About this file

This document is an Amendment (Number 0006) to a federal solicitation for a bulkhead replacement project at the Raymark Superfund Site in Stratford, Connecticut. The amendment addresses a contractor's question about sheet pile specifications, with the government clarifying that alternative sheet pile materials are acceptable, provided they meet specific requirements: the material must comply with ASTM 572 Grade 50, and the size must meet minimum requirements without limiting the use of the MC 18 steel channel. The amendment references specification changes in sections 31 41 16 and drawings S-201 and S-501, and maintains all other terms and conditions of the original solicitation unchanged. The amendment is dated 09 MAY 2025 and was issued by the U.S. Army Corps of Engineers New England Contracting Division.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendmnet 0006 _S-201 BULKHEAD ELEVATIONS MAY 2025.pdf PDF
Amendment 0006_Spec Change 31 41 16_MAY2025.pdf PDF
Amendment 0006_S-501 BULKHEAD DETAILS MAY 2025.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Spec Secion 31 41 16.pdf PDF
Amendment 0001.pdf PDF
Amendment 0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 01 00 00 - General Requirements

The Requirements text has been modified to:

1. Can the contractor use an alternative sheet pile with equivalent or greater properties then the specified PZ-27 sheets?

GOVERNMENT RESPONSE: Yes, the contractor can use an alternative sheet pile as long as the material meets the minimum requirements for ASTM 572 Grade 50, and the size meets the minimum requirements without limiting the use of the MC 18 steel channel. (See Spec Changes 31 41 16 and Drawings S-201and Drawings S-501).

W912WJ25BA0130006

IDCode: J
Page: 1
Pages: 2
AmendNo: 0006
EffDate: 09 MAY 2025
ReqNo:
ProjNo: 468757
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ELIZABETH GLASGOW, EMAIL: ELIZABETH.K.GLASGOW@USACE.ARMY.MIL TELEPHONE: 978-318-8671 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ25BA013
SolDate: 14 APR 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE RESPONSES TO REQUESTS FOR INFORMATION (RFIS). ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
ContNameTitle:
CoNameTitle: ERIN E. BRADLEY
ContDate:
CODate: 22 MAY 2025

File details come from the government source that posted it. Updated .