This document is a Specifications document related to a federal contract opportunity for maintenance dredging of the Kennebec River in Bath, Maine.

The U.S. Army Corps of Engineers, New England District is issuing an Invitation for Bids (IFB) on behalf of the United States Navy (USN) for maintenance dredging of two portions of the Federal Navigation Project in the lower Kennebec River. The work involves removal of approximately 50,000 cubic yards of clean sand, with 40,000 cubic yards from the Doubling Point area and 10,000 cubic yards from the Popham Beach area. The dredged material will be placed at in-river and nearshore placement sites. The estimated construction cost is $1,000,000 to $5,000,000. The available work window is from December 1, 2024 to March 1, 2025. The NAICS code for the work is 237990 with a $37M size standard. This will be an unrestricted competitive procurement. Any responsible source meeting the standard may submit a bid.

View the file

Other files

File Type Posted
BidAbstract.pdf PDF
W912WJ24B0019_Solicitation.pdf PDF
Amendment 0001.pdf PDF
Drawings_Final_June2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number:

W912WJ24B0019

Maintenance Dredging Kennebec River, Maine

Construction Solicitation and Specifications

July 2024

Kennebec River Maintenance Dredge

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 54 50 DREDGING PLANT AND EQUIPMENT

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 71 23 FIELD ENGINEERING FOR DREDGING

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

35 20 23.23 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM - HOPPER DREDGE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

Kennebec Ri ver Mai nt enance Dr edge

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1. 1 PROJECT LOCATI ON AND DESCRI PTI ON

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 3 PERI OD OF PERFORMANCE, ENVI RONMENTAL WI NDOW, AND DREDGI NG AND

DI SPOSAL PERI OD

1. 3. 1 Per i od of Per f or mance

1. 3. 2 Envi r onment al Wi ndow

1. 3. 3 Dr edgi ng and Di sposal Per i od

1. 4 REFERENCES

1. 5 SUBMI TTALS

1. 6 PROJECT SI TE CONDI TI ONS

1. 6. 1 Physi cal Dat a

1. 7 SUPERI NTENDENCE BY THE CONTRACTOR

1. 8 WORK SEQUENCI NG AND SCHEDULI NG

1. 8. 1 Hour s of Oper at i ons

1. 8. 2 Compl et i on Requi r ement s

1. 8. 3 Wor k Sequence

1. 8. 3. 1 Gener al

1. 8. 3. 2 Two- Week Schedul e of Wor k Act i v i t i es

1. 8. 3. 3 I ni t i al Pr oj ect Schedul e

1. 8. 3. 4 Per i odi c Schedul e Updat es

1. 8. 3. 5 Schedul i ng

1. 8. 4 Rat e of Pr ogr ess

1. 9 CONTRACTOR' S USE OF UPLAND FACI LI TI ES AND HAULI NG ROUTES

1. 10 CONTRACTOR USE OF PREMI SES

1. 10. 1 Gener al

1. 10. 2 Access t o t he Si t e and St or age/ St agi ng Ar eas

1. 10. 3 Tempor ar y Faci l i t i es and Ut i l i t i es, and St or age Ar eas

1. 10. 4 Wor k Li mi t s

1. 10. 5 Pr ot ect i on and Secur i t y

1. 10. 6 Wor k By Ot her Cont r act or s

1. 10. 7 Emer gency Cont act s

1. 10. 8 Damaged Pr oper t y

1. 10. 9 Cont r act or ' s Recei pt of Suppl i es

1. 10. 10 Dai l y Cl ean Up

1. 10. 11 Li t t er i ng

1. 10. 12 Gover nment Sani t ar y Faci l i t i es

1. 11 QUALI TY ASSURANCE

1. 12 COORDI NATI ON

1. 12. 1 Dai l y Dr edge Oper at i ons Locat i on Map ( DOLM)

1. 12. 2 Publ i c Not i ce

1. 12. 3 Not i ce t o Mar i ner s

1. 12. 4 Ai ds t o Navi gat i on

1. 12. 5 Poi nt s of Cont act

1. 13 GENERAL SAFETY REQUI REMENTS

1. 13. 1 Gener al

1. 13. 2 Cont r act or ' s Pr oj ect Super i nt endent

1. 14 ENVI RONMENTAL PROTECTI ON

1. 15 PRECONSTRUCTI ON CONFERENCE

SECTI ON 01 11 00 Page 1

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 00 Page 2

Mai nt enance Dr edgi ng, Kennebec Ri ver , Mai ne

SECTI ON 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1. 1 PROJECT LOCATI ON AND DESCRI PTI ON

The gener al descr i pt i on bel ow i s gi ven t o i ndi cat e t he appr oxi mat e scope of t hi s pr oj ect onl y. I t does not l i mi t t he wor k r equi r ed under t he pr oj ect dr awi ngs and speci f i cat i ons.

The aut hor i zed Feder al Navi gat i on Pr oj ect f or t he l ower Kennebec Ri ver consi st s of a channel , 27- f oot deep and 500- f oot wi de ext endi ng f r om t he r i ver mout h near Popham Beach t o a poi nt about 13 mi l es upst r eam at t he c i t y of Bat h, Mai ne.

The wor k of t hi s pr oj ect i nvol ves mai nt enance dr edgi ng of t wo l ocat i ons of t he Feder al pr oj ect i n t he Kennebec Ri ver , Mai ne. Dr edgi ng i s needed t o r emove danger ous shoal s f r om t he channel i n advance of t he t r ansi t of new Navy combat shi ps and has been deemed cr i t i cal t o nat i onal def ense.

The Cont r act or shal l per f or m mai nt enance dr edgi ng t o r emove cl ean sandy mat er i al f r om t wo ar eas: i n t he v i c i ni t y of Doubl i ng Poi nt ( j ust bel ow Bat h) and al so at t he mout h of t he r i ver near Popham Beach. The aut hor i zed pr oj ect pr ovi des f or a 32- f oot - deep, pl us 2- f eet of al l owabl e over dept h i n Doubl i ng Poi nt and a 27- f oot - deep, pl us 2- f eet of al l owabl e over dept h i n Popham Beach.

