W13G86120194200001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to provide responses to questions posed from industry.
Closing extended to 10 November 2021 at 5:00 PM Est.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22Q0004
X 9B. DATED (SEE ITEM 11)
26-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Nov-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CHIEF, CONTRACTING DIVISION
W912WJ22Q0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
REQUEST FOR INFORMATION
Question 1: Does this project require that a crane be used to remove two concrete decks in order to remove and replace the generator?
Answer 1: There are no concrete decks to be removed for this project.
Question 2: Please confirm if taxes should be carried in proposals?
Answer 2: The awarded Contractor may request a tax exemption certificate for work on a federal project, however, it is the contractor’s responsibility to determine the applicability of the tax exemption certificate to supplies, sales, equipment, etc. that will be required for the project.
Question 3: Please confirm if any state, local, and/or Federal permits will be required on this project?
Answer 3: Please see section I.6(g) Electrical and section I.10 Permits of the contract solicitation.
Question 4: Please confirm if there are any known hazardous materials?
Answer 4: Oils, No.2 heating fuel Question 5: Please confirm how much fuel is in the existing tank?
Answer 5: Depends on when the contract is awarded to how much fuel is left in the tank Question 6: Are contractors to furnish any fuel once new tank is installed?
Answer 6: As stated in contract solicitation Part 3.1.(e) Remove existing day tank and fuel. Contractor shall pump fuel back into storage tank before removal.
Question 7: Can one person perform the duties of the Superintendent, QC & SSHO?
Answer 7: One person can perform additional duties.
Question 8: Will any commissioning be required? If so, please provide a specification for commissioning required?
Answer 8: As stated in the contract: At the completion of the installation the contractor will conduct a performance test of the new generator for a minimum of thirty minutes. The Technical Point of Contact will confirm that each element of the system is working properly.
Question 9: Can the on-site Superintendent use space in the facility for an office or should a trailer be provided?
Answer 9: No space is available in the facility Question 10: Are new louvers, dampers, duct work required or are we to use existing? If new are to be provided, please provide specifications?
Answer 10: As stated in contract solicitation Part 3.2.(b) Installation shall include all necessary connections to the existing generator venting ductwork.
Question 11: Is there any new control work required? If so, is there a controls company (controls that has this site already)?
Answer 11: N/A Question 12: Is a new muffler/silencer required? If so, what is the size piping required for the new exhaust?
Answer 12: No, connect to existing muffler system Question 13: Is there any insulation specification for the welded exhaust piping? Interior & exterior?
Answer 13: Connect to existing HVAC.
Question 14: Will any housekeeping pads be required?
Answer 14: No housekeeping pads required.
W912WJ22Q0004
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Nov-2021 05:00 PM to 10-Nov-2021 05:00 PM.
(End of Summary of Changes)