This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a bridge coating project issued by W25D Endist New England Kontracting Division. The amendment provides responses to industry questions and clarifies various technical requirements, including safety personnel (SSHO) roles, certification standards, coating specifications, work schedules, and project logistics. Key clarifications include: a Level 3 Safety and Health Officer (SSHO) is permitted to dual hat responsibilities, AAMP certifications are not required, and day-to-day trailers can be brought to the bridge area but must be removed to a designated storage area at the end of each day. The solicitation closing remains September 9, 2025 at 5:00 PM Eastern, with all other terms and conditions remaining unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ25QA094.pdf | ||
| Appendix A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
QUESTION 1: SSHO requirements are stated to be a SSHO level 3, CP or QP. Generally, SSHO (most often Level 1) shall not have any other responsibilities on the jobsite. Will the level 3 SSHO be allowed to dual hat?
RESPONSE 1: Yes, a Level 3 SSHO is permitted to dual hat responsibilities.
QUESTION 2: There is no reference to AAMP QP-1, QP-2, or QS-1. Please clarify if these are requirement for the contractor performing the work.
RESPONSE 2: AAMP (Association for Materials Protection and Performance) QP-1, QP-2, or QS-1 certifications are not required.
QUESTION 3: A topcoat color was not referenced, please clarify if it is to be aluminum like the original color.
RESPONSE 3: Refer to Part 2. Products, Overcoat Product, 3 d. of the Statement of Work.
QUESTION 4: Will any items be required to be removed from the cleaning and coating limits?
RESPONSE 4: Refer to Part 3. Execution, Notes, iv. of the Statement of Work.
QUESTION 5: Just want to clarify the top flange limit is only to include the top of the top flange and not the bottom side?
RESPONSE 5: Refer to Part 3 Execution, b. Top Flanges and Expansion Joint Cover Plates of the Statement of Work.
QUESTION 6: What are the allowable workdays and hours?
RESPONSE 6: Refer to section I.4. Schedule of the Statement of Work. Typically, there is flexibility on the hours and days that can be worked, but it is dependent on other factors and is completely situational.
QUESTION 7: Where are the contractors designated lay down area for the project? I do see there is a storage and staging area designated on the SITE PLAN, however that is not in close proximity to the project for a laydown area. Can the cul-de-sac turnaround area at the end of the bridge be used for a designated laydown area for the project for the period of performance?
W912WJ25QA0940001
RESPONSE 7: The cul-de-sac cannot be used as a lay down area. Day to day trailers can be brought to the bridge area and kept alongside the guardrail but would need to be removed and brought up to the storage area designated on the site plan at the end of each day.
W912WJ25QA0940001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 03 SEP 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ25QA094 |
| SolDate: 26 AUG 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: AMENDMENT IS NECESSARY TO PROVIDE RESPONSES TO QUESTIONS FROM INDUSTRY. |
SOLICITATION CLOSING REMAINS SEPTEMBER 9, 2025 AT 5:00 PM EASTERN.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 03 SEP 2025 |