The Cont r act or i s r esponsi bl e f or dr edgi ng and di sposi ng of t he t ot al awar ded cont r act quant i t y by t he wor k compl et i on dat e i dent i f i ed i n Sect i on 00 80 00 SPECI AL CONTRACT REQUI REMENTS, Subpar t COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK ( APR 1984) FAR 52. 211- 10

The Cont r act or shal l pr osecut e t he wor k di l i gent l y and mai nt ai n a dr edgi ng pr oduct i on r at e, based on wor ki ng 24 hour s per day and seven days per week, of not l ess t han 20, 000 cubi c yar ds f or each 30 cal endar day per i od of act ual dr edgi ng wor k at t he s i t e. The Cont r act or i s r esponsi bl e f or dr edgi ng and di sposi ng of t he t ot al awar ded cont r act quant i t y by t he wor k compl et i on dat e i dent i f i ed i n Sect i on SPECI AL CONTRACT REQUI REMENTS, Subpar t COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK ( APR 1984) FAR

52. 211- 10

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

A. The Cont r act or shal l per f or m t he wor k i n st r i ct accor dance wi t h t he cont r act dr awi ngs and speci f i cat i ons and pr ovi de al l super vi s i on, pl ant , l abor , mat er i al s, equi pment , saf et y, and qual i t y cont r ol necessar y t o per f or m al l oper at i ons as necessar y t o accompl i sh t he wor k, compl et e. The Cont r act or i s r esponsi bl e f or pr ovi di ng and ut i l i z i ng appr opr i at e pl ant and equi pment t o r emove and di spose of t he dr edged mat er i al .

B. The gener al descr i pt i on of t he wor k descr i bed bel ow i s gener al i n nat ur e and i s onl y gi ven t o i ndi cat e t he appr oxi mat e scope of wor k under t hi s cont r act . I t does not l i mi t t he wor k r equi r ed under t he pr oj ect cont r act dr awi ngs and speci f i cat i ons.

SECTI ON 01 11 00 Page 1

C. Gener al Descr i pt i on of t he Wor k:

( 1) Mobi l i zat i on and demobi l i zat i on as necessar y t o compl et e al l wor k i n accor dance wi t h t he cont r act document s.

( 2) The pr oposed wor k i nvol ves t he mai nt enance dr edgi ng pl us over dept h at t he f ol l owi ng l ocat i ons wi t hi n t he Kennebec Ri ver Feder al Navi gat i on Pr oj ect : Al l mai nt enance dr edgi ng i n t he Popham Beach r each i s t o - 27 f eet Mean Lower Low Wat er ( MLLW) , wi t h t wo f eet of al l owabl e over dept h t o - 29 f eet MLLW. Al l Mai nt enance dr edgi ng i n t he Doubl i ng Poi nt r each i s t o - 32 MLLW, wi t h t wo f eet of al l owabl e over dept h t o - 34 f eet MLLW.

( 3) The pr oposed wor k shal l be per f or med wi t h a hopper dr edge. The mat er i al dr edged f r om t he Doubl i ng Poi nt ar ea shal l be di sposed of at t he i n- r i ver pl acement s i t e l ocat ed nor t h of Bl uf f Head. Mat er i al dr edged f r om t he Popham Beach ar ea shal l be di sposed at a pr evi ousl y used near - shor e pl acement s i t e l ocat ed about 0. 4 naut i cal mi l es sout h of Jackkni f e Ledge. For descr i pt i on and l ocat i on of t he di sposal s i t es r ef er t o subpar agr aph " DI SPOSI TI ON OF MATERI ALS" i n Sect i on

35 20 23 DREDGI NG.

D. The pr oj ect descr i pt i on i s f ur t her def i ned i n t he cont r act dr awi ngs and speci f i cat i ons.

1. 3 PERI OD OF PERFORMANCE, ENVI RONMENTAL WI NDOW, AND DREDGI NG AND DI SPOSAL

PERI OD

To ensur e i mmedi at e r eadi ness t o st ar t dr edgi ng oper at i ons as ear l y as possi bl e wi t hi n t he envi r onment al wi ndow and dr edgi ng and di sposal per i od under t hi s cont r act , t he Cont r act or shal l commence on pr el i mi nar y cont r act admi ni st r at i ve wor k by pr ompt l y pl aci ng al l or der s, awar di ng subcont r act s, and pr epar i ng, pr ocessi ng, and submi t t i ng a pr oj ect schedul e wi t hi n 5 cal endar days and al l ot her r equi r ed submi t t al s and det ai l s wi t hi n 15 cal endar days af t er t he dat e t he Cont r act or r ecei ves t he Not i ce t o Pr oceed

( NTP) .

1. 3. 1 Per i od of Per f or mance

The per i od of per f or mance i s def i ned i n t he SPECI AL CONTRACT REQUI REMENTS, Subpar t COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK ( APR 1984) FAR

52. 211- 10. The per i od of per f or mance i ncl udes al l wor k def i ned by t hi s pr oj ect and may di f f er f r om t he envi r onment al wi ndow and dr edgi ng and di sposal per i od.

1. 3. 2 Envi r onment al Wi ndow

I n or der t o mi ni mi ze i nt er f er ence wi t h, di st ur bance t o, and damage t o par t i cul ar speci es of f i sh, mar i ne mammal s, bi r ds, and ot her aquat i c wi l dl i f e, an envi r onment al wi ndow has been est abl i shed f or dr edgi ng and di sposal oper at i ons under t hi s cont r act . The wi ndow, as not ed i n t he Wat er Qual i t y Cer t i f i cat e ( WQC) at t ached at t he end of Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS, i s as f ol l ows:

1 December 2024 t o 1 Mar ch 2025.

Dr edgi ng and di sposal wor k under t hi s cont r act wi l l not be per mi t t ed out si de of t hi s wi ndow. An ext ensi on t o t hi s wi ndow wi l l not be per mi t t ed.

SECTI ON 01 11 00 Page 2

The Cont r act or shal l not e t hat t he envi r onment al wi ndow di f f er s f r om t he dr edgi ng and di sposal per i od, as out l i ned bel ow.

1. 3. 3 Dr edgi ng and Di sposal Per i od

The Cont r act or shal l not e t hat t he dr edgi ng and di sposal per i od f or t hi s cont r act i s 1 December 2024 t o 15 Febr uar y 2025.

Al l dr edgi ng and di sposal wor k t o be per f or med under t hi s cont r act must be per f or med dur i ng t hi s per i od, t o i ncl ude any cor r ect i ve dr edgi ng wor k r equi r ed unt i l f i nal accept ance by t he Cont r act i ng Of f i cer . See Sect i on 01 71 23 FI ELD ENGI NEERI NG FOR DREDGI NG, Subpar t 3. 2, GOVERNMENT SURVEYS.

The Cont r act or ' s const r uct i on schedul e shal l show t he compl et i on of al l wor k wi t hi n t he per i od of per f or mance, envi r onment al wi ndow, and t he dr edgi ng and di sposal per i od, as appr opr i at e t o t he act i v i t y t o be per f or med.

1. 4 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2024) Saf et y and Occupat i onal Heal t h ( SOH) Requi r ement s

1. 5 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

I ni t i al Pr oj ect Schedul e; G, RO

I n accor dance wi t h t he cont r act c l auses, t he Cont r act or shal l , wi t hi n 5 days af t er r ecei pt of Not i ce t o Pr oceed ( NTP) or as ot her wi se det er mi ned by t he Cont r act i ng Of f i cer , submi t f or appr oval a pr act i cabl e pr oj ect schedul e. When changes ar e aut hor i zed t hat r esul t i n cont r act t i me ext ensi ons, t he Cont r act or shal l submi t a r evi sed pr oj ect schedul e f or appr oval by t he Cont r act i ng Of f i cer .

