and recreational craft.

The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of applicable regulations. The Contractor shall conduct the work in such a manner as to obstruct navigation as little as possible, and in the event the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, the plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. The Contractor shall coordinate with the Portland Pilots to obtain a report for each day's channel traffic.

f. Tide and Weather Conditions: Flow data and tide conditions in Portland Harbor shall be determined by the Contractor.

g. Utilities: There are no known utility crossings in areas to be impacted by the work. The Contractor shall make his own investigations concerning utility lines crossing in work areas.

SECTION 01 11 00 Page 3

1.8 SUPERINTENDENCE BY THE CONTRACTOR

a. At all times during the performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work and have on the worksite a competent Project Superintendent who is satisfactory to the Contracting Officer and has the authority to act for the Contractor.

b. The qualified Project Superintendent, and competent alternate, shall be capable of reading, writing, and conversing fluently in the English language.

c. The Project Superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate project superintendent are the same as for the Project Superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

d. The Project Superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project. The Project Superintendent is required to attend partnering meetings, and quality control meetings.

e. The Project Superintendent shall maintain a physical presence at the site at all times and be responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.

f. The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion.

Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.

g. The Project Superintendent may not serve as the Site Safety and Health Officer (SSHO) or the CQC Manager.

1.9 WORK SEQUENCING AND SCHEDULING

1.9.1 Hours of Operations

Operational Hours: The Contractor will be allowed to perform work 24 hours per day, 7 days per week, excluding holidays, for the entire performance period of this contract.

1.9.2 Work Restrictions

All work shall be completed within the designated performance of work period as specified in Subpart 1.2 PERIOD OF PERFORMANCE, subject to the restrictions specified in Subpart 1.3 PROHIBITED IN-WATER WORK PERIODS.

SECTION 01 11 00 Page 4

Also refer to part titled "Special Environmental Requirements" in Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS for additional environmental compliance or work restrictions that may be required.

1.9.3 Notification of Sturgeon Strikes

If a sturgeon is found struck or injured due to the Contractor's operations, the incident shall be reported to NOAA by the Contractor. See Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS, Subpart 1.9 SPECIAL ENVIRONMENTAL REQUIREMENTS for detailed requirements.

1.9.4 Work Sequence

1.9.4.1 General

There are certain essential criteria relative to the preparation of a work sequence and time schedule which the Contractor will be required to implement and follow during the prosecution of the work. Minor variations in the sequence of the items of work as approved may be made by the Contractor, provided such variations do not conflict with critical elements of the schedule. Proposed minor variations shall be noted on the progress charts submittal required by CONTRACT CLAUSE, entitled "SCHEDULES FOR CONSTRUCTION CONTRACTS." Variations shall be approved by the Contracting Officer prior to implementation.

1.9.4.2 Initial Project Schedule

a. The initial project schedule shall be in the form of a chart graphically indicating the sequence proposed to accomplish each work feature or operation pursuant to FAR Clause 52.236-15 "Schedules for Construction Contracts". Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The chart shall be prepared to show the starting and completion dates of all work features on a linear horizontal time scale beginning with date of Notice to Proceed and indicating calendar days to completion. The scheduling of the entire project is required. Provide a schedule that is a forward planning as well as a project monitoring tool. The Contractor shall indicate on the chart the important work features or operations that are critical to the timely overall completion of the project. Key dates for such important work features and portions of work features are milestone dates and shall be so indicated on the chart. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail, as appropriate to the project:

(1) Activity Durations

(2) Design and Permit Activities

(3) Procurement Activities

(4) Mandatory Tasks

(a) Submission, review and acceptance of SD-01 Preconstruction Submittals (individual activity for each).

(b) Submission, review and acceptance of features requiring design

SECTION 01 11 00 Page 5 completion and submission, review and acceptance of design packages.

(c) Submission of mechanical/electrical/information systems layout drawings.

(d) Long procurement activities

(e) Submission and approval of O & M manuals.

