W912WJ23B0003 Amendment 001.pdf
PDF 586 KB Posted
- Solicitation number
- W912WJ23B0003
About this file
This amendment to a solicitation provides responses to contractor questions and extends the response deadline. The solicitation is for improvement dredging of approximately 4,000 cubic yards of mixed sediments from channels and basins at Great Chebeague Island, Maine between November 2023 and December 2023. Mechanical dredging will be used to remove material which will be transported via scow to the Portland Disposal Site approximately 15 nautical miles away. The amendment clarifies that a hydraulic excavator is required for removal rather than a clamshell bucket due to sediment stiffness, provides a video of prior sediment probing, and allows the site safety and health officer to also serve as quality control systems manager. The response deadline is extended to May 8, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Response to RFI No.3 Attachment Chebeague Video May2022 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is necessary to respond to requests for information and to extend the bid opening date. All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23B0003
X 9B. DATED (SEE ITEM 11)
03-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-May-2023
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ23B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT
Requests for Information 1- There is a known area of ledge adjacent to stone pier within the dredge prism that is above grade, how is the contractor expected to achieve contract grade in this area?
Additional probes were conducted in June of 2021 and May of 2022 to determine the extent of hard material or ledge. Ledge was not discovered during these probes. Refer to probe results attached at the end of specification Section 00 32 00. If ledge is discovered during dredging operations to remove the remaining material at Chebeague, the work to remove the ledge may be negotiated between the contractor and the Contracting Officer which may entail an increase to the contract price in accordance with the CONTRACT CLAUSE titled “CHANGES.
2- Why is the contractor limited to a hydraulic excavator as means for removal of material?
Due to the stiffness of the sediment material to be removed, it was decided that a fixed-arm excavator with bucket will have the advantage of pushing the bucket into the stiff sediment to the desired cut-level and not rely on the weight of a clam shell bucket for penetration.
3- Please provide any photographic records of the material retrieved with the geotechnical borings performed in the project area in May 2022.
Probes, and not borings, were performed in May 2022 as shown in the attachment to Section 00 32 00 titled “Sedimentation Probes.” Please also refer to the attached file to this amendment, "Chebeague_Video_May2022.pdf" posted on SAM.gov.
4- Contractor performed dredging work in Chebeague island under the previous contract and encountered extensive homogenous, glacial clay in the entirety of the 8’ deep project area, preventing contract completion with clamshell equipment. Why has this information not been included in the current solicitation for the completion of this work?
Without actual borings and soil analysis of samples that confirmed the material to be "homogenous, glacial clay," the information could not be included in the current solicitation.
5- Contractor requests the USACE allow contractor to examine the core samples collected during the geotechnical borings prepared for this project.
USACE did not collect geotechnical borings for this project.
6- Specification section 01 35 26, sub-section 1.6.1.1 states that the SSHO can have no other duties. Sub-section 1.6.1.2 states that the SSHO can also serve as the Contractor Quality Control Systems Manager. Please clarify whether the SSHO can also serve as the CQCS Manager.
The last sentence of the first paragraph under Subpart 1.6.1.1 of Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS has been amended in this Amendment [Amendment 0001]. The SSHO may also serve as the CQC Systems Manager as noted under Subpart 1.6.1.2.
Specification section 01 35 26, sub-section 1.6.1.1 has changed to the following
1.6.1.1 Site Safety and Health Officer (SSHO)
Provide an SSHO that meets the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one (1) person at each project site to function as the Site Safety and HealthOfficer (SSHO). The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated
W912WJ23B0003
sub-paragraphs. The SSHO shall have no other duties, except they may also serve as the CQC Systems Manager as noted below under Subpart 1.6.1.2”.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 04-May-2023 01:00 PM to 08-May-2023 01:00 PM.
(End of Summary of Changes)