Two- Week Schedul e of Wor k Act i v i t i es

I n addi t i on t o t he schedul i ng and not i f i cat i on r equi r ement s speci f i ed el sewher e i n t he cont r act , t he Cont r act or shal l pr ovi de t o t he Cont r act i ng Of f i cer a det ai l ed schedul e of wor k act i v i t i es, whi ch t he Cont r act or i nt ends t o per f or m over t he f ol l owi ng t wo week per i od ( Monday t hr u Fr i day f or t wo weeks) .

Publ i c Not i ce; G, RO

SECTI ON 01 11 00 Page 3

Submi t a copy of t he pr oposed wor di ng of t he Publ i c Not i ce t o t he Cont r act i ng Of f i cer f or appr oval , wi t hi n 5 cal endar days of t he Not i ce t o Pr oceed.

Not i ce t o Mar i ner s

Submi t a copy of Not i ce t o Mar i ner s t o t he Cont r act i ng Of f i cer .

Ai ds t o Navi gat i on

Submi t pr oof of coor di nat i on wi t h t he USCG f or any necessar y r el ocat i on or movement of ai ds t o navi gat i on.

Saf e Har bor Pl an; G, RO

The Cont r act or shal l submi t a Saf e Har bor Pl an t o t he Cont r act i ng Of f i cer f or appr oval pr i or t o t he st ar t of on- si t e wor k. The Saf e Har bor Pl an shal l i ncl ude a wr i t t en descr i pt i on of t he Cont r act or ' s pl an t o pr ovi de f or t he saf et y and secur i t y of f l oat i ng pl ant , equi pment , and per sonnel i n t he event of a st or m or ot her s i t e emer gency. The l ocat i on f or t he docki ng of f l oat i ng pl ant and t he of f - l oadi ng of equi pment and cr ews shal l be c l ear l y i ndi cat ed.

SD- 07 Cer t i f i cat es

Per i odi c Schedul e Updat es; G, RO

1. 6 PROJECT SI TE CONDI TI ONS

1. 6. 1 Physi cal Dat a

Dat a and i nf or mat i on f ur ni shed or r ef er r ed t o bel ow i s f or t he Cont r act or ' s i nf or mat i on. The Gover nment shal l not be r esponsi bl e f or any i nt er pr et at i on of or concl usi on dr awn f r om t he dat a or i nf or mat i on by t he Cont r act or .

a. Si t e Condi t i ons: The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons and sur veys on t he dat es i ndi cat ed on t he dr awi ngs.

The condi t i ons r epr esent ed pr evai l ed at t he t i me t he i nvest i gat i ons and sur veys wer e made. A pr e- dr edge sur vey wi l l be per f or med by t he Gover nment pr i or t o t he st ar t of Cont r act or dr edgi ng oper at i ons at t he s i t e. Bef or e commenci ng wor k at t he s i t e, t he Cont r act or shal l ver i f y t he exi st i ng condi t i ons i ndi cat ed on t he dr awi ngs and i n t he speci f i cat i ons. See CONTRACT CLAUSE ent i t l ed " SI TE I NVESTI GATI ON AND

CONDI TI ONS AFFECTI NG THE WORK" .

b. Weat her Condi t i ons: Weat her condi t i ons f or t he s i t e may be obt ai ned by t he Cont r act or f r om t he Nat i onal Oceani c and At mospher i c Admi ni st r at i on' s Nat i onal Weat her Ser vi ce; www. NOAA. gov.

c. Ti de Condi t i ons: The mean t i dal r ange i n t he pr oj ect ar ea i s 9. 24 f eet mean hi gher hi gh wat er ( MHHW) t o mean l ower l ow wat er ( MLLW) . The i nner channel and anchor age i s mar gi nal l y shel t er ed f r om t he ef f ect s of coast al st or ms. Pr edi ct ed t i mes and hei ght s of t i des f or each day of t he year can be obt ai ned f r om t he Nat i onal Oceani c and At mospher i c Admi ni st r at i on, Nat i onal Ocean Ser vi ce, " Ti dal Cur r ent Tabl es, SECTI ON 01 11 00 Page 4

At l ant i c Coast of Nor t h Amer i ca. "

d. Tr anspor t at i on f aci l i t i es: The Cont r act or shal l make i t s own i nvest i gat i ons on t he use of t own, St at e and Feder al hi ghways, r oads, st r eet s, and br i dges.

e. Condi t i on of Channel : The ar eas t o be dr edged i n t hi s cont r act wer e l ast mai nt ai ned i n 2022. At t hat t i me, a hopper dr edge r emoved appr oxi mat el y 47, 500 cubi c yar ds of sedi ment f r om t he r i ver , and pl aced t he mat er i al at t he t wo di sposal s i t es.

f . Channel Tr af f i c : The channel i s used by commer ci al vessel s, U. S. Navy vessel s t r ansi t i ng t o and f r om t he Bat h I r on Wor ks ( BI W) , commer ci al f i shi ng cr af t and r ecr eat i onal cr af t .

g. Ti de and Weat her Condi t i ons: Fl ow dat a and t i de condi t i ons i n t he Kennebec Ri ver shal l be det er mi ned by t he Cont r act or . Based on hi st or i cal dat a, t he Cont r act or shal l expect i ce f l ows on t he Kennebec Ri ver .

Har d Mat er i al : Based on af t er dr edge sur vey dat a i n Oct ober 2022, have i ndi cat ed t hat r equi r ed dept h may be unachi evabl e at cer t ai n l ocat i ons wi t hi n t he FNP and t hat t hi s i s l i kel y due t o t he pr esence of har d mat er i al . Ref er t o t he I nf or mat i onal Dr awi ngs i ncl uded wi t h t he Cont r act Dr awi ngs f or mor e det ai l s. Thi s i s pr ovi ded t o t he Cont r act or f or t hei r conveni ence and i s f or i nf or mat i onal pur poses onl y

h. Ut i l i t i es: Ther e ar e no known ut i l i t y cr ossi ngs i n ar eas t o be dr edged. The Cont r act or shal l make hi s own i nvest i gat i ons concer ni ng ut i l i t y l i nes cr ossi ng i n ar eas t o be dr edged.