(f) Submission and approval of as-built drawings.

(g) Submission and approval of installed equipment lists.

(h) Submission and approval of test data, and reports

(i) Show Government and other agency activities that could impact progress. These activities include, but are not limited to:

approvals, acceptance, design reviews, environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE), etc.

b. This schedule will be the medium through which the timeliness of the Contractor's construction effort is appraised. Anticipated adverse weather delay days shall be included in the schedule.

c. Submit the Initial Project Schedule for approval within 15 calendar days after notice to proceed is issued. No payment will be made for work items not fully detailed in the Project Schedule.

d. An Early Completion Schedule is an Initial Project Schedule (IPS) that indicates all scope of the required contract work will be completed before the contractually required completion date.

e. No IPS indicating an Early Completion will be accepted without being fully resource-loaded (including crew sizes and manhours) and the Government agreeing that the schedule is reasonable and achievable.

f. The Government is under no obligation to accelerate work items it is responsible for to ensure that the early completion is met nor is it responsible to modify incremental funding (if applicable) for the project to meet the contractor's accelerated work.

1.9.4.3 Periodic Schedule Updates

An updated schedule showing actual progress shall be submitted monthly and with each pay request. Changes to the base-line schedule shall be outlined in a narrative describing the reason for the change.

1.9.4.4 Weekly Progress Meetings

Conduct a weekly meeting with the Government (or as otherwise mutually agreed to) for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress, and to review planned activities for the upcoming two weeks. Use the current approved schedule update for the purposes of this meeting and for the production and review of reports. At the weekly progress meeting, address the status of RFIs, RFPs and Submittals.

SECTION 01 11 00 Page 6

1.9.4.5 Scheduling

All work shall be carefully scheduled to prevent delays and any excessive interruptions with channel traffic.

1.9.5 Rate of Progress

Employ ample personnel and sufficient equipment to accomplish the work of this contract in the least amount of time, within the prosecution period specified in the SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.

Should the Contractor fail to maintain the progress of the work as outlined in the approved Progress Schedule, the Contracting Officer may require that additional personnel and equipment be placed on the work and weekend and overtime work be performed, in order that the work be brought up to schedule and maintained. If, after a reasonable amount of time determined by the Contracting Officer, progress has either not been initiated, or has failed to sufficiently bring the work back on schedule to be completed by the scheduled contract period, the contract may be terminated.

1.10 CONTRACTOR'S USE OF UPLAND FACILITIES AND HAULING ROUTES

A. Unless obtained by the Government or specified otherwise in the contract documents, the Contractor shall be responsible for the following:

1. Locating, coordinating, and obtaining permission to use any land-based water access (docks, piers, ramps, etc.) that the Contractor deems necessary to complete the work.

2. Determining, if necessary, the trucking and hauling routes and associated restrictions to and from the work, to include the coordination for the use of such routes with local, state, and federal authorities.

3. Complying with all local, state, and federal regulations and restrictions when using any upland facilities or hauling routes.

B. The Government and its representatives will be allowed the use of the same land-based water access obtained by the Contractor.

1.11 CONTRACTOR USE OF PREMISES

1.11.1 General

Prior to the start of construction, the Contractor shall arrange with the Contracting Officer a sequence of procedures, means of access to work areas, space utilization for staging and storage of materials and equipment, and the use of approaches to the work areas.

1.11.2 Access to the Site and Storage/Staging Areas

The Contractor is responsible for maintaining access necessary for its equipment, material, and plant to and from the work area.

1.11.3 Temporary Facilities and Utilities, and Storage Areas

See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS, SECTION 01 11 00 Page 7 subpart "Contractor's Temporary Facilities."

1.11.4 Work Limits

The limits of work shall be within the Federal Channel as shown on the contract drawings.

1.11.5 Government Access to Work Site

Prior to the start of work, the Contractor shall ensure that the Government has access from the mainland to the work site. Access to the work site will be discussed at the Preconstruction Conference.

