Amendment W912WJ23Q0118-0001.pdf
PDF 450 KB Posted
- Attached to
- Compact Track Loader Supply, Delivery and Unload, North Hartland Lake, North Hartland, VT.
- Solicitation number
- W912WJ23Q0118
About this file
This document is an amendment to a solicitation seeking a compact track loader, accessories, and related services for the North Hartland Lake project. The Army Corps of Engineers is requesting the supply, delivery, and unloading of one compact track loader meeting specified requirements including a minimum 70HP diesel engine, 6000-pound tipping load, and enclosed climate-controlled cab. Required accessories include a heavy-duty bucket, claw/root grapple, forestry mulcher, and optional pallet forks and power rake, all capable of quick attachment. Delivery to North Hartland, Vermont is due within 120 days of award. The response due date is extended to August 16, 2023. The incumbent equipment will be considered for trade-in.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_W912WJ23Q0118.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 is to revise the Supply Requirement, Equipment Requirements, 7. and extend the quote due date by tw o (2) days, until August 16, 2023 at 2:00 pm.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23Q0118
X 9B. DATED (SEE ITEM 11)
02-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Aug-2023
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ23Q0118
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Aug-2023 02:00 PM to 16-Aug-2023 02:00 PM.
The following have been added by full text:
REVISED SUPPLY REQUIREMENT
COMPACT TRACK LOADER
U.S. ARMY CORPS OF ENGINEERS
NORTH HARTLAND LAKE
NORTH HARTLAND, VERMONT
SUPPLY REQUIREMENT
General
1. Scope – Supply, deliver, and unload one compact track loader and accessories. Equipment and Materials are to be provided in accordance with the following requirements and schedule.
2. Location – The North Hartland Lake Project Office is located at 112 Clay Hill Road, North Hartland, Vermont 05052. All Equipment and Materials shall be delivered to and unloaded at this location.
3. Project Coordination – Contact the Technical Point of Contact (TPOC), Heather Morse at 978-318-8469 or heather.l.morse@usace.army.mil to coordinate the specific delivery schedule (Date and Time).
4. Schedule – All materials identified in these requirements shall be delivered and unloaded no later than 120 days after Contract Award. The project area will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all deliveries must be completed during those hours unless alternate hours are approved by the Technical Point of Contact
5. Safety Requirements – All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety (USACE) and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety, and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf
NOTE: Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
6. Accident Reporting- All accidents and near misses shall be investigated by the Contractor.
All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.
7. Environmental Protection – The contractor shall prevent pollution or damage to the environment resulting from work performed during this contract. The contractor will receive no additional payment for environmental protection work. Prevention of pollution and environmental damage is a contractor obligation under current state and federal laws and regulations. Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor. All spills/environmental damage shall be immediately reported to the TPOC.
8. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
9. Security – The contractor will comply with all established security policies at North Hartland Lake. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.
10. Payment – The contractor will furnish the TPOC with one invoice, stating the contract number, the materials delivered, the date of delivery, the date of acceptance and the amount to be paid. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made for actual materials delivered at the applicable contract unit price.
All invoices may be mailed to:
U.S. Army Corps of Engineers
North Hartland Lake 112 Clay Hill Rd.