1. 7 SUPERI NTENDENCE BY THE CONTRACTOR

a. At al l t i mes dur i ng t he per f or mance of t he cont r act and unt i l t he wor k i s compl et ed and accept ed, t he Cont r act or shal l di r ect l y super i nt end t he wor k or assi gn and have on t he wor ksi t e a compet ent pr oj ect super i nt endent who i s sat i sf act or y t o t he Cont r act i ng Of f i cer and has t he aut hor i t y t o act f or t he Cont r act or .

b. The pr oj ect super i nt endent shal l mai nt ai n a physi cal pr esence at t he s i t e at al l t i mes and be r esponsi bl e f or al l const r uct i on and r el at ed act i v i t i es at t he s i t e, except as ot her wi se accept abl e t o t he Cont r act i ng Of f i cer .

c. Fai l ur e t o compl y wi t h t hese r equi r ement s shal l be deemed as cause f or a non- compensat or y st oppage and suspensi on of wor k unt i l t he def i c i ency i s r emedi ed.

d. The pr oj ect super i nt endent may not ser ve as t he Si t e Saf et y and Heal t h Of f i cer ( SSHO) .

1. 8 WORK SEQUENCI NG AND SCHEDULI NG

1. 8. 1 Hour s of Oper at i ons

Oper at i onal Hour s: The Cont r act or wi l l be al l owed t o per f or m wor k 24 hour s per day, 7 days per week, excl udi ng hol i days, f or t he ent i r e per f or mance per i od of t hi s cont r act .

SECTI ON 01 11 00 Page 5

1. 8. 2 Compl et i on Requi r ement s

At t he compl et i on of dr edged mat er i al pl acement oper at i ons on Bat h or Phi l l i psbur g, a r epor t shal l be submi t t ed by emai l t o bot h Nat i onal Mar i ne Fi sher i es Ser vi ce ( NMFS) and USACE, summar i z i ng t he vessel r out es t aken, number of t r i ps, any s i ght i ngs of Endanger ed Speci es Act ( ESA) - l i s t ed speci es, and any act i ons t aken t o avoi d i nt er act i ons wi t h ESA- l i st ed speci es.

1. 8. 3 Wor k Sequence

1. 8. 3. 1 Gener al

Ther e ar e cer t ai n essent i al cr i t er i a r el at i ve t o t he pr epar at i on of a wor k sequence and t i me schedul e whi ch t he Cont r act or wi l l be r equi r ed t o i mpl ement and f ol l ow dur i ng t he pr osecut i on of t he wor k. Mi nor var i at i ons i n t he sequence of t he i t ems of wor k as appr oved may be made by t he Cont r act or , pr ovi ded such var i at i ons do not conf l i c t wi t h cr i t i cal el ement s of t he schedul e. Pr oposed mi nor var i at i ons shal l be not ed on t he pr ogr ess char t s submi t t al r equi r ed by CONTRACT CLAUSE, ent i t l ed " SCHEDULES FOR CONSTRUCTI ON CONTRACTS. " Var i at i ons shal l be appr oved by t he Cont r act i ng Of f i cer pr i or t o i mpl ement at i on.

1. 8. 3. 2 Two- Week Schedul e of Wor k Act i v i t i es

I n addi t i on t o t he schedul i ng and not i f i cat i on r equi r ement s speci f i ed el sewher e i n t hi s sect i on, t he Cont r act or shal l pr ovi de t o t he Cont r act i ng Of f i cer a det ai l ed schedul e of wor k act i v i t i es, whi ch t he Cont r act or i nt ends t o per f or m over t he f ol l owi ng t wo week per i od ( Monday t hr u Fr i day f or t wo weeks) . The schedul e of wor k act i v i t i es shal l be updat ed and submi t t ed by t he Cont r act or t o t he Cont r act i ng Of f i cer on a weekl y basi s, by noon on ever y Thur sday dur i ng t he pr osecut i on of wor k per i od.

1. 8. 3. 3 I ni t i al Pr oj ect Schedul e

The i ni t i al pr oj ect schedul e shal l be i n t he f or m of a char t gr aphi cal l y i ndi cat i ng t he sequence pr oposed t o accompl i sh each wor k f eat ur e or oper at i on pur suant t o FAR Cl ause 52. 236- 15 " Schedul es f or Const r uct i on Cont r act s" . Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The char t shal l be pr epar ed t o show t he st ar t i ng and compl et i on dat es of al l wor k f eat ur es on a l i near hor i zont al t i me scal e begi nni ng wi t h dat e of Not i ce t o Pr oceed and i ndi cat i ng cal endar days t o compl et i on. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool .

The Cont r act or shal l i ndi cat e on t he char t t he i mpor t ant wor k f eat ur es or oper at i ons t hat ar e cr i t i cal t o t he t i mel y over al l compl et i on of t he pr oj ect . Key dat es f or such i mpor t ant wor k f eat ur es and por t i ons of wor k f eat ur es ar e mi l est one dat es and shal l be so i ndi cat ed on t he char t .

Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l , as appr opr i at e t o t he pr oj ect :

1. Act i v i t y Dur at i ons

2. Desi gn and Per mi t Act i v i t i es

3. Pr ocur ement Act i v i t i es

SECTI ON 01 11 00 Page 6

4. Mandat or y Tasks

a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .

b. Submi ssi on, r evi ew and accept ance of f eat ur es r equi r i ng desi gn compl et i on and submi ssi on, r evi ew and accept ance of desi gn packages.

c. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout dr awi ngs.

d. Long pr ocur ement act i v i t i es

e. Submi ssi on and appr oval of O & M manual s.

f . Submi ssi on and appr oval of as- bui l t dr awi ngs.

g. Submi ssi on and appr oval of i nst al l ed equi pment l i s t s.

h. Submi ssi on and appr oval of t est dat a, and r epor t s i . Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess. These act i v i t i es i ncl ude, but ar e not l i mi t ed t o:

appr oval s, accept ance, desi gn r evi ews, envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) , et c.

Thi s schedul e wi l l be t he medi um t hr ough whi ch t he t i mel i ness of t he Cont r act or ' s const r uct i on ef f or t i s appr ai sed. Ant i c i pat ed adver se weat her del ay days shal l be i ncl uded i n t he schedul e.

Submi t t he I ni t i al Pr oj ect Schedul e f or appr oval wi t hi n 5 cal endar days af t er not i ce t o pr oceed i s i ssued. No payment wi l l be made f or wor k i t ems not f ul l y det ai l ed i n t he Pr oj ect Schedul e.

An Ear l y Compl et i on Schedul e i s an I ni t i al Pr oj ect Schedul e ( I PS) t hat i ndi cat es al l scope of t he r equi r ed cont r act wor k wi l l be compl et ed bef or e t he cont r act ual l y r equi r ed compl et i on dat e.

No I PS i ndi cat i ng an Ear l y Compl et i on wi l l be accept ed wi t hout bei ng f ul l y r esour ce- l oaded ( i ncl udi ng cr ew si zes and manhour s) and t he Gover nment agr eei ng t hat t he schedul e i s r easonabl e and achi evabl e.

The Gover nment i s under no obl i gat i on t o accel er at e wor k i t ems i t i s r esponsi bl e f or t o ensur e t hat t he ear l y compl et i on i s met nor i s i t r esponsi bl e t o modi f y i ncr ement al f undi ng ( i f appl i cabl e) f or t he pr oj ect t o meet t he cont r act or ' s accel er at ed wor k.