1.11.6 Protection and Security

A. Protection to Contractor personnel or their equipment cannot be provided at the worksite by the Government.

B. The Contractor shall protect all its personnel, Government personnel, and the general public from injury.

C. The Contractor shall conduct all its work so as to prevent injury or unsafe conditions during construction.

D. The Contractor shall report any vandalism, suspicious activities, or devices to the Contracting Officer and local police as soon as possible.

1.11.7 Work By Other Contractors

During the performance period of this contract, no other work is anticipated to occur by other Federal Government contractors.

1.11.8 Emergency Contacts

The Contractor shall provide a list of emergency contacts to be used in the event of an emergency. The list shall include the contact names, addresses, and telephone numbers. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.11.9 Damaged Property

Work shall proceed in a manner which will minimize disturbance or risk of damage to boats, structures, and surrounding lands. The Contractor shall repair such items damaged in the course of carrying out the work at no additional cost to the Government. All repairs shall match similar existing items in all aspects. All replacements shall be in kind.

1.11.10 Contractor's Receipt of Supplies

The Contractor shall be responsible for all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site.

1.11.11 Daily Clean Up

The Contractor shall at all times keep rubbish from entering surrounding lands and water. Rubbish accumulated at the temporary facilities shall be removed from the premises daily.

SECTION 01 11 00 Page 8

1.11.12 Littering

The Contractor may be subjected to fines by State or local authorities for littering or discarding of tobacco materials other than into receptacles.

1.11.13 Government Sanitary Facilities

Toilet facilities are not available on site for Contractor's use. The Contractor shall provide portable toilets for its personnel and subcontractors as specified in EM 385-1-1 under Section 2, Sanitation.

1.12 QUALITY ASSURANCE

A. All items of work not addressed in the contract documents shall be completed in strict accordance with the manufacturers’ specifications.

B. The Government is not obligated to inspect the Contractor’s work, or to protect the Contractor from the consequences of its work. Government inspections are a general examination of the Contractor’s conduct and workmanship and are solely for the purpose of the Government.

Government-designated Quality Assurance Representatives (QARs) do not have the authority to accept work, nor is a Government inspection to be construed as conclusive.

C. Government agents including QARs and project engineers are not authorized to change the contract without the written approval of the Contracting Officer; this lack of authority extends to all situations in which the action of these agents could be construed as constituting a change.

D. The quality of workmanship is subject to audit by Government or Government-designated QARs at any time during the contract. The Contractor shall cooperate fully and provide all information necessary for this audit.

E. The Contractor shall submit all requests for changes in writing to the Contracting Officer. Do not proceed with changes without possession of written authorization of the Contracting Officer.

1.13 COORDINATION

1.13.1 Notice to Mariners

The Contractor shall coordinate with the U.S. Coast Guard (USCG) to issue a "Notice to Mariners" regarding the work to be performed and the Contractor's proposed operations within 15 calendar days of the Notice to Proceed.

The Corps of Engineers and the USCG have agreed to phraseology when issuing navigational bulletins and notices. The information furnished shall be consistent with USCG Broadcast Notice to Mariners and Local Notice to Mariners. When requesting local USCG offices to issue navigational information for Corps of Engineers work involving marine construction, the following terminology shall be used, as applicable:

For cautionary areas: "Mariners are urged to use extreme caution in the area."

SECTION 01 11 00 Page 9

For dredging and work operations: "Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made."

The USCG LMN Information form is attached at the end of this specification section.

1.13.2 Aids to Navigation

Aids to navigation (beacons, buoys, markers, etc.) have been placed by the USCG in the vicinity of the project area. The Contractor shall not interfere with these aids to navigation. If the work of this project requires the temporary movement or relocation of any aid to navigation, the Contractor shall notify the USCG and the Contracting Officer of the requirement 30 days in advance. USCG personnel will then move or relocate the aid to navigation as appropriate for the progress of the work. Under no circumstances shall the Contractor move or relocate an aid to navigation under his own authority with his own personnel. The Contractor shall also contact the USCG at the completion of all work and the removal of all marine plant.