North Hartland, VT 05052 or emailed to heather.l.morse@usace.army.mil
Equipment Requirements
Compact Track Loader: The Contractor shall supply, deliver, and unload the following equipment and materials (new & unused) that satisfy the following requirements:
1. Compact Track Loader with Cab
a. Engine
i. 4-cyliner liquid cooled turbo diesel
ii. Horsepower: Minimum 70 HP at 2400 rpm
iii. Emissions: interim Tier 4
iv. Starter Volts: 12V
v. Integrated OEM Engine block heater 120 volt
vi. Cold weather package
vii. Reversible fan
b. Fuel Capacity
i. Minimum 20 gallons
ii. Lockable filler cap
c. Loader performance:
i. Tipping load: 6000 pounds
ii. Lift arm path: vertical
d. Hydraulic System
i. High flow hydraulics
ii. Quick attach
iii. 14-pin coupler
e. Dimensions & Tracks
i. Track length on ground: minimum 55 inches
ii. Minimum 13” width with four season all surface tracks
iii. Weight: 8000-9500 pounds
iv. Ground clearance minimum 8”
v. Rated Operating Capacity 2500 pounds
vi. Tipping load at 50% capacity 3000 pounds
f. Electrical
i. Battery: heavy duty 12V
ii. Ground: negative
iii. Charging System: alternator
iv. Battery capacity 900 CCA
g. Powertrain
i. Two speed travel
h. Lighting
i. Headlights: 2 LED type
ii. Signal/Warning Lights: 2 forward & 2 rear mounted
i. Cab/Roll Over Protection System
i. Adjustable air ride suspension seat
ii. Climate controlled cab with heat & air conditioning
iii. Rearview camera
iv. Interior rearview mirror
v. USB charger
vi. AM/FM/Bluetooth Radio
vii. Windshield: defroster & wiper
viii. Front and top cage
ix. Impact resistance polycarbonate windshield and side windows
x. Backup alarm
xi. Security door lock
xii. Service horn
2. Compact Tracked Loader Accessories
a. Heavy Duty bucket
i. Bolt on cutting edge
ii. Minimum 72-inch width
iii. Mount: coupler quick attach capability
iv. Minimum 0.6 cubic yard capacity
b. Claw/root grapple
i. Mount: coupler quick attach capability
ii. Maximum pressure rating 3500 psi
iii. 6” teeth spacing
iv. Minimum number of teeth, 12 bottom and 11 top
v. Tooth thickness 12”
vi. Heavy duty, minimum weight 900 pounds
vii. Width: Minimum 72 inches
c. Forestry Mulcher
i. Mount: coupler quick attach capability
ii. Heavy duty construction
iii. Enclosed anti dust machine body
iv. Mechanical adjustable guard frame
v. Adjustable support skids
vi. Front door trap
vii. Working pressure control gauge
viii. Protection chains
ix. Working (cutting) width at least 60”
x. Number of teeth- 34
xi. Number of blades- 34
xii. Mulch material at least 5” in diameter
d. OPTIONAL Pallet forks with brick guard (full back guard)
i. Mount: coupler quick attach capability 14 pin coupler
ii. Heavy duty construction
iii. 1 ½” by 48” tine length
iv. Sliding adjustable rail
v. 5000-pound capacity
vi. Working Width: Minimum 50 inches
e. OPTIONAL Power rake
i. Mount: coupler quick attach capability 14 pin coupler
ii. Working width: minimum 72”
iii. Carbide tipped studs and bidirectional roller
iv. Replaceable teeth
v. Hydraulic angle actuator
vi. Replaceable skid shoes
vii. Heavy duty drive chains
3. The equipment shall have an Authorized service facility within 75 miles of the North
Hartland Lake Project (Zip Code 05052).
4. All accessories shall be fully operable with tracked loader specifications and plumbed for 3rd function set up on loader.
5. Upon delivery a demonstration of operation and safety procedures shall be provided within 7 days of delivery.
6. Warranty
a. Compact Tracked Loader - Manufacturer warranty of 24 months or longer
b. Attachments - Manufacturer warranty of 24 months or longer
7. Price will reflect the Trade In of one (1) 2011 Caterpillar D4K XL tracked bulldozer (see
Informational Photo 1). Specifications are as follows:
a. Engine: 84 HP diesel 4 cylinder
b. Hydrostatic transmission control
c. Fully enclosed cab with ROPS and heater and air conditioning
d. Variable speed hydraulic controlled winch and logging arch with 75-foot cable
e. Cab protection screens
f. Air ride cloth seat
g. Six-way blade
h. Approximately 320 hours, may vary due to usage
i. In 2021- Glass doors replaced, fuel leak repaired, new batteries
j. Condition good/fair
(End of Summary of Changes)
File details come from the government source that posted it. Updated .