1. 8. 3. 4 Per i odi c Schedul e Updat es

An updat ed schedul e showi ng act ual pr ogr ess shal l be submi t t ed mont hl y and wi t h each pay r equest . Changes t o t he base- l i ne schedul e shal l be out l i ned i n a nar r at i ve descr i bi ng t he r eason f or t he change.

1. 8. 3. 5 Schedul i ng

A. Al l wor k shal l be car ef ul l y schedul ed t o pr event del ays and any

SECTI ON 01 11 00 Page 7 excessi ve i nt er r upt i ons wi t h channel t r af f i c .

B. Ref er t o Speci f i cat i ons Sect i on 35 20 23, Subpar t t i t l ed " Dr edgi ng Oper at i on Pl an" f or addi t i onal r equi r ement s and consi der at i ons when det er mi ni ng sequenci ng and devel opi ng schedul es.

1. 8. 4 Rat e of Pr ogr ess

A. Empl oy ampl e per sonnel and suf f i c i ent equi pment t o accompl i sh t he wor k of t hi s cont r act i n t he l east amount of t i me, wi t hi n t he pr osecut i on per i od speci f i ed i n t he SPECI AL CONTRACT REQUI REMENTS, Subpar t

COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK ( APR 1984) FAR 52. 211- 10.

B. Pr osecut e t he wor k di l i gent l y, and mai nt ai n a dr edge pr oduct i on r at e, based on wor ki ng 24 hour s a day, 7 days a week, of not l ess t han 20, 000 cubi c yar ds f or each 30 cal endar day per i od of act ual dr edgi ng wor k at t he s i t e. Thi s dr edge pr oduct i on r at e does not i ncl ude Excessi ve Dr edgi ng as def i ned i n 35 20 23, par agr aph 1. 8. 3

C. Shoul d t he Cont r act or f ai l t o mai nt ai n t he r equi r ed r at e of pr ogr ess, t he Cont r act i ng Of f i cer may r equi r e t hat addi t i onal per sonnel and equi pment be pl aced on t he wor k and weekend and over t i me wor k be per f or med, i n or der t hat t he wor k be br ought up t o schedul e and mai nt ai ned. I f , af t er a r easonabl e amount of t i me det er mi ned by t he Cont r act i ng Of f i cer , pr ogr ess has ei t her not been i ni t i at ed, or has f ai l ed t o suf f i c i ent l y br i ng t he wor k back on schedul e t o be compl et ed by t he schedul ed cont r act per i od, t he cont r act may be t er mi nat ed.

1. 9 CONTRACTOR' S USE OF UPLAND FACI LI TI ES AND HAULI NG ROUTES

A. Unl ess obt ai ned by t he Gover nment or speci f i ed ot her wi se i n t he cont r act document s, t he Cont r act or shal l be r esponsi bl e f or t he f ol l owi ng:

1. Locat i ng, coor di nat i ng, and obt ai ni ng per mi ssi on t o use any l and- based wat er access ( docks, pi er s, r amps, et c. ) t hat t he Cont r act or deems necessar y t o compl et e t he wor k.

2. Det er mi ni ng, i f necessar y, t he t r ucki ng and haul i ng r out es and associ at ed r est r i ct i ons t o and f r om t he wor k, t o i ncl ude t he coor di nat i on f or t he use of such r out es wi t h l ocal , st at e, and f eder al aut hor i t i es.

3. Compl yi ng wi t h al l l ocal , st at e, and f eder al r egul at i ons and r est r i ct i ons when usi ng any upl and f aci l i t i es or haul i ng r out es.

B. The Gover nment and i t s r epr esent at i ves wi l l be al l owed t he use of t he same l and- based wat er access obt ai ned by t he Cont r act or .

1. 10 CONTRACTOR USE OF PREMI SES

1. 10. 1 Gener al

Pr i or t o t he st ar t of const r uct i on, t he Cont r act or shal l ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur es, means of access t o wor k ar eas, space ut i l i zat i on f or st agi ng and st or age of mat er i al s and equi pment , and t he use of appr oaches t o t he wor k ar eas.

SECTI ON 01 11 00 Page 8

1. 10. 2 Access t o t he Si t e and St or age/ St agi ng Ar eas

The Cont r act or i s r esponsi bl e f or mai nt ai ni ng access necessar y f or i t s equi pment , mat er i al , and pl ant t o and f r om t he wor k ar ea.

1. 10. 3 Tempor ar y Faci l i t i es and Ut i l i t i es, and St or age Ar eas

See Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS, subpar t " Cont r act or ' s Tempor ar y Faci l i t i es. "

1. 10. 4 Wor k Li mi t s

The l i mi t s of wor k wi t hi n t he Feder al Navi gat i on Pr oj ect ar e t he channel .

Speci f i c dr edgi ng ar eas and si de sl ope ar eas wi t hi n t hese l i mi t s shal l be dr edged t o obt ai n t he r equi r ed dept hs and si de sl opes as shown on t he cont r act dr awi ngs.

1. 10. 5 Pr ot ect i on and Secur i t y

A. Pr ot ect i on t o Cont r act or per sonnel or t hei r equi pment cannot be pr ovi ded at t he wor ksi t e by t he Gover nment .

B. The Cont r act or shal l pr ot ect al l i t s per sonnel , Gover nment per sonnel , and t he gener al publ i c f r om i nj ur y.

C. The Cont r act or shal l conduct al l i t s wor k so as t o pr event i nj ur y or unsaf e condi t i ons dur i ng const r uct i on.

D. The Cont r act or shal l r epor t any vandal i sm, suspi c i ous act i v i t i es, or devi ces t o t he Cont r act i ng Of f i cer and l ocal pol i ce as soon as possi bl e.

1. 10. 6 Wor k By Ot her Cont r act or s

Dur i ng t he per f or mance per i od of t hi s cont r act , no ot her wor k i s ant i c i pat ed t o occur by ot her cont r act or s.

1. 10. 7 Emer gency Cont act s

The Cont r act or shal l pr ovi de a l i s t of emer gency cont act s t o be used i n t he event of an emer gency. The l i s t shal l i ncl ude t he cont act names, addr esses, and t el ephone number s. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 10. 8 Damaged Pr oper t y

Wor k shal l pr oceed i n a manner whi ch wi l l mi ni mi ze di st ur bance or r i sk of damage t o boat s, st r uct ur es, and sur r oundi ng l ands. The Cont r act or shal l r epai r such i t ems damaged i n t he cour se of car r y i ng out t he wor k at no addi t i onal cost t o t he Gover nment . Al l r epai r s shal l mat ch si mi l ar exi st i ng i t ems i n al l aspect s. Al l r epl acement s shal l be i n k i nd.