1.13.3 Points of Contact

A. Coast Guard:

(1) Aids to Navigation:

LT Amanda Barnett Waterways Management Division Chief Telephone: 207-899-6291 email: Amanda.B.Barnett@uscg.mil Waterways Management Division group email: NNEwaterways@uscg.mil

(2) Notice to Mariners:

email: D01-SMB-LNM@uscg.mil Office Phone: 617-223-8356 Fax: 617-223-8094

(3) USCG Sector Northern New England

LT Amanda Barnett Waterways Management Division Chief Telephone: 207-899-6291 email: Amanda.B.Barnett@uscg.mil Waterways Management Division group email: NNEwaterways@uscg.mil

B. Portland, Maine Harbormaster:

Mr. Paul Plummer 2 Portland Fish Pier, Suite 105 Portland, ME 04101 Office Telephone: 207-772-8121 email: phm.admin@portlandharbor.org Office hours: Monday through Friday 9:00 am to 3:00 pm

C. Portland Pilots, Inc.

Captain Calvin Klopp

SECTION 01 11 00 Page 10

President, Portland Pilots, Inc.

Telephone: 207-774-5623; 24 hour Pilot on call 207-767-0937; Office 207-838-0936; Cell Email: portlandpilots1@gmail.com

1.14 GENERAL SAFETY REQUIREMENTS

1.14.1 General

The Contractor shall take all necessary precautions in observing safety regulations in accordance with Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, and shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government property. The Contractor shall perform the work in a manner consistent with security and with fire safety regulations especially with regards to ingress and egress. Temporary closures shall not compromise life safety, security or fire safety.

1.14.2 Contractor's Project Superintendent

The Contractor's project superintendent shall take an active role in enforcing the safety requirements by participation in safety conferences, hazard analysis, tool box meetings, walk-through inspections, correction of violations, etc., and including that of any subcontractor's work.

1.15 ENVIRONMENTAL PROTECTION

To provide for control of all environmental pollution arising from construction activities, the Contractor and its subcontractors, in the performance of this contract, shall comply with Section 01 57 19 TeMPORARY ENVIRONMENTAL CONTROLS, and all applicable Federal, State, and local laws and regulations concerning environmental protection pollution control and abatement.

1.16 PRECONSTRUCTION CONFERENCE

The Contracting Officer will conduct a preconstruction conference with key Contractor personnel. The purpose of the conference is to review contract requirements and to establish a working relationship between the Contractor's Staff and the U.S. Army Corps of Engineers (USACE) personnel who will be closely associated with the project. During the conference, the Contracting Officer will inform the Contractor concerning topics such as, but not limited to, job safety, quality control, temporary facilities and storage areas, labor relations, and environmental protection. The Contractor's Project Superintendent, Quality Control Representative, and Site Safety and Health Officer (SSHO) shall attend this conference.

1.17 PRECONSTRUCTION SURVEY PROCESS MEETING

Following the Preconstruction Conference, the Contracting Officer will also conduct a Preconstruction Survey Process Meeting with key Government and Contractor personnel. The purpose of the meeting is to outline and confirm necessary surveys to fulfill the contract, discuss the required communication between the Contractor and Government for timely coordination of surveys, and identify and address any potential challenges associated with survey requirements. The Contractor's Superintendent and Quality Control Representative shall attend this meeting. In lieu of a separate meeting, this meeting can be conducted as part of the

SECTION 01 11 00 Page 11

Preconstruction Conference.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 11 00 Page 12

LNM Information Form

DATE:

NAME:

PHONE NUMBER:

EMAIL ADDRESS:

COMPANY NAME:

TYPE OF WORK:

LOCATION (STATE AND WATERWAY) WHERE WORK WILL BE DONE:

LAT/LONG: (degrees, minutes, seconds & thousandths)

BEGINNING/ENDING DATES:

HOURS OF OPERATION (DAYS PER WEEK, HOURS PER DAY):

EQUIPMENT ON SCENE:

RADIO FREQUENCY VESSELS CAN BE CONTACTED ON (IF USED):

PASSING ARRANGEMENTS/Time to move vessels to not impede navigation:

Please email the form two weeks before the work is to begin to:

D01-SMB-LNM@uscg.mil or you can fax the form to: 617-223-8094.

The completed LNM (Local Notice to Mariners) can be found on the following website: http://www.navcen.uscg.gov and is posted by Thursday morning of the current week.

mailto:D1lnm@uscg.mil http://www.navcen.uscg.gov/

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 CONTRACT COST BREAKDOWN

1.2 JOB PAYMENT ITEM

1.3 BIDDING SCHEDULE - PAYMENT ITEM

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 22 00 Page 1

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 CONTRACT COST BREAKDOWN

The Contractor must furnish within 15 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced item as between early and late payment or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included. This Contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.

1.2 JOB PAYMENT ITEM

The payment item for the work of this contract for which contract job payments will be made is listed in the BIDDING SCHEDULE and described below. The job price and payment made for the item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3 BIDDING SCHEDULE - PAYMENT ITEM

The payment item for the work of this contract on which the contract progress payments will be based is listed in the BIDDING SCHEDULE and is described below. All costs for items of work, which are not specifically mentioned to be included in a particular Bidding Schedule job payment item shall be included in the listed job payment item.

A. Item Number 0001, "Removal and Disposal of Navigation Obstruction".

All costs for labor, equipment, and materials for removal and disposal of the navigation obstruction, as shown on the contract drawings and in accordance with the specifications. All work of this project must be included in this Bid Item

Payment of this bid item will be dependent on Government acceptance of the work via survey as outlined in the specifications. The Government will utilize the bottom surface shown by the soundings of an after-removal survey made as soon as practicable after the removal of the navigation obstruction.

Unit of Measure: Job.

PART 2 PRODUCTS

Not Used

SECTION 01 22 00 Page 2

PART 3 EXECUTION

Not Used

SECTION 01 22 00 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 MINIMUM INSURANCE REQUIREMENTS

1.2 SUPERVISION

1.3 PRECONSTRUCTION CONFERENCE

1.4 PARTNERING

1.5 ELECTRONIC MAIL (E-MAIL) ADDRESS

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 30 00 Page 1

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required during the entire period of performance under this contract. Provide other insurance coverage as required by State of Maine law.

1.2 SUPERVISION

See Section 01 11 00 SUMMARY OF WORK, Subpart SUPERINTENDENCE BY THE

CONTRACTOR.

1.3 PRECONSTRUCTION CONFERENCE

See Section 01 11 00 SUMMARY OF WORK, Subpart PRECONSTRUCTION CONFERENCE.

1.4 PARTNERING

The Contractor shall host a partnering meeting within 10 days of receipt of the Notice to Proceed. To most effectively accomplish this Contract, the Contractor, Government, and the users of the harbor must form a cohesive partnership with the common goal of completion of the work in the most efficianet manner for both the Contractor and the users without safety mishaps, conforming to the Contract, within budget, and on schedule. The partnering team must consist of personnel from the Government, the Contractor, the USCG, Harbormaster, Marine Police, Pilots and any other users that the Government considers necessary. The Government will furnish a list of persons to be invited in a timely manner so as not to delay the partnering meeting. Key Personnel from the Contractor as well as key subcontractors are required to participate in the Partnering meeting.

Required outcomes of this meeting include:

1. A complete contact list with Name, Position, Phone Number, Email of all parties in attendance and including any other parties, not in attendance, that may be a part of coordination of work, vessel traffic, and needs related to emergencies or potential hazards to navigation that may occur due to the work outlined in the specification, at the Contractor's temporary trailer.

