AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0002 is to answ er questions from industry.
The quote due date remains June 20, 2023 at 2:00 pm.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23Q0100
X 9B. DATED (SEE ITEM 11)
09-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2023
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ23Q0100
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
QUESTION 1: Can we get access to the log boom from the east bank?
ANSWER 1: No, all access to the log boom will be from the west bank. The east bank has a steep, forested embankment with no access for vehicles.
QUESTION 2: What is the river depth at the log boom?
ANSWER 2: The river is approximately 16-20 feet deep at the log boom.
QUESTION 3: What happens when it rains?
ANSWER 3: It depends on the weather conditions leading up to the rain event. If the ground is relatively dry, the rain may be absorbed into the ground with little to no runoff into the river. However, if there have been several days of rain, the ground may be saturated and additional rain may run off into the river. If there is enough rain running into the river, there is a chance that the Project could go into flood conditions. If flood conditions occur when the debris removal services are scheduled, the Government may have to postpone the service due to increased flows. Services are generally scheduled for July and August during normal lowest flow seasons.
QUESTION 4: Does the concrete at the dam intake extend all the way to the river bottom?
ANSWER 4: Yes, the concrete trash rack extends all the way to the river bottom.
QUESTION 5: Can we get information about how many truck loads of debris were removed last year? Are there any photos?
ANSWER 5: The Government does not keep track of the number of truck loads of debris that were removed in previous years. Please refer to the attached photos from the 2022 Debris Removal solicitation for debris conditions prior to removal.
QUESTION 6: There is a lot of debris already in the “Stump Dump” debris storage area.
What if we run out of space?
QUESTION 6: The Government will plan to push back the debris that is currently in the debris storage area prior to the start of services. If the debris storage area fills up during the contract services, the Government will be responsible for pushing back the debris to make more room.
W912WJ23Q0100
(End of Summary of Changes)
DEBRIS REMOVAL – LOG BOOM AND TRASH RACK AREA
U.S. ARMY CORPS OF ENGINEERS
HOPKINTON LAKE
HOPKINTON, NH
Performance Work Statement
April 2022
Informational Photo
Informational Photo 1: Debris at the Hopkinton Dam Log Boom prior to cleaning (29 March
2022). The photo is intended to provide context to the nature of the work. Any estimate of quantity or type of material should be determined during a site visit prior to the submission of a quote.
HOPKINTON LAKE
HOPKINTON, NH
Performance Work Statement
Informational Photo 2: Debris at the Hopkinton Dam Trash Rack prior to cleaning (29
March 2022). The photo is intended to provide context to the nature of the work. Any estimate of quantity or type of material should be determined during a site visit prior to the submission of a quote.
HOPKINTON LAKE
HOPKINTON, NH
Performance Work Statement
Informational Photo 3: Debris at the Hopkinton Dam Trash Rack prior to cleaning (29
March 2022). The photo is intended to provide context to the nature of the work. Any estimate of quantity or type of material should be determined during a site visit prior to the submission of a quote.