1. 10. 9 Cont r act or ' s Recei pt of Suppl i es

The Cont r act or shal l be r esponsi bl e f or al l ar r angement s f or t he r ecei pt of mat er i al s and suppl i es at t he j ob s i t e. Gover nment per sonnel ar e not per mi t t ed t o r ecei ve or s i gn f or i t ems del i ver ed t o t he s i t e.

SECTI ON 01 11 00 Page 9

1. 10. 10 Dai l y Cl ean Up

The Cont r act or shal l at al l t i mes keep r ubbi sh f r om ent er i ng sur r oundi ng l ands and wat er . Rubbi sh accumul at ed at t he t empor ar y f aci l i t i es shal l be r emoved f r om t he pr emi ses dai l y.

1. 10. 11 Li t t er i ng

The Cont r act or may be subj ect ed t o f i nes by St at e or l ocal aut hor i t i es f or l i t t er i ng or di scar di ng of t obacco mat er i al s ot her t han i nt o r ecept acl es.

1. 10. 12 Gover nment Sani t ar y Faci l i t i es

Toi l et f aci l i t i es ar e not avai l abl e on si t e f or Cont r act or ' s use. The Cont r act or shal l pr ovi de por t abl e t oi l et s f or i t s per sonnel and subcont r act or s as speci f i ed i n EM 385- 1- 1 under Sect i on 2, Sani t at i on.

1. 11 QUALI TY ASSURANCE

A. Al l i t ems of wor k not addr essed i n t he cont r act document s shal l be compl et ed i n st r i ct accor dance wi t h t he manuf act ur er s’ speci f i cat i ons.

B. The Gover nment i s not obl i gat ed t o i nspect t he Cont r act or ’ s wor k, or t o pr ot ect t he Cont r act or f r om t he consequences of i t s wor k. Gover nment i nspect i ons ar e a gener al exami nat i on of t he Cont r act or ’ s conduct and wor kmanshi p and ar e sol el y f or t he pur pose of t he Gover nment .

Gover nment - desi gnat ed Qual i t y Assur ance Repr esent at i ves ( QARs) do not have t he aut hor i t y t o accept wor k, nor i s a Gover nment i nspect i on t o be const r ued as concl usi ve.

C. Gover nment agent s i ncl udi ng QARs and pr oj ect engi neer s ar e not aut hor i zed t o change t he cont r act wi t hout t he wr i t t en appr oval of t he Cont r act i ng Of f i cer ; t hi s l ack of aut hor i t y ext ends t o al l s i t uat i ons i n whi ch t he act i on of t hese agent s coul d be const r ued as const i t ut i ng a change.

D. The qual i t y of wor kmanshi p i s subj ect t o audi t by Gover nment or Gover nment - desi gnat ed QARs at any t i me dur i ng t he cont r act . The Cont r act or shal l cooper at e f ul l y and pr ovi de al l i nf or mat i on necessar y f or t hi s audi t .

E. The Cont r act or shal l submi t al l r equest s f or changes i n wr i t i ng t o t he Cont r act i ng Of f i cer . Do not pr oceed wi t h changes wi t hout possessi on of wr i t t en aut hor i zat i on of t he Cont r act i ng Of f i cer .

1. 12 COORDI NATI ON

1. 12. 1 Dai l y Dr edge Oper at i ons Locat i on Map ( DOLM)

The Cont r act or shal l pr epar e a Dr edge Oper at i ons Locat i on Map ( DOLM) f or each day t hat dr edgi ng act i v i t i es ar e pl anned f or t hi s pr oj ect . The DOLM shal l i ndi cat e t he l ocat i ons wher e dr edge( s) shal l be wor ki ng dur i ng a speci f i c 24 hour per i od, pl anned di sposal act i v i t y, and ot her s i gni f i cant act i v i t i es pl anned. The DOLM shal l be pr epar ed i n PDF f or mat and f or war ded t o t he par t i es i ndi cat ed on a di st r i but i on l i s t t hat wi l l be pr ovi ded t o t he Cont r act or af t er r ecei pt of t he Not i ce t o Pr oceed. An exampl e of a DOLM i s at t ached at t he end of t he speci f i cat i ons. Al l i nf or mat i on shown on t he exampl e i s r equi r ed f or each DOLM pr epar ed, i ncl udi ng vessel i nf or mat i on, l ocat i on, maps, channel st at i ons, et c. The

SECTI ON 01 11 00 Page 10

DOLM' s shal l be pr epar ed and di st r i but ed a mi ni mum of 24 hour s pr i or t o t he st ar t of t he per i od addr essed i n t he speci f i c DOLM.

1. 12. 2 Publ i c Not i ce

The publ i c shal l be not i f i ed of t hi s dr edgi ng pr oj ect wi t hi n t wo weeks of t he Not i ce t o Pr oceed. A br i ef descr i pt i on of t he wor k t o be per f or med and t he i nt ended schedul e of dr edgi ng and di sposal oper at i ons shal l be publ i shed i n a newspaper of gener al c i r cul at i on i n t he ar ea adj acent t o t he dr edgi ng and di sposal . The not i ce shal l i ncl ude t he l ocat i ons wher e t he wor k i s t o be per f or med, t he t i me sequence of event s, a map of t he haul r out e t o be f ol l owed bet ween t he dr edgi ng ar eas and t he di sposal s i t e wi t h r ef er ence t o t he wi dt h of t he haul l ane, t he l ocat i on and l i mi t s of t he di sposal s i t e, and t he pr ocedur e t he Cont r act or wi l l use t o r espond t o c l ai ms f or l oss of pr oper t y dur i ng t he haul i ng wor k. The not i ce shal l i ncl ude t he Cont r act or ' s poi nt of cont act and t el ephone number .

The Mai ne Depar t ment of Mar i ne Resour ces ( DMR) r equi r es t hat t hey be not i f i ed of any f i el d wor k pot ent i al l y i mpact i ng Mai ne f i shi ng i nt er est s.

The cont r act or shal l compl et e a DMR Not i f i cat i on of Fi el d Wor k f or m and submi t t hat t o DMR at t he same t i me t he Publ i c Not i ce i s post ed i n t he newspaper s. The DMR Not i f i cat i on of Fi el d wor k For m i s l ocat ed at t he end of t hi s sect i on and shal l be submi t t ed t o:

Ms. Lor r ai ne Mor r i s Resour ce Management Coor di nat or Mai ne Depar t ment of Mar i ne Resour ces l or r ai ne. mor r i s@mai ne. gov

The Mai ne Depar t ment of Envi r onment al Pr ot ect i on ( DEP) r equi r es t hat t he Cont r act or publ i sh t he dr edge haul r out e i n t he Commer ci al Fi sher i es News publ i cat i on. The Cont r act or shal l cont act t he publ i cat i on Of f i ce Manager t o i ni t i at e t hi s pr ocess:

Ms. Janet Acker Of f i ce Manager Commer ci al Fi sher i es News of f i cemgr @f i sh- news. com

Phone: 800- 989- 5253 or 207- 403- 4014

1. 12. 3 Not i ce t o Mar i ner s

The Cont r act or shal l coor di nat e wi t h t he U. S. Coast Guar d ( USCG) t o i ssue a " Not i ce t o Mar i ner s" r egar di ng t he wor k t o be per f or med and t he Cont r act or ' s pr oposed oper at i ons wi t hi n 5 cal endar days of t he Not i ce t o Pr oceed.

