Amendment W912WJ24Q0180-0003.pdf
PDF 393 KB Posted
- Solicitation number
- W912WJ24Q0180
About this file
This document is an Amendment to Solicitation W912WJ24Q0180 for the Demolition of a Beach Restroom and Septic System at Otter Brook Lake in Keene, NH. The amendment provides responses to five questions from industry regarding the project requirements. Key details include:
The solicitation closing date remains September 9, 2024 at 5:00 pm Eastern. There is no incumbent contractor for this project. OSHA 30 training is not required, and the work is not subject to the Davis-Bacon Act. The minimum footing depth is 6 inches, but the entire footing may be removed as long as additional material is provided to match the existing elevation. A site-specific Silica Compliance Plan is required for the concrete demolition work, regardless of the exposure level. All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ24Q0180-0002.pdf | ||
| Amendment W912WJ24Q0180-0001.pdf | ||
| Solicitation_W912WJ24Q0180.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 is necessary to provide a response to a question from industry, question and response No. 5 is applicable to this amendment.
The solicitation closing date remains September 9, 2024 at 5:00 pm Eastern.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24Q0180
X 9B. DATED (SEE ITEM 11)
28-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ24Q0180
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
REQUEST FOR INFORMATION
QUESTION 1: If there is an incumbent, can the government please provide the most recent contract award number & contract value?
RESPONSE 1: There is not an incumbent for this project.
QUESTION 2: Is OSHA 30 a requirement for this project?
RESPONSE 2: OSHA 30 is not a requirement for this work.
QUESTION 3: Does this requirement fall under Bacon Davis?
RESPONSE 3: No, the requirement is a service. Please refer to the wage determinations
No. 2015-4027 listed in the solicitation.
QUESTION 4: The solicitation states the footing of the building to be brought to 6” underground and the rest to be left and covered over, is that a requirement or a minimum? Could the entire footing be removed?
RESPONSE 4: The 6” is the minimum. The entire footing may be removed as long as the depth would not require an excavation and trenching plan and the contractor understands that additional material would be required to match the existing elevation. The cost of material shall be included in the vendor’s quote and will not be considered separately by the Government.
QUESTION 5: The project details state that we will need a site-specific Silica
Compliance Plan. We will be hammering and breaking the concrete vs. saw cutting, so there will be less exposure. What is the threshold for the silica exposure? Or does it matter? As long as we are working with the concrete, do we have to provide the plan?
RESPONSE 5: A Silica Control plan is required. There is not a threshold for exposure limits for this work.
W912WJ24Q0180
(End of Summary of Changes)