2. A plan for daily coordination between the Contractor and the users that will ensure communications necessary to minimize impacts to both the users and the contractor. This may or may not include daily calls, emails, discussion of the need for advance notice from both the user and contractor side should there be a need to move vessels or work equipment.

The Contractor is responsible for determining a location for the meeting that is mutually agreed to by the Contracting Officer and the Contractor.

The Contractor is responsible for sending the invitation, creating the

SECTION 01 30 00 Page 1

Contact list and producing minutes from the meeting that clearly outline the plan for daily communications. The Minutes and Contact list shall be distributed to the contact list no more than five days after the Partnering Meeting.

1.5 ELECTRONIC MAIL (E-MAIL) ADDRESS

Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.

It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 30 00 Page 2

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

1.1.2 Project Type

1.1.3 Submission of Submittals

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

1.2.2 Approving Authority

1.2.3 Work

1.3 SUBMITTALS

1.4 SUBMITTAL CLASSIFICATION

1.4.1 Government Approved (G)

1.4.1.1 Approval Codes

1.4.2 For Information Only

1.5 PREPARATION

1.5.1 Transmittal Form

1.5.2 Submittal Format

1.5.2.1 Format of SD-01 Preconstruction Submittals

1.5.2.2 Format for SD-02 Shop Drawings

1.5.2.2.1 Drawing Identification

1.5.2.3 Format of SD-03 Product Data

1.5.2.3.1 Product Information

1.5.2.3.2 Standards

1.5.2.3.3 Data Submission

1.5.2.4 Format of SD-04 Samples

1.5.2.4.1 Sample Characteristics

1.5.2.4.2 Sample Incorporation

1.5.2.4.3 Comparison Sample

1.5.2.5 Format of SD-05 Design Data

1.5.2.6 Format of SD-06 Test Reports

1.5.2.7 Format of SD-07 Certificates

1.5.2.8 Format of SD-08 Manufacturer's Instructions

1.5.2.8.1 Standards

1.5.2.9 Format of SD-09 Manufacturer's Field Reports

1.5.2.10 Format of SD-10 Operation and Maintenance Data (O&M)

1.5.2.11 Format of SD-11 Closeout Submittals

1.5.3 Source Drawings for Shop Drawings

1.5.3.1 Source Drawings

1.5.3.2 Terms and Conditions

1.6 QUANTITY OF SUBMITTALS

1.6.1 Number of SD-04 Samples

1.7 INFORMATION ONLY SUBMITTALS

1.8 PROJECT SUBMITTAL REGISTER

1.8.1 Submittal Management

1.8.2 Preconstruction Use of Submittal Register

SECTION 01 33 00 Page 1

1.8.3 Contractor Use of Submittal Register

1.8.4 Approving Authority Use of Submittal Register

1.8.5 Action Codes

1.8.5.1 Contractor Action Codes

1.8.6 Delivery of Copies

1.9 VARIATIONS

1.9.1 Considering Variations

1.9.2 Proposing Variations

1.9.3 Warranting that Variations are Compatible

1.9.4 Review Schedule Extension

1.10 SCHEDULING

1.11 GOVERNMENT APPROVING AUTHORITY

1.11.1 Review Notations

1.12 DISAPPROVED SUBMITTALS

1.13 APPROVED SUBMITTALS

1.14 APPROVED SAMPLES

1.15 WITHHOLDING OF PAYMENT

1.16 STAMPS

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 33 00 Page 2

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

1.1.2 Project Type

The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:

Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.

1.1.3 Submission of Submittals

Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:

SD-01 Preconstruction Submittals

Submittals that are required prior to or at the start of construction (work) or the next major phase of the construction on a multiphase contract.

Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.