The Cor ps of Engi neer s and t he USCG have agr eed t o phr aseol ogy when i ssui ng navi gat i onal bul l et i ns and not i ces. The i nf or mat i on f ur ni shed shal l be consi st ent wi t h USCG Br oadcast Not i ce t o Mar i ner s and Local Not i ce t o Mar i ner s. When r equest i ng l ocal USCG of f i ces t o i ssue navi gat i onal i nf or mat i on f or Cor ps of Engi neer s wor k i nvol v i ng mar i ne const r uct i on, t he f ol l owi ng t er mi nol ogy shal l be used, as appl i cabl e:

For caut i onar y ar eas: " Mar i ner s ar e ur ged t o use ext r eme caut i on i n t he ar ea. "

For dr edgi ng and wor k oper at i ons: " Mar i ner s ar e ur ged t o t r ansi t at

SECTI ON 01 11 00 Page 11 t hei r s l owest saf e speed t o mi ni mi ze wake and pr oceed wi t h caut i on af t er passi ng ar r angement s have been made. "

The USCG LMN I nf or mat i on f or m i s at t ached at t he end of t hi s speci f i cat i on sect i on.

1. 12. 4 Ai ds t o Navi gat i on

Ai ds t o navi gat i on ( beacons, buoys, mar ker s, et c. ) have been pl aced by t he USCG i n t he v i c i ni t y of t he pr oj ect ar ea. The Cont r act or shal l not i nt er f er e wi t h t hese ai ds t o navi gat i on. I f t he wor k of t hi s pr oj ect r equi r es t he t empor ar y movement or r el ocat i on of any ai d t o navi gat i on, t he Cont r act or shal l not i f y t he USCG and t he Cont r act i ng Of f i cer of t he r equi r ement 30 days i n advance. USCG per sonnel wi l l t hen move or r el ocat e t he ai d t o navi gat i on as appr opr i at e f or t he pr ogr ess of t he wor k. Under no ci r cumst ances shal l t he Cont r act or move or r el ocat e an ai d t o navi gat i on under hi s own aut hor i t y wi t h hi s own per sonnel . The Cont r act or shal l al so cont act t he USCG at t he compl et i on of al l wor k and t he r emoval of al l mar i ne pl ant .

1. 12. 5 Poi nt s of Cont act

a. Coast Guar d:

( 1) Ai ds t o Navi gat i on:

Mr . Pat r i ck Br own Of f i ce Tel ephone: 207- 899- 6285 emai l : Pat r i ck. R. Br own@uscg. mi l

( 2) Not i ce t o Mar i ner s:

emai l : D01- SMB- LNM@uscg. mi l Of f i ce Phone: 617- 223- 8356 Fax: 617- 223- 8094

( 3) Local Har bor mast er s:

Bat h, ME: Sgt . Dan Cout ur e, 207- 443- 5563 ( 207- 200- 7514 cel l ) , dcout ur e@ci t yof bat h. com

Phi ppsbur g, ME: Connor MacDonal d, 207- 607- 1536, har bor mast er @phi ppsbur g. com

Geor get own: Woody Hanst ei n, 592- 7092

1. 13 GENERAL SAFETY REQUI REMENTS

1. 13. 1 Gener al

The Cont r act or shal l t ake al l necessar y pr ecaut i ons i n obser vi ng saf et y r egul at i ons i n accor dance wi t h Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS, and shal l assume t he r esponsi bi l i t y t o guar d agai nst causi ng of f i r es and/ or expl osi ons and t o pr ot ect Gover nment pr oper t y. The Cont r act or shal l per f or m t he wor k i n a manner consi st ent wi t h secur i t y and wi t h f i r e saf et y r egul at i ons especi al l y wi t h r egar ds t o i ngr ess and egr ess. Tempor ar y c l osur es shal l not compr omi se l i f e saf et y, secur i t y or f i r e saf et y.

SECTI ON 01 11 00 Page 12

1. 13. 2 Cont r act or ' s Pr oj ect Super i nt endent

The Cont r act or ' s pr oj ect super i nt endent shal l t ake an act i ve r ol e i n enf or ci ng t he saf et y r equi r ement s by par t i c i pat i on i n saf et y conf er ences, hazar d anal ysi s, t ool box meet i ngs, wal k- t hr ough i nspect i ons, cor r ect i on of v i ol at i ons, et c. , and i ncl udi ng t hat of any subcont r act or ' s wor k.

1. 14 ENVI RONMENTAL PROTECTI ON

To pr ovi de f or cont r ol of al l envi r onment al pol l ut i on ar i s i ng f r om const r uct i on act i v i t i es, t he Cont r act or and i t s subcont r act or s, i n t he per f or mance of t hi s cont r act , shal l compl y wi t h Sect i on 01 57 19 TeMPORARY ENVI RONMENTAL CONTROLS, and al l appl i cabl e Feder al , St at e, and l ocal l aws and r egul at i ons concer ni ng envi r onment al pr ot ect i on pol l ut i on cont r ol and abat ement .

1. 15 PRECONSTRUCTI ON CONFERENCE

The Cont r act i ng Of f i cer wi l l conduct a pr econst r uct i on conf er ence wi t h key Cont r act or per sonnel . The pur pose of t he conf er ence i s t o r evi ew cont r act r equi r ement s and t o est abl i sh a wor ki ng r el at i onshi p bet ween t he Cont r act or ' s St af f and t he U. S. Ar my Cor ps of Engi neer s ( USACE) per sonnel who wi l l be c l osel y associ at ed wi t h t he pr oj ect . Dur i ng t he conf er ence, t he Cont r act i ng Of f i cer wi l l i nf or m t he Cont r act or concer ni ng t opi cs such as, but not l i mi t ed t o, j ob saf et y, qual i t y cont r ol , t empor ar y f aci l i t i es and st or age ar eas, l abor r el at i ons, and envi r onment al pr ot ect i on. The Cont r act or ' s Pr oj ect Super i nt endent , Qual i t y Cont r ol Repr esent at i ve, and Si t e Saf et y and Heal t h Of f i cer ( SSHO) shal l at t end t hi s conf er ence.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Sect i on - -

SECTI ON 01 11 00 Page 13

FILE NAME:

DRAWING DATE:

DRAWN BY:

USACE JOB NO:

GLDD JOB N0.

