This document is an Amendment to a Solicitation for Debris Removal Services at the Hopkinton Dam in Hopkinton, New Hampshire (Solicitation No. W912WJ24Q0114). The amendment provides responses to industry questions regarding the scope of work, including the requirements for removing debris throughout the water column (up to 16-18 feet deep) and the lack of plans to lower the river water levels during the work. The Government confirms that a minimum 100-ton crane with a 0.5-yard clamshell bucket is required, and that no dredging of the river bottom will be permitted, only removal of the specified debris. The solicitation closing date remains May 28, 2024 at 2:00 PM Eastern. This procurement is set-aside for small business vendors under NAICS code 561990 with a $16.5 Million size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments.pdf | ||
| Solicitation W912WJ24Q0114.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to provide responses to questions from industry.
Solicitation closing remains May 28, 2024 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-May-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24Q0114
X 9B. DATED (SEE ITEM 11)
15-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-May-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ24Q0114
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUEST FOR INFORMATION
QUESTION 1: . In regards to Informational Photo 8 which is a photo of the area in front of the intake and trash rack. The photo caption reads that “Debris can be found throughout the entire water column in this area which is approximately 16-18 feet deep.” Is the Government indicating that all the debris, including submerged debris down to the river bottom must be removed?
RESPONSE 1: Yes, please see Section II.Part 4.3. Trash Racks Debris Removal Requirements of the Performance Work Statement for additional information.
QUESTION 2: Does the Government anticipate the lowering of water to access the river bottom to remove debris?
RESPONSE 2: The river will not be lowered to aid in the removal of any of the submerged debris. The USACE staff, with proper notice, may manipulate flows while work is being performed if conditions allow.
QUESTION 3: Is the debris being held in place by a trash rack? Debris is likely to be caught in this rack and cannot be removed until the whole area is drained and the debris cut free by hand.
RESPONSE 3: The debris is held in place against the vertical concrete piers called, “trash racks”, by the force of the water flows. The debris is not “caught” within a metal/steel rack. The river will not be lowered to aid in the removal of any of the submerged debris. The USACE staff, with proper notice, may manipulate flows while work is being performed if conditions allow.
QUESTION 4: Extremely heavy logs have come to rest against the bottom of the trash rack .
This debris is invisible and will make the work much more difficult. Will this be handled with a change order?
RESPONSE 4: Debris of various weights and sizes may be submerged within the area and shall be removed per the requirements of the Performance Work Statement. Equipment should be utilized that can handle various weights and sizes.
QUESTION 5: Trying to pull up debris caught in a submerged trash rack may damage the rack.
Does the Government anticipate dredging operations in front of the dam with a clamshell?
REPONSE 5: The Government does not anticipate dredging operations with the clam shell as there is a concrete bib on the river bottom. Care shall be taken not to damage the concrete piers
W912WJ24Q0114
with the clam shell. A minimum of a 100-ton crane with at least a half yard clam shell bucket is required per Section II.Part 2.2. Type of Equipment of the Performance Work Statement.
QUESTION 6: Is the reservoir going to be drained so that workers can clear debris along the log boom?
RESPONSE 6: The river will not be lowered to aid in the removal of any of the submerged debris. The USACE staff, with proper notice, may manipulate flows while work is being performed if conditions allow.
QUESTION 7: Does the Government know the condition of the bottom of the river? Do workers have to walk out on the drained bottom to remove the debris if this possible?
RESPONSE 7: The river bottom is typically a soft bottom consisting of sand and silt. The river will not be lowered to aid in the removal of any of the submerged debris. The USACE staff, with proper notice, may manipulate flows while work is being performed if conditions allow.
QUESTION 8: Does the Government anticipate dredging using a crane in front of the log boom area?
RESPONSE 8: There shall be no dredging of the river bottom material, only the removal of debris shall be permitted. The definitions of debris can be found in Section II.Part 4.1. River Debris of the Performance Work Statement.
(End of Summary of Changes)