SECTION 01 33 00 Page 3

Certificates Of Insurance

Surety Bonds

List Of Proposed Subcontractors

List Of Proposed Products

Baseline Network Analysis Schedule (NAS)

Submittal Register

Schedule Of Prices Or Earned Value Report

Accident Prevention Plan

Work Plan

Quality Control (QC) plan

Environmental Protection Plan

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.

Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports

Daily logs and checklists

Final acceptance test and operational test procedure

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.

SECTION 01 33 00 Page 4

Confined space entry permits

Text of posted operating instructions

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).

Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

1.2.2 Approving Authority

Office or designated person authorized to approve the submittal.

1.2.3 Work

As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Submittal Register ; G, RO

1.4 SUBMITTAL CLASSIFICATION

1.4.1 Government Approved (G)

Government approval is required for extensions of design, critical materials, variations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government.

Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, submittals are considered to be "shop drawings."

1.4.1.1 Approval Codes

A. Construction Division {"AO" (Area Office), "RO" (Resident Office), or "PO" (Project Office) Reviewer}: An "AO", "RO", or "PO" in column "f" indicates that the submittal review action is by New England District Construction Division. Send all such submittals to the project Resident or Area Engineer, as applicable.

SECTION 01 33 00 Page 5

B. Engineering Division {"DO" (District Office) Reviewer): A "DO" on the attached submittal register, column "f" indicates that the submittal review action is by the New England District, Engineering Division, or other organization in the District Office. Send all such submittals to the project Resident or Area Engineer for distribution to the appropriate approving authority.

C. Architect-Engineer Firm {"AE" reviewer): An "AE" on the attached submittal register, column "f" indicates that the submittal review action is by the Architect-Engineer firm associated with the project.

D. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

E. Government acceptance is required for submittals with a "G, A" designation.

1.4.2 For Information Only

Submittals not requiring Government approval will be for information only. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are not considered to be "shop drawings."

1.5 PREPARATION

1.5.1 Transmittal Form

Use the ENG Form 4025-R transmittal form for submitting both Government-approved and information-only submittals. Submit in accordance with the instructions on the reverse side of the form. These forms are attached at the end of this section and are included in the RMS CM software that the Contractor is required to use for this contract.

Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.5.2 Submittal Format

1.5.2.1 Format of SD-01 Preconstruction Submittals

When the submittal includes a document that is to be used in the project, or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.

Provide data in the unit of measure used in the contract documents.

1.5.2.2 Format for SD-02 Shop Drawings

Provide shop drawings not less than 8-1/2 by 11 inches nor more than 30 by 42 inches, except for full-size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless another form is required.

Ensure drawings are suitable for reproduction and of a quality to produce clear, distinct lines and letters, with dark lines on a white background.

a. Include the nameplate data, size, and capacity on drawings. Also include applicable federal, military, industry, and technical society

SECTION 01 33 00 Page 6 publication references.

b. Dimension drawings, except diagrams and schematic drawings. Prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.

Submit an electronic copy of drawings in PDF format.

1.5.2.2.1 Drawing Identification

Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph

IDENTIFYING SUBMITTALS.

Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location next to the title block. Place the Government contract number in the margin, immediately below the title block, for each drawing.

Reserve a blank space on the right-hand side of each sheet for the Government disposition stamp.

1.5.2.3 Format of SD-03 Product Data

Present product data submittals for each section as a complete, bound volume. Include a table of contents, listing the page and catalog item numbers for product data.

Indicate, by prominent notation, each product that is being submitted;

indicate the specification section number and paragraph number to which it pertains.

1.5.2.3.1 Product Information

Supplement product data with material prepared for the project to satisfy the submittal requirements where product data does not exist. Identify this material as developed specifically for the project, with information and format as required for submission of SD-07 Certificates.

Provide product data in units used in the Contract documents. Where product data are included in preprinted catalogs with another unit, submit the dimensions in contract document units, on a separate sheet.

1.5.2.3.2 Standards

Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's…

This is the start of the file's text. The full file is on GovTribe.