APPROVED BY:

SCALE:

PAGE OF

EE

BOSTON GLDD TRAFFIC MAP

ALX

OCT 17, 2017

W912WJ-16-C-0036

1AJB 1

EQUIPMENT TRAFFIC MAP

15666 TO FIT

E6EPGTJM

Text Box Daily Dredge Operations Location Map Example

LNM Information Form

DATE:

NAME:

PHONE NUMBER:

EMAIL ADDRESS:

COMPANY NAME:

TYPE OF WORK:

LOCATION (STATE AND WATERWAY) WHERE WORK WILL BE DONE:

LAT/LONG: (degrees, minutes, seconds & thousandths)

BEGINNING/ENDING DATES:

HOURS OF OPERATION (DAYS PER WEEK, HOURS PER DAY):

EQUIPMENT ON SCENE:

RADIO FREQUENCY VESSELS CAN BE CONTACTED ON (IF USED):

PASSING ARRANGEMENTS/Time to move vessels to not impede navigation:

Please email the form two weeks before the work is to begin to:

D01-SMB-LNM@uscg.mil or you can fax the form to: 617-223-8094.

The completed LNM (Local Notice to Mariners) can be found on the following website: http://www.navcen.uscg.gov and is posted by Thursday morning of the current week.

mailto:D1lnm@uscg.mil http://www.navcen.uscg.gov/

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 CONTRACT COST BREAKDOWN

1. 2 SUBMI TTALS

1. 3 JOB PAYMENT I TEMS

1. 4 UNI T PRI CE PAYMENT I TEMS

1. 5 BI DDI NG SCHEDULE - PAYMENT I TEMS

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 22 00 Page 1

SECTI ON 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 CONTRACT COST BREAKDOWN

The Cont r act or must f ur ni sh wi t hi n 15 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s Cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 05 Desi gn Dat a

Quant i t y Sur veys

Submi t or i gi nal s of al l f i el d not es and al l ot her r ecor ds r el at i ng t o t he quant i t y sur veys.

1. 3 JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The j ob pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 4 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems. Submi t or i gi nal s of al l f i el d not es and al l ot her r ecor ds r el at i ng t o Quant i t y Sur veys.

SECTI ON 01 22 00 Page 1

1. 5 BI DDI NG SCHEDULE - PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act pr ogr ess payment s wi l l be based ar e l i s t ed i n t he BI DDI NG SCHEDULE and ar e descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar Bi ddi ng Schedul e j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed j ob or uni t pr i ce i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. Any bi d pr i ce f or i t ems i ndi cat ed i n t he BI DDI NG SCHEDULE whi ch ar e unbal anced as t o pr i ce may be r ej ect ed as non- r esponsi ve. An unbal anced bi d i s one whi ch i s based on pr i ce s i gni f i cant l y l ess t han cost f or some wor k and pr i ce whi ch i s s i gni f i cant l y over st at ed f or ot her wor k.

A. I t em Number 0001, " Mobi l i zat i on and Demobi l i zat i on f or Dr edgi ng and Di sposal " .

Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on f or dr edgi ng oper at i ons and di sposal oper at i ons as def i ned i n Speci al Cont r act Requi r ement s c l ause " PAYMENT FOR

MOBI LI ZATI ON AND DEMOBI LI ZATI ON" .

Uni t of Measur e: Job.

B. I t em Number 0002, " Dr edgi ng and Di sposal , Mat er i al f r om Doubl i ng Poi nt Ar ea" .

C. I t em Number 0003, " Dr edgi ng and Di sposal , Mat er i al f r om Popham Beach Ar ea" .

The cont r act pr i ce per cubi c yar d f or Payment I t em Number s 0002 and 0003 shal l i ncl ude al l cost s f or t he r emoval , t o t he speci f i ed dept hs as i ndi cat ed on t he cont r act dr awi ngs, of al l dr edged mat er i al s encount er ed f r om t he Feder al Navi gat i on Pr oj ect ( FNP) whi ch i ncl udes t he 27- f oot deep by 500- f oot wi de channel , wi t h t r anspor t i ng t o and di sposal of t he dr edged mat er i al at t he desi gnat ed i n- r i ver pl acement s i t e l ocat ed nor t h of Bl uf f Head and at a pr evi ousl y used near - shor e pl acement s i t e l ocat ed about 0. 4 naut i cal mi l es sout h of Jackkni f e Ledge, as speci f i ed i n Sect i on 35 20 23 MECHANI CAL DREDGI NG.

The t ot al amount of mat er i al r emoved and pai d f or under t he cont r act f or t hese I t ems wi l l be measur ed by t he cubi c yar d i n pl ace by comput i ng t he vol ume bet ween t he bot t om sur f ace shown by soundi ngs of t he l ast Gover nment speci f i cat i onl ast or pr e- dr edge sur vey made bef or e dr edgi ng begi ns and t he bot t om sur f ace shown by t he soundi ngs of an af t er - dr edge sur vey made as soon as pr act i cabl e af t er t he r emoval of t he mat er i al . Dr edged mat er i al wi l l be i ncl uded t hat i s wi t hi n t he l i mi t s of t he s i de sl opes and speci f i ed over dept hs as descr i bed i n Sect i on 35 20 23 DREDGI NG, Subpar t OVERDEPTH AND SI DE SLOPES, l ess any deduct i ons t hat may be r equi r ed f or mi spl aced mat er i al descr i bed i n Subpar t 3. 3. 1 " Mi spl aced Mat er i al Di sposal " .

The cont r act dr awi ngs ar e bel i eved t o accur at el y r epr esent condi t i ons exi st i ng on t he dat e of t he sur vey shown on t he dr awi ngs, but t he dept hs and t he speci f i c ar eas t o be dr edged shown t her eon may be ver i f i ed and cor r ect ed by soundi ngs t aken by t he Gover nment bef or e dr edgi ng begi ns. Det er mi nat i on of quant i t i es r emoved and t he deduct i ons made t o det er mi ne quant i t i es af t er havi ng once been made by t he Cont r act i ng Of f i cer , wi l l not be r eopened, except on evi dence of

SECTI ON 01 22 00 Page 2 col l usi on, f r aud, or obvi ous er r or . Ref er t o Speci al Cont r act Requi r ement s, subpar t " Cont r act Dr awi ngs and Speci f i cat i ons" f or addi t i onal i nf or mat i on and r equi r ement s r egar di ng cont r act dr awi ngs.

The cont r act pr i ce per cubi c yar d f or dr edgi ng f or t hese i t ems shal l i ncl ude t he cost of r emoval and di sposal of al l mat er i al s as speci f i ed her ei n or i ndi cat ed on t he cont r act dr awi ngs, except l edge r ock, l ar ge boul der s, and ot her uncl assi f i ed mat er i al s, whi ch cannot be r emoved by t he pl ant speci f i ed i n t he accept ed bi d, or t he equi val ent of such pl ant , wi t hout bl ast i ng.